Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Gospel Oak to Barking line

From Wikipedia, the free encyclopedia
Railway line in London

Gospel Oak to Barking line
Overview
StatusOperational
Owner[1]
LocaleGreater London
Termini
Stations13
Service
TypeSuburban rail andgoods
SystemNational Rail
Services1
Operator(s)London Overground
Rolling stockClass 710 "Aventra"
Technical
Line length13 miles 58 chains (22.1 km)
Number of tracks2
Track gauge4 ft 8+12 in (1,435 mm)standard gauge
ElectrificationSeries 225 kV ACOHLE
Route map

(Click to expand)
Gospel Oak to Barking line
Gospel Oak
Highgate Road Low-level
Highgate Road High-level
Junction Road
Upper Holloway
Hornsey Road
Crouch Hill
Harringay Green Lanes
St Ann's Road
Seven SistersLea Valley linesVictoria Line
Lea Valley lines (7 Sisters branch)
South Tottenham
Blackhorse RoadVictoria Line
Walthamstow Queen's Rd
Leyton Midland Road
Leytonstone High Road
Wanstead Park
Woodgrange Park
High Speed 1 London Tunnel 2
Barking Station Junction
BarkingDistrict LineHammersmith & City LineNational Rail
Barking sidings
Barking Freight Terminal
Castle Green
(proposed)
Barking Riverside
London River Services
[2][3][4]

TheGospel Oak to Barking line,[5] also shortened toGOBLIN,[6] is arailway line in London. It is 13 miles 58 chains (22.1 km) in length and carries both throughgoods trains andLondon Overground passenger trains, connectingGospel Oak in north London andBarking Riverside in east London. The line is part ofNetwork Rail Strategic Route 6, and is classified as a London and South East Commuter line.[7]

On 15 February 2024, Transport for London announced that the Overground service which runs on the line will be branded as theSuffragette line, with the new name coming into use in November 2024.[8][9]

For much of its existence the line has played a minor role in London's transport system; however, in recent years it has received significant investment to increase its capacity, including full 25kV ACoverhead electrification, completed in 2018.[10] At the eastern end of the line, the extension to theBarking Riverside regeneration site opened on 18 July 2022.[11]

History

[edit]
A 1914 map of the Tottenham and Hampstead Junction Railway

Original lines

[edit]

The line is mostly an amalgamation of lines built in the 19th century. The main section, between South Tottenham and Woodgrange Park, was built as theTottenham and Forest Gate Railway, a joint project between theMidland Railway and theLondon, Tilbury and Southend Railway. This opened on 9 July 1894, linking the Midland and Great Eastern joint line at South Tottenham and the Forest Gate and Barking line at Woodgrange Park. The section west of South Tottenham was built as theTottenham and Hampstead Junction Railway, which opened in 1868 but had not been commercially successful as a stand-alone railway.[citation needed]

Predecessor routes

[edit]

Although the route between Upper Holloway and Woodgrange Park has been constant, several stations have been the ends of the line.Kentish Town,St Pancras,Gospel Oak andMoorgate (via St Pancras) have all been the western termini.East Ham was an alternative eastern terminus for some time. Some trains were extended beyond Barking to destinations such asSouthend andTilbury. There was a regular boat train service between St Pancras and Tilbury.[citation needed]

A connection to Gospel Oak was added in 1888, but the routes via Kentish Town remained the primary ones and the Gospel Oak branch was abandoned during 1926. The connection to East Ham was abandoned in 1958.[citation needed]

TheTottenham and Hampstead Junction Railway section of the line had stations that were closed due to proximity to other stations or for other reasons. These includeHighgate Road (closed 1918),Junction Road (closed 1943),Hornsey Road (closed 1943) andSt Ann's Road (closed 1942).[12]

The line was considered for closure to passengers in 1963 as part of theBeeching Axe,[13] but local users protested and formed an action group to prevent closure. Beeching's proposals for London were not implemented for the most part, and the line remained open. Even so, it was allowed to fall into a poor state of repair and reliability,[14] and by 1980 had been cut back to an hourly service between Kentish Town and Barking. The station canopies were gradually demolished, ticket offices closed and staff withdrawn from stations.[citation needed]

New link to Gospel Oak

[edit]

During 1981, the situation began to improve when electrification and upgrades to the line out ofSt Pancras (later part ofThameslink) displaced the line from Kentish Town. A new link to Gospel Oak was built and the hourly service from Kentish Town was replaced by the current route from Gospel Oak with two trains per hour. The service remained relatively unreliable, largely due to the age of the rolling stock used, which were initially Class115 and108 units, replaced in the early 1990s by Class117 and121 units.[citation needed]

Private operators

[edit]
A Silverlink Class 150 at Gospel Oak

Initially part ofBritish RailNetwork SouthEast, the line wasprivatised in 1994, the track being owned byRailtrack (subsequentlyNetwork Rail) with the passenger service provided by the North London Railways franchise. This passed toNational Express in 1997, which operated the line under the brand nameSilverlink until November 2007. Under Silverlink, theslam door trains were replaced byClass 150 units in 2000, which improved reliability significantly. There were minor improvements in station facilities (such as CCTV and information points) but no major investment to upgrade the line and boost capacity, and the stations remained unstaffed.

London Overground

[edit]
Early London Overground branded signage at Wanstead Park

During the opening years of the twenty-first century, many lines within London were running at full capacity, and as a consequence the line took on a new strategic significance as a bypass, relieving load on other lines by allowing passengers to travel between north and east London directly.

TheRailways Act 2005 abolished the franchise and gave the operation of passenger services toTransport for London (TfL). During 2005, TfL started funding a small number of additional peak time and late evening services to relieve the worst overcrowding.[citation needed]

In November 2007, TfL took full control of the line, after which it introduced improved late night and weekend services, and staff, ticket machines andOyster equipment at all stations. The frequency was increased to three trains per hour during morning and afternoon peaks and the line was included on theTube map for the first time.[citation needed]

The line was closed throughout most of September 2008 for upgrade work carried out byNetwork Rail. Capacity was increased from six trains per hour to eight (four each for passenger and goods trains). By replacing the overbridges carrying Sussex Way and Albert Road, and lowering the track in some other locations, it was made possible forW10 loading gauge goods trains to operate.Electrification was not included.[15]

In 2010, eight newClass 172Turbostar diesel trains replaced the Class 150 units, with two 23-metre coaches and the option to introduce a third coach.[16][17] The service frequency was increased to four trains per hour in January 2011.[18]

Electrification

[edit]
The electrified stretch at South Tottenham (completed before the rest of the line)

During 2008, electrification was ruled out by the Mayor of London on grounds of cost and difficulty of electrifying a line with so many viaducts and bridges,[19] but the Network Route Utilisation Strategy published byNetwork Rail in October 2009 showed abenefit–cost ratio for the scheme of 2.4:1.[20] During 2012, theMayor of London,Boris Johnson, indicated that funding was "a matter for theDepartment for Transport".[20]

In 2011, Network Rail proposed electrification inControl Period 5 (CP5), however, in July 2012,Justine Greening, theSecretary of State for Transport, stated that electrification was not included in theHigh Level Output Specification for CP5, and that any funds would need to be provided by TfL.[21] In August, the Mayor wrote to the Secretary of State for Transport to seek a way forward, and "she committed her officials to support work with TfL, Network Rail, train operators and other industry parties to see if a viable way can be found to bridge the funding gap."[22]

During November 2012, the magazineModern Railways reported that the Department for Transport had ruled out the work on the basis of an estimated cost of£90 million, in contrast to an estimate of £40 million by TfL.[23]

In June 2013, it was announced that £115 million of funding for electrification would be made available as part of upgrades to rail infrastructure included in the government's 2013 spending round.[24] At the same time Transport for London announced that they had obtained a £90m commitment from theChancellor of the Exchequer and the Secretary of State for Transport.[25]

In September 2015, Network Rail awarded the £56.9 million contract to electrify the line toJ. Murphy & Sons.[26] There were part closures (at weekends and from South Tottenham to Barking) from June to late September 2016, followed by a full closure from October 2016 to February 2017. In February 2017, Network Rail announced that whilst the line would re-open as scheduled, they were not able to complete all the work planned due to "incorrect" designs and late delivery of materials.[27] Further evening and weekend works until late June 2017 were already planned, followed by around four months of commissioning work before the electric wires could be turned on so thatClass 710 trains could run.[28] Although the line was completely electrified by mid-January 2018,[29] delays prevented the introduction of new electric trains until 2019.[30][31]

The line was electrified using the NR Series 2 OLE (Overhead Line Equipment) range.[32]

New trains

[edit]
A Class 710 four-coach electric train at Barking station

On account of the completion of electrification in 2018, new electricClass 710 trains were supposed to run from March 2018. However, the delivery of these trains was delayed by the manufacturer; at one point, officials were not even willing to divulge an anticipated service date for the Class 710 sets.[33][34][35]

Due to the Class 172 units being needed byWest Midlands Trains, threeClass 378 units (378 206, 378 209 and 378 232) were moved from other parts of theLondon Overground and shortened down from five to four carriages to provide an interim service until the class 710 units entered service. However, six trains are needed to be able to run a full service, so from 15 March 2019 (the day the last Class 172 units left London Overground) the frequency on the line was halved to two trains per hour.[34]

Increases in passenger numbers led to severe overcrowding at peak times, but it was not possible to increase peak frequencies without reducing the number of goods trains, as the line could accommodate only eight trains per hour in each direction. The two-coach Class 172 diesel trains in use between 2010 and 2019 were incapable of handling the increased number of passengers experienced after the incorporation into the London Overground. Between 2016 and 2018 the line was electrified by Network Rail; this work was delayed due to a number of design, track works and delivery problems. At the same time, platforms were lengthened to accommodate the new four-coach electric Class 710 trains. These trains were intended to be introduced in the spring of 2018, but the delivery was delayed by the manufacturer, the first two entering service on 23 May 2019,[36] but the existing two trains per hour service was maintained until the full timetable was restored in June of that year.[37] The full fleet entered service in August 2019.[38] Because the delay caused timetable cutbacks and continued overcrowding, TfL offered a month's free travel, financed by the manufacturerBombardier, to compensate passengers for the months of disruption they experienced.

Extension to Barking Riverside

[edit]
Main article:Barking Riverside railway station

The line was extended southeast by 4.5 kilometres (2.8 mi) from the terminus atBarking to serve theBarking Riverside regeneration area, abrownfield site with permission for around 10,800 new homes.[39] Proposed in the mid 2010s following cancellation of theDLR extension to Dagenham Dock, the extension was approved in 2017,[40] leading to construction commencing during late 2018.[41] Running partially alongside the existingLondon, Tilbury and Southend Railway line and then a new viaduct to theBarking Riverside station, the extension opened to passengers on Monday 18 July 2022[42] at an estimated cost of £327m.[43]

Accidents and incidents

[edit]

On 23 January 2020, a freight wagon derailed between Leyton Midland Road and Walthamstow Queen's Road stations, causing extensive damage to more than 2.5 miles (4 km) of track; the line was closed between Barking and South Tottenham stations while repair works took place, whereby 10,000 tonnes ofballast, 5,300concrete sleepers and 39 new pieces of rail were installed.[44] The line re-opened on 19 February 2020.[45]

Current operations

[edit]
Suffragette line
London Overground service
Gospel OakMildmay line
Upper Holloway
Crouch Hill
Harringay Green Lanes
South Tottenham
Blackhorse RoadVictoria Line
Walthamstow Queen's Rd
Leyton Midland Road
Leytonstone High Road
Wanstead Park
Woodgrange Park
BarkingDistrict LineHammersmith & City LineNational Rail
Castle Green
(proposed)
Barking Riverside
London River Services
[46][47]

Stations

[edit]
Walthamstow Queens Road station entrance

The line has thirteen stations, eleven of which are managed byLondon Overground, one byc2c (Barking) and one byLondon Underground (Blackhorse Road).

Station facilities

[edit]

Except at the interchange stations, station facilities are very basic. There are small shelters, information points with recorded service information, information screens and CCTV cameras. Typically, there are one or two staff members on duty. Where there are no station buildings they operate out of container-sized portable offices.

Step-free access

[edit]

The line has some stations with step-free access, allowing wheelchairs/pushchairs etc. easy access from street level to the platforms, atGospel Oak,Upper Holloway,Harringay Green Lanes,South Tottenham,Walthamstow Queens Road,Barking[48] andBarking Riverside.[42]

As the trains do not align exactly with the platform height,wheelchair users require assistance from a member of staff to board or alight from trains. The only exception however is at the newest station on the line, Barking Riverside, built with level access.

Services

[edit]

The line carries both goods and passenger traffic. It is owned byNetwork Rail, with the exception of the Barking Riverside branch which is owned byTransport for London.

Passenger services on the line are operated byArriva Rail London as part of theLondon Overground network under contract to TfL. There are four trains per hour in each direction, running from around 06:30 to 23:30 on Monday to Saturday, and around 06:30 to 22:00 on Sundays.[49][50][51] There is a single weekday morning service fromWoodgrange Park toWillesden Junction, calling at all intermediate stations except for Gospel Oak.

The line is heavily used by freight as it provides part of an orbital route around London, connecting with many radial routes and theNorth London Line at Gospel Oak. Freight services are operated byDB Cargo UK,GB Railfreight andFreightliner.[citation needed]

Other services use parts of the line infrequently, or as a diversionary route, but do not stop at most stations:

The line has an active users' group, "The Barking–Gospel Oak Rail User Group".[53]

Renaming

[edit]

In July 2023, Sadiq Khan, Head ofTfL and Mayor Of London announced that it would be giving each of the six Overground services unique names, relevant to the "historical contributions by minority groups" of the area the service passes through, by the end of the following year.[54][55]

On 15 February 2024, it was confirmed that the service using the Gospel Oak to Barking line would be named theSuffragette line, to honour East London's major contribution to the Suffragette movement. Barking activistAnnie Huggett, who died in 1996 at the age of 104, was known as “The Last Suffragette” due to her great age.[56] The line will be coloured green on the updated network map; green, along with white and purple, was one of the colours of the Suffragette movement.[57]

Ticketing

[edit]

Except at the interchange stations, staffed ticket offices were withdrawn by BR in the late 1980s. With operations transferred to London Overground, self-service ticket machines were introduced in November 2007. Oyster- and contactless-card validators (for touching in and out) are at all stations. The ticket machines can be used to load credit onto Oyster cards. Passengers are required to buy tickets, or touch in with their Oyster or contactless cards, or else face apenalty fare.

Owing to the lack of ticket barriers and the difficulty of ticket verification when trains are crowded, the line has historically had a high level offare avoidance. Under Silverlink most stations lacked any ticket purchasing facilities. In theory, passengers could purchase tickets from the conductors on the trains, but it was not always possible to do this. Following the introduction of the current ticketing arrangements, ticketless travel fell from an estimated peak of 40% under Silverlink, to 2% in March 2008.[58]

Passenger volume

[edit]

The number of paying passengers has increased very significantly since London Overground assumed the line's management.

This is the passenger volume for the years beginning April 2002 to April 2023.[59]

Station usage
Station name2002–032004–052005–062006–072007–082008–092009–102010–112011–122012–132013–142014–152015–162016–172017–182018–192019–202020–212021–222022–232023–24
Gospel Oak627,750340,980397,7001,511,609922,6991,052,692956,4741,508,2642,198,1282,755,2143,498,0583,568,7722,629,0762,355,8522,379,4602,699,6042,458,9221,112,6122,005,6422,223,682
Upper Holloway189,63252,33147,992206,090204,715283,884285,272505,822736,306900,5381,086,5121,166,1021,291,668415,180696,2861,088,442974,102594,5001,063,2581,159,000
Crouch Hill72,72745,25144,680271,491152,633189,696171,598321,100497,964636,424789,704832,150825,262284,672469,790706,722596,958353,194668,250726,486
Harringay Green LanesNo data36,45734,052319,250228,338299,934273,160502,600762,442955,6601,189,9901,292,5341,395,266408,558722,8641,075,256927,894617,5721,025,2221,106,422
South Tottenham135,20845,83442,090243,519183,840232,748225,126441,988657,598799,9501,001,8701,046,5161,379,768409,534748,7581,168,598948,036683,1621,054,2861,129,644
Blackhorse RoadNo data26,14322,593169,06786,55069,904184,472444,802669,050828,002813,5321,101,6362,013,700774,2201,428,3962,014,3941,838,242972,2861,753,1201,932,462
Walthamstow Queen's Road76,67534,37930,50362,52068,68169,41886,904216,142334,630405,656458,732541,314945,750218,732500,768734,832644,254404,150689,920764,968
Leyton Midland Road110,04634,86532,407285,208224,047308,836302,722501,186749,488951,7301,182,1221,355,0701,340,438286,620795,2361,178,1221,014,328631,4081,101,8441,193,380
Leytonstone High Road60,22731,54226,724261,238224,047251,676244,624416,310587,078733,060858,8641,001,820977,634210,496570,554837,232709,980437,732801,860841,092
Wanstead Park52,47729,01425,717179,718147,521215,262213,644351,450505,344627,170767,308845,9261,013,078212,572563,186886,990769,666517,316871,416890,942
Woodgrange Park52,32029,09025,256173,771115,969168,434171,972310,006484,632602,428702,302750,758977,648196,244513,594764,606629,330453,500731,542775,936
Barking4,687,6655,121,8944,908,4993,762,5623,559,4023,753,5824,677,9526,515,6067,427,4228,072,3568,330,6329,675,01213,428,60812,786,54213,473,37414,451,65213,831,4886,742,91811,231,85012,730,212
Barking Riverside461,384
The annual passenger usage is based on sales of tickets in stated financial years fromOffice of Rail and Road estimates of station usage. The statistics are for passengers arriving and departing from each station and cover twelve-month periods that start in April. Methodology may vary year on year. Usage since the period 2019–20 have been affected by theCOVID-19 pandemic, especially the period 2020–23.

Notes

[edit]
  • The large increases in the year beginning April 2006 were partly due to travelcards for National Rail journeys being made from stations that have only a London Underground office and also using a different methodology to estimate likely journeys made from National Rail stations in Zone 1.
  • The large increases in the year beginning April 2010 were partly due toOyster Cards being introduced in January 2010,[60] and new rolling stock.
  • Usage of the Gospel Oak to Barking line on the London Overground reduced as a result of engineering works throughout the year. Work included a full closure between October 2016 and February 2017.
  • Barking Riverside opened in 2022.

Trains

[edit]
Class 378 at Harringay Green Lanes station
Class 710 standing at Barking

Until 2010 London Overground operated sixClass 150 two-coach diesel units on the line. They were replaced by eightClass 172/0 two-coachdiesel multiple units (DMUs).

In 2017, all trains werediesel powered as the line was not fullyelectrified, with only two short sections havingoverhead electrification, at South Tottenham, to provide a link from Seven Sisters to Stratford, and from the junction with theGreat Eastern Main Line toBarking but excluding the bay platform which this service uses. These sections were used only by occasional electric trains on other routes or by goods trains.[citation needed]

Electrification of the line was completed in 2018, but electric trains did not run at first as the delivery of the newClass 710 sets had been delayed.[61] As the leases for the Class 172 came to an end in early 2019,London Overground temporarily shortened three of itsClass 378s to run on the line to substitute the Class 172s until the long-delayed Class 710s entered service on 23 May 2019.[36] All of the Class 378s were replaced by Class 710s by August 2019.

Interchanges

[edit]
Sign advertising the interchange at Gospel Oak

The line has same-station interchanges with:

There are out-of-station interchanges at:[62]

There are official TfL out-of-station-interchanges,[65] whereby the passenger can continue an unbroken journey between:

Two other interchanges are walkable:

Vibrations

[edit]

Residents inWalthamstow complained in 2012 that vibrations from goods traffic on the line were causing damage to their houses.[66]

Future

[edit]

Castle Green/Renwick Road

[edit]
Main article:Castle Green railway station

As part of the extension toBarking Riverside, a station, called Castle Green, at Renwick Road on theLondon, Tilbury & Southend Railway was proposed.[67] Although not built as part of the extension to Barking Riverside, the station site was safeguarded so that it can be built at a later stage.[68]

Potential Abbey Wood extension

[edit]

Following the plan to extend the line toBarking Riverside, there were also proposals to extend the line further across the river toAbbey Wood viaThamesmead, to allow for easier Orbital journeys in East London, and provideThamesmead with a railway connection for the first time.[69] This was outlined in theR25 orbital railway proposal in 2014,[70] and the potential of a future extension was mentioned in the inspectors report of theTransport and Works Order authorising the extension to Barking Riverside.[40]

However, in 2019Transport for London andCity Hall proposed anextension of the Docklands Light Railway (DLR) to serveThamesmead instead of an extension of theOverground, as part of the proposed Thamesmead and Abbey WoodOAPF (Opportunity Area Planning Framework).[71] A DLR extension was chosen due to lower connectivity benefits of an Overground extension, the low frequency (four trains per hour) of the Gospel Oak to Barking line, and — most significantly — a construction cost twice as much as the DLR, as the gradients required to cross theRiver Thames would require large scale tunnelling works when compared to the DLR.[72] Despite recommending an extension of the DLR toThamesmead, the consultation also noted that an extension of the Gospel Oak to Barking line could provide good orbital transport links in the long term.

Other proposed changes

[edit]

Local residents and users of the line have proposed adding a station betweenLeytonstone High Road andWanstead Park to serve theCann Hall area. TheLeyton and Wanstead branch of theLabour Party has expressed an interest in the proposal.[73] The line's user group and Islington Borough Council have been pressing for the reopening of the station atJunction Road, as its proximity toTufnell Park Underground station would allow interchange with theNorthern line.[74]

References

[edit]
  1. ^Johnson, Marc (12 September 2017)."In focus: London Overground's Barking Riverside Extension".railstaff.co.uk. Retrieved15 April 2020.
  2. ^"Detailled London transport map (track, depot, ...)".carto.metro. Retrieved9 January 2020.
  3. ^"Map images".National Library of Scotland. Retrieved14 January 2020.
  4. ^"Online tube map"(PDF).Transport for London. Retrieved9 January 2020.
  5. ^"What we do".Transport for London. Retrieved7 September 2022.
  6. ^Lydall, Ross (16 April 2021)."London Overground lines to be renamed to reflect capital's diversity". The Standard.
  7. ^"Route 6 – North London Line and Thameside : 2009 Route Plan"(PDF).Network Rail. 2009. Archived fromthe original(PDF) on 7 June 2011. Retrieved28 May 2009.
  8. ^"London Overground: New names for its six lines revealed".BBC News. 15 February 2024. Retrieved16 February 2024.
  9. ^https://www.bbc.co.uk/news/articles/cpvzp272pe9o
  10. ^"Network Rail has completed the electrification works to the Gospel Oak to Barking line". Network Rail. Archived fromthe original on 20 July 2017. Retrieved11 September 2018.
  11. ^"London Overground: Opening date of first new stop since 2015 confirmed". BBC News. 11 July 2022. Retrieved11 July 2022.
  12. ^"London's Abandoned Stations". Abandonedstations.org.uk. Retrieved11 July 2010.
  13. ^Map 9A, from The Reshaping of Britain's Railways (Report).British Railways Board. 1963. Archived fromthe original on 20 March 2014.
  14. ^"On London Overground's Gospel Oak to Barking line, electric dreams do come true".CityMetric. 11 June 2018. Archived fromthe original on 8 August 2020. Retrieved12 September 2018.
  15. ^Transport, The UK Department for."Barking to Gospel Oak Railway and Freight Capability Enhancements".webarchive.nationalarchives.gov.uk. Archived fromthe original on 7 August 2007.
  16. ^"Transport for London signs new train leasing contract | Transport for London". Transport for London. 20 February 2008. Archived fromthe original on 25 April 2012. Retrieved30 May 2011.
  17. ^http://www.tfl.gov.uk/corporate/media/newscentre/16672.aspx[dead link]
  18. ^"Gospel Oak to Barking". Transport for London.
  19. ^"Mayor answers to London (Question 1541/2008)".London Assembly. 16 July 2008. Archived fromthe original on 21 July 2011. Retrieved11 July 2010.
  20. ^ab"Mayor answers to London: Barking to Gospel Oak line (Question 1158/2012)".London Assembly. 23 May 2012. Archived fromthe original on 23 August 2012. Retrieved5 December 2012.
  21. ^"Rail Investment: 16 Jul 2012: House of Commons debates".TheyWorkForYou. Retrieved5 December 2012.
  22. ^"Mayor answers to London: Diesel trains (Question 2942/2012)".London Assembly. 17 October 2012. Archived fromthe original on 20 March 2014. Retrieved5 December 2012.
  23. ^Wallis, Glenn (1 November 2012)."Barking–Gospel Oak Line User Group News eBulletin 1 November 2012"(PDF). Barking–Gospel Oak Line User Group. Retrieved5 December 2012.[permanent dead link]
  24. ^HM Treasury (June 2013)."Investing in Britain's future"(PDF).The Stationery Office. p. 26. Retrieved26 June 2012.
  25. ^"Mayor secures 'unprecedented' transport settlement for London to support long-term economic growth".Greater London Authority. 26 June 2013. Archived fromthe original on 30 June 2013. Retrieved17 July 2013.
  26. ^"J Murphy & Sons to carry out electrification of Gospel Oak-Barking route".Rail Technology Magazine. 29 September 2015. Retrieved20 March 2017.
  27. ^"London Overground Gospel Oak to Barking route to reopen on Monday 27 February but further work is required". Network Rail. 7 February 2017. Retrieved8 February 2017.
  28. ^"TfL tries to reduce line-closure time for GOBLIN electrification".Rail Technology Magazine. 2 February 2016.
  29. ^"Beleaguered Barking to Gospel Oak line to reopen".New Civil Engineer. Retrieved28 May 2018.
  30. ^Gelder, Sam."New Overground trains for Gospel Oak to Barking line delayed... by three months".Islington Gazette. Archived fromthe original on 4 November 2018. Retrieved28 May 2018.
  31. ^"Gospel Oak to Barking electrification works to be complete in time for arrival of new double-length electric trains".Network Rail Media Centre.
  32. ^"CP5 Enhancements Delivery Plan June 2015"(PDF).Network Rail. June 2015. Archived fromthe original(PDF) on 26 March 2016. Retrieved21 January 2016.
  33. ^"London Overground receives first new Class 710 EMU | Global Rail News".Global Rail News. 20 June 2018. Archived fromthe original on 11 September 2018. Retrieved11 September 2018.
  34. ^ab"Trains to be halved on troubled 'Goblin' Barking to Gospel Oak line". Evening Standard. 12 March 2019. Retrieved23 April 2019.
  35. ^"Bombardier Class 710/2s authorised, but wait goes on for entry into traffic".railmagazine.com. Retrieved23 April 2019.
  36. ^ab"Aventra finally enters Barking-Gospel Oak service".Rail Magazine. 28 May 2019. Retrieved3 October 2023.
  37. ^Gelder, Sam (24 June 2019)."Three-year nightmare is over! Full service resumes on Gospel Oak to Barking Overground line". Islington Gazette. Retrieved11 August 2019.
  38. ^"Gospel Oak to Barking trains".Transport for London. Retrieved11 June 2019.
  39. ^"Improvements and Projects - Barking Riverside extension".Transport for London. Retrieved12 October 2021.
  40. ^ab"Transport and Works Act 1992: Application for the Proposed London Overground (Barking Riverside Extension) Order and Deemed Planning Permission - letter from Secretary of State"(PDF).Department for Transport. 4 August 2017. Retrieved17 April 2020.
  41. ^"JV picks up £196m Barking Riverside contract delayed by Carillion collapse".Construction News. 24 December 2018. Retrieved15 April 2020.
  42. ^ab"Barking Riverside extension". Transport for London. Archived fromthe original on 11 August 2016. Retrieved13 July 2022.
  43. ^Horgan, Rob (7 December 2020)."TfL's Barking Riverside Extension suffers year delay and another cost hike".New Civil Engineer.Archived from the original on 7 December 2020. Retrieved20 January 2021.
  44. ^"UPDATE: Gospel Oak to Barking line freight derailment (Monday 27 January)". Network Rail. 27 January 2020. Retrieved28 January 2020.
  45. ^Cumiskey, Lucas (19 February 2020)."Gospel Oak to Barking line service resumes after freight train derailment damage repaired".Hampstead Highgate Express. Archived fromthe original on 29 September 2020. Retrieved23 February 2020.
  46. ^"Detailled London transport map (track, depot, ...)".carto.metro. Retrieved9 January 2020.
  47. ^"Online tube map"(PDF).Transport for London. Retrieved9 January 2020.
  48. ^"National Rail, Accessibility Maps (London and South East)"(PDF). Archived fromthe original(PDF) on 15 March 2007.
  49. ^"Gospel-Oak-Barking-May2011"(PDF).Transport for London. 2011. Archived fromthe original(PDF) on 5 June 2011. Retrieved25 May 2011.
  50. ^"Arriva wins £1.5bn London Overground contract".BBC News. 18 March 2016.
  51. ^"TfL confirm London Overground contract with Arriva signed".Railway Technology Magazine. 18 April 2016.
  52. ^"PSUL 2019". Archived fromthe original on 3 August 2020. Retrieved12 January 2019.
  53. ^"The Barking – Gospel Oak Rail User Group". Barking-gospeloak.org.uk. Retrieved11 July 2010.
  54. ^"Naming London Overground lines".Transport for London. Retrieved11 February 2024.
  55. ^"London Overground lines to be given unique names".BBC News. 15 August 2023. Retrieved11 February 2024.
  56. ^Barking and Dagenham Post -https://www.barkinganddagenhampost.co.uk/news/20922886.post-memories-womens-centre-named-barking-suffragette-annie-huggett/
  57. ^"London Overground: New names for its six lines revealed".BBC News. 15 February 2024. Retrieved15 February 2024.
  58. ^"London Overground Review"(PDF). Transport for London. p. 5. Archived fromthe original(PDF) on 4 June 2011.
  59. ^"Estimates of station usage | Office of Rail and Road".orr.gov.uk. Retrieved11 June 2019.
  60. ^"Estimates of station usage | Office of Rail and Road".orr.gov.uk. Retrieved29 May 2018.
  61. ^"UK railway news round-up".Railway Gazette. 31 January 2019. Archived fromthe original on 2 February 2019. Retrieved2 February 2019.
  62. ^"National Rail Timetable"(PDF). Network Rail. p. 46. Archived fromthe original(PDF) on 4 September 2013. Retrieved25 October 2013.
  63. ^Marshall, Geoff; Frost, Matthew."New Station Entrance, Walthamstow – StationMasterApp". Retrieved29 December 2014.
  64. ^Binns, Daniel (25 January 2013)."Link between Walthamstow Central and Queens Road stations 'due this summer'".Waltham Forest Guardian. Retrieved27 June 2013.
  65. ^"Interchanging Trains".Oyster Fares Central. 24 August 2014. Retrieved12 May 2023.
  66. ^Browning, Simon (18 August 2012)."Residents demand action over 'shaking' homes".BBC News.BBC. Retrieved18 August 2012.
  67. ^"Have your say on the proposed London Overground extension to Barking Riverside - Transport for London - Citizen Space".consultations.tfl.gov.uk. Archived fromthe original on 9 August 2020. Retrieved15 April 2020.
  68. ^"Barking Riverside Extension Intermediate Station Feasibility Report"(PDF). Transport for London. December 2015. Archived fromthe original(PDF) on 21 August 2017. Retrieved23 July 2017.
  69. ^"Call to bring London Overground to Thamesmead – south east London's largest town with no trains".This is London Local. 22 September 2014.
  70. ^Dudman, Jane (1 August 2014)."Boris Johnson's London orbital railway – is it a good idea?".The Guardian.ISSN 0261-3077. Retrieved17 April 2020.
  71. ^"Workshops about the future of Thamesmead and Abbey Wood opened to public".News Shopper. 31 January 2020. Retrieved17 April 2020.
  72. ^"Thamesmead and Abbey Wood OAPF - OAPF Transport Strategy - December 2019 Draft"(PDF).Greater London Authority. December 2019. Retrieved17 April 2020.
  73. ^"WALTHAM FOREST: Campaign for new station in Leytonstone".Waltham Forest Guardian. 29 February 2012. Retrieved5 December 2012.
  74. ^"BGO History".barking-gospeloak.org.uk. Retrieved12 February 2014.

Further reading

[edit]
  • "London's forgotten railway".RAIL. No. 321. EMAP Apex Publications. 31 December 1997 – 13 January 1998. pp. 18–22.ISSN 0953-4563.OCLC 49953699.

External links

[edit]
Wikimedia Commons has media related toGospel Oak to Barking Line.
Network
Services
Suffragette line
Railway lines
Other topics
Future plans
Planned and proposed stations
Planned and proposed routes
Rolling stock
Current
Former
Operations
History
Main lines
Primary
Secondary
Branch
Regional
Intra-London
Disused
Retrieved from "https://en.wikipedia.org/w/index.php?title=Gospel_Oak_to_Barking_line&oldid=1289351602"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp