Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Sleaford railway station

Coordinates:52°59′44″N0°24′37″W / 52.995488°N 0.410350°W /52.995488; -0.410350
From Wikipedia, the free encyclopedia
Railway station in Lincolnshire, England

‹ ThetemplateInfobox station is beingconsidered for merging. ›
Sleaford
National Rail
General information
LocationSleaford,North Kesteven
England
Coordinates52°59′44″N0°24′37″W / 52.995488°N 0.410350°W /52.995488; -0.410350
Grid referenceTF067454
Managed byEast Midlands Railway
Platforms3
Other information
Station codeSLR
ClassificationDfT category E
Passengers
2019/20Decrease 298,572
 Interchange Decrease 43,088
2020/21Decrease 76,590
 Interchange Decrease 12,071
2021/22Increase 224,066
 Interchange Increase 31,840
2022/23Increase 231,092
 Interchange Decrease 31,340
2023/24Increase 257,300
 Interchange Increase 34,025
Location
Map
Notes
Passenger statistics from theOffice of Rail and Road
View from the level crossing
Platform view

Sleaford railway station serves the town ofSleaford inLincolnshire,England. It lies on thePeterborough–Lincoln line. The station is 21 miles (34 km) south ofLincoln Central.

The station is now owned byNetwork Rail and managed byEast Midlands Railway who provide all rail services.

History

[edit]

Early proposals

[edit]

TheSleaford Navigation, which canalised a12+12-mile (20.1 km) stretch of theRiver Slea from its junction with theRiver Witham toSleaford, opened in 1794. It facilitated the export of agricultural produce to themidlands and the import of coal and oil. Mills sprang up along the river's course and the Navigation Company's wharves were built near its office on Carre Street in Sleaford.[1][2] In 1827, the River Witham Navigation committee investigated the possibility of a railway allowingAncaster stone to be transported to the Sleaford Navigation. The cost of doing so and competition from other quarries meant that their plans came to nothing.[3]

An 1836 scheme envisaged a railway betweenNottingham andBoston which would have stopped at Sleaford, but the plans never left the drawing board. Another attempt, theEastern Counties scheme, unsuccessfully tried to build a railway betweenLincoln andCambridge, with a branch to Boston viaHeckington and an extension to Sleaford. After protests from the Sleaford Navigation company, the necessaryBill never passed. In 1845, theAmbergate Company designed a railway fromAmbergate to Nottingham, with branches to Boston,Spalding,Grantham and Sleaford. A Bill to that effect passed through theHouses of Parliament in 1846, but the railway only reached Grantham. In the meantime, the more ambitiousGreat Northern Railway fromLondon toYork was also endorsed by anAct of Parliament; it passed through Grantham and a loop line from Boston to Lincoln was operating by 1848, yet its planned extension between Boston and Sleaford was not sanctioned.[4]

The railways arrive

[edit]

A new plan emerged in 1852 and was presented before Parliament the following year. The Sleaford, Boston and Midland Counties Railway would pass through Boston, Sleaford and Grantham. The proposals met with considerable support from businessmen in Sleaford, including a number of Navigation officials; they envisaged it as a mode of transporting coal and stone.[5] The Bill passed in August 1853. Constructed by Smith, Knight & Co. under the supervision of the engineers W. H. Brydone and Edward Harrison, the line betweenBarkston, near Grantham, and Sleaford opened on 15 June 1857.[6][7][8] An elaborate set of celebrations were organised for the opening day of the new Sleaford railway station, which saw all of the town's businesses close to allow their employees chance take part in the festivities; over 700 men from the area were invited to a free lunch on the cricket fields.[9]

The Grantham–Sleaford line cost £130,000 to construct, averaging at £11,850 per mile; the extension to Boston opened on 12 April 1859, at a cost of £6,500 per mile, considerably cheaper thanks to the flat terrain (the hillierAncaster area, by contrast, required cuttings).[10] From the outset, therolling stock was owned by the Great Northern Railway Company (GNR), who took over ownership of the line on 1 July 1864.[11]

New connections

[edit]

TheGreat Eastern Railway wanted to build a line from Cambridge to York, which would have passed through Sleaford andBourne, but Parliament would not allow it.[12] The GNR submitted a proposal for a line between Bourne and Sleaford, which, after amendments to the route, was approved in 1865 and opened in 1872.[12][13] Next came theGreat Northern and Great Eastern Joint Railway which opened fromSpalding through Sleaford toRuskington and from there toLincoln Central in 1882. Kirk and Parry, Sleaford-based building contractors, built the line, while the Ruskington-based builders Pattinson's constructed the new stations along the route.[13] The line was designed to transport freight, which necessitated an avoiding line around Sleaford;[14] Sleaford station was also extended.[15] The last new line through Sleaford ranto RAF Cranwell and opened in 1916.[16]

Operations and later history

[edit]

The Cranwell branch ran at a loss: in response to aParliamentary Question, it was revealed that, allowing for a credit in respect of the c.15,000 tons of Government stores that were transported along it during 1924, the line made a loss of some £3,570, although it was reported that "any alternative means ... would involve considerably greater expenditure".[17] Having ceased to carry passenger traffic in 1927, it closed completely in 1956.[16]

19 September 1954. A1 4-6-2 No. 60136 'Alcazar' headsTrains Illustrated Fenland Rail Tour at Sleaford

Passenger services on the Bourne branch ceased on 22 September 1930.[12] The Spalding line closed in 1964.[14]

TheGrantham toBoston andSpalding toLincoln Central lines remain open, as does the north to south link line bypassing the station. This has recently been refurbished byNetwork Rail and returned to full operation after several years of disuse[18] (as part of the plan to route more freight trains onto the latter and away from the busyEast Coast Main Line).

Sleaford is still one of only a few places still to have signal boxes named 'North', 'South', 'West' and 'East' around the area. With the North and South boxes on thePeterborough–Lincoln line, and then the West and East boxes are at each end of the station on the Grantham to Boston Line. So if travelling from Lincoln Central to Peterborough on the train you would pass all four boxes. The North and South boxes are however due to be decommissioned as part of the upgrade work mentioned above at the end of 2013.

Station Masters

[edit]
  • Mr. Brittain ca. 1859
  • Mr. Lewin ca. 1862
  • Edwin Dibben ca. 1876
  • James L Rayner 1882 - 1885[19] (afterwards station master at Spalding)
  • Arthur Frederick Borwell 1885 - 1897[20]
  • William Durston Bagg 1897 - 1925[21]
  • Edward Walter Hammond 1926 - 1936
  • E. Mitchell 1936 - 1937
  • Ernest Edward Haynes 1937 - 1940[22]
  • S.J.W. Pickering 1940 - 1943[23]
  • F.M. Wright ca. 1947
  • A.J. Marshall ca. 1955
This list isincomplete; you can help byadding missing items.(September 2017)

Services

[edit]

All services at Sleaford are operated byEast Midlands Railway.

On weekdays and Saturdays, the station is generally served by an hourly service northbound toLincoln and southbound toPeterborough. Five trains per day are extended beyond Lincoln toDoncaster. The station is also served by a single daily service to and fromNewark North Gate. Services to/from Peterborough now run in the evenings since the route was modernised and resignalled in 2015.

The station is also served by an hourly service westbound toNottingham viaGrantham and eastbound toSkegness viaBoston.[24]

On Sundays, the service is served by a limited service between Nottingham and Skegness, with additional services during the summer months. Enhancements to the Nottingham to Skegness service on Sundays are due to be made during the life of the East Midlands franchise.[25] There are no Sunday services to Peterborough or Lincoln.

Preceding stationNational RailNational RailFollowing station
Grantham East Midlands Railway
 Heckington
Rauceby
Limited Service
  
Ruskington East Midlands Railway
 Spalding
 Historical railways 
Line and station open
Great Northern and Great Eastern Joint Railway
Line open, station closed
Disused railways
TerminusGreat Northern Railway
Line and station closed
Line and station closed
Great Northern RailwayTerminus

References

[edit]

Citations

[edit]
  1. ^Pawley 1996, pp. 64–66
  2. ^"History – The Company".Sleaford Navigation Trust. Archived from the original on 29 November 2014. Retrieved29 November 2014.{{cite web}}: CS1 maint: bot: original URL status unknown (link) Archived at theInternet Archive on
  3. ^Ellis 1981, p. 79
  4. ^Ellis 1981, p. 79-80
  5. ^Ellis 1981, p. 80
  6. ^Ellis 1981, pp. 80–81
  7. ^Historic England."Sleaford and Boston Branch Railway (1365060)".Research records (formerly PastScape). Retrieved24 August 2015.
  8. ^"Opening of the Boston, Sleaford and Midland Counties Railway.-Grantham to Sleaford".Illustrated London News. 20 June 1857. Retrieved24 August 2015.
  9. ^Ellis 1981, pp. 81–82
  10. ^Ellis 1981, pp. 83–84
  11. ^Ellis 1981, p. 85
  12. ^abcHistoric England."Bourne & Sleaford railway (1365418)".Research records (formerly PastScape). Retrieved15 December 2010.
  13. ^abEllis 1981, p. 86
  14. ^abHistoric England."Spalding and Lincoln Railway (1365440)".Research records (formerly PastScape). Retrieved25 August 2015.
  15. ^Historic England."Sleaford railway station (1062114)".National Heritage List for England. Retrieved16 March 2015.
  16. ^ab"Heritage Gateway Record for RAF Cranwell – Reference Name MLI83189".Lincs To The Past.Lincoln, England: Lincolnshire Archives. 2 March 2012. Retrieved30 May 2012.
  17. ^"Cranwell and Sleaford Railway. HC Deb vol 185 cc494-5".Parliamentary Debates (Hansard). 17 June 1925. Retrieved30 May 2012.
  18. ^Network Rail starts renovation work on Sleaford Avoiding LineRailway Technology website news article; Retrieved 3 July 2013
  19. ^"Popular GNR Official".Lincolnshire Chronicle. England. 28 September 1855. Retrieved2 September 2017 – via British Newspaper Archive.
  20. ^"Appointment".Grantham Journal. England. 24 April 1897. Retrieved3 September 2017 – via British Newspaper Archive.
  21. ^"Sleaford Station-Master Dead".Lincolnshire Standard and Boston Guardian. England. 21 November 1925. Retrieved2 September 2017 – via British Newspaper Archive.
  22. ^"Stationmaster Retiring".Boston Guardian. England. 7 August 1940. Retrieved3 September 2017 – via British Newspaper Archive.
  23. ^"LNER Retirement".Lincolnshire Echo. England. 17 September 1942. Retrieved3 September 2017 – via British Newspaper Archive.
  24. ^Table 58, 59National Rail timetable, May 2023
  25. ^"East Midlands Rail Franchise".Department for Transport. Archived fromthe original on 14 May 2019. Retrieved18 January 2021.

Bibliography

[edit]

External links

[edit]
Wikimedia Commons has media related toSleaford railway station.
  • England – Lincolnshire (Map). 1:10,560. County series, Epoch 1. Ordnance Survey. 1891. Sheet 106/NW. ; Sleaford station on 1891 OS map.
Railway stations inLincolnshire
Barton line
Birmingham–Peterborough line
Doncaster–Lincoln line
Newark–Grimsby line
Nottingham–Grantham line
Nottingham–Lincoln line
Peterborough–Lincoln line
Poacher Line
South Humberside Main Line
Sheffield–Lincoln line
Heritage railways
Lincolnshire Wolds Railway
Railway stations served byEast Midlands Railway
Stations in italics are served on peak hours and/or Sundays only on the service indicated.
EMR Intercity
EMR Connect
Luton Airport Express
EMR Regional
East Midlands
Yorkshire and the Humber
East of England
West Midlands
North West England
Retrieved from "https://en.wikipedia.org/w/index.php?title=Sleaford_railway_station&oldid=1290222147"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp