Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Tanah Merah MRT station

Coordinates:1°19′38.49″N103°56′46.84″E / 1.3273583°N 103.9463444°E /1.3273583; 103.9463444
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia
Mass Rapid Transit station in Singapore
This article is about the Singapore MRT station. For theKTM Intercity station, seeTanah Merah railway station.

‹ ThetemplateInfobox station is beingconsidered for merging. ›
Tanah Merah
 EW4  CG 


丹那美拉[1]
தானா மேரா[2]
Platforms A and C of Tanah Merah station
General information
Location920 New Upper Changi Road
Singapore 467356
Coordinates1°19′38.49″N103°56′46.84″E / 1.3273583°N 103.9463444°E /1.3273583; 103.9463444
SystemMass Rapid Transit (MRT) interchange and terminus
Owned byLand Transport Authority
Operated bySMRT Trains Ltd (SMRT Corporation)
Line
Platforms4 (2 island platforms)
(2 (1 island platform) (U/C))
Tracks3
1 (U/C)
ConnectionsBus, Taxi
Construction
Structure typeElevated
Platform levels1
ParkingNo
Bicycle facilitiesYes
AccessibleYes
History
Opened4 November 1989; 36 years ago (1989-11-04)
Opening9 December 2025; 13 days' time (2025-12-09) (Platform A)
mid-2030s (Thomson–East Coast Line)
ElectrifiedYes
Previous namesBedok,[4] Changi[5][6]
Passengers
June 202414,378 per day[3]
Services
Preceding stationMass Rapid TransitFollowing station
Simei
towardsPasir Ris
East–West LineBedok
towardsTuas Link
TerminusEast–West Line
Changi Airport Line
Expo
ExpoThomson–East Coast Line
Future service
Terminus
Track layout
 
toExpo
 
toSimei
toBedok
 
Future layout
toSimei
toExpo
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Tanah Merah
Tanah Merah MRT station in Singapore

Tanah Merah MRT station (/ˈtɑːnɑːˌmrɑː,-ˌmɛrɑː/TAH-nahMAY-rah) is an elevatedMass Rapid Transit (MRT) station on theEast–West Line (EWL). Located inBedok, Singapore, the station is along New Upper Changi Road and serves various residential developments, including Casa Merah. It is the terminus of the EWL branch toChangi Airport station.

Tentatively namedChangi during its construction, the station opened on 4 November 1989. The station began to serve the Changi Airport branch on 10 January 2001 following the opening of Expo station. On 25 May 2019, it was announced that Tanah Merah station would interchange with theThomson–East Coast Line (TEL) when TEL takes over the Changi Airport branch following its extension toChangi Airport Terminal 5 by the mid-2030s.

History

[edit]

The station was named Bedok in the early plans of the MRT network published in May 1982.[4] The station was officially confirmed as "Changi" station when the Phase II stations were announced in October 1983.[7][8] The contract for the construction of Changi station and associated viaducts was awarded to a joint venture between Wah Chang International Corporation andHyundai Engineering and Construction Co Ltd forS$68.76 million (US$93.8 million in 2022).[9]

The station's name changed to Tanah Merah in March 1987.[5] The station opened on 4 November 1989 as part of the MRT segment fromBugis to this station,[10][11] with the official opening ceremony hosted at this station by deputy prime ministerGoh Chok Tong.[12][13]

Half-height platform screen doors were installed at this station between 2008 and 2012 as part of theLand Transport Authority's (LTA) programme to improve safety in MRT stations.[14][15][16] Between 2012 and 2013,high-volume low-speed fans were installed at this station as part of a network-wide programme to improve ventilation at the platforms of elevated stations.[17]

Changi Airport branch

[edit]

While a branch toChangi Airport from this station was included in the early plans of the MRT network in May 1982,[4] the Mass Rapid Transit Corporation (MRTC) concluded through a feasibility study in 1983 that there might not be sufficient passenger traffic to justify such a branch.[18] The proposals for an MRT extension from this station to Changi Airport was revisited in August 1994 following a surge in airport usage.[19]

Finalised plans for the 6.4-kilometre (4.0 mi) branch were announced by deputy prime ministerLee Hsien Loong on 15 November 1996.[20] The branch, projected to be completed in 2001, would run from this station and have an intermediate stop at Somapah to serve the Changi Business Park and the exhibition centre.[21][22] The branch opened on 10 January 2001,[23] with shuttle services running viaExpo station.[24]

Additional platform

[edit]
New viaduct and platform under construction in July 2025

In 2014, the LTA announced that Tanah Merah station would be expanded with a new platform to increase frequency for the Changi Airport branch. The new platform will be constructed next to the existing eastbound platform. When completed, the middle two tracks will be used to serve the Changi Airport branch. Additional tracks will also be constructed to connect the station to theEast Coast Integrated Depot (ECID).[25][26] This will be LTA's second project to construct new tracks and platforms for an existing station afterJurong East station.[25]

The contract for the construction of the new platform and viaducts was awarded to Lum Chang Building Contractors Pte. Ltd. for S$325 million (US$242.54 million) in October 2016. Construction works were scheduled to begin at the end of that year with an expected completion date of 2024.[27][28] On 25 May 2019, the LTA further announced that the Changi Airport branch will be converted to be part of the Thomson–East Coast line (TEL) when TEL extends to Changi Airport fromSungei Bedok station viaTerminal 5 by the mid-2030s.[29][30] In November 2022, transport ministerS Iswaran announced that, as part of efforts for sustainable transport infrastructure, studies are ongoing to convert an existing 1-kilometre (0.62-mile) viaduct set to be decommissioned to a green corridor for pedestrians and cyclists.[31] On 29 April 2024, the LTA called a tender to modify the existing station, along withExpo andChangi Airport stations, in preparation for their conversion to being part of the TEL.[32] The new platform will open on 9 December 2025, and works will begin on the platform that previously servedPasir Ris-bound trains to connect with the airport branch line.[33]

To connect the tracks between the EWL and the ECID, train services between Tanah Merah andTampines stations were suspended from 7 to 10 December 2024.[34] Another round of service suspension between theBedok and Tampines stations, and between Tanah Merah and Expo stations, is planned take place from 29 November to 8 December 2025.[33] Following the track connections works, Pasir Ris-bound services will run on the new Platform A from 9 December onwards.[35] Another service suspension is planned to take place in the first half of 2026.[33]

Details

[edit]
Platform D which serves the Changi Airport branch

Tanah Merah station serves theEast–West line (EWL) and is between theSimei andBedok stations. The station is also the terminus of the Changi Airport branch, with the next station beingExpo. The official station code is EW4/CG.[36][37] When it opened, it had the station code of E9[38] before being changed to the current alphanumeric style in August 2001 as a part of asystem-wide campaign to cater to the expanding MRT System.[39][40] As a part of the EWL, the station is operated bySMRT Trains.[41] Tanah Merah station is located along New Upper Changi Road and serves various private residential developments including Casa Merah, Optima @ Tanah Merah and The Glades.[42] The station is also close to Simpang Bedok, and schools such as APSN (Katong School) andBedok View Secondary School andAnglican High School.

The station operates daily between 4:55 am and 12:45 am.[43] Mainline train frequencies range from 2 to 5 minutes.[44] Since 22 July 2003, Tanah Merah station became the terminus for shuttle services to Changi Airport station,[45] with frequencies for the service ranging from 7 to 13 minutes.[26] The station has three tracks with two island platforms; this will be upgraded to three island platforms and four tracks in 2025.[46] The existing middle track is used for shuttle services to Changi Airport station.[25][26]

References

[edit]
  1. ^"System Map"(PDF) (in Chinese).Land Transport Authority.Archived(PDF) from the original on 10 December 2024. Retrieved10 February 2025.
  2. ^"System Map"(PDF) (in Tamil).Land Transport Authority.Archived(PDF) from the original on 13 December 2024. Retrieved10 February 2025.
  3. ^"Land Transport DataMall".mytransport.sg.Land Transport Authority.Archived from the original on 14 August 2024. Retrieved14 August 2024.
  4. ^abc"Proposed MRT stations".The Straits Times. 23 May 1982. p. 1. Retrieved12 December 2020 – via NewspaperSG.
  5. ^abDhaliwal, Rav (27 March 1987)."Five MRT stations renamed to better reflect the locality".The Straits Times. p. 19 – via NewspaperSG.
  6. ^"Name change for five MRT stations".Business Times.Singapore Press Holdings. 27 March 1987. p. 2 – via NewspaperSG.
  7. ^"What Residents Say of the Sites".Singapore Monitor. 26 October 1983. p. 2. Retrieved28 March 2023 – via NewspaperSG.
  8. ^"From Kembangan to Pasir Ris".The Straits Times. 27 October 1983. p. 21. Retrieved28 March 2023 – via NewspaperSG.
  9. ^"MRTC awards two jobs on eastern line".Business Times.Singapore Press Holdings. 14 January 1986. p. 2. Retrieved28 March 2023 – via NewspaperSG.
  10. ^Dhaliwal, Rav (4 November 1989)."East-enders get ticket to ride as MRT opens line".The Straits Times. p. 23. Retrieved21 April 2020 – via NewspaperSG.
  11. ^"MRT goes east".The Straits Times. 4 November 1989. p. 23. Retrieved21 April 2020 – via NewspaperSG.
  12. ^"Speech By Mr Goh Chok Tong, First Deputy Prime Minister And Minister For Defence, At The Commencement Of Passenger Service Of The Sixth Section Of The Mrt System At Tanah Merah Station On Saturday, 4 November 1989 At 9.45 am"(PDF).National Archives of Singapore.Ministry of Communications and Information.Archived(PDF) from the original on 28 March 2023. Retrieved28 March 2023.
  13. ^"MRT trains to Pasir Ris from Dec 16 MRT trains to Pasir Ris from Dec 16".The Straits Times. 5 November 1989. p. 1. Retrieved6 December 2020 – via NewspaperSG.
  14. ^"Platform screen doors for all above-ground MRT stations by 2012".The Straits Times. 25 January 2008. Archived fromthe original on 28 January 2008.
  15. ^"Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am".Ministry of Transport. 25 January 2008. Archived fromthe original on 12 January 2015. Retrieved11 January 2015.
  16. ^"LTA completes installing elevated MRT station screen doors early".Channel NewsAsia. 14 March 2012. Archived fromthe original on 14 March 2012. Retrieved14 March 2012.
  17. ^"Enhancing Connectivity and Comfort for Commuters".Land Transport Authority.gov.sg. 13 October 2011. Archived fromthe original on 25 December 2012. Retrieved6 July 2012.
  18. ^"No line to the airport".The Straits Times. 17 November 1983. p. 18. Retrieved20 February 2022 – via NewspaperSG.
  19. ^Dhaliwal, Rav (2 August 1994)."MRT extension to airport reconsidered".The Straits Times. p. 1.Archived from the original on 19 February 2022. Retrieved20 February 2022.
  20. ^"Singapore Mass Rapid Transit Employees' Union (SMRTEU)'s annual Dinner and Dance"(PDF).National Archives of Singapore. 15 November 1996.Archived(PDF) from the original on 10 July 2019. Retrieved10 July 2019.
  21. ^Tan, Hsueh Yan (16 November 1996)."MRT line to be extended to Changi Airport".The Straits Times.Archived from the original on 1 March 2022. Retrieved1 March 2022.
  22. ^"Changi Airport MRT line details".Business Times. 12 December 1996.
  23. ^"Expo MRT station opens today".Business Times.Singapore Press Holdings. 10 January 2001.
  24. ^"Speech by Mr Yeo Cheow Tong at the Opening of the Expo MRT Station on 10 January 2001".www.mot.gov.sg.Archived from the original on 21 August 2020. Retrieved25 April 2020.
  25. ^abc"New Platform at Tanah Merah MRT station for Faster Travel to Expo and Changi Airport".Land Transport Authority. 25 August 2014. Archived fromthe original on 29 July 2017. Retrieved29 July 2017.
  26. ^abcLee, Jian Xuan (25 August 2014)."New platform at Tanah Merah MRT station for trains to Expo, Changi Airport in 2024".The Straits Times. Archived fromthe original on 29 March 2023. Retrieved29 March 2023.
  27. ^"LTA Awards Civil Contract to Build A New Platform at Tanah Merah Station".Land Transport Authority. 26 October 2016.Archived from the original on 29 March 2023. Retrieved29 March 2023.
  28. ^"New platform, viaducts to be built at Tanah Merah MRT station for S$325 million".Today.Mediacorp. 26 October 2016.Archived from the original on 29 March 2023. Retrieved29 March 2023.
  29. ^"Land Transport Master Plan 2040: Bringing Singapore Together".Land Transport Authority.Archived from the original on 23 August 2019. Retrieved26 May 2019.
  30. ^Chong, Aaron (25 May 2019)."New stations, line extensions planned for Singapore's rail network".CNA.Archived from the original on 13 February 2020. Retrieved25 March 2021.
  31. ^Kok, Yufeng (13 November 2022)."Tanah Merah MRT viaduct may be turned into elevated green corridor when decommissioned in 2026".The Straits Times.Archived from the original on 29 March 2023. Retrieved29 March 2023.
  32. ^Kok, Yufeng (1 May 2024)."Preparatory work to connect Thomson-East Coast Line with Changi Airport to begin in 2025".The Straits Times. Retrieved1 May 2024.
  33. ^abcLoi, Esther (3 October 2025)."No MRT service from Bedok to Tampines, Tanah Merah to Expo from Nov 29 to Dec 8, for track works".The Straits Times.Archived from the original on 3 October 2025. Retrieved3 October 2025.
  34. ^Mohan, Matthew (5 November 2024)."No train services between Tanah Merah and Tampines from Dec 7 to 10 as works are carried out: LTA".CNA. Retrieved5 November 2024.
  35. ^"Reminder on Train Service Adjustments along East-West Line from 29 November to 8 December 2025 to Facilitate Track Connection to the East Coast Integrated Depot and Operationalise New Platform at Tanah Merah MRT station".LTA. Retrieved25 November 2025.
  36. ^"MRT System Map"(PDF).Land Transport Authority.Archived(PDF) from the original on 15 November 2022. Retrieved10 January 2023.
  37. ^"System Map". TransitLink.Archived from the original on 10 November 2022. Retrieved11 November 2022.
  38. ^"Going to N1, B3, W11, El2, anyone?".The Straits Times. 25 October 1985. p. 21. Retrieved19 November 2024 – via NewspaperSG.
  39. ^Salim, Shazalina (3 August 2001)."Red, green and grey".Today. p. 9. Retrieved15 December 2024 – via NewspaperSG.
  40. ^"New Signage System For MRT And LRT Network".Land Transport Authority. Archived fromthe original on 1 August 2003. Retrieved15 December 2024.
  41. ^"Getting Around – Public Transport – Rail Network".Land Transport Authority.Archived from the original on 1 November 2019. Retrieved27 April 2021.
  42. ^"Tanah Merah – Map".SMRT Journeys.SMRT Corporation.Archived from the original on 29 March 2023. Retrieved29 March 2023.
  43. ^"Tanah Merah – First and last trains".SMRT Journeys.SMRT Corporation.Archived from the original on 29 March 2023. Retrieved9 April 2020.
  44. ^"Transport Tools – MRT/LRT".Land Transport Authority. 6 May 2020.Archived from the original on 1 November 2019. Retrieved19 June 2020.
  45. ^"Board MRT to airport from Tanah Merah".The Straits Times. 18 July 2003. p. 2.
  46. ^"Annex A: Layout of New Platform at Tanah Merah Station (EW4)"(PDF).Land Transport Authority.Archived(PDF) from the original on 28 March 2023. Retrieved29 March 2023.

External links

[edit]
Italicised locations are currently not in operation
East–West Line
Changi Airport Line
Depot(s)
Retrieved from "https://en.wikipedia.org/w/index.php?title=Tanah_Merah_MRT_station&oldid=1324091811"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp