Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

SkyTrain (Vancouver)

Route map:
From Wikipedia, the free encyclopedia
Rapid transit system in British Columbia

SkyTrain
Overview
OwnerProvince ofBritish Columbia
LocaleMetro Vancouver, British Columbia
Transit typeMedium-capacity rapid transit system
Number of lines3
Number of stations54 (13 under construction) (List of stations)
Daily ridership456,300 (weekdays, Q2 2025)[1]
Annual ridership149,066,500 (2024)[2]
WebsiteTransLink
Operation
Began operationDecember 11, 1985; 39 years ago (1985-12-11)[3]
Operator(s)TransLink
CharacterElevated, underground, and at-grade
Number of vehicles298
Train length2-, 4-, 5- or 6-car trainsets
Headway
  • 2–10 minutes (Expo and Millennium Lines)
  • 3–15 minutes (Canada Line)
Technical
System length
  • 79.6 km (49.5 mi)[4]
  • 21.7 km (13.5 mi) under construction[5][6]
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
Electrification650 V DCthird raillinear induction (Expo and Millennium Lines)
750 V DCthird rail conventionaltraction motors (Canada Line)
Average speed
  • 40 km/h (25 mph) (Expo and Millennium Lines)[7]
  • 32 km/h (20 mph) (Canada Line)[7]
Top speed80 km/h (50 mph)[8][9]
System map
MapShow interactive map
Show static map
(2027)
Arbutus
Waterfront
(2027)
South Granville
Burrard
(2027)
Oak–VGH
Vancouver City Centre
Yaletown–Roundhouse
Granville
Olympic Village
Stadium–Chinatown
Broadway–
Main Street–
Science World
Amtrak
( 2027)
City Hall
Mount Pleasant
(2027)
King Edward
Great Northern
Way–Emily Carr
(2027)
VCC–Clark
Oakridge–
41st Avenue
Commercial–
Broadway
Renfrew
Langara–49th Avenue
Rupert
Nanaimo
Marine Drive
29th Avenue
Zone 1
Zone 2
Joyce–
Collingwood
Operations and
Maintenance Centre
Bridgeport
Patterson
Metrotown
Templeton
Royal Oak
Sea Island Centre
Gilmore
Vancouver International AirportYVR–Airport
Brentwood
Town Centre
Capstan
Holdom
Aberdeen
Sperling–
Burnaby Lake
Lansdowne
Lake City Way
Richmond–Brighouse
Production Way–
University
Edmonds
Lougheed
Town Centre
Edmonds Yard
22nd Street
Future storage facility
New Westminster
Braid
Columbia
Sapperton
Zone 2
Zone 3
Scott Road
Burquitlam
Gateway
Surrey Central
Moody Centre
King George
Inlet Centre
(2029)
Green Timbers
Vehicle storage facility
(2029)
152 Street
Coquitlam
Central
(2029)
Fleetwood
Lincoln
(2029)
Bakerview–166 Street
Lafarge Lake–
Douglas
Future storage facility
(2029)
Hillcrest–184 Street
(2029)
Clayton
(2029)
Willowbrook
(2029)
Langley City Centre
Key
Canada Line
Expo Line
Handicapped/disabled access All stations are accessible
Millennium Line
This diagram:
Show route diagram

SkyTrain is themedium-capacity rapid transit system serving theMetro Vancouver region in British Columbia, Canada.[10] SkyTrain has 79.6 km (49.5 mi) of track and usesfully automated trains on grade-separated tracks running on underground and elevated guideways, allowing SkyTrain to hold consistently high on-time reliability.[4][11] In 2024, the system had an annual ridership of 149,066,500, or about 456,300 per weekday as of the second quarter of 2025, making it the 7thbusiest metro system in North America and the 5th busiest in Canada and the US.

The name "SkyTrain" was coined for the system duringExpo 86 because the first line (Expo) principally runs on elevated guideway outside ofDowntown Vancouver, providing panoramic views of the metropolitan area. SkyTrain uses the world's third-longest cable-supported transit-only bridge, known asSkyBridge, to cross theFraser River.[12]

With the opening of theEvergreen Extension on December 2, 2016, SkyTrain became the longestrapid transit system in Canada and the longest fully automated driverless system in the world.[13] The total lengths of the automated lines of theShanghai Metro,[14]Singapore MRT, Kuala LumpurRapid KL,Dubai Metro andRiyadh Metro have since surpassed those of SkyTrain.[15]

SkyTrain has54 stations served by three lines: theExpo Line, theMillennium Line, and theCanada Line. The Expo and Millennium Lines are operated by British Columbia Rapid Transit Company under contract fromTransLink (originally BC Transit), a regional government transportation agency. The Canada Line is operated on the same principles by the private concessionaire ProTrans BC under contract to TransLink and is an integrated part of the regional transport system. SkyTrain uses a fare system shared with other local transit services and is policed by theMetro Vancouver Transit Police. SkyTrain attendants (STAs) provide first aid, emergency response, directions and customer service, inspect fares, monitor train faults, and operate the trains manually if necessary.

Network

[edit]

Expo Line

[edit]
Main article:Expo Line (SkyTrain)

The Expo Line connectsWaterfront station in Vancouver toKing George station inSurrey, principally along a route established by the Westminster and Vancouver Tramway Company as an interurban line in 1890.[16] The Expo Line (originally referred to as simply "SkyTrain" until the opening of the Millennium Line) was built in 1985 in time forExpo 86. It now has 24 stations. The Expo Line ran only as far asNew Westminster station initially. In 1989, it was extended toColumbia station and in 1990, once theSkyBridge was finished, it continued across the Fraser River to Scott Road station in Surrey. In 1994, the terminus of the Expo Line became King George station in central Surrey. It was built on a budget of $854 million (1986 dollars).[17] Effective October 22, 2016, Expo Line trains began operating on a new branch toProduction Way–University station, taking over the previousMillennium Line service between Waterfront and that station. During peak periods, trains between Waterfront and Columbia arrive every 2 to 3 minutes. Between Waterfront and King George, trains arrive every 2 to 5 minutes during peak hours, while trains between Waterfront and Production Way arrive every 6 to 7 minutes in the peak hours.[18]

Millennium Line

[edit]
Main article:Millennium Line

Prior to October 22, 2016, the Millennium Line shared tracks with the Expo Line from Waterfront station to Columbia station in New Westminster, then continued along its own elevated route throughNorth Burnaby andEast Vancouver, ending atVCC–Clark station, nearVancouver Community College's Broadway campus. It was built on a $1.2-billion budget and the final extension from Commercial Drive station (nowCommercial–Broadway station) to VCC–Clark station was opened on January 6, 2006.[19] From October 22, 2016, to December 1, 2016, the Millennium Line operated from VCC–Clark to Lougheed Town Centre station.[20] As of December 2, 2016, the Millennium Line operates between VCC–Clark station in Vancouver andLafarge Lake–Douglas station in Coquitlam. The Millennium Line has 17 stations, three of which are transfer stations with the Expo Line (Commercial–Broadway, Production Way–University, and Lougheed Town Centre) and two which connect with the West Coast Express commuter train (Moody Centre andCoquitlam Central). The original Millennium Line's stations were designed by British Columbia's top architects and are unlike those on the Expo Line.[19] In 2004, Busby and Associates Architects, designers of theBrentwood Town Centre station inBurnaby, were honoured for their work with aGovernor General's Medal in Architecture.[21]

Construction on the Millennium Line'sEvergreen Extension, from Lougheed Town Centre in Burnaby to Lafarge Lake–Douglas in Coquitlam, was completed in 2016 and it was opened for revenue service on December 2, 2016.[13] This extension adds 11 km (6.8 mi) and 6 new stations to the Millennium Line.[22]

Canada Line

[edit]
Main article:Canada Line

The Canada Line begins at the Waterfront station hub, then continues south through Vancouver into the City of Richmond and Sea Island. FromBridgeport station, the Canada Line splits into two branches, one heading west to theYVR–Airport station atVancouver International Airport and the other continuing south to theRichmond–Brighouse station in Richmond's city centre. Opened on August 17, 2009, the Canada Line added 15 stations and 19.2 km (11.9 mi) to the SkyTrain network. Waterfront station is the only station where the Canada Line directly connects with the Expo Line; however,Vancouver City Centre station is within a three-minute walk fromGranville station via thePacific Centre mall, making an unofficial transfer to the Expo Line. The Canada Line cost $1.9 billion, financed by the Governments of Canada and British Columbia, TransLink, and InTransitBC.[23] The Canada Line's trains, built byHyundai Rotem, are fully automated, but are of a different design from the Expo and Millennium Lines' Bombardier-built fleet. They use conventional electric motors rather than linear induction motor technology. Canada Line tracks do not interconnect with the rest of the SkyTrain network, and there is a separate fleet maintenance depot.[24]

Operations

[edit]
LineOpening yearRoute length[citation needed]StationsTerminus stationsTravel timeFrequency[25]Combined frequency
PeakOff-peakPeakOff-peak
Expo Line198528.9 km (18.0 mi)[a]20[a]WaterfrontKing George40 min2–5 min6–10 min2–3 min[b]3–5 min
201629.7 km (18.5 mi)[a][c]20[a][c]Production Way–University41 min12 min12 min
2024[d]25.9 km (16.1 mi)[a]18[a]Braid36 min12 min
Millennium Line2002[e]25.5 km (15.8 mi)[c]17[c]VCC–ClarkLafarge Lake–Douglas36 min3–4 min6–10 min
Canada Line200914.4 km (8.9 mi)[f]14[f]WaterfrontRichmond–Brighouse25 min6 min6–15 min3 min3–8 min
15.1 km (9.4 mi)[f]13[f]YVR–Airport26 min6 min6–15 min
  1. ^abcdefExpo Line service is interlined for 16 stations, accounting for 22.2 km (13.8 mi) of route, between Waterfront and Columbia.
  2. ^Additional peak hour only service operates between Waterfront and Commercial–Broadway.
  3. ^abcdExpo and Millennium Line service is interlined for two stations, accounting for 1.8 km (1.1 mi) of route, between Lougheed Town Centre and Production Way–University.
  4. ^Temporary service change due to single tracking between Braid and Lougheed Town Centre for the construction of a future storage yard. Passengers can transfer at Braid to a Production Way-University bound train.[26]
  5. ^Evergreen Extension started revenue service on December 2, 2016.[13]
  6. ^abcdCanada Line service is interlined for 10 stations, accounting for 11.1 km (6.9 mi) of route, between Waterfront and Bridgeport.

Frequency

[edit]

SkyTrain provides high-frequency service, with trains arriving every 2 to 6 minutes at all stations during peak hours.[25] Trains operate between 5:07 a.m. and approximately 1:55 a.m. on weekdays, with reduced hours on weekends on the Expo and Millennium lines. The last eastbound trains leave the downtown terminus between approximately 12:40 a.m to 1:15 a.m on weekdays.[27] SkyTrain has longer hours of service during special events, such as New Year's Eve, theVancouver 2010 Olympics, and marathons.[28][29]

Cash fares as of July 1, 2025[30]
Fare classOne zoneTwo zonesThree zonesAirport AddFare
Adult (cash)$3.35$4.85$6.65+$5.00
Adult (stored value)$2.70$4.00$5.10+$5.00
Concession$2.25$3.30$4.50+$5.00

Fares

[edit]
Further information:TransLink (British Columbia) § Transit fares
A ticket vending machine (right), next to an old faresaver validator (2006)

TransLink's SkyTrain service area is divided into three zones, with fares varying depending on how many zone boundaries are crossed during one trip (two- and three-zone passengers are charged the one zone rate after 6:30 pm rush hour, and on weekends and statutory holidays). Customers may purchase fares using cash, debit cards, or credit cards from self-serve ticket vending machines at the mezzanine level of each station. A variety of transit passes are available, such as the pre-paid FareSaver ticket, daily DayPass, monthly FareCard, annual EmployerPass, post-secondary studentU-Pass, and other specialized passes.Canadian National Institute for the Blind identification cards are accepted without the need to be read by the fare box. One-time fares are valid for 90 minutes on any mode of transportation with any number of transfers, including all SkyTrain lines and bus andSeaBus routes. Concession fares are available for secondary school students with a valid Go-Card and the elderly.[31] Children under 12 have been able to ride the system for free since September 2021.[32]

Until April 2016, SkyTrain's fare system was aproof-of-payment system; there were noturnstiles at the entrances to train platforms. Instead, fares were typically enforced by random ticket inspections – usually by police or transit security but occasionally by SkyTrain attendants – through trains and stations. This was supplemented by controlled access – with the payment of a fare or proof of payment required to pass through a staffed gate – at special events where extremely high ridership was expected, such as immediately afterBC Lions orVancouver Canucks games.[33][34]

Fare gates

[edit]
Fare gates atNew Westminster station (2018)
Further information:Compass card (British Columbia)

Installing faregates to preventfare evasion was considered as early as at the time of the system's opening, but was rejected multiple times because the expense of implementing, maintaining, and enforcing them would exceed the losses prevented.[35] In 2005, TransLink estimated it was losing $4 million (5 percent of revenue attributed to SkyTrain) annually to fare evasion on SkyTrain.[36] While the Canada Line stations, along with those on the Millennium Line, were designed to allow for future fare gates, the Canada Line opened in 2009 without them, despite stated intentions to include them.[37] Expo Line stations have since been redesigned and retrofitted to accommodate the new fare gate system.

The 2008 Provincial Transit Plan outlined several SkyTrain system upgrades, including replacement of the proof-of-payment system with a gated-ticket system.[38] According to Minister of TransportationKevin Falcon, the gated-ticket system was to be implemented by a private company by 2010.[39] In April 2009, it was announced that the provincial and federal governments would spend $100 million[40] to put the gates in place by the end of 2010. However, in August 2009, a TransLink spokesman said the gates would not be installed before 2012, and that a smart card system would be implemented at the same time.[41]

It was announced on August 14, 2013, that bus-issued transfers (magnetic strip paper cards) would continue to be issued for cash fares paid on buses, but that these transfers would not work at SkyTrain or SeaBus station fare gates, which require a Compass Card or a 90-minute paper Compass ticket to operate. This means that a bus rider paying cash is required to pay a second fare to transfer to SkyTrain or SeaBus. Those transit users paying cash but beginning their trips at a SkyTrain or SeaBus station are not subject to this second fare because they are issued Compass tickets which are accepted as valid transfers on TransLink buses.

Construction of SkyTrain fare gates was completed in May 2014, but they remained open until April 2016 owing to multiple system problems. While open for the nearly two-year period, holders of paper-based monthly passes, bus-issued transfers, and FareSaver tickets continued to pass through the gates into the stations' fare-paid zones unimpeded, although they were subject to having their fare inspected by transit security or transit police once inside the fare-paid zone. Starting in April 2016, they were initially fully closed only during peak hours, with one gate remaining open during off-peak times for people with accessibility issues who could not reach their Compass Cards to the fare gates to tap in or out. Full implementation of the fare gates was also delayed by problems with Compass Cards when riders were tapping out as they exited buses. The tapping-out process on buses was too slow and did not always record the tap which—because the system initially deducted a three-zone fare until a tap-out was recorded and a refund was issued to those having only travelled one or two zones—often resulted in customers being charged for travelling through three zones when in fact they had only travelled through one or two.[42] This was a serious setback for TransLink as the entire system was supposed to be operational by 2013. A solution was finally implemented where the requirement to tap out of buses was removed and all bus travel was considered as within a single zone, creating significant savings for those travelling multiple zones using buses only and in some cases changing transit usage patterns.[43] The last fare gates left open for users with accessibility issues were closed on July 25, 2016, and the system has been in full operation since.[44]

Airport surcharge

[edit]

Travel on the Canada Line is free between the threeSea Island stations near the Vancouver International Airport:Templeton,Sea Island Centre, and YVR–Airport.

Single-use Compass tickets purchased with cash at Compass vending machines in stations on Sea Island include a surcharge, the "YVR AddFare", of $5.00 on top of the normal fare. This charge is also added to trips initiated at Sea Island stations for travel east to Bridgeport station and beyond using Compass Card stored value or DayPasses. It is not applied to trips using monthly passes, nor to trips travelling to the airport using DayPasses or single-use Compass tickets which were purchased and activated off Sea Island.[45][46] The YVR AddFare came into effect on January 18, 2010.[47] The revenue collected from the AddFare goes back to TransLink.[45]

Ridership

[edit]
Interior of a Mark I train travelling along the Expo Line betweenCommercial–Broadway station andMain Street–Science World station (2019)
Canada Line trains atVancouver International Airport (2008)

Passengers on SkyTrain made an average of 526,400 trips on weekdays by the end of September 2019[update].[48] Overall in 2017, the network carried a total of 151 million passengers.[49] This compares to 117.4 million passengers in 2010: 38,447,725 on the Canada Line and 78,965,214 on the interlined Expo and Millennium Lines.[50] The Canada Line carried an average of 110,000 passengers per weekday in early 2011, and is three years ahead of ridership forecasts.[51]

SkyTrain's highest ridership came during the2010 Winter Olympics when each event ticket included unlimited day-of transit usage. During the 17-day event, Canada Line ridership rose 110 percent to an average of 228,000 per day, with a single-day record of 287,400 on February 19, 2010. Expo and Millennium Line ridership rose 64 percent to an average of 394,000 per day, with a single-day record of 567,000 on February 20, 2010. At times, every available train was in service on all three lines.[52] After the Olympics ended, overall transit usage remained 7.8 percent above the previous year.[51]

TransLink SkyTrain ridership by year
Year2016[53]2017[54]2018[55]2019[56]2020[57]2021[58]2022[58]2023[59]2024[60]
Trips (millions)137.4151.4160.0165.174.5[a]76.32116.6141.3149.1
030,000,00060,000,00090,000,000120,000,000150,000,000180,000,00020162018202020222024TripsTransLink SkyTrain ridership by year
TransLink ridership by mode, 2024[61]
ModeTrips% of total
050,000,000100,000,000150,000,000200,000,000250,000,0002024SkyTrainWest Coast ExpressSeaBusBusTransLink (British Columbia) ridership by mode, 2024

SkyTrain
149,066,50037.00

West Coast Express
1,559,1000.39

SeaBus
5,398,9001.34

Bus
246,877,50061.30
Total402,902,000[b]100.00

Funding

[edit]

The cost of operating SkyTrain in 2008, with an estimated 73.5 million boardings, was $83 million.[62][63] To cover this, TransLink draws mostly from transit fares, advertising ($360 million in 2008) and tax ($262 million from fuel taxes and $298 million from property taxes in 2008), funds which are also shared with bus services, roads and bridge maintenance, and other infrastructure and services.[62] The capital costs of building the system are shared with other government agencies. Capital expenses were $216 million[62] in 2008. For example, the cost of building the Canada Line was shared between TransLink ($335 million or 22 percent), the federal government (29 percent), the provincial government (28 percent), the airport authority (19 percent), and the City of Vancouver (2 percent).[64] While TransLink has run surpluses for operating costs since 2001,[65][66] it incurs debt to cover these capital costs. As a whole, TransLink had $1.1 billion in long-term debt in 2006, of which $508 million was transferred from the province in 1999 when responsibility for SkyTrain was given to TransLink.[65][67] The province retained ownership of the causeway, bridge, certain services, and a portion of SkyTrain's debt.[68]

Security

[edit]
Bus advertisement for theMetro Vancouver Transit Police (2007)
Canada and Millennium Line stations were designed for fare gates (2009).

Law enforcement services are provided by theMetro Vancouver Transit Police (MVTP). They replaced the old TransLinkspecial provincial constables, who had limited authority.

On December 4, 2005, MVTP officers became the first and onlytransit police force in Canada to have full police powers and carry firearms. There was public concern in March 2005 when it was announced that transit police would carry firearms. Solicitor General of British ColumbiaJohn Les defended the move at the time, saying that it was necessary to enhance SkyTrain security.[69] Transit officers receive the same training as officers in municipal and RCMP forces. They may arrest people for outstanding warrants, enforce drug laws, enforce the criminal code beyond TransLink property, and deal with offences that begin off TransLink property and make their way onto it. They issue tickets for fare evasion and other infractions on SkyTrain, transit buses,SeaBus, andWest Coast Express.[70]

Transit police officers and Transit Security officers inspect fares at Skytrain stations as part of TransLink's fare audit. Transit Security officers mostly focus their efforts on the bus system, bus loops, and SeaBus.

SkyTrain attendants provide customer service and first aid, troubleshoot train and station operations, and perform fare checks alongside the transit police force.[71] SkyTrain attendants can be identified by their uniforms which say "SkyTrain" on them.

Over the years, violence and other criminal activities have been concerns at time, but TransLink maintains that the system is safe.[72][73][needs update] In 2009, Inspector Kash Heed of theVancouver Police Department said that little crime takes place in the stations themselves; however, criminal activity becomes more visible 400–700 metres (1,000–2,000 ft) outside them.[74]

Each station is monitored with an average of 23closed-circuit television cameras, allowing SkyTrain operators to monitor passenger and station activity.[75] Designated waiting areas have enhanced lighting, benches, and emergency telephones. Trains have yellow strips above each window which, when pressed, silently alert operators of a security hazard. On-board speaker phones provide two-way communication between passengers and control operators.[76]

In 2007, it was reported that the entire surveillance system was upgraded from analogue two-hour tape recording to digital technology, which was to allow police to retrieve previous footage for up to seven days.[77] However, incidents since the upgrade have still limited police to a two-hour loop, resulting in loss of potential evidence.[78]

By November 2008, at least 54 deaths had occurred on the platforms and tracks of the Expo and Millennium Lines. 44 of those deaths were suicides, while the remaining ten were accidental.[79]

History

[edit]
Main article:History of the SkyTrain
Aplaque commemorating the inauguration of the SkyTrain

Planning

[edit]

Vancouver had plans as early as the 1950s to build amonorail system, with modernist architectWells Coates to design it; that project was abandoned.[80] The lack of a rapid transit system was said to be the cause of traffic problems in the 1970s, and the municipal government could not fund the construction of such a system.[81] During the same period,Urban Transportation Development Corporation, then anOntario crown corporation, was developing a new rapid transit technology known as an "Intermediate Capacity Transit System".[82] In 1980, the "Advanced Light Rapid Transit" system was selected by the British Columbia provincial government for use on one of two planned corridors, connecting Vancouver to New Westminster in time forExpo 86.[83]

Expo Line

[edit]
A first-generation Bombardier Mark II train atRupert station (2005)
Main article:Expo Line (SkyTrain)

SkyTrain was conceived as a legacy project of Expo 86 and the first line was finished in time to showcase the fair's theme: "Transportation and Communication: World in Motion – World in Touch".[84] Construction was funded by the provincial and federal governments and began in March 1982.[85][86] It was built through theDunsmuir Tunnel under downtown, which had originally been built for theCanadian Pacific Railway, to save costs.[86]

The first 21.4 kilometres (13.3 mi) of the system, from Waterfront toNew Westminster station, opened for limited and fare-free service on December 11, 1985.[87] Revenue service began on January 3, 1986, and within its first year the line had carried over 30 million passengers—including visitors to Expo 86.[88][89] The following year, construction began on an extension including the SkyBridge, Columbia station, andScott Road station, extending service by 3.1 kilometres (1.9 mi) to Surrey; it opened on March 16, 1990.[90][91] The line was expanded again in 1994 with the opening ofGateway,Surrey Central, andKing George stations. SkyTrain is part of the 1996Greater Vancouver Regional District's (GVRD) Livable Region Strategic Plan, which discusses strategies to deal with the anticipated increase of population in the region. These strategies include increasing transportation choices and transit use.[92]

Millennium Line

[edit]
A Mark I train in the Grandview Cut betweenVCC–Clark andCommercial–Broadway stations (2006)
Main article:Millennium Line

The first section of the Millennium Line opened in 2002, withBraid andSapperton stations. Most of the remaining portion began operating later that year, servingNorth Burnaby andEast Vancouver. Phase I of the Millennium Line was completed $50 million under budget. Critics of the project dubbed it the "SkyTrain to Nowhere", claiming that the route of the new line was based on political concerns, not the needs of commuters.[93] One illustration of the legitimacy of this complaint is that the end of the Millennium Line is located in a vacant field, chosen because it was supposed to be the location for a new high-tech development and is close to the head office of QLT Inc., but additional development was slow to get off the ground.[94][95] That station,VCC–Clark near Clark Drive and Broadway, did not open until 2006 due to the struggles of negotiating the right-of-way with BNSF, the owner of the freight tracks beside the station, but it is still five kilometres short of the original proposed Phase II terminus at Granville Street and 10th Avenue. At the time VCC–Clark station opened, it was revealed that the additional westward extension and its three stations was out of favour and "not a high priority anymore".[96]

Evergreen Extension

[edit]
Coquitlam'sLincoln station on the Evergreen Extension of the Millennium Line (2017)
Main article:Evergreen Extension

The Evergreen Extension, known as the Evergreen Line during construction, is the second phase of the Millennium Line, extending from Lougheed Mall in Burnaby to the Douglas College campus in Coquitlam. Originally referred to as the Port Moody-Coquitlam (PMC) Line, it provides a "one-seat ride" from Coquitlam to Vancouver. Switches to the PMC Line were installed to the east of Lougheed Town Centre station during its initial construction and a third platform at the station was roughed-in in anticipation of the extension. Phase II was postponed following a change in provincial government and a shuffling of priorities that led to prioritizing building the Canada Line due to Vancouver's hosting of the 2010 Olympics. Preliminary construction of the Evergreen Extension began in July 2012 and major construction started in June 2013 with the construction of support columns for the line. The extension began revenue service on December 2, 2016.[97]

Canada Line

[edit]
Main article:Canada Line

The Canada Line was built as a public–private partnership, with the winning consortium (now known as ProTransBC), led bySNC-Lavalin, contributing funds toward its construction and operating it for 35 years. A minimum ridership was guaranteed to ProTransBC by TransLink.[98] The Richmond–Vancouver corridor had been considered for a rapid transit line as early as 1979 but such a project was not funded until the early 2000s with the approval of the Canada Line.[86] The line opened on August 17, 2009, 15 weeks ahead of schedule and on budget.[99] Ridership rose three years ahead of forecasts, hitting 100,000 passengers per weekday in May 2010 and 136,000 passengers per weekday in June 2011.[100] The Canada Line is operationally independent from the other SkyTrain lines, using different rolling stock (shorter overall train and station length, but wider cars) that is incompatible with the Expo and Millennium Lines.[101][102]

Impact

[edit]

SkyTrain has had a significant impact on the development of areas near stations, and has helped to shapeurban density in Metro Vancouver. Between 1991 and 2001, the population living within 500 m (1,640 ft) of SkyTrain increased by 37 percent, compared to the regional average of 24 percent.[102] Since SkyTrain opened, the total population of the service area rose from 400,000 to 1.3 million people.[103] According to BC Transit's documentSkyTrain: A catalyst for development, more than $5 billion of private money had been invested within a 10–15 minute walking distance of the SkyTrain andSeaBus. The report claimed that the two modes of transportation were the driving force of the investment, though it did not disaggregate the general growth in that area.[104]

Design

[edit]

Routes

[edit]
TransLink major routes
Lonsdale Quay
UBC Exchange
Western Parkway
Sasamat
Waterfront
Burrard
Granville Street
Alma / W 10th
Granville
Macdonald
Vancouver City Centre
Yaletown–Roundhouse
Cambie Street
Arbutus
Stadium–Chinatown
Granville Street
Main Street–Science World
Heather / Willow
Olympic Village
Broadway–City Hall
Main Street
King Edward
Main Street
Fraser
Broadway
extension
(
under
construction
)
Clark Drive
VCC–Clark
Oakridge–41st Avenue
Commercial Drive
Commercial–Broadway
Nanaimo Street
Langara–49th Avenue
Renfrew Street
Marine Drive
Nanaimo
29th Avenue
Renfrew
Joyce–Collingwood
Rupert
Kootenay Loop
Gilmore
Gilmore Avenue
Bridgeport
Brentwood Town Centre
Patterson
Willingdon Avenue
Holdom
Hythe Avenue
Metrotown
Holdom Avenue
Royal Oak
Sperling–Burnaby Lake
Templeton
Kensington Avenue
Sea Island Centre
Lake City Way
YVR–Airport
Production Way–University
Edmonds
Duthie Avenue
22nd Street
Lougheed Town Centre
New Westminster
Braid
Columbia
Sapperton
Capstan
SFU Transportation Centre
Aberdeen
SFU Exchange
Lansdowne
Richmond–Brighouse
Guildford Exchange
Burquitlam
148 Street
Moody Centre
144 Street
Scott Road
140 Street
Gateway
Whalley
Surrey Central
Inlet Centre
King George
Proposed Port
Coquitlam extension
Surrey–Langley extension
under construction
Coquitlam Central
96 Avenue
Lincoln
88 Avenue
Lafarge Lake–Douglas
80 Avenue
76 Avenue
Port Coquitlam
Newton Exchange
Pitt Meadows
Maple Meadows
Port Haney
Mission City

Handicapped/disabled access All stops and stations are accessible
Legend
Expo Line
Millennium Line
Canada Line
West Coast Express
SeaBus
B-Line bus (99)
RapidBus (R1,R5)
Fare zones
 1 
 2 
 3 
 4 
West Coast Express only
 5 
West Coast Express only
A schematic diagram of the SkyTrain network as of late 2020

There are three main routes: the Expo Line, Millennium Line and Canada Line. The Expo Line travels between Waterfront station inDowntown Vancouver and Columbia station inNew Westminster, serving the cities of Vancouver,Burnaby, and New Westminster. From Columbia, the Expo Line splits into two branches. One branch travels through Surrey toKing George station, while the other travels through New Westminster and Burnaby, terminating atProduction Way–University station.

Millennium Line trains travel betweenVCC–Clark station andLafarge Lake–Douglas station in the city ofCoquitlam. Near the western end of the line is a major transfer point with the Expo Line at Commercial–Broadway station. Further east,Lougheed Town Centre station andProduction Way–University station serve as two more transfer points with the Expo Line.

The Canada Line travels southward from Waterfront station in Downtown Vancouver toRichmond, where the track splits atBridgeport station; trains alternate between a southern branch ending atRichmond–Brighouse station and a western branch ending atVancouver International Airport.

Although most of the system is elevated, SkyTrain runs at or belowgrade through Downtown Vancouver, for the Vancouver portion of the Canada Line until just before it reaches Richmond at Marine Drive station, through the 2.1-kilometre (1.3 mi) tunnel used by the Millennium Line between Coquitlam and Port Moody, through the 0.6-kilometre (0.4 mi) tunnel between Columbia and Sapperton stations in New Westminster, and for short stretches in Burnaby and New Westminster.

SkyTrain's Expo Line uses the world's second longest bridge dedicated to transit services, the SkyBridge, which crosses theFraser River betweenNew Westminster and Surrey. It is a 616-metre-long (2021 ft)cable-stayed bridge,[105] with 123-metre-tall (404 ft) towers. Two additional transit-only bridges, theNorth Arm Bridge and theMiddle Arm Bridge, were built for the Canada Line. The North Arm Bridge is anextradosed bridge with a total length of 562 m (1844 ft), with shorter 47-metre (154 ft) towers necessitated by its proximity to theVancouver International Airport, and also has a pedestrian/bicycle deck connecting the bicycle networks of Vancouver and Richmond.[106] The Middle Arm Bridge is a shorterbox girder bridge.

Technology

[edit]

Thesignalling technology used on all three SkyTrain lines to run trains automatically was originally developed byAlcatel and loaded from a3.5" diskette. There were initially four systems called the vehicle control computer (VCC) with three divided over the mainline and one for the storage yard. VCC1 controls trains from Waterfront to Royal Oak; VCC2 controls trains from Royal Oak to King George (it now also controls a portion of the Millennium Line); and VCC3 controls trains in the yard. Additional VCCs were added as Skytrain expanded. Each VCC is a cluster of three IBM Type 7588 rack-mount single-board computers with Intel-IA32 Pentium processors and proprietary hardware in a fault-tolerant configuration.[107] For example, VCC3 is composed of CPU1, CPU2, and CPU3. For every command that is sent to a train, at least two of the CPUs must agree with the action, otherwise an error is generated and the command is ignored. The VCC communicates with the train's vehicle on board computer (VOBC), whose data is transmitted through coax cables laid along the tracks. There are up to two VOBCs per married-pair trains, i.e. 4-car train would have two VOBCs. If the VCCs fail or communication between the VCC and the VOBC is lost, the train will "time-out" and emergency-brake (EB) through aQuester Tangent brake assurance monitor (BAM) that controls propulsion and braking systems.[108] The VCCs have a command-line-console, but normally the trains are controlled through a system known as the SMC, which also provides scheduling. All commands from the SMC are verified to be safe by the VCC before execution. However if the SMC fails, the system can still be operated through the VCC. This is known as "degraded mode". The SkyTrain health monitoring unit (HMU) developed byQuester Tangent[108] provides monitoring and diagnostic functionality for vehicle maintenance by connecting to CAN vehicle network and providing a maintenance display in the Hostler Panel.[108]

SkyTrain's signalling system later provided the basis ofSelTrac, which is currently maintained and sold byThales and has equipped many lines around the world. Largely as a result of this, the Expo and Millennium Lines have a combined punctuality record of over 96 percent; the principal cause of train delays is passenger interference with train doors.[109] There have been two derailments during revenue service in the system's history.[110][111]

Accessibility

[edit]

The SkyTrain network is fully mobility-needs accessible, including vehicles and stations. Mark I train cars have one designated wheelchair position, Mark II, Mark III andHyundai Rotem cars have two, and all stations have elevators. TransLink upgraded all Expo Line platform station edges to match those on the Millennium Line shortly after it was completed. The new, wider edges are brighter and are tiled to provide a safer environment for the visually impaired. The Canada Line also uses this safety feature in its stations.[112] Since the opening of the Millennium Line, aside from platform tile upgrading, many Expo line stations have also been refitted with new signage and ticket vending machines. Accessibility is provided for deaf individuals through real-time English signage and displays at stations and on newer trains, although a reliance on verbal communication for service disruptions has been identified as a transportation barrier.[113]: 33 

The distinctive three-tone chime used in the SkyTrain system was recorded in 1984–85 atLittle Mountain Sound Studios in Vancouver.[114] The automated train announcements have been voiced by Laureen Regan since the opening of the Millennium Line in 2002, and by Karen Kelm between 1985 and 2001.[115]

Rolling stock

[edit]
Main article:SkyTrain (Vancouver) rolling stock

Expo and Millennium Lines

[edit]

The Expo Line and Millennium Line useBombardier'sAdvanced Rapid Transit (ART) system, a system of automated trains driven bylinear induction motors, formerly known as Intermediate Capacity Transit System (ICTS). These trains reach speeds of 90 km/h (56 mph);[116] including wait times at stops, the end-to-end average speed is 45 km/h (28 mph), three times faster than a bus and almost twice as fast as aB-Line express bus.[117] During cold weather, TransLink crews usehockey sticks to clear snow and ice from train doors, which would otherwise prevent some doors from being able to open.[118] The trains are also slowed and staffed by TransLink attendants, who can manually override the automatic controls in the event of an obstruction caused by snow or ice.[119]

UTDC ICTS Mark I fleet

[edit]
An original Mark I train (2013)
The interior of a Mark I train on the Expo line

The initial fleet consisted of 12.7 m (41 ft 8 in) lightweight Mark I ICTS cars fromUrban Transportation Development Corporation, similar to those used by Toronto'sLine 3 Scarborough and theDetroit People Mover. Mark I vehicles are composed of mated pairs and normally run as six-car trains and only on the Expo Line, but can be run in two-, four-, or six-car configurations. The maximum based on current station platform lengths is a six-car configuration, totalling 76.2 metres (250 ft). The SkyTrain fleet includes 150 Mark I cars. These trains have a mix of forward-, reverse- and side-facing seats; red, white, and blue interiors; and four doors per car, two per side.

Bombardier ART Mark II fleet

[edit]
A second generation Mark II train in New Westminster (2019)
The interior of a Mark II train on the Expo Line

When the Millennium Line was built, TransLink ordered new-generation Mark II ART trains fromBombardier Transportation, some of which were assembled in a Burnaby factory.[120] Similar trains are used in Kuala Lumpur'sKelana Jaya Line, New York'sJFK AirTrain, and theBeijing Airport Express. These trains are run in four-car configurations on the Expo Line, and two-car configurations on the Millennium Line. Each pair of cars is semi-permanently joined together in atwin unit or "married pair", with a length of 33.4 metres (110 ft). Mark II trains have a streamlined front and rear, an articulated joint allowing passengers to walk the length of a married pair, white/grey/blue interior, and six doors per car, three per side. TransLink also ordered 48 Mark II ART cars (2009/2010 model) in 2009 to further supplement supply and integrate new features such as CCTV, new seats and stanchions in a different layout, destination signs at the ends, lower floor entrances, LED door indicators, and visual maps with LED lights.[121][122][123]

Bombardier Innovia Metro 300 (ART Mark III) fleet

[edit]
A Mark III train in Vancouver (2020)
The interior of a Mark III train on the Expo Line

The Bombardier ART model has undergone several redesigns from the original UTDC ICTS model, and the Mark II design has been updated by Bombardier, with this newest offering being theInnovia Metro 300. Dimensions are similar to the Mark II, with capacity improvements offered over the outgoing model through redesigned car layout. TransLink ordered 28 Mark III cars, which began delivery in 2015, and went into service beginning in August 2016.[124][125] The vehicles appear sleeker, with larger windows on the sides of the train, and redesigned windows and headlights on the ends of the cars. The interior is largely similar to the second generation of Mark II cars, with the some seats removed to better accommodate bicycles and strollers.[126] TransLink has claimed that the interior of the Mark III offers better sound and heat insulation.[125][126] TransLink ordered the cars for the Evergreen Extension in a 4-car articulated configuration, with two centre cars, to allow full-length train movements by passengers. However, due to a shortage of trains, the Mark IIIs are being used on the Expo Line, while 2-car Innovia 200 (Mk2) serve the Millennium Line. On December 16, 2016, TransLink ordered 28 more Mark III cars, bringing the total of Mark III cars to 56 by the end of 2019.[127][128] On February 22, 2018, TransLink announced a further order of 28 Mark III cars, which will bring the total number of Mark III cars to 84 once all trains are in service by the end of 2020.[128]

Alstom Mark V fleet

[edit]
The Mark V trains are the longest trains on the network at 85 m (279 ft) long.
The interior of a Mark V train on the Expo Line

In 2020, TransLink ordered 205 new trains for $723 million. This was done in anticipation of the opening of the Millennium Line's Broadway extension and to replace the aging Mark I trains.[129]Alstom, which bought Bombardier Transportation in January 2021, was contracted to build the Mark V trainsets. These trains come in sets of five cars, and they share a similar design to the Mark III trains. They are the longest trains in the system at 85 m (279 ft) long.[130] Some new features include a new seating layout, replacing the LED signs used in second-generation Mark II and Mark III trains, LCD displays above the doorways, new door indicator lights, wider aisles for more standing space, more flex areas for wheelchairs, bikes, strollers, leaning pads, and improved HVAC. Some other notable features include the addition of Indigenous artwork decorating the interiors and the return of the "driver's seat" at each train end, last seen in the Mark II models.[131][132] Initial testing for Mark V trains on the SkyTrain network began in March 2025 during non-peak hours to assess safety and reliability[133] and revenue service for the trains began that July.[134]

Canada Line

[edit]
Canada Line's Hyundai Rotem trains are wider than Bombardier Mark II trains, with spaces assigned for wheelchairs, bicycles and luggage (2009).
Real-time information is provided on every station platform on the Canada Line (2009).

The Canada Line uses Hyundai RotemEMU vehicles, with cars powered by conventional electric motors instead of the linear induction motor (LIM) technology used by the Expo and Millennium Line vehicles; as a result, the Canada Line vehicles cannot be used on the Expo and Millennium Lines. There are 20 trains, which operate as two-carriage articulated units and can reach a speed of 80 km/h (50 mph).[135] They are maintained at a yard next toBridgeport station in Richmond.

On February 22, 2018, TransLink announced an additional order of 24 Canada Line cars to be brought into service by 2020, bringing the total to 32 trains operating as two-car units.[128]

Future expansion

[edit]

Several possible expansions to the SkyTrain network have been announced. In 2005, TransLink released a ten-year outlook outlining a potential line to theUniversity of British Columbia (UBC) and further expansion of the Expo Line into Surrey.[136] In 2011, two separate rapid transit studies have given further examination and consultation into rapid transit options for expansion for the UBC–Broadway corridor, and Surrey and the South of Fraser region.[137] Expo Line capacity upgrades are also being planned to meet future demand.

A pair of expansions—the Broadway corridor extension and the Expo Line to Langley—began construction in the early 2020s alongside the addition of 235 new cars and upgrades to SkyTrain facilities.[138][139]

Broadway corridor extension

[edit]
Main article:Millennium Line § Broadway extension

Early proposals planned to extend SkyTrain west along the Broadway corridor, but stopped well short of UBC because of the cost, estimated at $700 million in 1999.[140] However, the Provincial Transit Plan, released in February 2008, included funding for the entire Broadway corridor to UBC. The line would replace the region's busiest bus routes, where over 100,000 trips are made daily. The line would also include an interchange with the Canada Line at Cambie Street. In 2008, the new line was estimated to cost $2.8 billion, with an expected completion date of 2020.[38]

Government statements suggested that the UBC line would be an extension of the SkyTrain network from VCC–Clark station via elevated platforms or a tunnel along Broadway ending atUniversity of British Columbia Vancouver. This would mean that riders travelling from Coquitlam to UBC would not need to change trains, as Millennium Line trains would continue to UBC from Lafarge Lake–Douglas station. Riders from the Evergreen Extension east of Commercial–Broadway station would also have a secondary route to downtown with the option of transferring to the Canada Line instead of the Expo Line. However, light rail and higher-capacitybus rapid transit were also proposed.[141]

In 2011, with the UBC Line Rapid Transit Study, SkyTrain was evaluated as a possible technology for rapid transit expansion along the Broadway corridor to UBC, along with light rail transit and bus rapid Transit. The June 2014 plan proposes a first phase that would extend the Millennium Line from VCC–Clark station to Arbutus Street using SkyTrain technology, with an interchange with the Canada Line atBroadway–City Hall station; a second phase would see the line extended from Arbutus to UBC.[142]A plebiscite to raise 25 percent of the funds required for the Broadway extension to Arbutus, among other transit expansion plans, was defeated in 2015.[143]

On March 16, 2018, the provincial government approved the construction of an extension of the Millennium Line underneath Broadway, which will extend the line underground west to Arbutus Street, while adding six new stations. Early work was slated to begin in 2019 with a completion date set for 2025.[144] On April 19, 2018, the UBC Board of Governors indicated it would consider contributing funds towards accelerating the extension of the Millennium Line from its new planned terminus at Arbutus to the university.[145]

On January 30, 2019,Vancouver City Council endorsed building the line underground all the way to UBC.[146]

On July 17, 2020, the British Columbia government announced that theAcciona–Ghella Joint Venture Company had been selected to receive the design–build contract for the Broadway extension.[147] Premier John Horgan confirmed on September 4, 2020, that construction would proceed in the fourth quarter of 2020 despite the ongoingCOVID-19 pandemic in British Columbia. Horgan also confirmed that the extension is expected to be in service by 2025. Transportation Minister Claire Trevena also stated that there were no immediate plans to extend the line towards the UBC campus.[148]

The provincial government announced on November 24, 2022, that the opening of the extension would be pushed back to early 2026 owing to a labour dispute affecting concrete workers which took place that June.[149] On May 24, 2024, the provincial government announced that the extension opening would be further delayed to late 2027, due to various delays which occurred during the tunnel-boring process.[150]

Expo Line extension

[edit]
Main article:Expo Line (SkyTrain) § Surrey–Langley extension

The 2008 Provincial Transit Plan included a 6-kilometre (3.7 mi) extension of the Expo Line fromKing George station inSurrey east toGuildford, then along 152 Street toFraser Highway and southeast to 168 Street; a further extension toWillowbrook Shopping Centre inLangley City was also included in the plan.[151] After a period of time where SkyTrain,light rail transit, and bus rapid transit were considered for service expansion,[152][153][154] federal funding was secured in 2021 to build a 16-kilometre (9.9 mi) SkyTrain extension to Langley City at a total cost (shared between thefederal government,provincial government, andTransLink) between $3.8 and $3.95 billion.[155][156] In July 2022, the extension received approval from the provincial government to be built in one single phase, opening in 2028 with eight stations.[157] Procurement for private contractors began in October 2022 and was scheduled to end with the selection of winning bids by December 2023. The project was divided into three general contracts—the guideway, stations, and electrical systems.[158] Construction began in November 2024 and is, as of 2025,[update] expected to be completed in 2029.[159]

Expo Line capacity expansion

[edit]
Main article:Expo Line (SkyTrain) § Capacity upgrades

Several options have been considered, planned, or implemented to improve capacity on the Expo Line, including operating longer trains, reducing operating headways, and extending station platforms beyond 80 metres (260 ft). In late 2020, TransLink ordered 41Alstom Mark V trainsets in five-car configurations that will eventually replace older, lower-capacity trains.[160] Six more Alstom Mark V trainsets were ordered in May 2024, bringing the total to 47 Mark V trainsets.[139]

Coquitlam maintenance facility

[edit]

In March 2021, it was announced that a new yard would be constructed to provide storage space and maintenance needed for the upcoming extensions of the Expo and Millennium lines.[161][162] This new facility is to be located near the New Westminster–Coquitlam border along North Road. The land was purchased for $82.5 million, while the cost for the structure and additional tracks was estimated at an additional $300 million. The new yard was expected to provide additional maintenance and space in time for the opening of the Millennium Line'sBroadway extension in early 2026.[149] As of February 2024, the opening of the Coquitlam maintenance facility, which is expected to have a storage capacity of 145 cars, is scheduled to take place in 2027.[163]

University of British Columbia extension

[edit]

On January 14, 2008, the British Columbia provincial government announced a commitment to the expansion of theMillennium Line to theUniversity of British Columbia (UBC) by 2020 as part of a $14-billion transit spending package to address climate change. It was not clear what route the new line would take, but it was hinted that there would be less use ofcut-and-cover tunnelling to minimize disruption to businesses alongBroadway and avoidthe same problems seen during the Canada Line construction alongCambie Street.[164] This expansion failed to materialize. On February 15, 2019, theTransLink Mayors' Council again approved an extension of the line to the UBC campus, although funding for this continuation past Arbutus Street had not yet been secured.[165] In April 2022, TransLink assessed possible route options in the UBC area, including the provision of additional pocket storage tracks near the UBC terminus owing to the distance between the university and the nearest storage yard.[166] As a result, the terminus at UBC would hypothetically be larger in size in order to accommodate the additional storage space and operational flexibility.[166] In March 2023, it was announced that a contractor would be hired to put together a business case for the extension, which was to be presented in December 2024.[167]

Port Coquitlam extension

[edit]

When the Evergreen Extension was built, the first few metres of track and a track switch for an eventual eastward extension toPort Coquitlam were built atCoquitlam Central station. Such an extension would create two branches where trains would alternate between going east toLafarge Lake–Douglas station or Port Coquitlam. A feasibility study was conducted, started during early 2020 and running for about six months. Both Port Coquitlam mayor Brad West, Port Coquitlam's city council, andCoquitlam's city council have stated support for the extension. However, as of 2022, no funding had been secured nor a formal plan created.[168]

North Shore connection

[edit]

In 2019, the BC Ministry of Transportation and Infrastructure announced its intention to study a rapid transit link fromVancouver's city centre to theNorth Shore, possibly in the form of SkyTrain. By March 2020, the provincial government confirmed it had selected six possible routes for a "high-capacity, fixed-link, rapid transit crossing acrossBurrard Inlet betweenVancouver and the North Shore".[169] In 2022, TransLink suggested that a North Shore link would likely be created usingbus rapid transit first while a concurrent feasibility study of a longer-term light rail transit or SkyTrain connection is conducted.[170]

See also

[edit]

Notes

[edit]
  1. ^Represents a significant ridership decrease from pre-2020 period owing to theimpact of the COVID-19 pandemic on public transport.
  2. ^Represents a significant ridership decrease compared to pre-2020 levels owing to theimpact of the COVID-19 pandemic on public transport.

References

[edit]
  1. ^"Transit Ridership Report Second Quarter 2025"(PDF).American Public Transportation Association. August 27, 2025. RetrievedAugust 29, 2025.
  2. ^"Transit Ridership Report Fourth Quarter 2024"(PDF).American Public Transportation Association. February 19, 2025. RetrievedFebruary 25, 2025.
  3. ^"The Buzzer – 2011-01-14". TransLink. January 14, 2011.Archived from the original on October 12, 2013. RetrievedJuly 23, 2013.
  4. ^ab"Evergreen Extension opening today".NEWS 1130. December 2, 2016.Archived from the original on August 31, 2017. RetrievedMay 16, 2017.
  5. ^"Broadway Subway Project – Government of British Columbia". RetrievedJuly 8, 2021.
  6. ^"Home – Surrey Langley Skytrain". RetrievedJanuary 18, 2025.
  7. ^ab"Rail: Key Characteristics by line". TransLink. 2022. Archived fromthe original on November 28, 2023. RetrievedDecember 7, 2023.
  8. ^"Quick Facts". Archived fromthe original on August 6, 2019. RetrievedNovember 27, 2016.
  9. ^"Canada Line Fact Sheet The Canada Line Vehicle"(PDF). canadaline.ca (TransLink). December 14, 2007. p. 2. Archived fromthe original(PDF) on March 26, 2009. RetrievedJune 16, 2015.
  10. ^"SkyTrain". TransLink. November 17, 2011.Archived from the original on July 15, 2016. RetrievedAugust 22, 2009.
  11. ^"Expo Line Upgrades Improve Communications". TransLink. October 11, 2011. Archived fromthe original on December 12, 2011. RetrievedNovember 17, 2011.
  12. ^"Skytrain Bridge". Buckland & Taylor Ltd. Archived fromthe original on July 6, 2008. RetrievedAugust 22, 2009.
  13. ^abcSlattery, Jill (December 1, 2016)."Evergreen SkyTrain Line launched".Global News.Archived from the original on December 3, 2016. RetrievedDecember 2, 2016.
  14. ^"Shanghai opens two new lines on longest metro in world".The Independent. December 31, 2021. RetrievedFebruary 16, 2022.
  15. ^Briginshaw, David (July 20, 2016)."Automated metros set to reach 2200 km by 2025".Archived from the original on April 15, 2018. RetrievedMay 16, 2018.
  16. ^Heckenast, Joe; McGraw, Jim (2006). Your Ride Guide 2006 (Vancouver Sun, with TransLink and Bombardier) (Report). New Westminster, BC: McGraw Media. p. 14.
  17. ^Mason, Bruce (December 31, 1989). "SkyTrain and Cambie Bridge taking us down road to Expo Series: The Eighties; [1* Edition]".The Province. p. 20.
  18. ^"SkyTrain Schedules".www.translink.ca. RetrievedJanuary 3, 2022.
  19. ^ab"Skytrain: The Smart Choice for Greater Vancouver". American Public Transportation Association. Archived fromthe original on September 27, 2007. RetrievedJanuary 14, 2007.
  20. ^Coling, Adrienne (September 19, 2016)."Everything Evergreen: New SkyTrain operating pattern for Expo and Millennium Lines".The Buzzer blog. TransLink. Archived fromthe original on October 5, 2016. RetrievedOctober 4, 2016.
  21. ^"Governor General's Medal in Architecture". Royal Architectural Institute of Canada. Archived fromthe original on September 27, 2007. RetrievedDecember 2, 2006.
  22. ^"Evergreen Extension – Opening at noon on Dec. 2, 2016!". TransLink.Archived from the original on December 1, 2016. RetrievedDecember 2, 2016.
  23. ^"Canada Line Financing". Archived fromthe original on August 8, 2009.
  24. ^"Canada Line Opens In November 2009."Railway Gazette International 162.(2006 Jul.): 47.Associates Programs Source Plus. Web. December 15, 2011.
  25. ^ab"TransLink SkyTrain Schedules". TransLink.Archived from the original on July 11, 2018. RetrievedJuly 11, 2018.
  26. ^Salvaloza, Vincelen; Tung, Allen (January 15, 2024)."Expo Line service to Production Way–University temporarily changing for construction".The Buzzer blog. RetrievedMay 22, 2025.
  27. ^"SkyTrain Schedules".www.translink.ca.Archived from the original on May 31, 2025. RetrievedJune 1, 2025.
  28. ^"TransLink offering free transit on New Year's Eve".www.translink.ca.Archived from the original on March 30, 2025. RetrievedJune 1, 2025.
  29. ^"Take transit to the 2025 Vancouver Sun Run".www.translink.ca. April 25, 2025. RetrievedJune 1, 2025.
  30. ^"Pricing and Fare Zones".www.translink.ca.
  31. ^"Greater Vancouver Transportation Authority Transit Tariff"(PDF). TransLink. January 1, 2005. Archived fromthe original(PDF) on May 13, 2005. RetrievedJune 17, 2007.
  32. ^"Children 12 and under will soon ride free on B.C. public transit".BC Government News. August 9, 2021. RetrievedJanuary 3, 2022.
  33. ^Thomas, Sandra (August 9, 2006)."'Helping hands' part of SkyTrain scam".Vancouver Courier. Archived fromthe original on June 30, 2007. RetrievedFebruary 24, 2007.
  34. ^"The Buzzer"(PDF). March 2, 2007. Archived fromthe original(PDF) on September 4, 2014. RetrievedMarch 4, 2007.
  35. ^"Riding without paying will cost $173".The Province. March 20, 2005.Archived from the original on September 29, 2007. RetrievedDecember 14, 2006.
  36. ^"Canada Line Controlled Access, Safety & Security and Fare Evasion"(PDF). TransLink. December 1, 2005. p. 8.Archived(PDF) from the original on February 2, 2019. RetrievedJune 18, 2007.
  37. ^Bennett, Nelson."Beating boosts call for transit turnstiles".Richmond News. Archived fromthe original on September 26, 2007. RetrievedDecember 25, 2006.
  38. ^ab"Provincial Transit Plan Brochure"(PDF). Archived fromthe original(PDF) on April 11, 2008. RetrievedJanuary 17, 2008.
  39. ^"BGates and smart cards on the way at Skytrain".CTV British Columbia. June 12, 2008. Archived fromthe original on January 24, 2009. RetrievedDecember 5, 2008.
  40. ^"Faregates and Smartcards coming to SkyTrain in spring 2010".The Buzzer Blog. April 9, 2009.Archived from the original on August 14, 2010. RetrievedAugust 8, 2010.
  41. ^"No turnstiles for SkyTrains until 2012".CBC British Columbia. August 14, 2009.Archived from the original on August 17, 2009. RetrievedSeptember 21, 2009.
  42. ^"Card system struggles with another glitch".The Vancouver Sun. October 29, 2014.Archived from the original on February 8, 2015. RetrievedFebruary 4, 2015.
  43. ^"SeaBus ridership hits all-time low after one-zone bus travel introduced".VancityBuzz. March 18, 2016.Archived from the original on October 21, 2017. RetrievedOctober 20, 2017.
  44. ^"TransLink to close accessible fare gates".CBC News. July 25, 2016.Archived from the original on September 24, 2016. RetrievedOctober 20, 2017.
  45. ^ab"Canada Line YVR AddFare".TransLink.ca.Archived from the original on September 22, 2016. RetrievedSeptember 19, 2016.
  46. ^"The Canada Line YVR Add Fare Questions and Answers".TransLink.ca. January 11, 2010. Archived fromthe original on May 14, 2014. RetrievedMay 13, 2014.
  47. ^"Canada Line YVR AddFare coming Mon Jan 18".The Buzzer Blog. TransLink. January 7, 2009.Archived from the original on January 11, 2010. RetrievedJanuary 8, 2010.
  48. ^"APTA Q3 2019 Ridership Report"(PDF). American Public Transportation Association. November 22, 2019. p. 37.Archived(PDF) from the original on May 8, 2019. RetrievedDecember 18, 2019.
  49. ^"2017—a record year for transit ridership in Metro Vancouver". TransLink. February 8, 2018.Archived from the original on February 16, 2018. RetrievedFebruary 15, 2018.
  50. ^"TransLink 2010 Ridership". TransLink. Archived fromthe original on February 21, 2011. RetrievedJune 1, 2011.
  51. ^ab"Rise in transit use called Olympic legacy".BC Local News. Archived fromthe original on July 7, 2011. RetrievedFebruary 11, 2011.
  52. ^"Olympic transit may turn small profit".BC Local News. March 23, 2010.[permanent dead link]
  53. ^"APTA 2016 Q4 Ridership Report"(PDF).American Public Transportation Association. RetrievedJuly 10, 2021.
  54. ^"APTA 2017 Q4 Ridership Report"(PDF).American Public Transportation Association. RetrievedJuly 10, 2021.
  55. ^"APTA 2018 Q4 Ridership Report"(PDF).American Public Transportation Association. RetrievedJuly 10, 2021.
  56. ^"APTA 2019 Q4 Ridership Report"(PDF).American Public Transportation Association. RetrievedJuly 10, 2021.
  57. ^"APTA 2020 Q4 Ridership Report"(PDF).American Public Transportation Association. RetrievedJuly 10, 2021.
  58. ^ab"APTA 2022 Q4 Ridership Report"(PDF).American Public Transportation Association.
  59. ^"APTA 2023 Q4 Ridership Report"(PDF).American Public Transportation Association. July 2, 2024.Archived(PDF) from the original on April 18, 2025. RetrievedApril 27, 2025.
  60. ^"APTA 2024 Q4 Ridership Report"(PDF).American Public Transportation Association. February 19, 2025.Archived(PDF) from the original on March 13, 2025. RetrievedApril 27, 2025.
  61. ^"APTA 2024 Q4 Ridership Report"(PDF).American Public Transportation Association. February 19, 2025.Archived(PDF) from the original on March 13, 2025. RetrievedApril 27, 2025.
  62. ^abc"TransLink Annual Report 2008"(PDF).TransLink.ca. TransLink.Archived(PDF) from the original on April 8, 2019. RetrievedApril 8, 2019.
  63. ^[dead link]"TransLink 2008 Financial and Performance Report".TransLink.ca. TransLink. RetrievedFebruary 8, 2010.[permanent dead link]
  64. ^Canada Line Rapid Transit Inc.Working: Annual Report 2006(PDF) (Report). p. 33. Archived fromthe original(PDF) on June 21, 2007. RetrievedJune 17, 2007.
  65. ^ab"TransLink Annual Report 2005"(PDF).TransLink.ca. TransLink. pp. 12, 22, 38, 45.Archived(PDF) from the original on April 8, 2019. RetrievedApril 8, 2019.
  66. ^"TransLink Annual Report 2003"(PDF). TransLink. p. 22.Archived(PDF) from the original on April 8, 2019. RetrievedApril 8, 2019.
  67. ^Ministry of Finance and Corporate Relations (August 31, 1999).Debt Statistics 1998/99(PDF) (Report). British Columbia. p. 5. Archived fromthe original(PDF) on June 21, 2007. RetrievedJune 17, 2007.
  68. ^"TransLink board-inbrief- April 17, 2003"(PDF).Greater Vancouver Regional District.Archived(PDF) from the original on February 25, 2009. RetrievedDecember 5, 2008.
  69. ^"SkyTrain gets armed transit cops".CBC News. December 5, 2005.Archived from the original on April 8, 2019. RetrievedJanuary 20, 2007.
  70. ^"Vancouver transit police begin packing guns".CBC News. December 5, 2005.Archived from the original on December 3, 2013. RetrievedDecember 25, 2006.
  71. ^"Common Questions". Greater Vancouver Transportation Authority Police Service. Archived fromthe original on December 8, 2006. RetrievedDecember 15, 2006.
  72. ^Carrigg, David (August 5, 2004)."SkyTrain says system safe despite latest attack".Vancouver Courier. Archived fromthe original on September 10, 2009. RetrievedMarch 18, 2009.
  73. ^"Murder charge laid after teen killed at B.C. SkyTrain stop".CBC News. July 4, 2005.Archived from the original on May 5, 2007. RetrievedJanuary 5, 2007.
  74. ^Howell, Mike (August 28, 2005)."Cyclist warns of crime increase".VancouverCourier. Archived fromthe original on September 11, 2009. RetrievedMarch 18, 2009.
  75. ^"Safety & Security on SkyTrain". Archived fromthe original on February 23, 2010. RetrievedApril 10, 2010.
  76. ^"Safety and Security on SkyTrain". TransLink. Archived fromthe original on October 4, 2006. RetrievedDecember 26, 2006.
  77. ^"SkyTrain crime fear 'overblown'".The News, Maple Ridge. January 13, 2007. p. 17.
  78. ^"SkyTrain evidence taped over after alert failed".The Vancouver Province. May 7, 2008. Archived fromthe original on September 4, 2015. RetrievedDecember 15, 2011.
  79. ^SkyTrain's Mounting Death TollArchived August 20, 2017, at theWayback Machine at The Tyee. Retrieved November 20, 2011.
  80. ^Taylor-Noonan, Michael (May 25, 2012)."Friday fun guest post: A history of monorails in Vancouver".The Buzzer blog. RetrievedDecember 8, 2021.
  81. ^Clarke, John (November 19, 1977). "Rapid transit system still a pipedream".The Globe and Mail. p. 8.
  82. ^Keating, Michael (November 13, 1971). "$61 million experiment could go down the drain New money crucial to give 'sky subvway [[ [sic]]] a shot at markets".The Globe and Mail. p. P5.
  83. ^Baldrey, Keith (January 3, 1986)."History of SkyTrain".The Vancouver Sun. p. A20. RetrievedDecember 8, 2022 – viaNewspapers.com.
  84. ^"Canada at International Expositions – Expo '86 in Vancouver". Government of Canada.Archived from the original on May 15, 2011. RetrievedMarch 27, 2010.
  85. ^Williamson, Robert (November 21, 1980). "Ontario train system may be used in Vancouver".Globe and Mail. p. 8.
  86. ^abcMackie, John (March 4, 2022)."This Week in History, 1982: Work begins on Vancouver's SkyTrain".Vancouver Sun. RetrievedDecember 8, 2022.
  87. ^Farrow, Moira; Cox, Sarah (December 11, 1985)."Glitter, bands and balloons".The Vancouver Sun. p. A1. RetrievedDecember 8, 2022 – via Newspapers.com.
  88. ^"In business, on time: System's first riders all had their reasons".The Vancouver Sun. January 3, 1986. p. A1. RetrievedDecember 8, 2022 – via Newspapers.com.
  89. ^Hall, Neal (December 27, 1986)."Happy birthday, SkyTrain".The Vancouver Sun. p. B12. RetrievedDecember 8, 2022 – via Newspapers.com.
  90. ^Schaefer, Glen (March 16, 1990)."Ride across river offers new views".The Province. p. 14. RetrievedDecember 8, 2022 – via Newspapers.com.
  91. ^Davis, Chuck (1997).The Greater Vancouver Book: an Urban Encyclopedia. Surrey, BC: Linkman Press.ISBN 978-1-896846-00-2. Archived fromthe original on August 6, 2007.
  92. ^"Details of The Livable Region Strategic Plan". City of Vancouver. Archived fromthe original on January 3, 2006. RetrievedMay 25, 2007.
  93. ^Sullivan, Paul (January 8, 2002)."B.C.'s SkyTrain to Nowhere".Globe and Mail.Archived from the original on April 3, 2017. RetrievedJune 6, 2007.
  94. ^Carrigg, David (February 19, 2001)."SkyTrain critics have their say".Vancouver Courier. Archived fromthe original on October 21, 2006. RetrievedDecember 21, 2006.
  95. ^"Google map showing location of VCC station". January 1, 1970. RetrievedJune 23, 2010.
  96. ^Carrigg, David (August 5, 2004)."SkyTrain extension off the rails".Vancouver Courier. Archived fromthe original on October 19, 2006. RetrievedDecember 21, 2006.
  97. ^"Evergreen Extension".transLink.ca. TransLink. Archived fromthe original on November 21, 2016. RetrievedNovember 30, 2016.
  98. ^Campbell's 'kaputski' on RAV line financing tops the list of keepers so far, Vaughn Palmer, The Vancouver Sun, December 3, 2004. p. A3
  99. ^"Canada Line Delivers a Smooth Ride".The Globe and Mail. December 28, 2009.Archived from the original on January 1, 2010. RetrievedDecember 28, 2009.
  100. ^"TransLink reports transit ridership heading for a new record". TransLink. August 22, 2011. Archived fromthe original on October 20, 2011. RetrievedDecember 28, 2009.
  101. ^"Frequently Asked Questions, Canada Line". Rapid Transit Office, City of Vancouver.Archived from the original on September 17, 2011. RetrievedDecember 2, 2008.
  102. ^ab"Making the Connection to a World of Choice". TransLink. Archived fromthe original on August 21, 2009. RetrievedApril 23, 2009.
  103. ^Newman, Peter W. G; Kenworthy, Jeffrey R.; Newman, Peter (1999).Sustainability and Cities. Washington, D.C.: Island Press. p. 221.ISBN 978-1-55963-660-5.
  104. ^"Vancouver BC SkyTrain"(PDF). City of Seattle. Archived fromthe original(PDF) on June 21, 2007. RetrievedFebruary 23, 2007.
  105. ^"Vancouver SkyTrain — a proven success story"(PDF).Japan Railways and Transport Review. Archived fromthe original(PDF) on October 8, 2006. RetrievedJanuary 28, 2007.
  106. ^Key Features of the North Arm Fraser BridgeArchived January 12, 2007, at theWayback Machine
  107. ^Sinoski, Kelly (August 4, 2014)."Inside the SkyTrain control room".Vancouver Sun. Archived fromthe original on December 27, 2024. RetrievedDecember 27, 2024.
  108. ^abc"Quester Tangent – SkyTrain for Fleet Operators".Archived from the original on March 6, 2015. RetrievedMarch 25, 2015.
  109. ^"A Timely SkyTrain Safety Reminder / A near-miss: a timely reminder – wait for the next train!". TransLink. July 17, 2009. Archived fromthe original on August 19, 2009. RetrievedAugust 11, 2009.In 2007 and 2008, 981 delays were caused by vehicle issues: 55% of those involved the doors, many of them held open by passengers.... With over 96% on-time performance, SkyTrain is rapid, ready and reliable.
  110. ^"TransLink investigates train derailment".Vancouver Sun. Archived fromthe original on May 31, 2010. RetrievedMay 28, 2010.
  111. ^"Two sheared bolts caused SkyTrain derailment: FOI documents".Business in Vancouver. September 28, 2022. RetrievedAugust 23, 2023.
  112. ^Thomas, Sandra (August 5, 2005)."TransLink putting in tactile strips on Expo Line to help visually impaired".The Vancouver Courier. Archived fromthe original on September 11, 2009. RetrievedMarch 18, 2009.
  113. ^Accessibility Plan 2023(PDF) (Report). 2023. RetrievedJanuary 3, 2024.
  114. ^"Podcast: the story of the SkyTrain chime".The Buzzer blog. TransLink. December 1, 2008.Archived from the original on September 10, 2009. RetrievedMay 26, 2009.
  115. ^"Buzzer Podcast: Voice of the SkyTrain".The Buzzer blog. TransLink. October 20, 2008.Archived from the original on August 19, 2009. RetrievedMay 26, 2009.
  116. ^"Equipment Limits of Approach – Contractor Safety While Working Near SkyTrain"(PDF). The British Columbia Rapid Transit Company Ltd. Archived fromthe original(PDF) on February 6, 2016. RetrievedFebruary 3, 2016.
  117. ^"Burnaby/New Westminster Area Transit Plan Summary Report"(PDF). Archived fromthe original(PDF) on January 9, 2005. RetrievedDecember 13, 2006.
  118. ^Tung, Allen (December 29, 2021)."The most Canadian solution to keep SkyTrain customers moving, eh?".The Buzzer. TransLink. RetrievedDecember 19, 2022.
  119. ^Tung, Allen (January 5, 2022)."This is why you see SkyTrain Attendants onboard during snow".The Buzzer. TransLink. RetrievedDecember 19, 2022.
  120. ^"Questions about Skytrain $".CBC News. May 25, 2000.Archived from the original on March 21, 2007. RetrievedFebruary 3, 2007.
  121. ^"New and Improved Features for 2009 Mark II SkyTrain Vehicles"(PDF).TransLink. RetrievedNovember 8, 2025.
  122. ^Pabillano, Jhenifer (May 6, 2009)."Improved interiors for the new SkyTrain cars!".TransLink. RetrievedNovember 8, 2025.
  123. ^Pabillano, Jhenifer (July 3, 2009)."The Buzzer rides the first of the new SkyTrain cars!". TransLink.Archived from the original on July 15, 2009. RetrievedFebruary 3, 2007.
  124. ^"TransLink launches first Mark III train". TransLink. August 18, 2016.Archived from the original on August 28, 2016. RetrievedAugust 19, 2016.
  125. ^ab"New SkyTrain cars coming to Expo Line".NEWS 1130. August 18, 2016.Archived from the original on August 19, 2016. RetrievedAugust 19, 2016.
  126. ^ab"More passengers, less noise: TransLink unveils SkyTrain Mark III".Archived from the original on August 19, 2016. RetrievedAugust 19, 2016.
  127. ^"28 new SkyTrain cars ordered to improve transit in Metro Vancouver".TransLink.ca. December 16, 2016.Archived from the original on January 3, 2017. RetrievedJanuary 2, 2017.
  128. ^abc"TransLink accelerating delivery of new SkyTrain cars".TransLink. February 22, 2018. Archived fromthe original on August 7, 2019. RetrievedOctober 10, 2023.
  129. ^"TransLink to buy 205 new SkyTrain cars from Bombardier for $723 million".Daily Hive. December 14, 2020. RetrievedJuly 11, 2025.
  130. ^Kertcher, Sarah (July 10, 2025)."TransLink's Mark V SkyTrain enters service".buzzer.translink.ca. RetrievedJuly 20, 2025.
  131. ^"New SkyTrain car design includes LCD screens, flex space".Daily Hive. November 12, 2021. RetrievedJuly 11, 2025.
  132. ^"SkyTrain Fleet Expansion".TransLink. RetrievedJuly 11, 2025.
  133. ^"Field testing begins for new SkyTrain cars".TransLink. March 7, 2025. RetrievedNovember 8, 2025.
  134. ^"A new era for SkyTrain: The Mark V rolls into service".TransLink. July 10, 2025. RetrievedJuly 11, 2025.
  135. ^"The Canada Line Factsheet – The Canada Line Vehicle"(PDF).Greater Vancouver Regional District. Archived fromthe original(PDF) on March 26, 2009. RetrievedDecember 5, 2008.
  136. ^"TransLink Three-Year Plan and Ten-Year Outlook"(PDF). Archived fromthe original(PDF) on September 2, 2005.
  137. ^"UBC Line Rapid Transit Study – Alternative Designs". TransLink. Archived fromthe original on September 4, 2015. RetrievedApril 21, 2011.
  138. ^Tung, Allen (September 26, 2023)."TransLink embarks on transformative SkyTrain Expansion Program".The Buzzer. TransLink. RetrievedSeptember 27, 2023.
  139. ^ab"Alstom will supply 6 additional Vancouver SkyTrain Mark V trains".Alstom.com. May 28, 2024. RetrievedMay 28, 2024.
  140. ^"Rapid Transit Office Millennium Line Extension". City of Vancouver. Archived fromthe original on February 7, 2006. RetrievedDecember 15, 2006.
  141. ^"Rapid Transit Principles for the Broadway Corridor and the UBC Line Rapid Transit Study"(PDF). City of Vancouver.Archived(PDF) from the original on March 14, 2016. RetrievedApril 10, 2010.
  142. ^"Broadway Subway Project". TransLink.Archived from the original on March 25, 2019. RetrievedApril 8, 2019.
  143. ^Bula, Frances (July 2, 2015)."Vancouver-region voters reject sales-tax hike to fund transit projects".The Globe and Mail.Archived from the original on February 24, 2017. RetrievedSeptember 1, 2017.
  144. ^Chan, Kenneth (March 16, 2018)."It's official: Broadway Subway and Surrey LRT will be built in $7-billion transit plan".Daily Hive Vancouver.Archived from the original on March 17, 2018. RetrievedMarch 17, 2018.
  145. ^"UBC to advocate completion of rapid transit to campus".UBC News. April 19, 2018.Archived from the original on April 22, 2018. RetrievedApril 22, 2018.
  146. ^"Vancouver moves forward on $3.8 billion subway extension to UBC".Toronto Star. January 30, 2019.Archived from the original on February 1, 2019. RetrievedJanuary 31, 2019.
  147. ^Smith, Charlie (July 17, 2020)."B.C. government announces who will design, build, and partially finance Broadway Subway Project".The Georgia Straight. RetrievedSeptember 4, 2020.
  148. ^"Construction on Broadway SkyTrain project to begin this fall".CBC News. September 4, 2020. RetrievedSeptember 4, 2020.
  149. ^abChan, Kenneth (November 24, 2022)."Broadway Subway opening delayed to 2026".Daily Hive Vancouver. Archived fromthe original on November 25, 2022. RetrievedNovember 25, 2022.
  150. ^Chan, Kenneth (May 24, 2024)."Broadway Subway opening further delayed until Fall 2027".Daily Hive Vancouver. Archived fromthe original on May 24, 2024. RetrievedMay 28, 2024.
  151. ^Nagel, Jeff (January 16, 2008)."More SkyTrains for Surrey".Surrey Leader. Archived fromthe original on January 20, 2008. RetrievedJanuary 25, 2008.
  152. ^"Rapid Transit Principles for the Broadway Corridor and the UBC Line Rapid Transit Study". TransLink. Archived fromthe original on January 13, 2012. RetrievedNovember 17, 2011.
  153. ^Nagel, Jeff (June 7, 2016)."Line to Langley may still be SkyTrain: TransLink CEO".Abbotsford News.Archived from the original on November 30, 2018. RetrievedFebruary 13, 2018.
  154. ^McElroy, Justin (November 15, 2018)."Metro Vancouver mayors agree to suspend Surrey LRT, start process for SkyTrain to Langley".CBC News.Archived from the original on December 4, 2021. RetrievedNovember 30, 2018.
  155. ^Chan, Kenneth (July 9, 2021)."Trudeau announces $1.3 billion for Surrey-Langley SkyTrain, confirms UBC support | Urbanized".DailyHive. RetrievedJuly 11, 2021.
  156. ^Weichel, Andrew (July 9, 2021)."Federal government providing up to $1.3 billion for Surrey-Langley SkyTrain extension".CTV News Vancouver. RetrievedJuly 9, 2021.
  157. ^Chan, Kenneth (July 14, 2022)."16-km-long Surrey-Langley SkyTrain extension receives full provincial and federal approval".Daily Hive. RetrievedJuly 20, 2022.
  158. ^Chan, Kenneth (October 11, 2022)."Bidding process begins for $475 million contract to build Surrey-Langley SkyTrain's eight stations".Daily Hive. RetrievedOctober 28, 2022.
  159. ^Chan, Kenneth (January 6, 2025)."It's official: Major construction now underway on 16-km-long Surrey-Langley SkyTrain".Daily Hive.Archived from the original on January 6, 2025. RetrievedJanuary 19, 2025.
  160. ^"TransLink to buy 205 new SkyTrain cars from Bombardier for $723 million | Urbanized".dailyhive.com. RetrievedAugust 17, 2023.
  161. ^Strandberg, Diane (March 16, 2021)."$300-million TransLink operations centre coming to Coquitlam". RetrievedMarch 22, 2021.
  162. ^Chan, Kenneth (March 11, 2021)."TransLink buys 27-acre site near Braid Station for new SkyTrain maintenance centre". RetrievedMarch 22, 2021.
  163. ^Chan, Kenneth (February 29, 2024)."This is what SkyTrain's new operations and maintenance centre will look like".Daily Hive Vancouver. RetrievedFebruary 29, 2024.
  164. ^Palmer, Vaughn (January 15, 2008)."Less than meets the eye, and light on details".Vancouver Sun. Archived fromthe original on November 3, 2012. RetrievedJanuary 15, 2008.
  165. ^"Metro Vancouver mayors vote yes on SkyTrain extension to UBC".CBC News. February 15, 2019. RetrievedFebruary 16, 2019.
  166. ^abChan, Kenneth (April 19, 2022)."TransLink outlines proposed UBC SkyTrain route and station locations".Daily Hive Vancouver. RetrievedFebruary 29, 2024.
  167. ^"Detailed design and planning set to begin for UBC SkyTrain extension | Urbanized".dailyhive.com. RetrievedMarch 22, 2023.
  168. ^"Port Coquitlam to launch feasibility study on Skytrain Extension".Daily Hive. November 28, 2019. RetrievedNovember 28, 2019.
  169. ^"6 route options for North Shore to Vancouver rapid transit line: BC government".Daily Hive. March 2, 2020.Archived from the original on March 4, 2020. RetrievedMarch 4, 2020.
  170. ^Chan, Kenneth."Buses first, SkyTrain maybe later: TransLink planning bus rapid transit from Park Royal to Metrotown".Daily Hive. RetrievedMarch 16, 2024.

External links

[edit]
Template:Attached KML/SkyTrain (Vancouver)
KML is not from Wikidata
Wikimedia Commons has media related toSkyTrain (Vancouver).
Expo Line 
Lougheed branch
Surrey–Langley extension (future)
Millennium Line 
Broadway extension (future)
Canada Line 
Airport branch
Passenger ferry and commuter rail
SeaBus 
West Coast Express 
B-Line 
RapidBus 
Exchanges
General
Former
B-Line
Exchanges
Miscellaneous
Cycling
Fares
Other
  • Stations ordered inbound → outbound
  • indicate connections
  • Future stations or routesitalicized
Intercity
Sightseeing
Commuter rail
Urban rail
Under construction
Planned
Cancelled or closed
Streetcar
Railbus
People mover
Heritage tramways
See also
Community of Metros benchmarking organization members
Asia
Europe
Americas
Oceania
Automated
trains
Automated
guideway
transit
Automated
people
movers
Personal
rapid
transit
Driverless
monorails
Retrieved from "https://en.wikipedia.org/w/index.php?title=SkyTrain_(Vancouver)&oldid=1322734865"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp