Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Yellow Line (Delhi Metro)

From Wikipedia, the free encyclopedia
Line on the Delhi Metro system

Yellow Line
(Line 2)
A Bombardier eight-coach train leaves from Patel Chowk Metro Station.
Overview
LocaleDelhi,Gurgaon
Termini
Stations37
Service
TypeRapid transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
Rolling stockMitsubishi-ROTEM
Bombardier MOVIA
History
Opened
Technical
Line length49.02 km (30.46 mi)
CharacterUnderground andElevated
Track gauge1,676 mm (5 ft 6 in) broad gauge
Electrification25 kV 50 Hz ACoverhead catenary
Route map

Siraspur Depot
Samaypur Badli
Rohini Sector 18, 19
Outer Ring Road
Haiderpur Badli Mor
Jahangirpuri
Adarsh Nagar
Ring Road
Azadpur
Model Town
GTB Nagar
Vishwavidyalaya
Timarpur - Kyber Pass Depot
Vidhan Sabha
Civil Lines
ISBT Road
Kashmere Gate
Maharana Pratap Inter State Bus Terminus
Chandni Chowk
Old Delhi Railway Station
Chawri Bazar
New DelhiNew Delhi railway station
service tunnel to Blue line
Rajiv Chowk
Patel Chowk
Central Secretariat
Rajpath
Udyog Bhawan
Lok Kalyan Marg
Jor Bagh
Dilli Haat - INA
Ring Road
AIIMS
Green Park
Hauz Khas
Outer Ring Road
Malviya Nagar
Saket
Mehrauli Badarpur Road
Qutab Minar
Chhatarpur
Sultanpur
Sultanpur Depot
Ghitorni
Arjan Garh
Delhi
Haryana
border
Guru Dronacharya
Sikanderpur
MG Road
IFFCO Chowk
Millennium City Centre Gurugram

TheYellow Line (Line 2) is arapid transit metro line of theDelhi Metro inDelhi, India. It consists of37 stations fromSamaypur Badli in Delhi toMillennium City Centre in the neighbouring city ofGurgaon inHaryana. The 49.02 kilometers (30.46 mi) line is mostly underground and laid under one of the most congested parts of Delhi.[1] The Yellow Line is the second line of Delhi Metro to become operational after theRed Line.

It is the 3rd longest metro line on the Delhi Metro network. This line coversNorth Delhi, throughCentral Delhi,New Delhi,South Delhi and finally the city of Gurgaon in Haryana. The Yellow line has interchanges with theRed,Blue,Violet,Pink andMagenta lines of the Delhi Metro, as well as with theOld Delhi andNew Delhi railway stations of theIndian Railways. The Line also connects with theAirport Express Line atNew Delhi metro station.Chawri Bazar metro station is the second deepest station of the Delhi Metro network and is situated about 25 metres (82 ft) below ground level and has 18 escalators.

History

[edit]

The Vishwa Vidyalaya to Kashmere Gate section was the firstunderground section of Delhi Metro to be completed and became operational for public. Prime MinisterManmohan Singh inaugurated this 4 km (2.49 mi) stretch on 19 December 2004.

The following dates represent the dates the section opened to the public, not the private inauguration.

Yellow Line
PhaseExtension dateTerminiLengthStations
I20 December 2004Vishwa VidyalayaKashmere Gate4.06 kilometers (2.52 mi)4
3 July 2005Kashmere GateCentral Secretariat6.62 kilometers (4.11 mi)6
II4 February 2009Vishwa VidyalayaJahangirpuri6.38 kilometers (3.96 mi)5
21 June 2010HUDA City CentreQutab Minar15.82 kilometers (9.83 mi)9
26 August 2010Chhatarpur[2]1
3 September 2010Central SecretariatQutab Minar[3]11.76 kilometers (7.31 mi)9
III10 November 2015JahangirpuriSamaypur Badli[4]4.38 kilometers (2.72 mi)3
TotalSamaypur BadliHUDA City Centre49.02 kilometers (30.46 mi)37

Stations

[edit]
Main article:List of Delhi Metro stations
Yellow Line
#Station NameOpeningInterchange ConnectionStation LayoutPlatform Level Type
EnglishHindi
1Samaypur Badliसमयपुर बादली10 November 2015Badli Railway stationElevatedSide
2Rohini Sector 18, 19रोहिणी सेक्टर १८ – १९10 November 2015NoneElevatedSide
3Haiderpur Badli Morहैदरपुर बादली मोड़10 November 2015Magenta Line
(Phase 4 – Under Construction)
ElevatedIsland
4Jahangirpuriजहाँगीरपुरी4 February 2009NoneElevatedSide
5Adarsh Nagarआदर्श नगर4 February 2009Adarsh Nagar Railway stationElevatedSide
6Azadpurआज़ादपुर4 February 2009Pink Line
Magenta Line
(Phase 4 – Under Construction)
ElevatedSide
7Model Townमॉडल टाउन4 February 2009NoneElevatedSide
8GTB Nagarगुरु तेग बहादुर नगर4 February 2009NoneUndergroundSide
9Vishwavidyalayaविश्वविद्यालय20 December 2004NoneUndergroundSide
10Vidhan Sabhaविधान सभा20 December 2004NoneUndergroundSide
11Civil Linesसिविल लाइन्स20 December 2004NoneUndergroundSide
12Kashmere Gateकश्मीरी गेट20 December 2004Red Line
Violet Line
Kashmere Gate ISBT
UndergroundIsland
13Chandni Chowkचाँदनी चौक3 July 2005Delhi Junction Railway stationUndergroundIsland
14Chawri Bazarचावड़ी बाज़ार3 July 2005NoneUndergroundIsland
15New Delhiनई दिल्ली3 July 2005Airport Express
Green Line
(Phase 4 – Under Construction)
New Delhi Railway Station
UndergroundIsland
16Rajiv Chowkराजीव चौक3 July 2005Blue LineUndergroundIsland
17Patel Chowkपटेल चौक3 July 2005NoneUndergroundIsland
18Central Secretariatकेन्द्रीय सचिवालय3 July 2005Violet LineUndergroundSide
19Udyog Bhawanउद्योग भवन3 September 2010NoneUndergroundIsland
20Lok Kalyan Margलोक कल्याण मार्ग3 September 2010NoneUndergroundIsland
21Jor Baghजोर बाग़3 September 2010NoneUndergroundIsland
22Dilli Haat – INAदिल्ली हाट आईएनए3 September 2010Pink LineUndergroundIsland
23AIIMSएम्स3 September 2010NoneUndergroundIsland
24Green Parkग्रीन पार्क3 September 2010NoneUndergroundIsland
25Hauz Khasहौज़ ख़ास3 September 2010Magenta LineUndergroundIsland
26Malviya Nagarमालवीय नगर3 September 2010NoneUndergroundIsland
27Saketसाकेत3 September 2010NoneUndergroundIsland
28Qutab Minarक़ुतुब मीनार21 June 2010NoneElevatedSide
29Chhatarpurछत्तरपुर26 August 2010Golden Line
(Phase 4 – Under Construction)
ElevatedSide
30Sultanpurसुल्तानपुर21 June 2010NoneElevatedSide
31Ghitorniघिटोरनी21 June 2010NoneElevatedSide
32Arjan Garhअर्जन गढ़21 June 2010NoneElevatedSide
33Guru Dronacharyaगुरु द्रोणाचार्य21 June 2010NoneElevatedSide
34Sikanderpurसिकन्दरपुर21 June 2010 Rapid Metro ElevatedSide
35MG Roadएम जी रोड21 June 2010NoneElevatedSide
36IFFCO Chowkइफ़्को चौक21 June 2010NoneElevatedSide
37Millennium City Centre Gurugramमिलेनियम सिटी सेंटर गुरुग्राम21 June 2010NoneElevatedSide

Gurugram Metro Plan

[edit]

The Haryana Mass Rapid Transit Corporation (HMRTC) has plans to establish a metro network spanning 188 kilometers in Gurugram.

Gurugram Metro Rail Limited (GMRL) will be responsible for constructing, maintaining, and operating this metro line, similar to the Delhi Metro Rail Corporation. Currently, all these lines will be developed in the first phase, with further expansion planned in the second/upcoming phase.

Gurugram Metro Network Plan
Name of RouteRoute Length (km)Starting StationTerminal StationConstruction StartConstruction End
Millennium City Center to Cyber City28.5Millennium City CenterCyber CityDecember 2024August 2027
Rezang La Chowk to Dwarka Sector 217Rezang La ChowkDwarka Sector 21December 2024August 2027
Faridabad to Vatika Chowk37FaridabadVatika ChowkDecember 2024August 2027
Vatika Chowk to Pachgaon KMP Interchange31Vatika ChowkPachgaon KMP InterchangeDecember 2024August 2027
Bhondsi to Daulatabad Dwarka Expressway via Railway Station23BhondsiDaulatabad Dwarka ExpresswayDecember 2024August 2027
Golf Course Extension Road to Sector 514Golf Course Extension RoadSector 5December 2024August 2027
Kherki Daula Dwarka Expressway Cloverleaf to Sector 11117Kherki Daula Dwarka Expressway CloverleafSector 111December 2024August 2027
Manesar to samalkha Kapasahera Road via New Colony Mor, Sadar Bazar, Old Delhi Gurgaon Road30ManesarSamalkha Kapasahera RoadDecember 2024August 2027
Total System Length188

Train info

[edit]
Yellow Line
RakesMitsubishiHyundai RotemBEMLBombardier
Train Length8
Train Gauge5 ft 6 in (1,676 mm)broad gauge
Electrification25 kV, 50 HzAC throughoverhead catenary
OHE
Train's Maximum Speed100 km/h
Train OperationSamaypur Badli - Millenium City Centre Gurugram

Vishwavidyalaya - Millenium City Centre Gurugram

Future extensions

[edit]

In the Phase-V of the Yellow Line of Delhi Metro will be extended to the following:

See also

[edit]

References

[edit]
  1. ^"Route map".delhimetrorail.com. Retrieved23 August 2021.
  2. ^"Chattarpur station to open today".The Times of India. 26 August 2010.Archived from the original on 3 November 2012. Retrieved26 August 2010.
  3. ^"Metro to bridge Delhi-Gurgaon divide today".The Hindu. Chennai, India. 3 September 2010. Retrieved3 September 2010.
  4. ^"The Jahangirpuri- Samaypur Badli section (Extension of Line-2)". Delhi Metro. Retrieved9 November 2015.
  5. ^"बादली-सिरसपुर मेट्रो कॉरिडोर की डीपीआर तैयार, छह महीने से सरकार से मंजूरी का इंतजार".Navbharat Times (in Hindi). Retrieved8 September 2024.

External links

[edit]
Lines
Red Line 1
Yellow Line 2
Blue Line 3/4
Main Line 3
Branch Line 4
Green Line 5
Main Line
Branch Line
Violet Line 6
Airport Express
Pink Line 7
Magenta line 8
Grey line 9
Yellow Line
Depot(s)
  • Siraspur, Khyber Pass & Sultanpur
Railways in Northern India
National network/
trunk lines
Branch lines/
sections
Urban and suburban
rail transport
Heritage railways
Monorails
Defunct lines
Manufacturing units
and workshops
Railway companies
See also
Suburban
rail
Operational
Under
construction
Planned
Proposed
Rapid
transit
Operational
Under
construction
Proposed
Monorail
Operational
Proposed
Cancelled
Metrolite
Planned
Proposed
Cancelled
Tram
Operational
Defunct
Retrieved from "https://en.wikipedia.org/w/index.php?title=Yellow_Line_(Delhi_Metro)&oldid=1322910358"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp