Solar power in Spain

From Wikipedia, the free encyclopedia

Solar power in Spain
Solar irradiation map of Spain
Installed capacity38.59 GW (2024) (7th)
Annual generation58.6 TWh (2024)
Capacity per capita816 W (2024)
Share of electricity20.9% (2024)

Spain is one of the first countries to deploy large-scalesolar photovoltaics, and is the world leader inconcentrated solar power (CSP) production.Spain is also one of the European countries with the most hours of sunshine. In 2022, the cumulative totalsolar power installed was 19.5 GW, of which 17.2 GW were solar PV installations and 2.3 GW were concentrated solar power.[1][2] In the same year, solar power accounted for 11.5% of total electricity generation in the country, up from 2.4% in 2010 and less than 0.1% in 2000.[3][4] Industry organizationSolar Power Europe projects Spain will more than double its solar PV capacity between 2022 and 2026.[5][6]

The country initially had a leading role in the development of solar power. Generous prices for grid connected solar power were offered to encourage the industry. The boom in solar power installations were faster than anticipated and prices for grid connected solar power were not cut to reflect this, leading to a fast but unsustainable boom in installations. Spain would find itself second only toGermany in the world for solar power installed capacity. In the wake of the2008 financial crisis, the Spanish government drastically cut its subsidies for solar power and capped future increases in capacity at 500 MW per year, with effects upon the industry worldwide.[7] Between 2012 and 2016, new installations stagnated in Spain while growth accelerated in other leading countries leaving Spain to lose much of its world leading status to countries such as Germany, China and Japan. The controversial "sun tax" and intimidating regulation surrounding solar self consumption introduced in 2015 were only begun to be repealed in late 2018 by the new government.As a legacy from Spain's earlier development of solar power, the country remains a world leader in concentrated solar power. Many large concentrated solar power stations remain active in Spain and may have provided some of the impetus for large CSP developments in neighbouring Morocco.

The 2020s are seeing a large increase in solar installations in Spain. Following three years of strong growth, the country's updated 2023 National Energy and Climate Plan anticipates solar PV capacity reaching 76 GW by 2030.[8][9]

Installed capacity

[edit]
5,000
10,000
15,000
20,000
2006
2010
2015
2020
2022
Installed Capacity (MW)        Solar PV        Solar thermal   

Installed capacity grew rapidly until 2013. Between 2013 and 2018 growth was negligible in Spain, and the country fell behind many other European countries in the development of capacity, though it retained its leading position in the deployment of solar thermal power. Growth resumed again after 2018.

Installed solar generation capacity (MW)[2][10]
20062007200820092010201120122013201420152016201720182019202020212022
Solar PV*1256373,3553,3993,8404,2614,5614,6394,6464,6564,6694,6884,7078,71111,66915,28618,164
Solar thermal1111612325329991,9502,3042,3042,3042.3042,3042,3042,304
Total1366483,4163,6314,3725,2606,5116,9436,9506,9606.9736,9927,01111,015
*Solar PV figures include only grid-connected capacity.

Timeline of developments

[edit]
The 150 MWAndasol solar power station is a commercialparabolic troughsolar thermal power plant, located inSpain. The Andasol plant uses tanks of molten salt to store solar energy so that it can continue generating electricity even when the sun isn't shining.[11]

2004

[edit]

Through a ministerial ruling in March 2004, the Spanish government removed economic barriers to the connection of renewable energy technologies to the electricity grid. The Royal Decree 436/2004 equalised conditions for large-scalesolar thermal andphotovoltaic plants and guaranteedfeed-in tariffs.[12]

2008

[edit]

Spain added a record 2.6 GW of solar photovoltaic power in 2008,[13] a figure almost five times that of the next record year, increasing capacity to 3.5 GW.[14] Spain surpassed both Japan and the United States in 2008 as the number two market as measured by cumulative installed PV capacity behind the world leader at the time Germany, accounting for 24% of global PV capacity.[15] PV capacity added during 2008 would still account for more than half of total capacity as of 2016. In 2008 the Spanish government committed to achieving a target of 12% of primary energy fromrenewable energy by 2010 and by 2020 expected the installed solar generating capacity of 10GW.[16]

2010–2011

[edit]

Since 2010, Spain has been the world's leader inconcentrated solar power (CSP). Spain is leapfrogged byItaly during 2011 following a later solar boom there to lose its position as the world's second largest installer of solar PV.

2012

[edit]

By the end of 2012, 4.5 GW of solar photovoltaics had been installed, and in that year 8.2 TWh of electricity was produced.[17] New installations of solar photovoltaics have slowed down significantly to around 300 MW during 2012. By the end of 2012 Spain had also installed over 2,000 MW of CSP.

2014–2016

[edit]
The first three units ofSolnova in the foreground, with the two towers of thePS10 andPS20 solar power stations in the background.

Almost no new solar capacity is added during this period following the removal of governmentfeed-in tariffs. Having promoted the solar industry with large government subsidies during earlier periods, the system now operates under a 180-degree turn with a punitive 'sun tax' applied to new PV systems which would otherwise flourish. Spain has been cited as a model in how not to develop renewables.[18] The hoped for growth in self consumption solar generation during 2016 fails to materialise due to delays to reforms following the extended time taken to form a government, albeit with just one party opposed to reforms in this area.[3]

2017

[edit]

In May 2017, Spain held an auction for new renewable capacity to be online by 2020. Solar projects won only 1 MW of the 3000 MW awarded. After complaints by the solar industry which felt the auction terms favouredwind power, another auction occurred in July. In this auction, solar projects received 3,909 MW and wind received 1,128 MW.[19][20] Financing, land acquisition and solar panel price fluctuations could reduce the actual amount of solar power installed.

2018

[edit]

A new sector of the market begins to make headway in the Spanish market following the easing of regulations on self consumption generation. 261.7 MW of new solar power was installed, of which just 26 MW were connected to the grid and the remainder, 235.7 MW being self-generating installations.[21] It is expected that this could increase to 300 to 400 MW per year following further easing of regulations in May 2018.[21] Renewable energy auctions held in the previous year have yet to show much impact on grid connected capacity but expected to make a considerable change during 2019. According to industry sources the 3.9 GW tendered through government auctions has been dwarfed by huge merchant and power purchase agreements bringing the combined total under consideration to 29 GW.[22] The re-emerging boom in Spanish solar PV is not being driven by subsidies or government tenders but as a result of solar being a highly cost effective proposition for electricity needs.

2023

[edit]

Spain is poised to become a major contributor to Europe's renewable energy landscape, supported by its robust solar potential and favorable market conditions. In 2023, Spain is on track to increase its solar capacity by 4 GW. The country also has ambitions to install an additional 19 GW of new capacity between 2022 and 2025, which would make it home to the largest solar pipeline in Europe. However, Spain grapples with lengthy permitting processes, which can take up to five years, posing a significant hurdle to project development. To address this challenge, the government introduced new regulations in March 2023, streamlining permitting for projects below 150 MW capacity and with low or mediumenvironmental impact. These measures aim to reduce permitting times to approximately two years.[23]

Solar thermal power plants

[edit]
The 11 megawattPS10 solar power tower produces electricity from the sun using 624 large movable mirrors calledheliostats.
Concentrated Solar Power (CSP) plants list
Name of Plant
Net Power
MW(e)
GW·h
/year
Capacity
factor
Completed
PS101023.40.242007
Andasol 1501650.412008
PS2020480.272009
Eureka22009, June[24]
Andasol 2502009
Puerto Errado 11.52009
Puertollano502009
La Risca502009
Extresol 1502010
Extresol 2502010
La Florida502010, July
Majadas502010, August
Solnova 1502010
Solnova 3502010
Alvarado I502010
Solnova 4502010
La Dehesa502010, November
Palma del Rio 2502011
Manchasol 1502011
Manchasol 2502011
Gemasolar202011
Palma del Rio 1502011
Lebrija 1502011
Andasol 3502011
Helioenergy 1502011
Astexol 3502011
Arcosol 50502011
Termosol 50502011
Helioenergy 2502012
Valle 1501702012
Valle 2501702012
Puerto Errado 2302012
Aste 1A502012
Aste 1B502012
Moron502012
Helios 1502012, May
Solaben 3502012, June
Guzman502012, July
La Africana502012, July
Olivenza 1502012, July
Helios 2502012, August
Extresol 3502012, August
Orellana502012, August
Solaben 2502012, October
Solarcor 1502012
Solarcor 2502012
Termosolar Borges252012, December
Solar Towers from left:PS10,PS20.
Gemasolar Thermosolar Plant was the first concentrated solar power plant to provide 24‑hour power.

In March 2007, Europe's first commercial concentratingsolar power tower plant was opened near the sunnyAndalusian city ofSeville. The 11 MW plant, known as thePS10 solar power tower, produces electricity with 624 large heliostats. Each of these mirrors has a surface measuring 120 square meters (1,290 square feet) that concentrates the Sun's rays to the top of a 115-meter (377 feet) high tower where a solar receiver and a steam turbine are located. The turbine drives a generator, producing electricity.[25]

TheAndasol 1 solar power station is Europe's firstparabolic trough commercial power plant (50 MWe), located nearGuadix in theprovince of Granada, also in Andalusia (the plant is named after the region). The Andasol 1 power plant went online in November 2008, and has athermal storage system which absorbs part of the heat produced in the solar field during the day. This heat is then stored in amolten salt mixture and used to generate electricity during the night, or when the sky is overcast.[26]

A 15 MWe solar-only power tower plant, theSolar Tres project, is in the hands of the Spanish company SENER, employing molten salt technologies for receiving and energy storage. Its 16-hour molten salt storage system will be able to deliver power around the clock. The Solar Tres project has received a €5 million grant from the EC's Fifth Framework Programme.[12]

Solar thermal power plants designed for solar-only generation are well matched to summer noon peak loads in prosperous areas with significant cooling demands, such as Spain. Using thermal energy storage systems, solar thermal operating periods can even be extended to meet base-load needs.[12]

Abengoa Solar began commercial operation of a 20-megawatt solar power tower plant nearSeville in late April 2009. Called thePS20, the plant uses a field of 1,255 flat mirrors, orheliostats, to concentrate sunlight on a receiver mounted on a central tower. Water pumped up the tower and through the receiver boils into steam, which is then directed through a turbine to produce electricity. The new facility is located adjacent to one with half its capacity, called PS10, which was the world's first commercial solar power tower plant. According to Abengoa Solar, the new facility is exceeding its predicted power output.[27]

Photovoltaics

[edit]
Main articles:Solar power in the European Union andGrowth of photovoltaics

Solar PV market segmentation

[edit]
Installed PV capacity in Spain by class size in 2017[28]
<10 kW2%
10-100 kW27%
100-500 kW43%
>500 kW28%

Utility scale solar PV dominated the cumulative installed capacity in 2018 accounting for over 75% of the total in Spain although some sources would not define smaller sized installations as utility scale. Only 2% of Spain's installations in 2017 were in the size typical for residential rooftop solar. This is typically the situation in European countries which had a short-term generous feed in their tariff system with little attention to policy consistency and scale of installations. As of 2018, 19% of Europe's cumulative PV capacity was installed on residential rooftops, and about 30% on commercial roofs, while the industrial segment accounted for 17%, and the utility market for 34%.[29]

The government projects an increase in solar PV capacity by approximately 30 GW, rising from 9 GW in 2020 to 21.7 GW by 2025, and reaching 39.2 GW by 2030.[30]

Residential solar PV capacity

[edit]

