Shoreham Nuclear Power Plant

Coordinates:40°57′40″N72°51′54″W / 40.96111°N 72.86500°W /40.96111; -72.86500
From Wikipedia, the free encyclopedia
Decommissioned nuclear power plant in New York

Shoreham Nuclear Power Plant
Map
CountryUnited States
LocationEast Shoreham, New York
Coordinates40°57′40″N72°51′54″W / 40.96111°N 72.86500°W /40.96111; -72.86500
StatusDecommissioned
Construction beganNovember 1, 1972[1]
Commission dateAugust 1, 1986[1]
Decommission dateMay 1, 1989[1]
Construction cost$6 Billion
OperatorLong Island Lighting Company
Nuclear power station
Reactor typeBWR[1]
Power generation
Units decommissioned820MW
External links
CommonsRelated media on Commons

TheShoreham Nuclear Power Plant was a completedGeneral Electric nuclearboiling water reactor located adjacent to Long Island Sound inEast Shoreham, New York.

The plant was built between 1973 and 1984 by theLong Island Lighting Company (LILCO). The plant faced considerablepublic opposition after the 1979Three Mile Island accident and the 1986Chernobyl disaster. There were large protests and two dozen local groups opposed the plant.

In 1983,Suffolk County determined that the county could not be safely evacuated in the event of a serious nuclear accident at the plant.GovernorMario Cuomo ordered state officials not to approve any LILCO-sponsored evacuation plan—effectively preventing the plant from operating at full capacity. The plant was completed in 1984 and in 1985 LILCO received federal permission for low-power (5 percent power) tests.

By 1989, it became apparent that not enough local communities would sign on to the evacuation plan for the plant ever to be able to open. On May 19, 1989, LILCO agreed not to operate the plant in a deal with the state under which most of the $6 billion cost of the unused plant was passed on to Long Island residents. In 1992, theLong Island Power Authority bought the plant from LILCO. The plant was fully decommissioned in 1994.

Proposal

[edit]

Long Island Lighting Company (LILCO) President John J. Tuohy announced plans for the plant on April 13, 1965, during a stockholder's meeting.[2] The plant was to be the first commercialnuclear power plant to be constructed on Long Island,[nb 1] and initially had little formal opposition, as Brookhaven already had multiple research nuclear reactors at theBrookhaven National Laboratory, about 5 miles (8.0 km) south of Shoreham.

LILCO purchased a 455-acre (1.84 km2) site in an area which was sparsely populated at the time. They announced the plant would produce 540 megawatts, cost between $65 and $75 million and would be online in 1973.[3][4] At the time, demand for electricity was increasing more than 10 percent per year on Long Island and theAtomic Energy Commission was strongly pushing all power companies to use nuclear power.[3]

In 1968, LILCO increased the size of the plant from 540 to 820 megawatts and announced plans to buildtwo more reactors nearJamesport. Those reactors never got beyond the drawing board stage, but this helped delay and increase the costs of the plant.[3][4]

In 1969, LILCO announced plans for a reactor atLloyd Harbor inHuntington – closer to Manhattan in a more densely populated area. Following resident opposition, the proposal was dropped in 1970, setting the stage for opposition to any nuclear power plant on Long Island.[3]

The plant was to be situated near the path of airplanes landing atMacArthur Airport and theNew Haven Airport. It was also to be built in an area that theU.S. Air Force had designated as "high hazard" due to its proximity to theNaval Weapons Industrial Reserve Plant, Calverton, whereGrumman military fighter planes were tested, which was five miles (8.0 km) from the Shoreham site. TheLloyd Harbor Study Group were concerned that a plane could crash into the plant,[5] though studies suggest that an airliner impacting a containment structure would not destroy the structure or even cause sufficient damage to permit the escape of radioactive materials from the reactor core.[6]

Construction

[edit]

The plant was built between 1973 and 1984, completed with a General Electric type 4 boiling water reactor using Mark II containment.[7] Its location onLong Island Sound – near the mouth of the small stream that forms the border between Brookhaven andRiverhead towns – was largely rural at the time (althoughwithin 60 miles ofManhattan). Cost overruns caused its estimated final cost to approach $2 billion by the late 1970s, due to low worker productivity and design changes ordered by the NRC.[3]

Public opposition

[edit]
See also:List of anti-nuclear protests in the United States

TheSierra Club, theAudubon Society and environmentalistBarry Commoner opposed the issuance of a construction permit for the Shoreham plant.[8] The plant drew considerable opposition after the 1979Three Mile Island accident and the 1986Chernobyl disaster, resulting in delays and cost increases before New York Governor Mario Cuomo ordered purchasing and decommissioning of the plant. The state would ultimately take over LILCO also.[9]

The first small anti-Shoreham demonstration took place in June 1976. On June 3, 1979, following theThree Mile Island accident, 15,000 protesters gathered in the largest demonstration in Long Island history.[3] 600 were arrested as they scaled the plant's fences.[10]

LILCO's problems were compounded by NRC rules in the wake of Three Mile Island, requiring that operators of nuclear plants work out evacuation plans in cooperation with state and local governments. This prompted local politicians to join the growing opposition to the plant. Since any land evacuation off the island would involve traveling at least 60 miles (97 km) back through New York City to reach its bridges, local officials feared that the island could not be safely evacuated.[3]

Nora Bredes, executive director of the Shoreham Opponents Coalition, was a primary organizer of the grass-roots campaign against Shoreham during the 1980s. She lobbied officials, organized advertising campaigns, wrote pamphlets, and planned rallies.[11] Ms. Bredes drew together more than two dozen local opposition groups which included the Lloyd Harbor Study Group, theFarm Bureau, The Long Island Safe Energy Coalition and its newsletter Chain Reaction, Safe'n Sound with itsSound Times newspaper, and theS.H.A.D. Alliance (modeled on New Hampshire'sClamshell Alliance). According to a Newsday poll, in 1981, 43 percent of Long Islanders opposed the plant; by 1986, that number had risen to 74 percent.[11]

Closure

[edit]

On February 17, 1983, theSuffolk County Legislature voted 15–1 in favor of a resolution stating that the county could not be safely evacuated in the event of an accident at Shoreham.[3][11] The newly elected governor of New York, Mario Cuomo, then ordered state officials not to approve any LILCO-sponsored evacuation plan.[3]

The plant was completed in 1984. In 1985 LILCO received federal permission for low-power 5 percent tests. Confidence in LILCO declined in 1985 when it took nearly two weeks to restore power to all of the island followingHurricane Gloria.

Between 1985 and 1989, as local communities continued to refuse to sign the necessary evacuation plan, LILCO proposed asking theU.S. Congress to approve a law for the evacuation — a move which went nowhere.

On February 28, 1989, Cuomo and LILCO announced a plan todecommission the plant, which involved the state taking over the plant and then attaching a 3 percent surcharge to Long Island electric bills for 30 years to pay off the $6 billion price tag.[3][11][12] On May 19, 1989, LILCO agreed not to operate the plant in a deal with the state under which most of the $6 billion cost of the unused plant was passed along to Long Island residents. TheLong Island Power Authority (LIPA), headed byRichard Kessel, was created in 1986 specifically to buy the plant from LILCO. In 1992, LIPA bought Shoreham from LILCO for the nominal sum of one dollar and closed it, making Shoreham the first commercial nuclear power plant in the US to be dismantled.[11] The plant was fully decommissioned in 1994.

Aftermath

[edit]

It cost $186 million to decommission the reactor, with the radioactive materials license ending in May 1995. The low-pressure turbine rotors are currently in use at theDavis-Besse Nuclear Power Station. LILCO paidPhiladelphia Electric Company $50 million to take its fuel to theLimerick Nuclear Power Plant.[13]

In August 2002 a 100 MW Gas Turbine Power Plant was commissioned on the Shoreham site utilizing the existing switchgear that was in place for the decommissioned nuclear facility. This facility utilizes two 42 MW GE LM6000PC Jet Engine Generators equipped with Sprint injection (can increase capacity to 50 MW each) and Spray Mist Evaporative Cooling (SMEC).[14] Its construction was part of a plan to build ten such plants across Long Island to avoid the risk ofrolling blackouts in the face of increased demand likethose experienced in California the previous year, given strain on the system froma heat wave in 2001.[15][16]

The electric transmission infrastructure has remained, connecting it to the Long Islandelectric grid. In 2002 theCross Sound Cable, asubmarine power cable capable of transmitting 330 MW, was laid from the Shoreham plant across Long Island Sound toNew Haven, Connecticut. During theNortheast Blackout of 2003 the cable was used to ease the effects of the blackout on Long Island. After extended negotiations withConnecticut, the cable was put into permanent use.[17]

Shoreham Nuclear Pant at Dusk

In 2004, the Long Island Power Authority erected two 100-foot, 50 kW wind turbines at the Shoreham Energy Center site,[18] as part of a renewable-energy program.[19][20] At a ceremony, chairman Kessel stated, "We stand in the shadow of a modern-day Stonehenge, a multibillion-dollar monument to a failed energy policy, to formally commission the operation of a renewable energy technology that will harness the power of the wind for the benefit of Long Island's environment." The turbines generate 200 MWh per year, or 1/35,000th of the energy the nuclear plant would have produced.[21]

Had the Shoreham Nuclear Power Station gone into operation as planned, it would have prevented the emission of an estimated three million tons of carbon dioxide per year, according to journalistGwyneth Cravens.[22]

On December 18, 2024 - LIPA approved plans to build abattery energy storage system that will be connected to the Shoreham substation. It is expected to be completed by 2028.[23]

Movies

[edit]
  • A scene from the 2012 movieThe Dictator is filmed inside the Shoreham Nuclear Power Plants Nuclear Control Room.[24]
  • The case of the Shoreham Nuclear power plant is used as an example of a successful anti-nuclear campaign in the 2013 documentaryPandora's Promise, underlining the role of the Oil Heat Institute of Long Island in financing anti-nuclear pro-solar ads.[25]

See also

[edit]

Notes

[edit]
  1. ^TheRavenswood Nuclear Power Plant was proposed in 1962 for theRavenswood Generating Station site inLong Island City, but was cancelled in 1964

References

[edit]
  1. ^abcd"SHOREHAM Reactor Details". IAEA. 2013-04-13. Retrieved2013-04-14.
  2. ^LILCO History - fundinguniverse.com - Retrieved November 17, 2007
  3. ^abcdefghijFagin, Dan (2007-05-29)."Lights Out at Shoreham".Newsday. Archived fromthe original on 2007-12-01. Retrieved2007-08-30.
  4. ^abGrimston, Malcolm (December 2005)."Shoreham - a case study"(PDF).The Importance of Politics to Nuclear New Build. London: Chatham House. Retrieved2007-08-30.
  5. ^McCallion, Kenneth F. (1995).Shoreham and the rise and fall of the nuclear power industry. Bloomsbury Academic. p. 8.ISBN 9780275942991.
  6. ^Cravens, Gwyneth (2007).Power to Save the World: the Truth about Nuclear Energy. New York: Vintage. p. 227.
  7. ^"Evaluation Of A Request For Extension Of Provisional Construction Permit"(PDF).NRC.gov. RetrievedMar 3, 2023.
  8. ^McCallion, Kenneth F. (1995).Shoreham and the rise and fall of the nuclear power industry. Bloomsbury Academic. p. 7.ISBN 9780275942991.
  9. ^McCallion, Kenneth F. (1995).Shoreham and the rise and fall of the nuclear power industry. Bloomsbury Academic.ISBN 9780275942991.
  10. ^McQuiston, John T. (June 4, 1979)."Shoreham Action Is One of Largest Held Worldwide; 15,000 Protest L.I. Atom Plant; 600 Seized 600 Arrested on L.I. as 15,000 Protest at Nuclear Plant Nuclear Supporter on Hand Governor Stresses Safety Thousands Protest Worldwide".The New York Times.
  11. ^abcdeHevesi, Dennis (August 22, 2011)."Nora Bredes, Who Fought Long Island Nuclear Plant, Dies at 60".The New York Times.
  12. ^Rather, John (January 26, 2003)."IN BRIEF; Court Declines Appeal Of Shoreham Ruling".The New York Times.
  13. ^"Shoreham".Nukeworker.com. Archived fromthe original on 2009-01-09.
  14. ^"Shoreham Energy Project".Fresh Meadow Mechanical Corporation. Archived fromthe original on November 19, 2011.
  15. ^Gootman, Elissa (19 October 2001)."Proposed Mini-Plants Are Part Of a Long-Term Energy Plan".The New York Times. Retrieved4 December 2014.
  16. ^McGinty, Tom (2001-10-19)."Watts up for LIPA next year".Newsday. p. 55. Retrieved2022-10-16.
  17. ^"Governor Pataki Hails Agreement on Cross Sound Cable and Gives Order to Energize Cable and Make It Operational".lipower.org (Press release). June 25, 2004. Archived fromthe original on August 4, 2004.
  18. ^Law, Kevin S. (2005)."Small Wind Electric Systems"(PDF).lipower.org. Archived fromthe original(PDF) on 2010-06-12.50 kW wind turbine at Shoreham Energy Center.
  19. ^Rather, John (October 1, 2004)."Wind Turbines At Shoreham".The New York Times. Retrieved2011-11-04.
  20. ^Rather, John (2005-01-30)."IN BRIEF; Power Authority Unveils Pair Of 100-Foot Wind Turbines".The New York Times.ISSN 0362-4331. Archived fromthe original on 2003-07-18. Retrieved2017-04-19.a combined 100 kilowatts of power under optimum wind conditions
  21. ^"American Public Power Association - Long Island Power Authority dedicates wind turbines at site of defunct nuclear plant".www.publicpower.org. Archived fromthe original on 2017-04-19. Retrieved2017-04-19.the two 50-kW machines can generate as much as 200,000 kWh of electricity annually
  22. ^Gwyneth., Cravens (2008-01-01).Power to save the world : the truth about nuclear energy. Vintage Books.ISBN 9780307385871.OCLC 844040455.
  23. ^"LIPA Approves Battery Storage at Site of Shuttered Shoreham Nuclear Power Plant | East End Beacon".www.eastendbeacon.com. 2024-12-19. Retrieved2025-01-15.
  24. ^"Movies Filmed at Shoreham Nuclear Power Plant — Movie Maps".moviemaps.org. Retrieved2019-09-08.
  25. ^The corresponding ad can be seen in this article"Smoking Gun Part 18 – An Oldie But a Goodie – Oil Heat Institute of Long Island Ad Using Scare Tactics to Fight Shoreham".atomicinsights.com. 5 January 2010. Retrieved2020-06-29.
Long Island power generation and distribution
Former LILCO plants
Other plants
Underwater transmission cables
Local transmission
Organizations
NRC Region I
(Northeast)
NRC Region II
(South)
NRC Region III
(Midwest)
NRC Region IV
(West)
Converted
Closed
Cancelled
(incomplete list,
whole plants only)
Future
General
Organizations
and
groups
People
Main
protest
sites
Books
Films
Authority control databasesEdit this at Wikidata
Retrieved from "https://en.wikipedia.org/w/index.php?title=Shoreham_Nuclear_Power_Plant&oldid=1299020032"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp