Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Vancouver Downtown Historic Railway

From Wikipedia, the free encyclopedia
"Olympic Line" redirects here. For the railway in Sydney, seeOlympic Park railway line.

Rail line
Vancouver Downtown Historic Railway
Streetcar No.1207
Overview
StatusIndefinitely suspended
OwnerCity of Vancouver
Service
TypeHeritage streetcar, seasonal
Services1
Operator(s)Transit Museum Society
History
OpenedJuly 29, 1998
ClosedOctober 2011
Technical
Track gauge1,435 mm (4 ft 8+12 in)
Old gauge4 ft 8+12 in (1,435 mm)
Electrification600 V DC
Map of Vancouver Downtown Historic Railway

Granville Island
Alder Crossing
Moberly Road
Leg-in-Boot
W 1st Avenue
Columbia Street
Ontario Street
Science World
This diagram:

TheVancouver Downtown Historic Railway was a heritage electric railway line that operated from 1998 to 2011 betweenGranville Island andScience World (Olympic Village Station after 2009), inVancouver, British Columbia, Canada. It operated only on weekends and holidays, usually from May to mid-October, and was aimed primarily at tourists. Two restoredinterurban trams were used on the line, which used a former freight railway right-of-way.

The line was owned by the City of Vancouver. The cars were operated by volunteers from theTransit Museum Society. The car shown (1207) was privately owned. By 2018 both tram cars (1207 and 1231) have been donated and moved to theFraser Valley Heritage Railway inCloverdale.

Heritage service

[edit]

Service was inaugurated on July 29, 1998, and was considered to be a demonstration project for a modern downtownstreetcar system that the city plans to develop.[1] It continued to operate almost every summer through 2011, as an excursion-oriented historic electric railway line. In 2010, the heritage service did not operate, with the line from west of Olympic Village used for a modern-streetcar demonstration service known as the "Olympic Line" (seesection below). Temporary modifications made to theoverhead wire took longer than expected to undo, delaying the start of 2011 service, with the service starting on July 1 and scheduled to run mid-October.[2] The line did not operate in 2012,[3] and service suspended indefinitely due to financial constraints with no set plans to resume operation.[4] Furthermore, a Vancouver City Council report published in March 2014 recommended against reviving service on the heritage line.[5]

When last operational in 2011, the line ran fromGranville Island toOlympic Village Station, however, Olympics-related construction razed the section of line east of theCambie Bridge.

Fleet of heritage railcars

[edit]
Make/ModelDescriptionFleet sizeYear builtYear retiredNotes
Built inNew Westminster,British ColumbiaInterurban car3 - only 1207 remains19051958ex-British Columbia Electric Railway
St. Louis Car CompanyInterurban carOriginally 20; 5 survive - 123119121958ex-British Columbia Electric Railway

The fleet also includes an ex-BrusselsLa Brugeoise et NivellesPCC-style streetcar, painted red and cream.

The line's operator, the Transit Museum Society, also owns a large fleet of vintagebuses andtrolley coaches.

Olympic Line

[edit]
Olympic Line near theOlympic Village station

From January 21 to March 21, 2010,[6] a 1.8-kilometre (1.1 mi) free demonstration service called the "Olympic Line" (named for the2010 Winter Olympics) ran every six minutes, 18 hours a day on the Downtown Historic Railway between Olympic Village station and Granville Island,[6] using two modernBombardier Flexity Outlook streetcars, No. 3050 and No. 3051, leased from theBrussels tram system.[7] The City of Vancouver and the administrators of Granville Island paid $8.5 million for associated upgrades to the infrastructure.

The two stations were single side platforms with two shelters providing partial coverage from the elements. The Olympic Village station shared the parking lot with existing Canada Line station at West 2nd Avenue and Cambie Street. The Granville Island station was only accessible via foot from Anderson Street and Lamey's Mill Road below theGranville Street Bridge andHighway 99.

StationConnectionsLocationNotes
Granville IslandRoute 50 - Waterfront Station - False Creek SouthAnderson Street and Lamey's Mill RoadSingle sided platform with shelters
Olympic VillageCanada Line
Route 15 Cambie - Olympic Village Station

Route 50 - Waterfront Station - False Creek South

Route 84 - VCC–Clark Station - UBC

West 2nd Avenue and Cambie StreetSingle sided platform with shelters. Shared parking withOlympic Village station

The City considered the streetcar demonstration "a tremendous success", with over 550,000 boardings during the two months of the experiment.[8] Bombardier received an award for "Exceptional Performance and Outstanding Achievement" at the 2010 CUTA awards, recognizing its operation of over 13,000 one-way trips with zero equipment failures, zero station delays and zero injuries.[9] Former mayorGregor Robertson indicated a desire to continue operation of the line, with a potential extension toMain Street-Science World station via False Creek South, but mentioned that the city alone lacks the millions of dollars needed to complete the construction and equipment purchases.[10] Nonetheless, a streetcar along the alignment used by the Olympic Line was part of two of the proposals for rapid transit running east–west through the city of Vancouver for 2020.[11]

Proposed future service

[edit]

The proposal for a full-service modern streetcar line would extend the former heritage line throughChinatown andGastown toWaterfront Station, and eventually toStanley Park. There would be a separate line intoYaletown with longer-term potential for a number of other lines.

On October 13, 2014, Emily Jackson, writing inMetro Vancouver Newspaper, reported that Friends of the Olympic Line called onVancouver City Council to commit $5 million to incorporate a refurbished line into Vancouver's transit authority.[note 1]The organization has called for the line to be extended toMain Street–Science World Station. The city has allocated $400,000 to decommission the line's former route.

In a 2021 report a two line light rail network (12 km and 25 stations) using most of the old route of the heritage line as well as new routing was estimated to be in the $1.1 billion range.[13]


See also

[edit]

Notes

[edit]
  1. ^Beginning in the fall of 2014, Friends of the Olympic Line / Vancouver Civic Railway established a Facebook page, and later a web site (VCRail.ca) to outline a proposal, based on discussions with stake holders, and particularly in response to the Granville Island 2040 presentation. Productive talks with private investors during 2017 have gone very well, and City of Vancouver Engineering Department and TransLink have become part of the conversation. The proposal calls for modern fully accessible replica streetcars, possibly different models representing different eras of streetcars that operated in Vancouver. Resumption of service on Phase 0 (Granville Island to Cambie St.) is expected by spring of 2020.[12]

References

[edit]
  1. ^Ward, Doug (July 7, 1998). "Electric streetcar launches revival of historic service".The Vancouver Sun.
  2. ^Tramways & Urban Transit. UK: LRTA Publishing. September 2011. p. 369.{{cite magazine}}:Missing or empty|title= (help)
  3. ^Tramways & Urban Transit. UK: LRTA Publishing. September 2012. p. 356.{{cite magazine}}:Missing or empty|title= (help)
  4. ^"Downtown Historic Railway". Archived fromthe original on July 31, 2013.
  5. ^Robinson, Matthew (March 23, 2014)."Vancouver's streetcar service a costly 'novelty' marred by problems: report".The Vancouver Sun. RetrievedAugust 24, 2014.
  6. ^ab"Vancouver's free streetcar makes first run to Granville Island".CBC News. January 21, 2010. RetrievedAugust 30, 2014.
  7. ^"Vancouver's 2010 Streetcar". Bombardier. RetrievedJune 10, 2009.Connecting Granville Island, a key entertainment centre for the 2010 Winter Games, and the Olympic and Paralympic Village Vancouver, the Olympic Line streetcar service will extend Vancouver's regional transit network along False Creek during 60 days of celebration before and during the 2010 Winter Games.
  8. ^"Olympic Line ridership". City of Vancouver. August 13, 2010. RetrievedAugust 25, 2010.
  9. ^"Bombardier Wins Award for the Olympic Line — Vancouver's 2010 Streetcar" (Press release). Benzinga. May 18, 2010. RetrievedJune 16, 2010.
  10. ^Bailey, Ian (February 25, 2010)."Robertson Sees Momentum for Transit Funding".The Globe & Mail. RetrievedJune 16, 2010.
  11. ^"Rapid Transit Alternatives". Translink. Archived fromthe original on September 19, 2010. RetrievedJune 16, 2010.
  12. ^Jackson, Emily (October 13, 2014)."Streetcar enthusiasts lobby Vancouver politicians for Olympic Line".Metro Vancouver Newspaper.Archived from the original on October 18, 2014. RetrievedOctober 17, 2014.The group called Friends of the Olympic Line is calling on politicians from all parties to commit $5 million to re-animate the line known as both the Downtown Historic Railway and the Olympic Line.
  13. ^Chan, Kenneth (September 16, 2021)."12-km-long streetcar network in downtown Vancouver and False Creek to cost $1 billion: city report".Urbanized.

External links

[edit]
Wikimedia Commons has media related toGranville Island - Science World heritage streetcar.
Intercity
Sightseeing
Commuter rail
Urban rail
Under construction
Planned
Cancelled or closed
Streetcar
Railbus
People mover
Heritage tramways
See also
Current
British Columbia
Alberta
Manitoba
Ontario
Québec
Yukon
Defunct
Retrieved from "https://en.wikipedia.org/w/index.php?title=Vancouver_Downtown_Historic_Railway&oldid=1293781994"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp