Movatterモバイル変換


[0]ホーム

URL:


17
Global
Height rank

Vincom Landmark 81

Ho Chi Minh City

© Atkins China Limited

© Aurecon

© Aurecon

© Atkins China Limited

© Atkins China Limited

© Atkins China Limited

© Atkins China Limited

© Atkins China Limited

© Atkins China Limited

© Atkins China Limited

© Atkins China Limited

© Atkins China Limited

© Vingroup

© Atkins China Limited

© Atkins China Limited

© Atkins China Limited

© Atkins China Limited

© Atkins China Limited

© Atkins China Limited

© Atkins China Limited

© Thomas Jaehndel

© Thomas Jaehndel

Height
1
To Tip:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
469.5 m / 1,540 ft
2
Architectural:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."
461.2 m / 1,513 ft
3
Occupied:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
382.6 m / 1,255 ft
123Vincom Landmark 81
  Floors
Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).
81
Below Ground
The number of floors below ground should include all major floors located below the ground floor level.
3
Height461.2 m / 1,513 ft
Floors81
Official Name
The current legal building name.

Vincom Landmark 81

Other Names
Other names the building has commonly been known as, including former names, common informal names, local names, etc.

Landmark 81

Name of Complex
A complex is a group of buildings which are designed and built as pieces of a greater development.

Vinhomes Central Park

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed

Completion

2018

Country
The CTBUH follows theUnited Nations's definition of Country, and thus uses the lists and codes established by that organization.

Vietnam

City
The CTBUH follows theUnited Nations's definition of City, and thus uses the lists and codes established by that organization.

Ho Chi Minh City

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

Hotel / Residential

Structural Material
All-Steel
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from steel. Note that a building of steel construction with a floor system of concrete planks or concrete slab on top of steel beams is still considered an “all-steel” structure as the concrete elements are not acting as the primary structure.

All-Concrete
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from concrete which has been cast in place and utilizes steel reinforcement bars and/or steel reinforced concrete which has been precast as individual components and assembled together on-site.

All-Timber
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from timber. An all-timber structure may include the use of localized non-timber connections between timber elements. Note that a building of timber construction with a floor system of concrete planks or concrete slab on top of timber beams is still considered an “all-timber” structure as the concrete elements are not acting as the primary structure.

Mixed-Structure
Utilizes distinct systems (e.g. all-steel, all-concrete, all-timber), one on top of the other. For example, a Steel Over Concrete indicates an all-steel structural system located on top of an all-concrete structural system, with the opposite true of Concrete Over Steel.

Composite
A combination of materials (e.g. steel, concrete, timber) are used together in the main structural elements. Examples include buildings which utilize: steel columns with a floor system of reinforced concrete beams; a steel frame system with a concrete core; concrete-encased steel columns; concrete-filled steel tubes; etc. Where known, the CTBUH database breaks out the materials used within a composite building’s primary structural elements.

Concrete-Steel Composite

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

461.2 m / 1,513 ft

To Tip
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
469.5 m / 1,540 ft
Occupied
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
382.6 m / 1,255 ft
Observatory
382.6 m / 1,255 ft
Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

81

Floors Below Ground
The number of floors below ground should include all major floors located below the ground floor level.

3

# of Apartments
Number of Apartments refers to the total number of residential units (including both rental units and condominiums) contained within a particular building.

491

# of Hotel Rooms
Number of Hotel Rooms refers to the total number of hotel rooms contained within a particular building.

204

# of Parking Spaces
Number of Parking Spaces refers to the total number of car parking spaces contained within a particular building.

857

# of Elevators
Number of Elevators refers to the total number of elevator cars (not shafts) contained within a particular building (including public, private and freight elevators).

29

Top Elevator Speed
Top Elevator Speed refers to the top speed capable of being achieved by an elevator within a particular building, measured in meters per second.

8 m/s

Tower GFA
Tower GFA refers to the total gross floor area within the tower footprint, not including adjoining podiums, connected buildings or other towers within the development.

249,000 m² / 2,680,214 ft²

Rankings

  • Login

    You must be a CTBUH Member to view this resource.

    By function
  • Login

    You must be a CTBUH Member to view this resource.

    By material
#
17
Tallest in the World
#
12
Tallest in Asia
#
1
Tallest in Vietnam
#
1
Tallest in Ho Chi Minh City

Construction Schedule

2015

Proposed

2015

Construction Start

2018

Completed

Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Wind
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Owner/Developer
Vingroup
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Atkins
Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Aurecon
Engineer of Record

The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.

INNO Joint Stock Company
Contractor
Main Contractor

The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.

Mace Limited; Coteccons Group
Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Façade

These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.

Aurecon
Fire
Aurecon
Lighting
Aurecon
Vertical Transportation
Aurecon
Wind
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Wind
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

  • Login

    You must be a CTBUH Member to view this resource.

    All Companies Involved
  • Owner/Developer
    Vingroup
    Architect
    Design

    Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

    Atkins
    Structural Engineer
    Design

    The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

    MEP Engineer
    Design

    The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

    Aurecon
    Engineer of Record

    The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.

    INNO Joint Stock Company
    Contractor
    Main Contractor

    The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.

    Mace Limited; Coteccons Group
    Other Consultant

    Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

    Façade

    These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.

    Aurecon
    Fire
    Aurecon
    Lighting
    Aurecon
    Vertical Transportation
    Aurecon
    Wind
    Material Supplier

    Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

    CTBUH Initiatives

    CTBUH 2019 Award of Excellence Winners Announced

    5 December 2018 - Awards

    CTBUH Vietnam Hosts Inaugural Event

    7 October 2016 - Event

     

    Research

    20 March 2020

    Interactive Study on The Tallest 20 in 2020: Then and Now

    CTBUH Research

    This research paper undertakes a review of the 2012 report by the Council on Tall Buildings and Urban Habitat, “Tallest 20 in 2020: Entering the...

    Global News

    09 April 2018

    New Photos Show Ho Chi Minh City’s Upcoming Tallest Skyscraper Has Topped Out

    New photos reveal that Vincom Landmark 81 in Ho Chi Minh City, set to become Vietnam’s tallest building upon completion, has architecturally topped out. Rising...

     

    Research

    20 March 2020

    Interactive Study on The Tallest 20 in 2020: Then and Now

    CTBUH Research

    This research paper undertakes a review of the 2012 report by the Council on Tall Buildings and Urban Habitat, “Tallest 20 in 2020: Entering the...

    29 July 2019

    Highest Special-Purpose Spaces

    Since humans first began constructing tall buildings, history has been cluttered with claims of all manner of “highest” records. In this study, we examine those...

    12 December 2018

    Year in Review: Tall Trends of 2018

    CTBUH Research

    The astronomical growth in tall building construction observed over the past decade continued in 2018, though the total numberof completed buildings of 200 meters’...

    20 March 2020

    Interactive Study on The Tallest 20 in 2020: Then and Now

    CTBUH Research

    This research paper undertakes a review of the 2012 report by the Council on Tall Buildings and Urban Habitat, “Tallest 20 in 2020: Entering the...

    29 July 2019

    Highest Special-Purpose Spaces

    Since humans first began constructing tall buildings, history has been cluttered with claims of all manner of “highest” records. In this study, we examine those...

    12 December 2018

    Year in Review: Tall Trends of 2018

    CTBUH Research

    The astronomical growth in tall building construction observed over the past decade continued in 2018, though the total numberof completed buildings of 200 meters’...

    There are no results for your search query. Please try a different variation.

    CTBUH Initiatives

    5 December 2018

    CTBUH 2019 Award of Excellence Winners Announced

    These projects will be represented at the CTBUH 2019 Tall + Urban Innovation Conference, where they will compete in real time for winning distinctions in each category.

    7 October 2016

    CTBUH Vietnam Hosts Inaugural Event

    The CTBUH Vietnam Chapter hosted an inaugural event to introduce the Council to a Vietnamese audience and explain its role within the skyscraper industry.

    5 December 2018

    CTBUH 2019 Award of Excellence Winners Announced

    These projects will be represented at the CTBUH 2019 Tall + Urban Innovation Conference, where they will compete in real time for winning distinctions in each category.

    7 October 2016

    CTBUH Vietnam Hosts Inaugural Event

    The CTBUH Vietnam Chapter hosted an inaugural event to introduce the Council to a Vietnamese audience and explain its role within the skyscraper industry.

    There are no results for your search query. Please try a different variation.

    Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.

    View our privacy policy

    We use cookies to improve your experience on our website. Review ourPrivacy Policy for more information.


    [8]ページ先頭

    ©2009-2025 Movatter.jp