Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Wenhualu station

Coordinates:40°04′44″N116°20′10″E / 40.07895°N 116.336061°E /40.07895; 116.336061
From Wikipedia, the free encyclopedia
Beijing Subway station under construction
‹ ThetemplateInfobox station is beingconsidered for merging. ›
Wenhualu

文华路
Beijing Subway
Exit A under construction (August 2025)
Chinese name
Simplified Chinese文华路站
Traditional Chinese文華路站
Transcriptions
Standard Mandarin
Hanyu PinyinWénhuá Lù zhàn
General information
LocationWest side of the intersection of Huilongguan West Street (回龙观西大街) and Wenhua Road (文华路),Longzeyuan Subdistrict
Changping District,Beijing
China
Coordinates40°04′44″N116°20′10″E / 40.07895°N 116.336061°E /40.07895; 116.336061
SystemBeijing Subway station
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line     Line 18
Platforms3 (1island platform and 1side platform)
Tracks3
Construction
Structure typeUnderground
AccessibleYes
History
OpenedLate-2025 (expected)[1]
Services
Preceding stationBeijing SubwayFollowing station
Huilongguan Xidajie
towardsMalianwa
Line 18Huilongguan Dongdajie
Location
Wenhualu is located in Beijing
Wenhualu
Wenhualu
Location in Beijing

Wenhualu station (simplified Chinese:文华路站;traditional Chinese:文華路站;pinyin:Wénhuá Lù zhàn) is a futurestation onLine 18 of theBeijing Subway. It is expected to open in late 2025.

Location

[edit]

The station is located under the west side of the intersection of Huilongguan West Street and Wenhua Road inLongzeyuan Subdistrict inChangping District.[2]

Station features

[edit]

The station will have an undergroundisland platform.

Exits

[edit]

The station will have 4 exits,[3] lettered A, B, C and D. Exits B2 and C2 are cancelled.[3][4]

History

[edit]

On September 26, 2023, the main structure of the station was topped out.[5]

On March 20, 2025, the Beijing Municipal Commission of Planning and Natural Resources announced the naming plan for the expansion and upgrading project of Line 13, and planned to name the station as Wenhualu.[2]

References

[edit]
  1. ^"本市加快谋划第三轮回天行动计划" [The city is accelerating the planning of the third round of the Huilongguan-Tiantongyuan Action Plan]. 2025-05-07. Retrieved2025-06-14.后厂村至天通苑东段的8座站点预计年底具备初期运营条件。今年底,回天地区轨道交通站点将增至20座,线路增至6条,将大幅缩短区域出行时间 [The eight stations from Houchangcun to Tiantongyuandong are expected to be ready for initial operation by the end of the year. By the end of this year, the number of rail transit stations in the Huilongguan-Tiantongyuan area will increase to 20 and the number of lines will increase to 6, which will significantly shorten regional travel time.]
  2. ^ab"关于轨道交通13号线扩能提升工程车站命名预案的公示(公示期限7天)" [Publicity on the naming plan for the station of Metro Line 13 capacity expansion and upgrading project (publicity period 7 days)] (in Simplified Chinese). 2025-03-20. Archived fromthe original on 2025-03-20. Retrieved2025-06-09.
  3. ^ab"追溯ID:4186".Huilongguan District Online 12345 (in Simplified Chinese). Archived fromthe original on 2025-06-14. Retrieved2025-06-14.新建文华路站,规划设出入口四个。原规划C2出口位于文华路和回龙观大街交叉口东南象限,经实际勘探,由于C2出口结构与创客广场地下停车场结构冲突,征求过创客广场意见,方案不可行;C2出入口结构施工需穿越地下污水管线,改移1.6米X1.9米电力方沟(内含多家用户高压电缆),拆除DN200中压燃气管线以及拆除中压燃气A4箱,施工难度极大,危险性极高,故取消C2出口 [The new Wenhua Lu Station is planned to have four entrances and exits. The original planned Exit C2 is located in the southeast quadrant of the intersection of Wenhua Road and Huilongguan Street. After actual exploration, the Exit C2 structure conflicts with the structure of the underground parking lot of the Chuangke Plaza. After consulting the Chuangke Plaza, the plan is not feasible; the construction of the Exit C2 structure needs to cross the underground sewage pipeline, relocate the 1.6m x 1.9m power square trench (containing high-voltage cables of multiple users), remove the DN200 medium-pressure gas pipeline and the medium-pressure gas A4 box. The construction is extremely difficult and dangerous, so Exit C2 is cancelled.]
  4. ^Huilongguan Community Network (2024-03-26)."地铁13号线文华路站取消B2出入口" [Subway Line 13 Wenhua Lu Station cancels Exit B2] (in Simplified Chinese). Archived fromthe original on 2025-03-29. Retrieved2025-06-09.因此,取消文华路站B2出入口,现规划为A、B1、C1、C2和D [Therefore, Exit B2 of Wenhua Lu Station is cancelled and the current planning is A, B1, C1, C2 and D]
  5. ^"北京地铁13号线扩能提升工程 全线首个车站文华路站主体结构今天封顶" [Beijing Metro Line 13 Capacity Expansion and Improvement Project: The main structure of Wenhualu Station, the first station on the entire line, was capped today] (in Simplified Chinese). 2023-09-26. Retrieved2025-06-09.

External links

[edit]
Line 18
Stations that are unopened, disused, proposed, under planning or under construction are shown initalics.
Retrieved from "https://en.wikipedia.org/w/index.php?title=Wenhualu_station&oldid=1323508622"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp