Nanchang Rail Transit | |||
---|---|---|---|
![]() | |||
Overview | |||
Locale | Nanchang,Jiangxi,China | ||
Transit type | Airport rail link | ||
Number of lines | 4 | ||
Number of stations | 103 | ||
Daily ridership | 934,000 (2021 average)[1] 1.447 million (2021 Peak)[2] | ||
Website | official site | ||
Operation | |||
Began operation | December 26, 2015; 9 years ago (2015-12-26) (Line 1)[3] | ||
Operator(s) | MTR Corporation. | ||
Technical | |||
System length | 128.3 km (79.7 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in)standard gauge | ||
|
Nanchang Rail Transit | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 南昌轨道交通 | ||||||||||
Traditional Chinese | 南昌軌道交通 | ||||||||||
| |||||||||||
Nanchang Metro | |||||||||||
Simplified Chinese | 南昌地铁 | ||||||||||
Traditional Chinese | 南昌地鐵 | ||||||||||
| |||||||||||
Nanchang Metro, officiallyNanchang Rail Transit, is anAirport rail link system inNanchang,Jiangxi,China. As of 2021, four lines are operational. The Metro opened for commercial operation in December 2015.[3] The network is currently 128.3 km (79.7 mi) in length with 4 lines. A total length of 163 km (101.3 mi) of network is planned, with Line 5 which is currently under planning.[4]
Line | Terminals (District) | Commencement | Newest Extension | Length km | Stations | |
---|---|---|---|---|---|---|
1 | Shuanggang (Qingshanhu) | Yaohu Lake West (Nanchang Co.) | 2015 | — | 28.7 | 24 |
2 | Nanlu (Xinjian) | Xinjia'an (Qingshanhu) | 2017 | 2019 | 31.5 | 28 |
3 | Jingdong Avenue | Yinsanjiao North | 2020 | — | 28.5 | 22 |
4 | Yuweizhou | Baimashan | 2021 | — | 39.6[5] | 29 |
Total | 128.3 | 103 |
On 24 November 2020, theNational Development and Reform Commission approved the extensions of Lines 1 & 2.[6] Line 1 north and Line 2 east extension both started construction in September 2021.[7][8]
Years | Line | Terminals (District) | Length (km) | Stations | Status | |
---|---|---|---|---|---|---|
2025 | 1 North Extension | Jiaoqiao (Xinjian) | Nanchang Changbei International Airport (Xinjian) | 16.62 km (10.33 mi) | 8 | Under Construction[8] |
1 East Extension | Yaohu Lake East station | Maqiu Station | 4.34 km (2.70 mi) | 2 | Under Construction[9] | |
2 East Extension | Jiefang West Road | Nanchang East railway station | 10.52 km (6.54 mi) | 9 | Under Construction[8] |
The construction of a rail transit system in Nanchang was first proposed in the beginning of the 2000s.[10] The population of the urban core of Nanchang is projected to reach 3.5 million people by 2020.[11] In August 2005, Jiangxi Provincial Development & Reform Commission and Nanchang City Government replied to the proposal of building a metro system, and the City Government considered listing the proposal in theEleventh Five-year plan.[12] In November, a plan of 4 metro and 1 light rail was drafted.[13][14] In 2006, the City officially started the research of building a rail transit system.[15] In the second half of 2007, the prophase research of the construction of the system was initiated.[10] On 30 July 2008, the construction of Nanchang Metro was formally included in the priority agenda.[16]
In 2008, Nanchang was approved to build a rail transit system by theState Council,[17] and Nanchang Rail Transit Group Co., Ltd. was incorporated on 16 October 2008 to construct and operate Nanchang Metro.[18] On 15 September, the planned 5 routes were notified to the public,[4][19][20][21] which was approved by the State Council in July 2009.[22][23] On 29 July 2009, the construction of Nanchang City Rapid Rail Transit officially began,[24][25] and also on the same day the detailed route and construction plan of the five lines was proclaimed at the press conference.[26]In July 2010, the National Development and Reform Commission approved the feasibility study report of the first phase of Nanchang Metro Line 1.[27]
Construction of Line 1 has started on 29 July 2009,[24] and the line opened on December 26, 2015.[28][29]
In April 2013, the Government planned to acquire approval for all 5 lines by 2014, start constructing all planned lines from 2015, and plan Line 6 to Line 10 to complement the existing network.[30][31]
As of August 2013, the construction of Line 2 also started with the first section opening on August 18, 2017.[32] The construction was planned for Line 3 to start in September 2014, and Line 4 will be constructed as soon as September 2015.[33][34]
On 31 May 2013, Nanchang Government submitted three candidate plans for the Phase 2 construction (2014-2020) to the expert panel,[35][36] which chose the compromising Plan 2.[33][37] According to the plan, Line 2 will be extended to both directions from 2014, Line 1 from 2016.
Line 1 north and Line 2 east extension both started construction in September 2021.[7][8] The project will extend Line 1 north from Shuanggang Station toChangbei Airport. The extension is 16.62 km (10.33 mi) in length, including 11.86 km (7.37 mi) underground and 3.23 km (2.01 mi) elevated.[6] Line 2 will be extended from Xinjia'an Station toNanchang East railway station, the extension is 10.52 km (6.54 mi) in length and fully underground.[6]
Nanchang Metro uses Type B rolling stock, whose cars are 2.8 m (9 ft 2 in) in width, 3.8 m (12 ft 6 in) in height and 19 m (62 ft 4 in) in length, providing the system with maximum capacity of 30,000 to 55,000 passenger per hour per direction.[38]
Single ticket will be available as plastic packaged RFID coin like many other cities in China.[39] Existing pre-payment smart cards such as localHongcheng Tong (Chinese:洪城通) are also expected to be used in Nanchang Metro.