Covenanter cruiser tank | |
---|---|
![]() Tank, Cruiser, Mk V, Covenanter (A13 Mk III) | |
Type | Cruiser tank |
Place of origin | United Kingdom |
Service history | |
In service | 1940–1943 |
Production history | |
Designer | LMS/Nuffield (turret) |
Manufacturer | LMS,English ElectricLeyland Motors |
Produced | 1939–1943 |
No. built | 1,771 |
Specifications | |
Mass | 18 long tons (18 t)[1] |
Length | 19 ft 0 in (5.79 m)[1] |
Width | 8 ft 7 in (2.62 m)[1] |
Height | 7 ft 4 in (2.24 m)[1] |
Crew | 4 (commander, gunner, loader, driver) |
Armour | 7–40 mm (0.28–1.57 in) |
Main armament | QF 2-pounder (40 mm) |
Secondary armament | 7.92 mmBesa machine gun (coaxial) 0.303 Bren light machine gun carried for AA defence |
Engine | Meadows D.A.Vflat-12 340 hp (250 kW) |
Power/weight | 18.6 hp (13.9 kW) / tonne |
Transmission | Meadows gearbox withWilson epicyclic steering |
Suspension | Christie |
Fuel capacity | 92 imperial gallons (420 L)[2][3] |
Operational range | 100 mi (160 km)[1] |
Maximum speed | 30 mph (48 km/h) |
TheCruiser tank Mk V orA13 Mk III Covenanter was a Britishcruiser tank of theSecond World War. The Covenanter was the first cruiser tank design to be given a name. Designed by theLondon, Midland and Scottish Railway as a better-armoured replacement for theCruiser Mark IV, it was ordered into production in 1939 before pilot models were built. Problems with the design became apparent only after production was under way.
The tank equipped various British armoured divisions for home defence and training. It never left the UK as poor engine cooling caused the Mk I to Mk III to be declared unfit for overseas service, especially in hot climates. This was rectified in the Mk IV after many corrective actions were undertaken but, by February 1944, it was declared obsolete. More than 1,700 of the type were built. It was named after theCovenanters, a Scottish religious and political movement at the time of theWars of the Three Kingdoms.[citation needed]
In 1938, the War Office had issued a requirement for a new, better armoured "heavy" cruiser tank to replace theCruiser IV.Nuffield's A16 (and the A14) design was found to be too expensive and, in 1939, a cheaper and lighter cruiser tank – under General Staff specification A13 Mk III Cruiser Mark V – was chosen to be developed. It had nothing apart from Christie suspension and armament in common with the other A13 specifications.[4]
The initial specification required aQF 2 pounder gun, at least one machine gun, the same A13Christie suspension in a lower hull,epicyclic steering transmission and "armour standard" (armour basis) of 30 millimetres (1.2 in).[5] The "30 mm armoured standard" referred to any vertical plate having to be 30 mm thick. Angled surfaces (through the principles ofsloped armour) could be thinner, provided they were at least as effective as a 30 mm thick vertical plate.[6]
From these, a design using many sloped surfaces was chosen to keep the weight low. To keep the silhouette low, the suspension used cranked arms and a low profile engine was envisaged. The engine, which was to be specifically designed for it, was to deliver at least 300 horsepower (220 kW). TheWilson transmission and steering of the A16 would be used.[7]
Design work was by theLondon, Midland and Scottish Railway Company (LMS), who had no prior experience in the design and production of fighting vehicles and had been invited to participate under a Government policy that British companies should develop skills in expectation of war.[8][note 1] The design assumed a welded hull rather than the usual riveting. The turret was designed by Nuffield, withHenry Meadows designing a new low profile engine for it. On 17 April 1939, before a prototype was produced, the first 100 vehicles were ordered from the LMS. Additional orders soon followed, withEnglish Electric andLeyland Motors joining the production effort, for a final production total of 1,771 Covenanters.[9][10] Nuffield was also approached but preferred to design its own offspring of the A13 line, which became theCruiser Mk.VI Crusader.[11]
Due to the expectation of war, the design was ordered "off the drawing board". The expectation was that two pilot models would serve for testing and results applied to the production lines.[12]
To meet the engine requirement, a horizontally opposed 12-cylinder design was used. Although flat, it was wide and left no room forradiators in the engine compartment and so the radiators were situated at the front of the vehicle. The unusual arrangement, although tested in mock up form first, when combined with the rushed design resulted in serious problems with engine cooling. Even when the systems were redesigned, there were problems and the piping from engine to the radiators heated the fighting compartment. These problems meant that the Covenanter would not be employed in theNorth African Campaign. Instead, Crusaders and American tanks were sent to Africa, while the Covenanters remained at home.[13]
LMS advised a return to riveted construction due to doubts about the strength of the welds and rather than risk delays due to a lack of welders, this was accepted. The welded design used two layers of armour plate, the inner being of steel that would weld readily without losing its properties. This two-plate system was retained when the design reverted to riveted construction. The use of rivets, steel wheels instead of aluminium and an increase in armour specification to 40 millimetres (1.6 in) at the front of hull and turret increased the weight to a level where the tank suspension was at maximum load, leaving no room for later development of the design.[7][note 2] Rather than risk the availability of the combined Wilson transmission and steering, affecting production, the A13 "crash" gear box was used with epicyclic steering units. This necessitated a reduced size of cooling fan for the transmission compartment.[14]
Contracts were placed with the manufacturers in 1939. The pilot model (with welded hull) was successfully tested in 1940; though the second pilot suffered from overheating. The first deliveries of production vehicles were not until after thebattle of Dunkirk. Production of turrets lagged behind that of hulls. Production ended in mid-1942. It is surprising that production was continued for so long, because newer, better tank designs were waiting for space on production lines.[15] A Covenanter tank cost the British Government £12,000, aCrusader tank cost £13,700, aMatilda tank cost £18,000, and aValentine tank £14,900.[16]
By late 1943, the Covenanter was considered too weakly armed and armoured to deal with new German tanks. It was decided that neither problem could be addressed without significant changes in the design, so the tank was declared obsolete and all vehicles except the bridge-layer variant were to be scrapped.[9][17]
Except for a few trial vehicles, Covenanters were never deployed outside the UK. The Covenanter was used to re-equip the1st Armoured Division (six armoured regiments in two brigades), which had lost most of its tanks in the Fall of France. When the 1st was sent to Egypt, the tanks were transferred to the9th Armoured Division.[9]
Eventually, a handful of vehicles were sent to the desert for service trials and were allocated to theREME for maintenance and evaluation. It is not clear if these tanks were ever used in combat; the unit markings indicate they may have been deployed alongside Kingforce with their new 6 pounder-equippedChurchill Mk III tanks.[18]
Covenanters were also used to equip theGuards Armoured Division in 1942 and elements of the1st Polish Armoured Division when it was formed in the UK; they were replaced before these units were sent to the frontline, except for a few bridgelayers that both divisions retained and used in their advance through Belgium and the Netherlands.[18]
Observation Post tanks were issued to artillery units to carry Forward Observation Officers forRoyal Artillery batteries. In an armoured division, there were two OP tanks for each RHA or field battery. Medium gun batteries had one. Command tanks were similar to OP tanks, but had only two No. 19 sets; one on the regiment radio net and the other on the brigade net.[19]
Covenanter bridgelayers were used by the1st Czechoslovak Armoured Brigade during thesiege of Dunkirk from October 1944 to May 1945.[20] The bridgelayer version was also used by the4th Armoured Brigade of theAustralian Army atBougainville andBalikpapan during thePacific Campaign in 1945.[21]
Some Covenanters were fitted with the "Anti-Mine Roller Attachment" (AMRA) Mk IC which was a mine clearing device consisting of four heavy rollers suspended from a frame. The weight of the rollers could be increased by filling them with water or sand.[19]
A single Covenanter gun–tank is preserved atThe Tank Museum, Bovington, in the UK. It is displayed in the markings it had during the War when it served with the13th/18th Royal Hussars, part of the9th Armoured Division. For unknown reasons, it was buried after the war on a farm nearDorking. In 1977 it was discovered, recovered, restored and put on display at the Bovington museum in 1985.[23][2] The Tank Museum also has the turret from an early Covenanter pilot model.[24]
A second Covenanter tank was recovered in May 2017 from the same farm, now the site ofDenbies vineyard.[25]
The partially buried, wrecked hulls of two tanks may be seen atTitchwell Marsh in Norfolk, UK.[26] Now aRoyal Society for the Protection of Birds nature reserve, the area was formerly a tank gunnery range and the Covenanters were likely used as targets.[27]
Two Covenanter Bridgelayers are preserved in Australia – one at the Royal Australian Armoured Corps Tank Museum,Puckapunyal, Victoria, and one at the1st/15th Royal New South Wales Lancers Lancer Barracks and Museum atParramatta, New South Wales.[28]