Usk Railway Bridge

Coordinates:51°35′28″N2°59′40″W / 51.59113°N 2.99453°W /51.59113; -2.99453
From Wikipedia, the free encyclopedia

Bridge in Newport
Great Western Railway Usk bridge
First Great WesternHigh Speed Train crossing the River Usk.
Coordinates51°35′28″N2°59′40″W / 51.5911°N 2.9945°W /51.5911; -2.9945
CarriesRailway
CrossesRiver Usk
LocaleNewport
OwnerNetwork Rail
Maintained byNetwork Rail
Rail characteristics
No. oftracks4
Track gauge1,435 mm (4 ft 8+12 in)
Electrified25 kV 50 Hz ACOHLE
Location
Map

TheUsk Railway Bridge is a railway viaduct inNewport city centre,Wales. It crosses theRiver Usk in an east—west direction, carrying theGreat Western Main Line.

The original bridge was constructed for theSouth Wales Railway and designed by the accomplished railway engineer,Isambard Kingdom Brunel. Brunel's viaduct, which was primarily constructed ofcreosote-treatedtimber, suffered a catastrophic fire near completion, resulting substantial delay and its rebuilding. The redesigned structure used considerably morewrought iron in place of wood, and included the first use of the now-common bow-string-shaped girder. This first bridge was opened to traffic during 1850.

During the late 1880s, a second bridge was constructed alongside the first, which benefitted from a simpler design in comparison to the first. During the 1910s, the second bridge was extended to accommodate a quadruple track configuration, enabling the original bridge to be retired during 1925. During 2019, the lines across the second bridge wereelectrified as part of the21st Century upgrade of the Great Western Main Line.

History

[edit]

Origins and predecessors

[edit]

The origins of the Great Western Railway Usk bridge are closely connected with the early history of theGreat Western Railway (GWR) and its renowned chief engineer,Isambard Kingdom Brunel.[1] The directors of the GWR had resolved to construct a trunk route betweenLondon andSwansea, running though various cities and major settlements in between. During the 1840s, Brunel, who had been put in charge of surveying and selecting the line's route, arrived in Newport for the purpose of planning how theSouth Wales Railway would traverse various geographic challenges, which included a means of carrying the line across the River Usk.[1]

Brunel decided that aviaduct would be the optimal means of crossing the river and designed such a structure.[1] Possessing eleven spans and stretching to a length of 1,200 ft, this viaduct was largely composed oftimber, which was treated withcreosote under pressure as to sufficiently weather-proof them against the prevailing conditions of the location. Construction work commenced during 1846.[1] The total cost of the viaduct's construction reportedly exceeded £20,000.[2] However, its extensive use of wood heavily contributed to the bridge's destruction just prior to completion. On 31 May 1848, as the final arch was being put into place, a heatedbolt used torivet a beam together ignited the flammable creosote; within the space of six minutes, a catastrophic fire had spread across the whole structure, setting the opening back by years.[1]

Brunel swiftly redesigned the bridge explicitly to prevent any recurrence of fire.[1] Recognising that starting from scratch would set the line's completion back even longer, he decided to incorporate the remaining structural elements into the new bridge. While some elements continued to use wood,wrought iron plates and girders were also adopted; the remaining wooden elements were subject to a different treating method, known aschyanizing.[1] In his redesign of the bridge, Brunel effectively invented the now-common bow-string-shaped girder to replace several of the wooden sections originally used.[2]

By 1850, the Usk railway bridge was effectively complete, and the first trains crossed the structure that same. It would be in service for exactly 75 years, being retired during 1925 and dismantled soon thereafter, having been replaced by a newer bridge alongside.[1]

Current bridge

[edit]

In 1888, the original bridge was supplemented with a second one, which was made largely of stone. Its deck, made of metal, made use of alattice, or criss-crossing, design to enable the supporting girders to resist bending forces; it was considered to be of a simpler and more routine design than its predecessor.[1] By 1911, the second bridge had been widened to accommodate the running of four lines across its deck, in anticipation of the first bridge's retirement. During 2019, the tracks across the second bridge wereelectrified as part of the21st Century upgrade of the Great Western Main Line.[3] For several years prior, the bridge was subject to preparatory and improvement works to renew the structure, which included numerous repairs and all exterior surfaces being repainted during temporary closures.[4]

Citations

[edit]
  1. ^abcdefghiWade, Martin (6 May 2016)."The Long View: How Newport's vital crossings were built".Telegraph & Argus.
  2. ^ab"Timber Railway Viaducts in Wales". engineering-timelines.com. Retrieved16 August 2020.
  3. ^"Electrifying the south Wales mainline – an important rail route linking major towns and cities". Network Rail. Retrieved16 August 2020.
  4. ^"Railway upgrade will improve Newport viaduct". Network Rail. Retrieved5 October 2017.

External links

[edit]
Wikimedia Commons has media related toGWR Usk railway bridge.
Crossings of theRiver Usk,Newport,South Wales, north to south
Railways
Railway stations
Bridges and viaducts
Tunnels and earthworks
Ships, harbours and waterways
Other engineering and building
Personal
Legacy and commemoration

51°35′28″N2°59′40″W / 51.59113°N 2.99453°W /51.59113; -2.99453

Retrieved from "https://en.wikipedia.org/w/index.php?title=Usk_Railway_Bridge&oldid=1193507568"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp