Tugun Bypass

From Wikipedia, the free encyclopedia
Motorway on the Gold Coast, Queensland, Australia

Tugun Bypass

Pacific Motorway

New South Wales
General information
TypeFreeway
LocationTugun
Length7 km (4.3 mi)
OpenedJuly 2008
Route number(s)
Major junctions
NE end
SW end
Highway system
Main article:Pacific Motorway (Brisbane–Brunswick Heads)

TheTugun Bypass is a 7.5-kilometre-long (4.7 mi) stretch of motorway-grade road,bypassing through the suburb ofTugun on theGold Coast, inQueensland,Australia. The speed limit on the Tugun bypass is 100 kilometres per hour (62 mph) and provides a high-speedmotorway link between the Gold Coast and northernNew South Wales, separating interstate vehicles from local traffic. There is a 334-metre (1,096 ft)tunnel under the extension to theGold Coast Airportrunway.[1] Thebypass connects directly to thePacific Motorway between the Stewart Road interchange atCurrumbin and the Tweed Heads Bypass north of Kennedy Drive. Opened in 2008, it has significantly relievedtraffic congestion on the Gold Coast Highway corridor. The Tugun Bypass carries the M1 designation and is officially called the "Pacific Motorway". The Tugun bypass has two vehicle lanes in each direction, with provision for widening to three lanes in the future.

History

[edit]

For more than 20 years the Gold Coast has grown by 17,000 permanent residents a year, placing enormous pressure on the city's infrastructure requirements,[2] in particular theGold Coast Highway betweenCurrumbin andTweed Heads. Speculation about a bypass began in the 1960s when the South Coast railway line was closed.[3]

It was not until theBeattie Government was in office at the end of the 20th century that a firm commitment was made to the bypass. In 2003 Acting Prime MinisterJohn Anderson and Queensland Transport MinisterSteve Bredhauer announced a 50 per cent joint agreement for the project allowing the project to proceed.[3] In May 2004 the Queensland and New South Wales Governments finally agreed to build the Tugun bypass along the western side of theGold Coast Airport, after New South Wales reneged on an agreement signed in 2000. The New South Wales government had previously been reluctant to go ahead with the project, citing environmental and planning reasons.[3]

While New South Wales finally agreed to the plan, it refused to contribute financially to the road. In February 2006, former Premier Peter Beattie announced the Commonwealth Government had given final approval for the road, with construction to start the following month.[3] Beattie said the New South Wales Government imposed additional approval conditions that bumped up the price tag. The tax-payer bill was now expected to exceed $540 million, and sixteen homes in New South Wales would be demolished to make way for the road.[3]

As part of a deal, Queensland was to fork out $7 million annual maintenance bill for the first 10 years. At the 10th year, in June 2018, the bypass was handed over to theNSW Government.[4]

Construction and design

[edit]

The Pacific Link Alliance consortium won the contract to work with theDepartment of Main Roads to design and build the road, complete with tunnel and bridges over Hidden Valley. Work on the 334-metre-long (1,096 ft) tunnel began in early June 2006, using a low headroom hydraulic cutting machine—one of two in the world—to meet the conditions of working so close to protected airspace.

The tunnel was built with provision for a future rail line underneath. The Tugun Bypass was intended to be open to traffic on 2 June 2008 but was delayed until important line marking could be carried out at either end of the new road.[5] Line marking could not be performed at the expected time due to wet weather.[5] The bypass finally opened during the afternoon of 3 June 2008.[6]

To address operational issues with overheight vehicles attempting to enter the tunnel - particularly from the Queensland side - new turning areas were constructed near the northbound and southbound tunnel entrances. Overheight detection systems were installed to activate variable speed signs to prevent entry, along with five new advance warning signs and traffic lights.[7]

The design includes an amphibian fence about 40 centimetres (16 in) in height with an adjacent rock aggregate to suppress vegetation.[6] Asmall fauna underpass was also incorporated into the design to allow for the movement of thewallum sedge frog.[6]

Funding

[edit]

The project is jointly funded by theQueensland Government 78% and theAustralian Government 22% at a cost of $543 million. Despite over 60% of the road being withinNew South Wales, there was no financial contribution towards the road from theGovernment of New South Wales.

Border marker

[edit]

On the Tugun bypass, there is a big "eye-catching and unique" border marker called Hyphen that looks like a very tall and bent metal structure that sits in the median on the border of Queensland and New South Wales.[8]

Controversy

[edit]
Earlyearthworks at Stewart RoadCurrumbin.
icon
This sectiondoes notcite anysources. Please helpimprove this section byadding citations to reliable sources. Unsourced material may be challenged andremoved.(May 2020) (Learn how and when to remove this message)

On Sunday 18 May 2008, three days prior to the commencement of that year'sState of Origin rugby league tournament, the New South Wales State Government mailed the Queensland Government with a land tax invoice of $235,607.40 for building part of the Tugun Bypass on NSW land. Queensland PremierAnna Bligh confirmed that the bill would be ignored by Queensland because they did not contribute to the $543 million project, saying: "I don't expect theMaroons to give an inch to the New South WalesBlues this week, and I don't intend to either." Of the $543 million it cost to build the bypass, the Federal Government contributed $120 million and Queensland paid the balance. Approximately 4 kilometres (2.5 mi) of the 7-kilometre (4.3 mi) bypass is located in New South Wales. "Of the total expenditure, $380 million – or 70 per cent – was spent in New South Wales," Ms Bligh said.

The NSW Office of State Revenue issued the bill to the Queensland Government on 6 May, asking for the payment for five years worth of land tax assessments. The NSW Chief Commissioner of State Revenue Tony Newbury said Queensland could pay in three instalments of $78,535.80 over the next three months. "Failure to comply with the payment options . . . will result in the imposition of interest and the instalment plan will be cancelled. Interest will be imposed on any outstanding land tax or penalty tax. The current rate is 14.37 per cent per annum calculated daily," he said. The assessments related to sixteen properties in the Tweed Shire bought by the Department of Main Roads from 2001 for the bypass construction. Queensland Treasurer Andrew Fraser said at the time of the acquisition of the sixteen properties, the NSW Government provided a transfer duty exemption to Queensland.

See also

[edit]

iconAustralian roads portal

References

[edit]
  1. ^"Tugun Bypass".Projects.Lend Lease. Retrieved6 September 2017.
  2. ^"Highway To Hell". Goldcoast.com.au. 2007.
  3. ^abcde"Tugun bypass opening".ABC. 2008. Archived fromthe original on 27 September 2009.
  4. ^"Bypass handed back to NSW". Tweed Daily News. 4 June 2018.
  5. ^abIronside, Robyn (2 June 2008)."Newly opened Tugun bypass closed due to rain".The Courier-Mail. Retrieved19 July 2008.
  6. ^abcGleeson, James; Deborah Gleeson (2012).Reducing the Impacts of Development on Wildlife. Csiro Publishing. pp. 62, 98.ISBN 0643100326.
  7. ^NSW, Transport for (6 March 2025)."Tugun tunnel's overheight issue overcome".www.transport.nsw.gov.au. Retrieved6 July 2025.
  8. ^"Tugun Bypass border marker competition – and the winner is…".Queensland Government. 2007.

Further reading

[edit]

External links

[edit]


Road infrastructure in theGold Coast
Motorways:
Highways:
Major roads:
Retrieved from "https://en.wikipedia.org/w/index.php?title=Tugun_Bypass&oldid=1299094222"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp