Route 29 widening in Fairfax County
City/county: Fairfax (county)
Overview
This project is reconstructing and widening 1.5 miles of Route 29 from four to six lanes between Union Mill Road and Buckleys Gate Drive. It will relieve a major bottleneck during peak hours, with lengthy backups occurring in particular at the signal for Stringfellow/Clifton roads (Route 645).
The project is also:
- Correcting vertical alignment to improve sight distance
- Adding shared-use paths on both sides of Route 29
- Providing connectivity to pedestrian/bicycle trails at the Fairfax County Parkway/West Ox Road interchange
Route 29 averages 30,000 vehicles a day within the project limits.
Benefits
This project aims to reduce congestion, improve safety, operations and access management, and enhance bicyclist and pedestrian accessibility and connectivity.
Major milestones
- Public information meeting: October 2018
- Design public hearing: June 2019
- Begin right of way acquisition: August 2021
- Award design-build contract: May 2022
- Begin construction: February 2023
- Groundbreaking ceremony: March 2023
- "Pardon our dust" meeting: April 2023
- Extended Stringfellow Road/Clifton Road left-turn lanes open: November 2023
- Final completion: Spring 2026
Other relevant links
- Noise Waiver - March 2025
- Noise Barrier Survey Results - August 2020
- Final Noise Report - April 2020
- Categorical Exclusion - May 2019
- Preliminary Noise Report- May 2019
The following documents are available by request, emailmichael.murphy@vdot.virginia.gov:
- Noise Reevaluation Memo - January 2023
- Final Noise Report Appendices - April 2020
Status:Under construction
Estimated start date:February 2023
Estimated completion date:Spring 2026
Estimated cost of the project:$94.4 million
- Preliminary engineering:$5.5 million
- Right of way acquisition and utility relocation:$9.7 million
- Construction:$79.2 million
Funding sources: Federal, state (including Smart Scale), Fairfax County and part of theconcession fee provided under the Transform 66 Outside the Beltway Project Comprehensive Agreement
UPC: 110329, 120509
State ID: 0029-029-350, P101, R201, C501, D612
Federal ID: NHPP-5A01 (917)
News release - November 2023
"Pardon our dust" meeting - April 2023
- A "pardon our dust" meeting was held in April 2023
- PDF Presentation
- Display Board 1
- Display Board 2
- Display Board 3
- Display Board 4
News release - March 8, 2023
Design public hearing - June 2019
- Summary of the Design Public Hearing
- Meeting Materials
- Ad
- Displays - Union Mill Rd to Sandy Point Ln
- Displays - Hampton Forest Way to Buckleys Gate Drive
Public information meeting - October 2018
Route 29 - 2023
Route 29 - Pre-Construction
%2fprod01%2fvdot-cdn-pxl%2fmedia%2fvdotvirginiagov%2fprojects%2fnorthern-virginia%2froute-29-widening-in-fairfax-county%2fasset_upload_file164_196773.png&f=jpg&w=240)
Project Typical Section
%2fprod01%2fvdot-cdn-pxl%2fmedia%2fvdotvirginiagov%2fprojects%2fnorthern-virginia%2froute-29-widening-in-fairfax-county%2fasset_upload_file911_202618.png&f=jpg&w=240)
No videos currently available.
Last updated: November 21, 2025