According to a report on behalf of the European Commission Spain had just 49 MW of residential solar PV capacity with just 12,000 residential solar PV prosumers in the country representing only 0.1% of households as of 2015.[31] The average size of residential solar PV installations in Spain moving forwards to 2030 is 3.94 kW.[31] The technical potential for residential solar PV in Spain is estimated at 13,620 MW.[31] The United Kingdom, a relative latecomer to Solar PV development, had 2,499 MW of residential solar PV installed as of 2015.[31] At the end of 2023, Spain had 2,400 MW of residential solar PV, most of it tied to the grid.[32]

Large PV roofs

[edit]
Selected Large Photovoltaic Roofs in Spain[33]
LocationOrganisation
(linked)
OnlineCapacity
(MW)
FigueruelasGM facility200811.8
MartorellSeat al Sol, SEAT facility2010–201311.0
CastalaActiu Technology Park20085.2

At the time of opening, the General Motors facility at Figueruelas was the world's largest photovoltaic (PV) roof, consisting of 85,000 lightweight panels, thereby reducing annual carbon dioxide emissions by 6,700 tonnes per year.[34] GM planned to install solar panels at eleven other plants across Europe.

Utility-scale systems

[edit]
Spain's largest photovoltaic (PV) power plants[35]
Name of PlantDC
Peak Power (MW)
GW·h/year[35]Capacity factorNotes
Núñez de Balboa Photovoltaic Power Plant500Commissioned April 2020[36]
Mula Photovoltaic Power Plant494Completed July 2019
Olmedilla Photovoltaic Park60850.16Completed September 2008
Puertollano Photovoltaic Park472008
Planta Solar La Magascona & La Magasquila34.5
Planta Solar Dulcinea[35]31.8Completed 2009
Merida/Don Alvaro Solar Park30Completed September 2008
Planta Solar Ose de la Vega30
Arnedo Solar Plant30Completed October 2008
Merida/Don Alvaro Solar Park30Completed September 2008
Planta Fotovoltaico Casas de Los Pinos28
Planta solar Fuente Álamo26440.19
Planta fotovoltaica de Lucainena de las Torres23.2Completed August 2008
Parque Fotovoltaico Abertura Solar23.1470.23
Parque Solar Hoya de Los Vicentes23410.20
Huerta Solar Almaraz22.1Completed September 2008
Parque Solar El Coronil 121.4
Solarpark Calveron21.2400.22
El Bonillo Solar Park20Completed October 2008
Huerta Solar Almaraz20Completed September 2008
Granadilla de Abona Photovoltaic Park20Completed 2008
Planta solar fotovoltaico Calasparra20
Planta Solar La Magascona20420.24
Beneixama photovoltaic power plant[37]20300.17Tenesol, Aleo, andSolon SE solar modules withQ-Cells
Planta de energía solar Mahora15Completed September 2008
Planta Solar de Salamanca13.8n.a.70,000Kyocera panels
Parque Solar Guadarranque13.6200.17
Lobosillo Solar Park12.7n.a.Chaori and YingLi modules
Parque Solar Fotovoltaico Villafranca12High concentration PV technology
Monte Alto photovoltaic power plant9.5140.17
Viana Solar Park8.7110.14

Photovoltaics (PV) convert sunlight into electricity and many solarphotovoltaic power stations have been built in Spain.[35] As of November 2010, the largest PV power plants in Spain include theOlmedilla Photovoltaic Park (60 MW),Puertollano Photovoltaic Park (47.6 MW),Planta Solar La Magascona & La Magasquila (34.5 MW),Arnedo Solar Plant (34 MW), andPlanta Solar Dulcinea (31.8 MW).[35]

BP Solar begun constructing a new solar photovoltaic cell manufacturing plant at its European headquarters in Tres Cantos,Madrid.[38] For phase one of the Madrid expansion, BP Solar aimed to expand its annual cell capacity from 55 MW to around 300 MW. Construction of this facility was underway, with the first manufacturing line expected to be fully operational in 2009.[38] The new cell lines would use innovative screen-printing technology. By fully automating wafer handling, the manufacturing lines would be able to handle the very thinnest of wafers available and ensure the highest quality.[38] Thin wafers are of particular importance since there has been a silicon shortage in recent years. However, after the new national law limiting installed power by year, in April 2009 BP Solar closed its factories.[39]

Since the beginning of 2007,Aleo Solar AG has also been manufacturing high-quality solar modules for the Spanish market at its own factory in Santa Maria de Palautordera near Barcelona. In 2014 SITECNO S.A. took over this facility[38]

Regional PV distribution

[edit]
PV capacity in watts per capita by autonomous communities in 2013[40]
  <1 watt
  1—10 watts
  10—50 watts
  50—100 watts
  100—200 watts
  200—350 watts
  350—500 watts
  500—750 watts
  >750 watts
Installed PV capacity in megawatts
Autonomous Communities201020112022Watts per
capita (2022)
Andalusia7658224,163488
Aragon1421461,8511,408
Asturias111
Balearic Islands6066225183
Basque Country20235123
Canary Islands13313821294
Cantabria2246
Castile-La Mancha8979234,0481,974
Castile and León4104671,438605
Catalonia20223429538
Ceuta andMelilla0.10.1
Community of Madrid3848639
Extremadura4925585,3475,076
Galicia1012186
La Rioja838999313
Navarre142155166251
Region of Murcia3574041,384908
Valencian Community27731341982
Source:[41][42][43]

Policies, laws and incentives

[edit]
Solar panels inCariñena, Aragon

New technical building code

[edit]

In 2006, Spain implemented a regulatory instrument of national jurisdiction promulgated by the Royal Decree 314/2006 referred to as the technicalbuilding code (TBC or CTE in Spanish) to regulate the basic quality requirements of buildings and their respective installations concerning thermal and photovoltaic solar energy. It applies to new constructions as well as any modifications made on any existing building with the final goal to guarantee and promote the use of renewable sources of energy.[44]

Concerning thermosolar energy, Spain was the first country in Europe to enforce the integration of solar thermal systems in new constructed or refurnished buildings to cover from 30 to 70% of the Domestic Hot Water (DHW) demand. Article 15.4 of the TBC states that "buildings with foreseen demand for hot water or the conditioning of a covered swimming pool, part of the thermal energy needs shall be covered by incorporating systems for the collection, storage and use of low temperature solar energy [...]".[45]

In relation to Photovoltaic power, Article 15.5 requires the incorporation of "systems for the collection and transformation of solar energy into electric power by photovoltaic processes for proprietary use or supply to the network".[46] This policy triggered the production of this type of renewable energy positioning Spain on top of the largest producers of photovoltaic electricity in the world by 2009.[47]

Subsidy reductions

[edit]

In the wake of the2008 financial crisis, the Spanish government drastically cut its subsidies for solar power and capped future increases in capacity at 500 MW per year, with effects upon the industry worldwide. "The solar industry in 2009 has been undermined by [a] collapse in demand due to the decision by Spain", according to Henning Wicht, a solar-power analyst.[7] In 2010, the Spanish government went further, retroactively cutting subsidies for existing solar projects, aiming to save severalbillion euro it owed.[13][48] According to the Photovoltaic Industry Association, several hundred photovoltaic plant operators may face bankruptcy.[49] Phil Dominy ofErnst & Young, comparing the feed-in tariff reductions inGermany andItaly, said; "Spain stands out as an example of how not to do it".[50] As a result, a Spanish association of solar power producers has announced its intention to go to court over the government's plans to cap solar subsidies. In 2014 alternative energy group NextEra filed a complaint against Spain at theInternational Centre for Settlement of Investment Disputes.[51]

Research and development

[edit]

ThePlataforma Solar de Almería (PSA), part of the Center for Energy, Environment and Technological Research (CIEMAT), is a center for research, development, and testing of concentrating solar power technologies.[52] ISFOC[53] in Puertollano is a development institute for concentrator photovoltaics (CPV) which evaluates CPV technologies at the pilot production scale to optimise operation and determine cost.Technical University of Madrid has a photovoltaic research group.[54]

Solar Concentra is the Spanish technology platform forconcentrated solar power (CSP).[55] It was created in 2010, and it combines the efforts of the different agents of the CSP sector in Spain.

See also

[edit]

References

[edit]
  1. ^"Photovoltaic Barometer 2023". EurObserv’ER. 5 May 2023. p. 2/7. Retrieved9 July 2023.
  2. ^ab"Red Eléctrica de España | Series estadísticas nacionales".www.ree.es (in Spanish). Retrieved4 July 2017.
  3. ^ab"IEA-pvps, Annual Report 2016".IEA-PVPS. 2016.
  4. ^"Share of electricity production from solar - Spain". Our World in Data. 2023. Retrieved20 June 2023.
  5. ^"Spain second country in Europe with the most solar energy". InSpain.news. 19 December 2022. Retrieved20 June 2023.
  6. ^Anu Bhambhani (19 December 2022)."European Union To Exit 2022 With Over 41 GW Solar Installed". TaiyangNews. Retrieved20 June 2023.
  7. ^abGonzalez, Angel; Keith Johnson (8 September 2009)."Spain's Solar-Power Collapse Dims Subsidy Model".The Wall Street Journal. Retrieved6 March 2011.
  8. ^Jonathan Touriño Jacobo (28 June 2023)."Spain updates NECP, targets 76GW of solar PV by 2030". PV Tech. Retrieved9 July 2023.
  9. ^Gareth Chetwynd (29 June 2023)."Spain eyes massive solar and wind boosts under new energy plan". Recharge News. Retrieved9 July 2023.
  10. ^"Wind energy and solar power capacity in Spain". Reve. 5 February 2021. Retrieved27 March 2021.
  11. ^Edwin Cartlidge (18 November 2011). "Saving for a rainy day".Science (Vol 334). pp. 922–924.{{cite web}}:Missing or empty|url= (help)
  12. ^abc"Spain pioneers grid-connected solar-tower thermal power"(PDF).
  13. ^abCouture, Toby D. (23 February 2011)."Spain's Renewable Energy Odyssey".Greentech Media. Retrieved6 March 2011.
  14. ^Sills, Ben (18 October 2010)."Spain's Solar Deals on Edge of Bankruptcy as Subsidies Founder".Bloomberg Markets Magazine.Bloomberg.com. Retrieved6 March 2011.
  15. ^"2008 Solar Technologies Market Report, U.S. Department of Energy"(PDF).
  16. ^"Spain expects 3,000 MW in solar plants by 2010". Environmental News Network. 25 September 2008. Retrieved6 March 2011.
  17. ^"Photovoltaic Barometer"(PDF).
  18. ^"Spain Is a Case Study in How Not to Foster Renewables". Retrieved4 July 2017.
  19. ^Hill, Joshua S (28 July 2017)."Spain Awards 4 Gigawatts Solar & 1 Gigawatt Wind In Renewables Auction".CleanTechnica.
  20. ^European Energy Auctions Yield Ever-Lower Wind Energy Prices In Germany & Spain,CleanTechnica, Joshua S Hill, 22 May 2017
  21. ^abPlanelles, Manuel (6 February 2019)."Self-generated energy soars in Spain as solar panels plunge in price".El País.ISSN 1134-6582. Retrieved5 July 2019.
  22. ^"Economics not tenders driving Spain's solar resurgence".PV Tech. 23 April 2018. Retrieved11 July 2019.
  23. ^"Spain's bulging solar pipeline heaps pressure on permitting".Reuters. 8 December 2022.
  24. ^"Abengoa Solar Business Group"(PDF).
  25. ^"Sunny Spain to Host Europe's First Large Solar Thermal Plant". Environment News Service. 30 June 2006. Retrieved6 March 2011.
  26. ^"Andasol 1 Goes Into Operation".
  27. ^"eere.energy.gov". Archived fromthe original on 3 March 2016. Retrieved21 May 2009.
  28. ^"Existing and Future PV Prosumer Concepts"(PDF). pvp4grid.eu. 2012. p. 18.
  29. ^"SolarPower Europe's Global Market Outlook 2019 – 2023"(PDF). 2019. p. 82. Archived fromthe original(PDF) on 15 February 2020. Retrieved10 July 2019.
  30. ^"Spain 2021 - Energy Policy Review"(PDF).International Energy Agency. 2021.
  31. ^abcd"Study on 'Residential Prosumers in the European Energy Union' , pg. 196"(PDF).
  32. ^"Why Spain's Rooftop Solar Owners Weren't Spared From the".Energy Connects. 3 May 2025.
  33. ^"Large Photovoltaic Roofs".pvresources.com. Retrieved15 July 2019.
  34. ^Keeley, Graham (8 July 2008)."GM installs world's biggest rooftop solar panels".The Guardian.ISSN 0261-3077. Retrieved24 July 2019.
  35. ^abcdePV Resources.com (2009).World's largest photovoltaic power plants
  36. ^"Europe's largest solar PV plant, a 500MW facility in Spain, begins production".RenewEconomy. Australia. 14 April 2020.
  37. ^Citysolar (2007).Solar park of the superlative
  38. ^abcd"BP Solar to Expand Its Solar Cell Plants in Spain and India". Archived fromthe original on 18 April 2016. Retrieved1 September 2015.
  39. ^"BP Solar closes its Spanish factories".
  40. ^"Global Market Outlook for Photovoltaics 2014–2018"(PDF).epia.org. EPIA – European Photovoltaic Industry Association. p. 24. Archived fromthe original(PDF) on 25 June 2014. Retrieved12 June 2014.
  41. ^Global Market Outlook 2016Archived 20 March 2013 at theWayback Machine pg. 71
  42. ^Lucía Fernández (14 June 2023)."Solar photovoltaic capacity in Spain in 2022, by autonomous community". Statista. Retrieved9 July 2023.
  43. ^"Population of Spain in 2022, by autonomous community". Statista. 21 July 2023. Retrieved23 July 2023.
  44. ^"CTE".Código Técnico de la Edificación.
  45. ^"The Spanish Technical Building Code, Article 15.4"(PDF).
  46. ^"The Spanish Technical Building Code, Article 15.5"(PDF).
  47. ^A. Prieto, Pedro (2013).Spain's Photovoltaic Revolution: The Energy Return on Investment. SpringerBriefs in Energy. Springer. p. 20.doi:10.1007/978-1-4419-9437-0.ISBN 978-1-4419-9436-3.
  48. ^Johnson, Steve (9 January 2011)."Investors may walk after Spain's solar cut".Financial Times. Retrieved1 March 2011.
  49. ^Sills, Ben (1 August 2010)."Spain Proceeds With Plans to Cut Solar Subsidies After Talks Break Down".Bloomberg.com. Retrieved7 March 2011.
  50. ^Wilson, Peter (5 March 2011)."Sun setting on European solar subsidies".The Australian. Retrieved6 March 2011.
  51. ^"U.S.'s NextEra files complaint over Spain's new renewable energy rules".Reuters. 26 May 2014.
  52. ^"General Description of the PSA". Archived fromthe original on 15 May 2007. Retrieved14 January 2023.
  53. ^isfoc.es
  54. ^ies.upm.es – Instituto Energía Solar
  55. ^solarconcentra.org

External links

[edit]
Portals:
Sovereign states
States with limited
recognition
Dependencies and
other entities
Other entities
Solar power by country
Solar thermal power stations
Photovoltaic power stations
Nuclear plants
Active
Cancelled
Closed
Wind farms
Fossil fuels
Solar power
Africa
Asia
Europe
European
Union
North America
Oceania
South America
Retrieved from "https://en.wikipedia.org/w/index.php?title=Solar_power_in_Spain&oldid=1318571445"
Category:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp