Union Station (Toronto)

Coordinates:43°38′40″N79°22′49″W / 43.64444°N 79.38028°W /43.64444; -79.38028
From Wikipedia, the free encyclopedia
Railway station in Toronto, Ontario, Canada
This article is about the railway station. For the adjacent subway station of the same name, seeUnion station (TTC). For the adjacent bus station, seeUnion Station Bus Terminal.
"Toronto Union Station" redirects here. For other uses, seeToronto Union Station (disambiguation).

‹ ThetemplateInfobox station is beingconsidered for merging. ›
Union Station
Eastward view along the Front Street facade
General information
Location65 Front Street West
Toronto, Ontario
Canada
Coordinates43°38′40″N79°22′49″W / 43.64444°N 79.38028°W /43.64444; -79.38028
Owned by
Operated by
LineUnion Station Rail Corridor
Platforms1side platform, 11island platforms
Tracks16
Connections
Construction
Structure typeElevated
ParkingNo
Bicycle facilities115 spaceparking station[1]
AccessibleYes
ArchitectRoss and Macdonald
Architectural styleBeaux-Arts
Other information
StatusStaffed station
Station code
IATA codeYBZ
Fare zone02
Websitetorontounion.ca
History
OpenedAugust 6, 1927; 98 years ago (1927-08-06)
Rebuilt1970s, 2009–2021
Passengers
20122.91 million Increase 0.5% (Via)
201569.5 million Increase 1.9% (GO Transit)
Services
Preceding stationVia RailFollowing station
Washago
towardVancouver
TheCanadianTerminus
Malton
towardSarnia
Sarnia–Toronto
Oakville
towardWindsor
Windsor–Toronto
Oakville
towardNew York
Maple Leaf
TerminusToronto–MontrealGuildwood
towardMontreal
Toronto–OttawaGuildwood
towardOttawa
Preceding stationGO TransitFollowing station
Downsview ParkBarrieTerminus
Bloor
towardsKitchener
Kitchener
Bramalea
towardsKitchener
Kitchener
(express)
Kipling
towardsMilton
Milton
ExhibitionLakeshore West
ClarksonLakeshore West
(peak express)
ExhibitionLakeshore West
(off-peak express)
TerminusLakeshore EastDanforth
towardsOshawa
Lakeshore East
(express)
Pickering
towardsOshawa
StouffvilleKennedy
towardsOld Elm
Richmond HillOriole
Preceding stationMetrolinxFollowing station
BloorUnion Pearson ExpressTerminus
Former services
Preceding stationAmtrakFollowing station
Malton
(1990–2004)
towardChicago
InternationalTerminus
Oakville
(1982–1990)
towardChicago
Preceding stationOntario Northland RailwayFollowing station
Washago
towardCochrane
NorthlanderTerminus
Preceding stationVia RailFollowing station
St. Clair Avenue
towardVancouver
Super ContinentalTerminus
Preceding stationCanadian National RailwayFollowing station
Sunnyside
towardSarnia
Grand Trunk Railway
Main Line
Danforth
towardMontreal
Riverdale
(closed 1932)
towardMontreal
SunnysideNiagara FallsToronto
Local stops
Terminus
Parkdale
towardNorth Bay
North BayToronto
Parkdale
towardSarnia
SarniaToronto
via Lucan Crossing
TerminusCapreolTorontoDon
towardCapreol
CNoRTorontoCobourg
Removed 1920s
Don
towardCobourg
TorontoBelleville via PeterboroDanforth
Toronto
Port Hope via Peterboro
Danforth
towardPort Hope
Preceding stationCanadian Pacific RailwayFollowing station
Parkdale
towardDetroit
DetroitMontrealDon
TerminusTorontoMontreal viaPeterboro
Parkdale
towardSudbury
SudburyTorontoTerminus
ParkdaleOwen SoundToronto
Sunnyside
towardHamilton
HamiltonToronto
Future services[2]
Preceding stationOntario Northland RailwayFollowing station
LangstaffNorthlander
(reopening mid-2020s)
Terminus
Official nameUnion Station (Canadian Pacific and Grand Trunk) National Historic Site of Canada
Designated1975
Designated1989
Official nameUnion Station Heritage Conservation District
Designated2006
Location
Union Station is located in Toronto
Union Station
Union Station
Location in Toronto
Show map of Toronto
Union Station is located in Southern Ontario
Union Station
Union Station
Location in Southern Ontario
Show map of Southern Ontario
Union Station is located in Ontario
Union Station
Union Station
Location in Ontario
Show map of Ontario
Union Station is located in Canada
Union Station
Union Station
Location in Canada
Show map of Canada

Union Station is a majorrailway station and intermodaltransportation hub inToronto, Ontario, Canada. The station is located indowntown Toronto, onFront Street West, on the south side of the block bounded byBay Street and York Street. Themunicipal government of Toronto owns the station building while the provincial transit agencyMetrolinx owns thetrain shed and trackage. It is operated by the Toronto Terminals Railway, a joint venture of theCanadian National Railway andCanadian Pacific Railway, which directs and controls train movement along the Union Station Rail Corridor, the largest and busiest rail corridor in Canada. Constructed in 1927, Union Station has been aNational Historic Site of Canada since 1975,[3][4] and aHeritage Railway Station since 1989.[5]

Its central position in Canada's busiestinter-city rail service area, "The Corridor", as well as being the central hub of GO Transit's commuter rail service, makes Union Station Canada's busiest transportation facility andthe second-busiest railway station in North America (behindNew York Penn Station), serving over 72 million passengers each year. More than half of all Canadian inter-city passengers and 91 percent of Toronto commuter train passengers travel through Union Station.[6][7]

Via Rail andAmtrak provide inter-city train services whileGO Transit operates regional rail services. The station is also connected to thesubway andstreetcar system of theToronto Transit Commission (TTC) at its adjacentnamesake subway station. GO Transit'sUnion Station Bus Terminal, located inCIBC Square, is connected to Union Station by a 40-metre (130 ft)enclosed walkway above Bay Street. TheUnion Pearson Express, which provides train service toToronto Pearson International Airport, has a platform a short walk west of the main station building, accessible by theSkyWalk.[8]

Site location

[edit]
Union Station is located onFront Street between York andBay Street.

Toronto's Union Station is located at 61 Front Street West, between Bay and York Streets in Toronto's business district, withToronto's Entertainment District beginning across Bay Street. It is roughly at the city's east-west centre. It is also close toLake Ontario, which marks Toronto's southern boundary. The southernmost part of theGardiner Expressway, which lies between Union Station and Lake Ontario, provides easy core access to GO Transit buses. Union Station's columned façade and main entrance faces north, towards downtown Toronto. TheFairmont Royal York Hotel, a former railway hotel, is directly across Front Street from Union Station and can be accessed from the station both at street level and via an underground passageway calledPath. TheDominion Public Building, another building from the same era, is just to the east of the station, at the corner of Front and Bay Streets.

Other major buildings near Union Station areTelus Tower,Royal Bank Plaza, andBrookfield Place. Brookfield Place is home to the Allen Lambert Galleria, a six story high pedestrian thoroughfare, as well as theHockey Hall of Fame, which holds theStanley Cup.

Scotiabank Arena,Rogers Centre,Metro Toronto Convention Centre, and theCN Tower are all close by, and are visible from some parts of the station. Like Union Station, these structures were built on formerRailway Lands. All of them can be accessed directly from Union Station via the Skywalk. The land around the CN Tower has been converted to a public park. Union Station will soon be linked via a Path bridge on the east side to the Backstage Condominium building at the corner of Esplanade and Yonge Street.

Structure

[edit]

Toronto's Union Station is Canada's largest and most opulent railway station. The Montreal architecture firm ofRoss and Macdonald designed the building in theBeaux-Arts style as a joint venture between the Grand Trunk Railway and the Canadian Pacific Railway, with help from CPR architect Hugh Jones and Toronto architectJohn M. Lyle. In 1975, the Historic Sites and Monuments Board of Canada cited its design as being of "national architectural significance as one of the finest examples of Beaux-Arts railway station design in Canada".[9]

The bilaterally symmetrical building comprises three connecting box masses facing Front Street West, with the main structure in the middle. Together, the three parts measure 752 feet (229 m) long and occupy the entire south side of the block between Bay Street in the east and York Street in the west.[10]

The facade of the Front Street entrance includes 22 colonnaded loggia constructed withlimestone.

The exterior Front Street façade is laid out in an ashlar pattern, constructed with smooth beigeIndiana and Queenston limestone. The colonnaded loggia which faces Front Street features 22 equally spaced Roman Tuscan columns made from Bedford limestone, each 40 feet (12 m) high and weighing 75 tons. Fourteen three-storey bays, each with severely delineated fenestration, form the façade on either side of the central colonnade for a total of 28 bays.[10] The structures at either end have an additional ten bays. Three rectangular windows fill each bay, lighting the interior hall with plenty of natural light. However, the building's external profile is hard and flat, with a line of huge columns, heavy ornamentation and strong symmetry.

The recessed main entrance is framed by two sets of four columns, with relief wreaths carved into the entablature above the columns. These columns are composed of three separate segments on top of an incongruous octagonal plinth, implying anIonic order orCorinthian order; however, the capital is sculpted in aDoric order. Consequently, these columns appear to be unfinished. The original plan for the columns is not known.

A wraparound dentil cornice and a recessed peaked hipped roof creates the illusion of a flat roof, just like a palazzo. On either side of the main entrance, a blind arch with an ornamental keystone contains a set of three steel-framed doors, along with a large arched window. Decorative friezes separate the arched window from the doors. When these entryway elements are combined, they create a processional experience through the entryway into the grand interior space. The flat-roof illusion, together with the axial symmetry, classical detailing in both structural and decorative elements, heavy ornamentation, and formal setting is typical of the Beaux-Arts style.[11]

The station housed a gun range on the seventh floor from 1927 until 2008. The range was operated for "Canadian Pacific Railway and Canadian National Railway police to practice their shooting skills. It eventually opened to members of the public". It was known as the Canadian National Recreation Association (CNRA) handgun club. The city closed the range in 2008 as a symbolic gesture to its effort to reduce gun violence.[12]

Great Hall and Via Concourse

[edit]

The front entranceway opens on to the expansive Ticket Lobby, informally known as the "Great Hall". This part of Union Station runs the entire length of the main section. It is 250 feet (76 m) long and 88 feet (27 m) high at its highest point. Like the outside facade, enduring materials such as bronze, limestone, marble, tiles, and translucent glass create a sense of enduring quality.[10]

Union Station's ticket lobby, or "Great Hall", is lit with diffused natural light fromclerestory windows throughout the lobby.

The entire space is lit with diffused natural light fromclerestory windows refracted throughout the lobby. Each end of the Great Hall also features four-storey tall arched windows, based on those of Roman baths.[10]

The two-storey-high vaulted ceiling, which is what makes it look from the front as though a second building were rising behind the colonnade, is made of cofferedGuastavino tiles.[13] The walls are faced with Zumbro stone from Missouri, and the floors are constructed ofTennessee marble laid in a herringbone pattern. Below the cornice surrounding the "Great Hall" are carved the names of many Canadian destinations, from the east coast to Vancouver, accessible by the Grand Trunk Railway or Canadian Pacific Railway at the time of the station's construction. Many remain destinations on Via Rail routes.

While historically shared by many different services, the Great Hall is now occupied primarily by Via Rail, whose agents also provide services toAmtrak passengers. The hall is home to Via's ticket and baggage desks,business class lounge, and several small displays, as well as the station's grand clock, aTraveller's Aid desk, and Via's departure board.

GO concourses and teamways

[edit]
The old Bay Concourse (circa 2009) which was in service from 1978 to 2015
Connections withGO Transit services can be accessed through the York Concourse.

Passengers can connect with GO Transit services through the 62,000 sq ft (5,800 m2) York Concourse, which opened on April 27, 2015, west of Union Station. This new concourse supplemented the York South Concourse that provided access to platforms 24 to 27.[14][15] The York and York South Concourses connect to the York East Teamway, as well as an entrance to a Path tunnel leading across Front Street, between York Street and University Avenue.[16] The York West Teamway is connected to Union Station via the Skywalk.[15]

Historically, the 3,700-square-metre (40,000 sq ft) Bay Street Concourse was the hub of GO Transit operations for almost 40 years.[14][17] The Bay Concourse was closed on August 16, 2015, for revitalization.[18][19][1] The new Bay Concourse reopened on July 27, 2021, featuring 72 departure screens, 30 Presto devices, seven ticket vending machines and six self-service Presto reload machines. Both the Bay and York concourses give access to GO train platforms.[20]

The Bay West Teamway provides access to platforms 4 to 13 and the Bay South Concourse.[19] The Bay East Teamway provides indoor access to platforms 4 to 13 directly from theUnion Station Bus Terminal.[21]

As of 2023[update],Metrolinx is constructing the new South Concourse. This will connect the south ends of the Bay, Via and York Concourses, and span between Bay and York Streets. It will also provide access to Union Square and Scotiabank Arena.[22]

Train shed

[edit]
A glass atrium forms the central portion of the train shed.

Trains arrive and depart from thetrain shed, which contains 23 platforms (11 island platforms and one side platform) south of the Great Hall.[23] On May 11, 2009, the last two platforms were opened, platforms 24/25 between tracks 12 and 13 and platforms 26/27 between tracks 13 and 14 on the south side of the train shed.[24] In July 2022,[update] Metrolinx was having platforms 24 to 27 and their three tracks demolished on the south side of the station in order to replace them with two new tracks and two new wider platforms to increase safety and capacity.[25]

The train shed was designed by A. R. Ketterson and built between 1929 and 1930. It is a variation of the Bush train shed invented byLincoln Bush.[26] A reconstruction of the train shed began in January 2010. The east and west sides of the shed, totalling approximately 30,000 square metres (320,000 square feet) were renovated and restored with input fromParks Canada to help preserve its heritage character. This renovation came with plans to have a green roof installed, reducing theurban heat island effect andstormwater runoff; however, with the project being almost eight years behind and multiple times over budget, along with the fact that plant-watering logistics would clash with the planned overhead wiring for electrification, the addition of a green roof was cancelled. The central portion of the original train shed, totalling 5,000 square metres (54,000 square feet), was removed and replaced with a glass atrium. The structure, designed byZeidler Architecture, floats above the tracks and allows daylight to reach the platforms.[27]

Platform 3 is the northernmost platform at Union Station and is the only platform at the station serving just one track. It reopened for service on January 10, 2022, after a renovation of its heritage features. Allowing a lower, lighter shed roof in the age of steam, the smoke vents over tracks 1 and 2 are a preserved heritage feature of the platform 3 area; these were restored. The decorative, cast-iron columns along the platform were restored and reinstalled. Other structural renovations were done along the length of the platform. Once the north tower of the CIBC Square is completed, stair and elevator access will be reinstated between platform 3 and the Bay East Teamway.[23]

Metrolinx media
image iconTrack and platform cross-section at Union station looking west

The 23 platforms are numbered from 3 to 27, but there is no platform 1, 2, 23 or 24. The platforms were renumbered in 2008 for the benefit of operational staff in order to provide a correlation between platform numbers and track numbers. (Prior to the renumbering, the platform numbers had an A or B suffix that proved to be confusing for both customers and operational staff.) Tracks and platforms are each numbered from north to south with track 1 being beside platform 3 on the north side of the train shed. There is an island platform between all pairs of tracks except between tracks 1 and 2 and tracks 11 and 12. Odd numbered platforms are on the north side of a track while even numbered platforms are on the south side of a track. There is a formula to compute the platform number given the track number, with an exception for track 1:[24]

  • The number for the platform on the south side of a track equals two times the track number.
  • The number for the platform on the north side of a track equals two times the track number minus one, except for track 1 where the platform number is set to 3 rather than 1.

Occasionally, freight trains from both Canadian National and Canadian Pacific networks pass through Union Station[28] using two tracks on the south side of the train shed.[29]

West wing and SkyWalk

[edit]

Union Station's west wing is west of the Great Hall.Metrolinx is headquartered in the west wing at 97 Front Street.[15][30] Across from these offices is an official tourism information centre that provides maps, visitor guides, brochures and tourism specialists to provide help to city visitors.[31]

A pathway known as theSkyWalk continues west from the west wing, overtop of York Street. The SkyWalk is considered part of the Path network, and connects Union to theCN Tower andRogers Centre. It is also the location of theUnion Pearson Express station.

History

[edit]

Predecessor stations

[edit]
Further information:Toronto Union Station (1858) andToronto Union Station (1873)
Toronto'ssecond Union Station in 1878, several years after its opening

The current Union Station's history can be traced to 1858, when theGrand Trunk Railway (GTR) opened Toronto'sfirst Union Station west of the present Union Station. The wooden structure was shared with theNorthern Railway and theGreat Western Railway. This structure was replaced by asecond Union Station on the same site, opening in 1873. TheCanadian Pacific Railway began using the facility in 1884 and it was completely rebuilt, opening in 1896.

TheGreat Toronto Fire of 1904 destroyed the block south of Front Street West, immediately east of the second Union Station (bounded by Bay and York streets), but did not damage the station. The GTR acquired this land east of the second Union Station for a new passenger terminal and in 1905 both the GTR and the CPR decided to proceed with the design and construction of a third union station.

Excavations for the third Union Station in 1915, with second Union Station in background

The decision to undertake the third union station was made against a backdrop of significant change in the Canadian railway industry. At the same time, the Government of Canada was encouraging the GTR to build a secondtranscontinental railway (what would become theGrand Trunk Pacific Railway and theNational Transcontinental Railway) and theCanadian Northern Railway was undertaking an aggressive expansion across the prairies and into southern Ontario.

Construction

[edit]
See also:Union Station Rail Corridor

On July 13, 1906, the Toronto Terminals Railway (TTR) was incorporated to "construct, provide, maintain and operate at the City of Toronto aunion passenger station". The TTR was jointly owned by the GTR and the CPR who each held 50% of the TTR shares. The TTR supervised construction of the new station which began in 1914 and proceeded to 1920, having faced significant delays in the shortage of construction material and workers as a result of theFirst World War, as well as the GTR's deteriorating financial position due to its ill-fated transcontinental GTPR railway project.[32]

The resulting construction saw the elimination of Lorne Street located between Simcoe and Bay from Front to Esplanade with tracks leading west of the new station now in place.

Although the new station's headhouse and east and west office wings (the station building visible from Front Street West) were completed in 1920, it did not open to the public for another seven years, until the system of approach tracks was designed and implemented by the TTR and its owners. During this time in 1923, the bankrupt GTR was fullynationalized by the Government of Canada and merged into theCanadian National Railways (CNR), which would assume the GTR's 50% ownership of the TTR and thus the third Union Station.

Opening and further construction

[edit]
Prince George at the opening of Union Station by his brother,Prince Edward, Prince of Wales, on August 6, 1927

Although the station was incomplete, its building was complete and the station was opened byPrince Edward, Prince of Wales, on August 6, 1927,[33] in a ribbon-cutting ceremony, using a pair of gold scissors. In attendance werePrince George,Lieutenant Governor of OntarioWilliam Donald Ross and his wife,Prime Minister of CanadaWilliam Lyon Mackenzie King,Prime Minister of the United KingdomStanley Baldwin and Mrs. Baldwin,Premier of OntarioGeorge Howard Ferguson, and other members of thegovernment of Ontario andgovernment of Canada.[34] Prince Edward was the first person to step off of a train into Union Station; a mixed choir composed of soloists from the city's churches sang the royal anthem, "God Save the King", as the royal party walked through the concourse.[35] Once he was in the Great Hall, the Prince of Wales quipped, "you build your train stations like we build our cathedrals".[36] He was then escorted to a nearbyCanadian National Railwaywicket and was presented with the first ticket issued at the station: one "valid for all time" and "between all stations". He proceeded to theCanadian Pacific Railway's wicket, where he was given a first-class fare from Toronto toHigh River,Alberta, where his ranch was located.[35] Prince George was given similar tickets.[35]

Four days later, the track network was shifted from the second Union Station. To get to trains, passengers would walk from the south doors to the tracks located several hundred feet to the south while the new viaduct, concourse and train shed were under construction.[33] Demolition of the second Union Station began almost immediately and was completed in 1928. The third Union Station project was not fully completed until 1930 when the train shed was completed; its construction was supervised by the TTR from 1925 to 1930.[32]

The TTR also constructed a central heating plant at the corner of York and Fleet streets (now Lake Shore Boulevard West) to replace the original Toronto Hydro plant on Scott Street which had been expropriated by the TTR to build the approach track viaduct to the new station. It was fuelled bycoal delivered by a CNR siding and was the largest such facility in Canada when it opened in 1929; it produced 150,000 kilograms (330,000 lb) of steam per hour and 270,000,000 kilograms (600,000,000 lb) annually to heat the station; the passenger cars in the train shed; CNR and CPR yard facilities in the area now occupied by theGardiner Expressway,Rogers Centre andScotiabank Arena; the CPR'sRoyal York Hotel; the Dominion Public Building; the federal post office building adjacent to the station; and the CN/CP Telecommunications building on Front Street.

Subway connection

[edit]
Excavation outside of Union Station on Front Street in 1950 for asubway line

The first major change to Union Station took place in 1954 when theToronto Transit Commission opened itsUnion subway station adjacent to Union Station but buried beneath Front Street West. This subway station acted as the southern terminus of its newsubway line. The subway station included a direct tunnel connection to the lower level passenger concourse. This passageway was closed and replaced by the direct connection between the railway station and the subway station in 1979 when the subway station mezzanine was renovated and enlarged. In 1990, the TTC's Harbourfront LRT project added an undergroundstreetcar loop now used by the509 Harbourfront and510 Spadina streetcar lines. TTC passengers using the Union subway and streetcar station may transfer between both modes without entering Union Station proper.

Metro Centre redevelopment proposal

[edit]
Further information:Railway Lands

During the early 1970s, Canada's two major passenger railways, theCanadian Pacific Railway and Canadian National, were reducing their services to the bare minimum mandated under the Canadian Transport Commission, largely as a result of unsustainable losses caused by increased competition from new subsidized four-lane highways and airports.

Construction for theCN Tower in 1973. Plans to redevelop theRailway Lands surfaced with freight traffic being diverted outside the downtown core.

The third Union Station's future was looking bleak by 1972, when both railways sought to increase return on their underutilized waterfront railclassification yards which were being viewed as valuable real estate. Both CN and CP began to abandon their extensive waterfront rail classification yards south of the passenger station to make way for urban redevelopment. TheGardiner Expressway project was constructed over part of the railway property and CN had proposed constructing a telecommunication tower (what would become theCN Tower later that decade).

CN and CPR proposed a "Metro Centre" development on the south side of Front Street on the site of Union Station and proposed to demolish the structure (which was costing an increasing amount of property taxes but not bringing in revenue). The proposed Metro Centre development was strikingly similar to what occurred with New York City'sPenn Station and would have consisted of an underground fourth Union Station (the terminal trackage would have been buried), a convention centre, a telecommunications tower, along with complementary office and retail developments. Local opposition to the proposal was successful in having the city council's decision to support the Metro Centre development overturned and Union Station was saved.

Although it was converted from coal tonatural gas, the Central Heating Plant built in 1929 was decommissioned in the 1980s, and demolished in 1990.[32] It is now the site of the Ice condominium towers.

In 1978, CN and CP transferred responsibility for their passenger rail services to Via Rail, a new federalCrown corporation but retained their 50% ownership shares of the TTR.

Growth and waterfront development

[edit]
TheSkyWalk was constructed over the train tracks of Union Station to connect theMetro Toronto Convention Centre andRogers Centre with the rest of thePath pedestrian network.

TheGO Transit commuter rail agency which was established on May 23, 1967, had been undergoing unprecedented expansion which was seeing Union Station see passenger levels that outstripped some of the busiest airports in the world. The consolidated TTR trackage included aflyover west of the station to permit freight trains to cross CN's Oakville subdivision without blocking GO Transit's commuter trains. The flyover was constructed in 1982–83 and also allowed GO trains destined for the CN Weston subdivision to cross over the tracks used by GO and Via trains using the CN Oakville subdivision.[citation needed]

The CN Tower had revamped the vision of Toronto's waterfront rail yards and proposals were made to construct what would later becomeSkyDome (1989) andAir Canada Centre (1999), resulting in further changes to the Union Station trackage. The Path pedestrian tunnel network was built to connect Union Station's passengers with many of the downtown office towers and theSkyWalk was constructed over the terminal trackage west of the station to connect the Path with theMetro Toronto Convention Centre and Rogers Centre.

21st century revitalization

[edit]
See also:Union station (TTC) § Station expansion
Union Station's southern entrance was opened in 2010.

In 2000, the City of Toronto purchased the station building from the TTR, while GO Transit purchased the railway corridor and the Union Station train shed. On July 24, 2003, the City of Toronto agreed to lease Union Station to Union Pearson AirLink Group, a subsidiary ofSNC-Lavalin, for a term of 100 years.

A subsequent announcement on May 24, 2006, addressed several issues for commuters including: constructing a direct connection from the GO Concourse to the Path pedestrian tunnel system, a new eastbound platform for theUnion TTC station, improved access to streetcars at Union TTC station, and improved capacity for inter-city railway passengers. These developments were part of a $100 million initiative announced by the city and its transit authorities, along with the Government of Ontario and Government of Canada.[37] On August 5, 2009, the Toronto City Council approved an update of this plan which was projected to cost $640 million, with construction lasting from 2010 to 2014.[38] Much of the work was undertaken by or managed byCarillion.[39]

Union Food Court, the first phase of the lower retail level, was opened in January 2019.
The new Bay Concourse (circa 2023) which opened in 2021

The work also involved a complete overhaul of the GO concourses, deepening them to create two storeys of space. The lower level (thefood court section of which opened in January 2019)[40] will provide retail space and room for pedestrian traffic flow, and the upper storey will be dedicated to passenger traffic onto the platforms. This will expand not only the current GO concourse in the east of the building, but also open up the western end; GO Transit's presence in the building will nearly quadruple. Additional aesthetic points include glass roofs over the moat space around the north sides of the building, and a tall atrium over the central portions of the platforms. A new southern entrance, adjacent to the Air Canada Centre, opened in 2010.[41][42]

The 2009 Ontario and Canada government budgets included financing to assist GO, Via and the city in redeveloping and restoring the station. Track has been upgraded with better signals and snow cleaning devices to reduce winter delays to train movement.

In 2016, it was realized that the renovated train shed roof was too low to allow electrification. The train shed roof is considered a heritage feature and cannot be removed. Remedies considered were raising the roof, or lowering the track level.[43]

By early 2018, the cost had increased from $640 million to an estimated $823.5 million. Work that was to have been completed in 2015 was projected to be finished late 2018[44] and in late 2018 revised to 2019.[45] In 2019 it was announced that the city's portion of construction would be complete in 2019, but then Metrolinx would have to start its work, with a projected 2020 completion date.[46]

In February 2019, charges were laid byToronto Fire Services against contactorBondfield Construction and the city for an over-crowding issue where doors had been blocked.[47] In March 2019 it was reported that Vaughan-based contractor Bondfield Construction had applied for bankruptcy protection under the Companies' Creditors Arrangement Act (CCAA).[48]

Heritage recognition

[edit]

Union Station became designated as a National Historic Site of Canada in 1975, and a Heritage Railway Station in 1989. In 1999, Union Station was inducted into theNorth America Railway Hall of Fame as being significant in the course of railway history.[49] The station is recognized as part of theUnion Station Heritage Conservation District (Designated Part V) under theOntario Heritage Act enacted by Toronto City Council on July 27, 2006.[50]

Passenger services

[edit]
Timetable forinter-city rail services in the Great Hall

Union Station is the busiest public transportation structure of any kind in Canada, including air travel. It handles 65 million passengers annually, with an average of 200,000 passengers each day. Approximately two-thirds of those passengers are GO train or GO bus commuters, while another 20 million take the subway. The remainder are intercity travelers between other cities in Canada and the United States.[6]

National

[edit]
Main article:Via Rail

Toronto is Canada's primary passenger train hub. Consequently, Union Station is by far Via Rail's busiest and most-used station. Each year, 2.4 million Via Rail passengers pass through Union Station, representing more than half of all Via Rail passengers carried systemwide.[6] This heavy usage is partly due to Union Station's position at the centre of Canada's busiest inter-city rail service area, the "Corridor", which stretches fromQuebec City in the east to Windsor in the west.

Via Rail train waiting in Union Station. The station is Via Rail's most used facility.

Westbound Via Rail trains from Toronto connect directly to most major cities inSouthwestern Ontario, includingKitchener,London,Sarnia, andWindsor. Additionally, westbound trains fromMontreal pass through Toronto en route toBurlington. Northbound and eastbound Via Rail trains from Toronto primarily serve the heavily travelledOttawa–Montreal–Toronto triangle. At Montreal, passengers can connect to trains heading to the Maritimes or north to the Laurentians.

Union Station is also the eastern terminus ofThe Canadian, Via Rail's transcontinental service westbound toVancouver viaWinnipeg,Saskatoon andEdmonton.

International

[edit]
TheMaple Leaf departing from Union Station to New York City
Main article:Amtrak

In partnership with Via Rail, Amtrak runs theMaple Leaf train from Toronto to New York City. The train uses anAmtrak consist but is operated by Via crews north ofNiagara Falls, Ontario. Other major U.S. destinations along the route includeBuffalo,Rochester,Syracuse andAlbany.

Amtrak and Via Rail formerly operated theInternational Limited from Toronto toChicago via theSarniaPort Huron border crossing, until it was cancelled in 2004. Both VIA Rail and Amtrak maintain service along the route on their respective sides of the border, but the trains do not cross the border.

Provincial and suburban

[edit]
Main article:GO Transit
Platform 25 is primarily used by GO Transit commuter rail service

Union Station is the central terminal for GO Transit, which handled approximately 69.5 million passengers in 2015.[51]

GO Transit'sUnion Station Bus Terminal is located atCIBC Square, 81 Bay Street, on the south side of the terminal. The terminal currently servesGO Transitregional buses as well asCoach Canada,TOK Coachlines, andOntario Northland long-distance bus services.

Connecting services

[edit]
The station includes access to theToronto subway system.
Main article:Toronto subway

Union Station is connected to the Toronto Transit Commission'sUnion Subway Station, which is part ofLine 1 Yonge–University of theToronto subway system. TwoToronto streetcar routes,509 Harbourfront and510 Spadina, can also be accessed underground without leaving Union Station. The streetcar platform was built in 1989 and is separate from the subway station platforms built in 1954. Altogether, twenty million TTC passengers pass through Union Station each year.[6] The TTC station was renovated and expanded in 2015, with an additional platform to increase capacity.[52]

Toronto Transit Commission bus routes 19 Bay, 72 Pape, 97 Yonge, 121 Esplanade–River, and night route 320 Yonge, use curbside stops on the streets outside.

Airport link

[edit]
Main article:Union Pearson Express

On June 6, 2015, the Union Pearson Express (UP Express), a dedicatedairport rail link service, started running between Union Station andToronto Pearson International Airport, stopping only atBloor andWeston GO stations. The opening of the line allowed Metrolinx to achieve its goal, announced in 2010, of operating an airport rail link from Union Station in time for the2015 Pan American Games.[53]

Union Pearson Express Union Station, located west of the main Union Station building

Trains on this line do not stop at the regular platforms used by GO and Via trains, but use a separate station located west of the main station building along the length of the mainatrium of theSkyWalk between York Street and Lower Simcoe Street. The UP Express Union Station is a 5-minute walk fromUnion subway station.[8]

Trains depart from the station's singleside platform every 15 minutes. Passengers access trains directly from an enclosed waiting area, and a glass wall withsliding doors separate trains from the platform and open to allow passengers to board directly from the waiting area without exposure to the elements. The floor of the waiting area is level with the train floor, which allows forstep-free boarding.

The UP Express Union Station has a dedicatedcustomer service counter,ticket vending machines and flightcheck-in kiosks. These kiosks permitcheck-ins forAir Canada andWestJet.[54] Three stands in the waiting area offerBalzac's coffee, souvenirs andMill Street Brewery draft beer.[55]

Former operations

[edit]

Ontario Northland

[edit]
Main article:Ontario Northland Railway
  • Northlander to Gravenhurst, Huntsville, North Bay, Cobalt and Cochrane

TheNorthlander provided a passenger train service between Union Station and Northeastern Ontario from 1976 until 2012. In March 2012, the Government of Ontario announced plans to discontinue this service,[56] and the final day of operations was September 28, 2012.

Amtrak

[edit]
  • International to Port Huron, Flint, Battle Creek, Niles, and Chicago

TheInternational (known until 1983 as theInternational Limited) provided a passenger train service between Union Station and Chicago Union Station from 1982 until 2004, when the cross-border service was discontinued and replaced by Via Rail'sToronto–Sarnia service, and Amtrak'sBlue Water route from Port Huron to Chicago. The final day of operations was April 23, 2004.

Other railway stations (terminals or depots) in Toronto

[edit]

References

[edit]
  1. ^"Bicycle Parking Stations".City of Toronto. October 12, 2017.
  2. ^"Northlander Passenger Train".www.ontarionorthland.ca.Ontario Northland Transportation Commission. June 6, 2023.[dead link]
  3. ^Union Station.Directory of Federal Heritage Designations.Parks Canada. Retrieved October 23, 2013.
  4. ^Union Station (Canadian Pacific and Grand Trunk) National Historic Site of Canada.Canadian Register of Historic Places. Retrieved August 19, 2011.
  5. ^Union Station.Canadian Register of Historic Places. Retrieved October 23, 2013.
  6. ^abcd"About Union Station". City of Toronto. Archived fromthe original on August 11, 2015. RetrievedAugust 14, 2015.
  7. ^"Info to GO"(PDF). GO Transit. April 2015. Archived fromthe original(PDF) on May 8, 2016. RetrievedApril 26, 2016.
  8. ^ab"Union Station".Union Pearson Express. June 9, 2015. RetrievedJune 9, 2015.
  9. ^Toronto Terminals Railway (November 2007)."Union Station design and architecture". Archived fromthe original on September 25, 2007. RetrievedNovember 24, 2007.
  10. ^abcd"Union Station Revitalization — Get on Board!"(PDF). City of Toronto. RetrievedAugust 14, 2015.
  11. ^"HistoricPlaces.ca". HistoricPlaces.ca. August 28, 1989. RetrievedJune 11, 2012.
  12. ^Daniel Kitts (September 24, 2015)."Battle over Union Station shooting range underlines urban gun divide".TVO. RetrievedSeptember 30, 2017.
  13. ^Vyhnak, Carola (August 7, 2006), "How Toronto almost lost Union Station",The Toronto Star, p. IN7
  14. ^ab"GO Concourse Improvements". Archived fromthe original on July 6, 2015. RetrievedAugust 5, 2015.
  15. ^abc"Union Detailed Map". Go Transit. Archived fromthe original on September 24, 2015. RetrievedAugust 14, 2015.
  16. ^"PATH map"(PDF). City of Toronto. Archived fromthe original(PDF) on August 20, 2015. RetrievedAugust 14, 2015.
  17. ^"Go Transit's Bay Concourse To Undergo Major Renovation". Archived fromthe original on October 16, 2017. RetrievedOctober 13, 2015.
  18. ^"Your GO Train Platform at Union Station is Changing"(PDF). GO Transit. April 2015. Archived fromthe original(PDF) on September 24, 2015. RetrievedAugust 14, 2015.
  19. ^ab"Bay Concourse Closing". GO Transit. Archived fromthe original on August 15, 2015. RetrievedAugust 14, 2015.
  20. ^"Brand new Bay Concourse opens to customers inside Union Station today".Metrolinx. July 27, 2021. Archived fromthe original on August 1, 2021. RetrievedJuly 28, 2021.
  21. ^"Bay Street pedestrian walkway at Union Station reopens".Metrolinx. May 26, 2021. Archived fromthe original on May 31, 2021. RetrievedJuly 7, 2021.
  22. ^"Improvements at Toronto's iconic transit hub continue".Metrolinx. February 21, 2023.Archived from the original on February 21, 2023.
  23. ^ab"Heritage platform at Toronto's Union Station reopens following restoration work".Metrolinx. January 10, 2022. Archived fromthe original on January 11, 2022.
  24. ^ab"Oh no, it's transit math – Solving the mystery of how Toronto's Union Station platform numbers work".Metrolinx. January 17, 2022. Archived fromthe original on January 17, 2022.
  25. ^"Improvements continue at Toronto's iconic transit hub as part of the Union Station Enhancemen".Metrolinx. July 6, 2022. Archived fromthe original on July 7, 2022.
  26. ^"Union Station Train Shed".eraarch.ca. RetrievedMarch 10, 2019.
  27. ^"GO Roof, Union Station". December 2012.
  28. ^"Ontario – Union Station Rail Corridor (USRC)". Toronto Terminals Railway. RetrievedFebruary 21, 2023.
  29. ^"History". Toronto Terminals Railway. RetrievedFebruary 21, 2023.
  30. ^"Contact Us". Metrolinx. RetrievedAugust 14, 2015.
  31. ^"Union Station Tourist Information Centre". City of Toronto. Archived fromthe original on August 11, 2015. RetrievedAugust 14, 2015.
  32. ^abcToronto Terminals Railway (November 2007)."Toronto Terminals Railway history". Archived fromthe original on October 23, 2007. RetrievedNovember 24, 2007.
  33. ^abRiddell 1994, p. 14.
  34. ^Filey, Mike (August 2007)."Union Station turns 80".Toronto Sun. Archived fromthe original on September 30, 2007. RetrievedNovember 24, 2007.
  35. ^abcGriffen, Frederick (August 6, 1927), "Entrance of Prince into Union Station marks great event",The Toronto Star, p. 1
  36. ^"The Royal Family in Toronto, Then and Now". Toronto Then and Now. November 20, 2010. RetrievedAugust 6, 2022.
  37. ^James Cowan (December 20, 2006)."Failed projects To Get Second chance".National Post.
  38. ^Brodie Fenlon (August 5, 2009)."Toronto approves Union Station makeover".The Globe and Mail. p. A6.
  39. ^Robyn Doolittle (May 26, 2014)."Over budget and behind schedule, Toronto Union Station project may miss Pan Am games deadline".The Globe and Mail. Toronto. RetrievedSeptember 1, 2015.
  40. ^Renee Suen (January 7, 2019)."Union Station's new food court is now open. Here's what you can order".Toronto Life. RetrievedJune 3, 2019.
  41. ^"Union Station"(PDF). November 17, 2017. RetrievedJanuary 20, 2018.
  42. ^"New South Platform – Platform 26/27". GO Transit. Archived fromthe original on July 9, 2016. RetrievedJuly 19, 2016.
  43. ^Gee, Marcus (January 28, 2016)."Raise the roof? Union Station reno runs into problem: New trains won't fit".www.theglobeandmail.com. RetrievedApril 3, 2018.
  44. ^Spurr, Ben (January 19, 2018)."Union Station renovation delayed again, will cost $23M more".www.thestar.com.
  45. ^"Construction on Union Station pushed back until 2019".thestar.com. November 13, 2018.
  46. ^Morris, Siobhan (March 1, 2019)."UNION STATION RENOVATION COULD STRETCH INTO 2020".Newstalk 1010. RetrievedMarch 10, 2019.
  47. ^Wilson, Codi (February 28, 2019)."Fire code violations laid after overcrowding situation at Union Station".CTV News Toronto. RetrievedMarch 10, 2019.
  48. ^CNGRPsite (March 8, 2019)."As it files for creditor protection, Bondfield Construction wins right to defamation trial against Globe and Mail".Ontario Construction Report. RetrievedMarch 10, 2019.
  49. ^"Union Station". North America Railway Hall of Fame. Archived fromthe original on September 28, 2013. RetrievedJanuary 1, 2013.Inducted 1999
  50. ^"Heritage Property Detail".City of Toronto. 2015. Archived fromthe original on February 7, 2023. RetrievedNovember 14, 2015.
  51. ^"Info to GO"(PDF). GO Transit. September 2016. Archived fromthe original(PDF) on November 7, 2016. RetrievedNovember 7, 2016.
  52. ^"TTC celebrates its completion of Union Station subway renovation".CTV News. July 2, 2015. RetrievedAugust 30, 2020.
  53. ^"Railway Gazette: Toronto airport rail link negotiations collapse". Archived fromthe original on September 9, 2012. RetrievedAugust 16, 2010.
  54. ^"Guest Services – FAQs".Union Pearson Express. June 8, 2015. RetrievedJune 8, 2015.
  55. ^Robin Levinson King Staff Reporter (June 6, 2015)."Union Pearson Express (UPX) opens to the public".Toronto Star. RetrievedJune 8, 2015.
  56. ^"Message from ONTC Chair Ted Hargreaves, March 23, 2012"(PDF).[permanent dead link]

Bibliography

[edit]

External links

[edit]
Wikimedia Commons has media related toUnion Station (Toronto).
Lakeshore West
Lakeshore East
Milton
Kitchener
Richmond Hill
Barrie
Stouffville
Union Pearson Express
Former or proposed
station sites
Bus terminals
Miscellaneous
See also
† anditalics denotes a future station. ‡ denotes station under construction.
British Columbia
Ontario
Quebec
Sports venues
Cultural and educational
Amusement
Shopping
Parks and squares
Institutional
and infrastructure
By type
Italics indicate structures now defunct or demolished.
Provinces
Territories
Other countries
International
National
Geographic
Other