Rosatom

From Wikipedia, the free encyclopedia
Russian state-owned nuclear technologies company
This article is about a corporation established in 2007. For Rosatom government body in 2004–2008, seeRosatom (Federal Agency).

State Atomic Energy Corporation Rosatom
Rosatom's headquarters atBolshaya Ordynka Street in Moscow
Native name
Государственная корпорация по атомной энергии «Росатом»
Company typeState-owned
IndustryNuclear power
Wind power
Hydrogen fuel
PredecessorFederal Agency on Atomic Energy
Founded1 December 2007; 17 years ago (2007-12-01)[1]
FounderVladimir Putin by signed law[2]
Headquarters,
Russia
Area served
Worldwide
Key people
Alexey Likhachev(General Director)
ProductsNuclear reactors
Nuclear fuel
Uranium mining
Uranium enrichment
Nuclear decommissioning
Nuclear medicine
Wind power
Hydrogen fuel
Additive manufacturing
Composites
Revenue₽1,207.4 billion[3] (2020)
Total assets₽4,722.4 billion[3] (2020)
OwnerRussian government
Number of employees
371,000[3] (2020)
SubsidiariesSeeorganization
Websiterosatom.ru/en/

State Atomic Energy Corporation Rosatom (commonly referred to asRosatom Russian:Росатом,IPA:[rosˈatəm]), also known asRosatom State Nuclear Energy Corporation, (Russian:Государственная корпорация по атомной энергии «Росатом»,romanizedGosudarstvennaya korporatsiya po atomnoy energii "Rosatom"), orRosatom State Corporation, is a Russianstate corporation headquartered inMoscow that specializes innuclear energy, nuclear non-energy goods and high-tech products.[4] It was established in 2007 and comprises more than 350 enterprises, including scientific research organizations, anuclear weapons complex, and the world's onlynuclear icebreaker fleet.[5]

The organization is the largest electricity generating company in Russia, producing 217.4 TWh of electricity, 20.28% of the country's total electricity production. The corporation ranks first in overseasnuclear power plant construction, responsible for 90% of global nuclear technology exports: 22 nuclear power plant units, at different stages of development, in 7 countries, as of December 2024.[6] Rosatom also manufactures equipment, produces isotopes for nuclear medicine, carries out research, and conducts material studies. It also produces supercomputers and software as well as different nuclear and non-nuclear products. Rosatom plans to further developrenewable energy andwind power. Four nuclear power plants are being built in Russia: The Kursk NPP-2 project includes four power units with Russian VVER-TOI reactor installations. Power Units No. 7 and No. 8 of the Leningrad NPP-2, equipped with VVER-1200 reactors, are being constructed to replace Power Units No. 3 and No. 4 with RBMK-1000 reactors. The Smolensk NPP-2 is a station designed to replace the retiring capacities of the operating units of the Smolensk NPP. The construction of Power Units No. 1 and No. 2 of the Smolensk NPP-2 is planned under the General Scheme for the Placement of Electric Power Facilities until 2035.[7] Rosatom has a 38% world market share and in 2019 led in global uranium enrichment services (36%) and covers 17% of the global nuclear fuel market.[8][9][10][11]

The state corporation is authorized on behalf of the state to fulfill Russia's international obligations in the field of the use of nuclear energy and ofnon-proliferation of nuclear materials.[4] Rosatom is also involved with large-scale projects such asITER andFAIR.

As of February 2021, the total portfolio orders of Rosatom reached $250 billion.[12][13] According to the 2023 corporate report, its 10-year foreign order portfolio stood at $127.1 billion, while revenue reached $16.2 billion. The 10-year order portfolio for new products stood at ₽1,110.1 billion while revenue reached ₽261.1 billion.[14][15][16]

Certain divisions and business lines of Rosatom were reoriented during wartime toward tasks directly or indirectly connected with military needs: the production of components and services demanded by the Ministry of Defense, increased involvement in projects of geopolitical significance, as well as the reinforcement of internal financial flows through areas “untypical” for the civilian nuclear sector.[17]

The involvement of Rosatom in military and paramilitary operations increases systemic nuclear security risks — from uncontrolled changes in the operation of nuclear power plants to threats during the transportation and storage of nuclear fuel and radioactive waste.[18]

History

[edit]
Further information:Ministry of Nuclear Engineering and Industry of the Soviet Union andFederal Agency on Atomic Energy (Russia)

Origins and establishment

[edit]

SeveralSoviet andRussian government entities with different tasks are among the Rosatom predecessors.[4] On 26 June 1953, theCouncil of Ministers transformed the First Main Directorate in charge ofnuclear weapons program into theMinistry of Medium Machine Building (MinSredMash). The ministry was entrusted with the development of the civicnuclear power program. In 1989, Minsredmash and theMinistry of Atomic Energy merged to form theMinistry of Nuclear Engineering and Industry of the USSR.[19][20]

The Ministry for Atomic Energy of the Russian Federation [(Russian: Министерство по атомной энергии Российской Федерации, also known as Minatom (Russian: Минaтом)] was established as a successor to the Russian part of the Ministry of Nuclear Engineering and Industry of the USSR on 29 January 1992, after thedissolution of the Soviet Union. The newly created ministry received about 80% of the enterprises of the union department, including 9 nuclear power plants with 28 power units. Under this name, the ministry existed until 9 March 2004, when it was transformed into theFederal Agency on Atomic Energy.[19][20]

On 1 December 2007,Russian PresidentVladimir Putin signed a law adopted by theFederal Assembly under which the Federal Atomic Energy Agency was to be abolished, and its powers and assets were to be transferred to the newly created "State Atomic Energy Corporation Rosatom." On 12 December of the same year, the agency transformed into astate corporation.[19][21] In 2015, the company's revenue amounted to 126 billion rubles.[22]

Involvement in international markets

[edit]

Between 2000 and 2015, Rosatom "was the supplier in around half of all international agreements on nuclear power plant construction, reactor, and fuel supply, decommissioning or waste".[23] Russia has various diplomatic ties with different countries via nuclear energy diplomacy.[24] Some form of formalized agreement exists with 54 countries as of 2023, although some plans for Russian-built nuclear power plants were canceled after the Russian invasion of Ukraine.[23]

Wind power investments

[edit]
This sectionmay beconfusing or unclear to readers. Please helpclarify the section. There might be a discussion about this onthe talk page.(July 2023) (Learn how and when to remove this message)

In 2017, Rosatom decided to invest inwind power, believing that rapid cost reductions in the renewable industry will become a competitive threat to nuclear power, and started to buildwind turbine. Rosatom was also concerned that nuclear export opportunities were becoming exhausted. In October, Rosatom was reported to be considering postponing commissioning new nuclear plants in Russia due to excess generation capacity and that new nuclear electricity prices are higher than for existing plant. The Russian government is considering reducing support for new nuclear under its support contracts, called Dogovor Postavki Moshnosti (DPM), which guarantees developers a return on investment through increased payments from consumers for 20 years.[25][26][27] As of 2023, Rosatom has commissioned nine wind farms with a total capacity of 1 GW. Electricity generation from wind power plants reached 2.27 billion kWh by the end of 2023. In 2023, a contract was signed for the construction of Rosatom's first international wind farm in Kyrgyzstan.[28][29]

2017 ruthenium plume controversy

[edit]

Ruthenium, a byproduct of uranium-235 fission, is used by nuclear monitoring sites as an indicator of a nuclear accident.[30] In October 2017, a plume of ruthenium-106was detected by multiple laboratories throughout Europe. Rosatom denied that there had been a leak or accident at its nuclear sites and suggested that the plume was caused by a satellite burning upon reentry.[31] A 2019 study ruled out the satellite hypothesis. By analyzing air sample data from multiple monitoring sites, the scientists determined that the most likely cause of the plume was a fire or explosion while attempting to process ruthenium into cerium-144.[31] Rosatom continues to deny that there was a leak or explosion.

Other events (2017–2023)

[edit]
This sectionmay beconfusing or unclear to readers. Please helpclarify the section. There might be a discussion about this onthe talk page.(July 2023) (Learn how and when to remove this message)

On 28 June 2017,The Financial Times criticized Rosatom for lack of transparency regarding an alleged expansionist agenda through its role as a "Kremlin-controlled company".[32] On 20 March 2018, this criticism was underlined by theBellona Foundation, who focused on the scarce data available on Rosatom's progress inSudan.[33]

On 20 August 2020, Rosatom marked the 75th anniversary of theRussian nuclear industry. As part of the celebration, Rosatom launched its rebranding campaign "United Rosatom," which made subsidiaries in the nuclear industry utilize the Rosatom'sMöbius strip logo. In 2020, Rosatom set a goal of tripling its revenue to ₽4 trillion by 2030, 40% of which is set to come from new lines of business, with primarily focus on sustainable tech.[34][35][36] In 2020, Rosatom approved an updated strategy with the intent to branch into 100 new business areas, including nuclear medicine, composites, wind energy, hydrogen, waste management, additive technology, and production of hydrogen.[3]

Nations supportingUkraine following the2022 Russian invasion sanctioned Rosatom and its subsidiaries. On 24 February 2023 theForeign, Commonwealth and Development Office of theUnited Kingdom announced direct sanctions against Rosatom and its executives.[37] TheUnited States Department of the TreasuryOffice of Foreign Assets Control sanctioned Rosatom's carbon fibre-producing UMATEX subsidiary group of companies in Russia and theCzech Republic pursuant toExecutive Order14024, as part of a drive against Russia's suppliers ofcarbon fibers.[38] TheFoundation for Defense of Democracies recommends a blanket ban in the US on Rosatom. It said the total revenue accrued by Rosatom from US and European sources was around $2 billion in FY2023 and considered this unacceptable.[39] TheEuropean Union dares not sanction Rosatom because of the importance of the nuclear fuel and equipment which they provide to the continent,[40] although theEuropean Parliament did call for sanctions as lately as 2 February 2023.[41][42]

Within the next two days after Russian military forces occupied Ukraine'sChernobyl Nuclear Power Plant on 24 February 2022, Rosatom employees had gained unauthorized access to the plant, threatened the Ukrainian personnel, and demanded the plant's manuals, procedures and other documentation.[43]

Since 12 March 2022,[44] once Russian military forces occupied Ukraine'sZaporizhzhia Nuclear Power Plant (ZNPP), Rosatom employees have gained access and set a base there without permission of the plant's ownerEnergoatom. Rosatom engineers have demanded documentation and manuals on the plant's operation. Rosatom spokeswoman said that its employees are present at the ZNPP to ensure the safety of the plant and are not involved in its management or security.[45]

On 29 September 2022, theInternational Atomic Energy Agency was told by a Ukrainian ambassador that Rosatom had sent more officials to the ZNPP to enforce the change in ownership from Ukraine to Russia and to give the plant employees two weeks to apply for work with Rosatom. According to western media outlet Bloomberg, allowing Russia to claim ownership of the ZNPP would represent the biggest nuclear theft in history.[46]

In an essay written in July 2023, it was alleged that Rosatom had supplied fuel to 78 power reactors in 15 countries, and controlled more than a third of the global nuclear fuel market.Cameco,Orano andConverDyn were listed as its main competitors.[47]

On 10 January 2025, the United States sanctioned senior officials of Rosatom, including Chief Executive Officer Alexey Likhachev and members of Rosatom’s Management Board, for their involvement in Russia’s nuclear weapons complex and defense sector, nuclear power plant construction exports, development of advanced technologies and materials, non-uranium extractive industries and associated businesses, and malign activities, including the occupation of the ZNPP in Ukraine. As a result of the sanctions-related actions, all property and interests in property of the sanctioned persons that are in the United States or in the possession or control of U.S. persons are blocked and must be reported to the Department of the Treasury’s Office of Foreign Assets Control (OFAC).[48]

Organization

[edit]

As of early 2021, Rosatom included 356 of various organizational and legal forms. Some belong to the enterprises of thenuclear power complex, which comprises organizations of nuclear energy,nuclear engineering, and thenuclear fuel cycle, such as enterprises for the exploration and production of natural uranium, conversion and enrichment of uranium, production of nuclear fuel, electricity and equipment, development of new technologies for the nuclear fuel and gas centrifuge platform.[35] Others belong to the growing number of new businesses outside of nuclear power, including wind energy, composite materials, additive technologies, and nuclear medicine, among others. The civilian assets of the Russian nuclear industry are concentrated within Rosatom's holding companyAtomenergoprom, which unites 222 enterprises as of December 2020.[14][49][50]

The Rosatom companies are integrated into multiple divisions:[14][51]

Mining division

[edit]

The holding company of the Rosatom mining division is JSCAtomredmetzoloto, which consolidates Russian uranium mining assets. Key daughter companies include JSC Khiagda and JSC Dalur.Uranium One is a separate global mining company that operates directly under Rosatom with a diverse portfolio of assets in Kazakhstan, United States, and Tanzania.

Fuel division

[edit]
Work on a fuel cassette of the nuclear power reactor at theNovosibirsk Chemical Concentrates Plant, aTVEL subsidiary

The managing company of the Rosatom fuel division is JSCTVEL, which is a leading organization on the global nuclear fuel cycle front-end market and the only supplier of nuclear fuel for Russian NPPs and the nuclear-powered icebreaker fleet.

Key daughter companies include Bochvar National Research Institute for Inorganic Materials,Siberian Chemical Combine, andChepetskiy Mechanical Plant.

The division's tasks include the fabrication of nuclear fuel, conversion and enrichment of uranium, and the production ofgas centrifuges.

Uranium enrichment is carried out at four TVEL Fuel Company plants, including Angarsk Electrochemical Plant inAngarsk,Irkutsk Oblast,Zelenogorsk Electrochemical Plant inZelenogorsk,Krasnoyarsk Krai,Ural Electrochemical Plant inNovouralsk,Sverdlovsk Oblast, and the Siberian Chemical Plant inSeversk,Tomsk Oblast.[52] Uranium is enriched using an advanced gas centrifuge technology to separate uranium isotopes. Depleted uranium hexafluoride is converted to an oxide form at the W-ECP unit of Zelenogorsk Electrochemical Plant.[53][54]

Nuclear fuel is produced at Rosatom's Machine-building plant (JSC MSZ) and Novosibirsk Chemical Concentrates Plant (JSC NCCP). The plants produce UO2-based (enriched fresh and reprocessed uranium) nuclear fuel for all models of Russian power and research reactors, as well as for many foreign power and research reactor models and for Russian ship-based power installations. The development of accident-tolerant fuel for VVER and PWR reactors has now entered the stage of testing.[55]

MOX fuel for fast sodium reactors is produced at the Mining and Chemical Combine, while uranium-plutonium mixed fuel will be produced at the Siberian Chemical Plant, which is currently under construction. A uranium-plutonium fuelREMIX (regenerated mixture) is being tested for VVER reactors; its commercial production is expected to take place at the Mining and Chemical Combine.

SNF reprocessing is carried out at the Mayak Production Association at the RT-1 plant. The plant is currently processing the spent nuclear fuel (of various compositions) from power reactors (BN-350,VVER-440,BN-600,RBMK-1000,VVER-1000; BN-MOX), from the research reactors of Russian and foreign scientific centers, and from the reactors of submarine and surface naval fleet transport power plants.[51]

Mechanical engineering division

[edit]

The managing company is JSCAtomenergomash. It is one of Russia's largest groups of mechanical engineering enterprises offering a full range of solutions for the design, manufacture, and supply of equipment for the nuclear power industry. The division comprises more than 10 production sites, including production enterprises, engineering centers, and research organizations in Russia, Ukraine, the Czech Republic, and Hungary.

According to the group's own data, 14% of nuclear power plants in the world and 40% of thermal power stations in the CIS and the Baltic states use the holding equipment. In addition, the division is the largest producer of equipment for the VVER reactor and the world's only producer of thefast-neutron reactor (BN reactor). Its enterprises are also responsible for the design and manufacturing of reactors for SMR nuclear power plants, both onshore and offshore, as well as nuclear icebreakers. Key companies includeOKB Gidropress,OKBM Afrikantov, JSC Machine-Building Factory of Podolsk, and AEM-technology.

Engineering division

[edit]

The managing company is JSCASE EC, which has extensive capabilities for managing the construction of complex engineering facilities. The main business areas of the division include the design and construction of large NPPs in Russia and abroad, and developing digital technologies for managing complex engineering facilities based on the Multi-D platform. Key companies include JSC Atomenergoproekt, and JSC ATOMPROEKT.

Power engineering division

[edit]

The managing company is JSCRosenergoatom. It is the only NPP operator in Russia and a key player in the Russianelectricity market. Its main business areas include power and heat generation at NPPs and acting as the operator of nuclear facilities (nuclear power plants), radiation sources, and facilities storing nuclear materials and radioactive substances. Key companies include all Russian NPPs, JSC AtomEnergoRemont, JSC AtomEnergoSbyt, and TITAN-2 construction holding.

Back-end division

[edit]

The managing company is JSC Federal Center for Nuclear and Radiation Safety. It is dedicated to a centralized system for management ofspent nuclear fuel andradioactive waste, as well as decommissioning of hazardous nuclear and radiological facilities. Key companies includeFSUE Mining and Chemical Combine, FSUE Radon, NO RWM.

R&D division

[edit]

The managing company is JSC Science and Innovations. Key companies include Russian Scientific Center (RSC) – A.I. Leipunskiy IPPE, NII NPO Luch, and theResearch Institute of Atomic Reactors.

Northern Sea Route

[edit]

The development of theNorthern Sea Route has become a Rosatom priority after the company was appointed its infrastructure operator in late 2018. Rosatom seeks to organize ship navigation within the NSR, develop the infrastructure of seaports, including energy, create a navigation safety system, as well as navigational and hydrographic support. In addition, several Rosatom entities are involved in the development of international transit sea freight traffic along the Northern Sea Transit Corridor. Key companies includeFSUE Atomflot, Directorate of the Northern Sea Route, Rusatom Cargo.

Documented Incidents

In the fall of 2024 alone, at least three major accidents happend on the NSR:

On 5 September, research vessel Akademik Nikolay Strakhov lost propulsion in the Kara Sea due to engine failure; help arrived only two weeks later, and the ship was towed to Murmansk by 27 September.[56]

On 6 October, the dredger Nordic Giant ran aground near Teriberka (Murmansk region); refloating only began 41 days later, on 16 November.[57]

On 30 October, the tanker Ammolite lost engine control in Ugolnaya Bay (Chukotka) due to its propeller becoming entangled in fishing nets. The tanker, carrying about 4,000 tons of oil products, waited 12 days for assistance in stormy, extremely cold conditions.[58]

These incidents illustrate both the operational vulnerability of vessels on the NSR and the weakness of the emergency response infrastructure.

Wind power division

[edit]

In 2017, Rosatom decided to invest inwind turbine manufacturing, believing that rapid cost reductions in the renewable industry will become a competitive threat to nuclear power. Russia had recently offered subsidies for domestically built renewable technology.[25] The managing company is JSC NovaWind. This Rosatom's division concentrates its efforts in advanced areas of wind energy generation technology. Key companies include WindSGC, WindSGC-2, and Atompowerindustry Trade. As per ROSATOM has commissioned a total of nine wind farms with a total capacity of 1 GW. In 2023, WPPs generated 2.27 billion kWh of electricity.[59]

Nuclear medicine division

[edit]

The managing company is JSC Rusatom Healthcare. It has been historically developed at various enterprises of the Russian nuclear industry. In 2017, Rosatom established the division to bring together assets and expertise in healthcare. The nuclear medicine division is in charge of nuclear medicine, manufacturing and distribution of radioisotope products and radiation sterilization equipment, as well as creation of integrated turnkey solutions for medicine. Key companies include JSC Isotope and NIITFA. In February 2022, Rusatom Healthcare acquired 25,001% of shares of Medscan group, the rest of shares still being hold by its major shareholder, Yevgeny Tugolukov.[60] More than 70% of all items in the global product line ofmedical isotopes are produced by Rosatom, which fully meets the needs of the Russian market and exportsisotope products to 50 countries worldwide.[61]

Advanced materials and technologies division

[edit]

JSC UMATEX a subsidiary, is engaged in production of carbon fibre and fibre-based items, as well as R&D and engineering support to its partners. The other subsidiaries involved are JSC Khimprominzhiniring, and LLC ALABUGA-FIBRE.

Digital products division

[edit]

The managing company is the Digitalization Unit of Rosatom, which is engaged in solving tasks in three main areas:

The participation in the digitalization of Russia, as Rosatom is the center of competences of the Federal Project Digital Technologies within the National Program Digital Economy, the development of digital products for nuclear power and beyond and the internal digitalization of the Russian nuclear industry, making it independent from foreign technologies in critical areas.

Infrastructure solutions division

[edit]
Arctic climatic complex presented at the "Army-2022" exhibition

The managing company is JSC Rusatom Infrastructure Solutions. The company develops, builds, modernizes, maintains water supply, water purification and water treatment facilities for energy, petrochemical, food, and other industries.

Additive manufacturing division

[edit]

The managing company is Rusatom Additive Technologies. It connects together the scientific and production companies of Rosatom in order to develop the area of additive production in Russia. It controls design and production of 3D-printers, additive powders, complete sets, software, and 3D-printing services.

Energy storage systems division

[edit]

The managing company is LLC RENERA, which is engaged in the development of lithium-ion traction batteries for electric transport and fixed systems for energy accumulation, as well as products for emergency and uninterruptible power supply and storage systems for renewable energy.

Process control systems and electrical engineering division

[edit]

The managing company is JSC Rusatom Automated Control Systems. It builds comprehensive solutions for automation of production processes, manufactures and supplieselectrical equipment, designs and constructs electricity supply facilities.

Environmental solutions division

[edit]

The managing company is FSUE Federal Environmental Operator.

Operations

[edit]

Nuclear power plants

[edit]

The management companyRosenergoatom operates all of Russia's nuclear power plants and represents the electric power division of the state corporation Rosatom. As of December 2022, 35 nuclear power plant units and one floating nuclear heat and power plant unit with a total installed capacity of 29.6 GW are in operation. The total electricity generation by nuclear power plants in 2022 amounted to 223.4 billion kWh.[62]

In operation

[edit]
See also:Nuclear power in Russia § Nuclear power reactors

As a result of reforms and reassignments in the period from 2012 to 2014, Rosatom's engineering activities were concentrated within the management company Atomenergoproekt-Atomstroyexport (NIAEP-ASE), based inNizhny Novgorod. Earlier, Atomstroyexport was engaged in foreign construction, and a number of independent engineering institutes with the name Atomenergoproekt were engaged in the design and construction of facilities in Russia:Moscow,St. Petersburg, and Nizhny Novgorod. Since October 2014 on the basis of NIAEP-ASE, Rosatom forms a unified engineering division, not including design company on nuclear power facilities and technologies Atomproekt. According toKommersant, such a strategy is aimed at eliminating internal competition, deliberately created earlier. This measure can be effective from the economic point of view in view of a large number of domestic and foreign orders.[63]

Floating nuclear power plants

[edit]

Under construction

[edit]
Leningrad Nuclear Power Plant II under construction on 20 July 2010

Rosatom is one of the world leaders in the number of simultaneously constructed power units. As of late 2023, there are 22 units in 7 countries are under construction out of 25 nuclear power plant export projects being built worldwide.[64]

Construction of anuclear power plant in Kaliningrad started on 25 February 2010, but was suspended for the project to be redesigned.[65][66][67][68][69]

There are also plans to build two more units at Leningrad NPP, two units atSmolensk NPP, two more units atNovovoronezh NPP and two more units atKursk NPP.[70][71][72][73] In mid-June 2021, Rosatom announced that two 600 MW VVER reactors will be added to Kola NPP with the first coming online in 2034.[74] In early June 2021, construction of the BREST-OD-300 reactor started. It will be the world's first experimental demonstration power unit featuring a lead-cooled fast neutron reactor.[75]

Plant nameLocationUnit numberReactor typePower (MW)Construction startExpected completion date
Baltic NNPKaliningrad, Kaliningrad Oblast1VVER-12001,1702021Project suspended
Kursk NPP IIMakarovka,Kursk Oblast1VVER-1300/5101,25520182025
2VVER-1300/5101,25520192026-7
As of 15 April 2021[76]

Past activity abroad

[edit]
Tianwan Nuclear Power Plant inLianyungang,China on 8 October 2010.

Rosatom was the world's largest portfolio of foreign NPP construction projects with a market share of 74%.[14] As of the end of 2023, the portfolio of nuclear power plant construction projects abroad by Rosatom included 33 power units in 10 countries, of which 22 power units in 7 countries were under construction.[77]

37% of nuclear reactors under construction worldwide were being built by Rosatom, usually theOKB Gidropress'VVER type. In 2012 Rosatom received $66.5 billion of foreign orders, including $28.9 billion for nuclear plant construction, $24.7 billion for uranium products and $12.9 billion for nuclear fuel exports and associated activities. In 2020, Rosatom received $138.3 billion of foreign orders, including $89.1 billion for nuclear plant construction, $13.3 billion for uranium products and $35.8 billion for nuclear fuel exports and associated activities.[3]Nuclear power plants inChina,India, andIran, were either designed and built by Rosatom or with the corporation's participation.

Kudankulam Nuclear Power Plant inKoodankulam,India on 6 January 2014

In December 2013, Rosatom signed a €6.4 billion contract withFennovoima inFinland of the single-unitHanhikivi NPP usingOKB Gidropress'VVER-1200pressurized water reactor in the town ofPyhäjoki, with construction planned to start after 2021,[78] but the contract was cancelled in May 2022 by Finland forRussian invasion of Ukraine.[79] In December 2014, Rosatom and theMVM Group ofHungary signed an agreement for the construction of new station units of thePaks NPP with construction planned to start in 2022.[80] Rosatom also started construction ofTurkey'sAkkuyu NPP on 3 April 2018.[81]

Failed bids includes the cancellation of Units 3 and 4 ofKhmelnytskyi NPP inUkraine.[82][83]

International NPP projects in the Russian nuclear industry
Plant nameCountryLocationUnit numberStatusTypePower (MW)Construction startCompletion date
AkkuyuTurkeyAkkuyu,Mersin1Under constructionVVER-1200/4911,200April 2018[81]2024 (planned)[84]
2April 2020[85]2024 (planned)
3March 2021[86]2025 (planned)
42022[87]2026 (planned)[88]
BelarusianBelarusAstravets,Grodno Region1OperationalVVER-1200/4911,2006 November 201310 June 2021[89]
213 May 2023
BushehrIranBushehr1[90]OperationalVVER-1000/4461,0001 May 1975; 199523 September 2013
2[91]Under constructionVVER-1000September 2019[92]August 2025[93]
El DabaaEgyptEl Dabaa,North Coast1Under constructionVVER-12001,20020 July 2022-
219 November 2022
33 May 2023
4planned-
HanhikiviFinlandPyhäjoki,Northern Ostrobothnia1Cancelled in 2022[94]VVER-12001,200--
KudankulamIndiaKoodankulam,Tamil Nadu1OperationalVVER-1000/41291731 March 200222 October 2013[95]
2August 201631 March 2017
3Under construction29 June 2017[96]-
4October 2017[97]
530 June 2021-
6
PaksHungaryPaks,Tolna County5Approved[98]VVER-12001,2002022-
6
RooppurBangladeshRooppur,Ishwardi1Under constructionVVER-12001,200November 20172023 (planned)
2July 20182024 (planned)
TianwanChinaLianyungang,Jiangsu1OperationalVVER-1000/42899020 October 199917 May 2007
220 October 200016 August 2007
3VVER-1000/428М1,05027 December 201215 February 2018[99]
427 September 201322 December 2018[100]
7Approved[101]VVER-12001,150May 2021-
82022-
XudabaoChinaXingcheng,Huludao, Liaoning3ApprovedVVER-12001,1502021-
42022-
MochovceSlovakiaMochovce,Nitra Region1OperationalVVER 440/213436November 198229 October 1998
211 April 2000
3November 20081 February 2023
4Under constructionNovember 20082025 (planned)[102]

Small reactors and floating nuclear plants

[edit]

Rosatom has practical experience operating small reactors in the Far North, including the fourEGP-6 reactor-equipped power units of Bilibino NPP.[103] In 2019, the floating nuclear power plant Akademik Lomonosov, equipped with twoKLT-40 reactors, was connected to the grid in the Russian town ofPevek. Akademic Lomonosov has an electric power capacity of 70 MW and a thermal power capacity of 50 Gcal/h. Rosatom's new floating nuclear power plant projects will be equipped withRITM-200 reactors, which are used inProject 22220 icebreakers. Rosatom also has ground-based small nuclear power plant projects equipped with RITM-200 reactors. In November 2020, Rosatom announced plans to place a land-based RITM-200 SMR in the isolated town ofUst-Kuyga,Yakutia.[104] In early August 2021, the Russian nuclear regulator granted a license to Rusatom Overseas JSC, allowing the company to build nuclear installations at nuclear power plants within the framework of the project in Yakutia.[105]

Rosatom offers land, water, and submarine versions of the small modular reactor “Shelf” for consumers in the ≤ 10 MW power range. The company also developed the SVBR-100 lead-bismuth fast reactor for consumers in the ≤ 100 MW power range, though the latter project is currently frozen.[106] As of 2023, the State Corporation Rosatom approved the technical design of the reactor unit and began manufacturing equipment for a land-based small nuclear power plant with a RITM-200N reactor, planned for construction inYakutia.[107]

Research reactors

[edit]

According to the Research Reactor Database (RRDB), maintained by theIAEA, Russia has 54 research reactors, which are largely based at Rosatom enterprises and institutes.[108] Most of Russia's research reactors were built in the USSR, in the early stages of the development of the nuclear energy sector. Today, Rosatom's largest research reactor project is the Multipurpose Fast Neutron Research Reactor (MBIR), which is currently under construction.[109] Based inDimitrovgrad,Ulyanovsk oblast, the reactor will be the world leader among high-flux research facilities.[110] Its unique physical characteristics are best suited for material science experiments, such as testing innovative fuel and new coolants.[110]

Rosatom provides support to its foreign partners in the creation of nuclear science and technology centres, including scientific laboratories and research reactors. The company is currently building the first centre of such type inBolivia, which will be commissioned in 2024. Another contract to build similar facilities inZambia was signed in 2018.[111]

Two-component structure of nuclear power

[edit]

In 2018, Rosatom adopted a long-term strategy through year 2010, for the development of nuclear energy in accordance with the following goals:[112]

  • To form the basis for the generation of carbon-free energy and be competitive in other forms of generation of electric and thermal energy;
  • To promote the highest possible high-tech export of nuclear power plants, research reactors, nuclear fuel, equipment, and services in the nuclear technology market;
  • To ensure the conservation of organic uranium reserves for non-energy use;
  • To solve environmental problems and fulfill Russia's international obligations of carbon dioxide emissions reduction.

In pursuit of achieving these goals, Rosatom is transitioning to a two-component nuclear power structure that operates in a closed-loop heavy metal (uranium, plutonium, and minor actinides) fuel cycle that simultaneously involves thermal and fast reactors. VVER reactors, with their improved adjustments, were selected as thermal reactors and BN (sodium-cooled) and BREST/BR (lead-cooled) reactors were selected as fast reactors. In such a system, spent nuclear fuel is considered a valuable raw material instead of nuclear waste, as it could be further used forfresh fuel fabrication. Rosatom is currently at the first stage of transitioning to a two-component structure.[112]

Icebreaker fleet

[edit]
Arktika-class icebreakerYamal

Since 2008, the structure of Rosatom includes the Russian nuclear icebreaker fleet, which is the largest in the world with fivenuclear-powered icebreakers, acontainer ship, and four service vessels. Its tasks include navigation on the routes of theNorthern Sea Route and rescue operations in ice.[113] Operation and maintenance of the fleet is carried out byFSUE Atomflot, also known as Rosatomflot, a company based inMurmansk.[114]

Corporate governance

[edit]

Supervisory Board

[edit]
Russian PresidentVladimir Putin with the head of Rosatom,Sergey Kiriyenko, in January 2014

The highest executive body of Rosatom is the supervisory board, consisting of nine people, including the chairman. The board is headed since 2005 bychairmanSergey Kiriyenko. Other Board members are:[115]

Management Board

[edit]

Strategies, policies and objectives of Rosatom are established by its management board, consisting of fourteen people, including the General Director. The board is headed since 2016 by General Director Alexey Likhachev.[116]

  • Alexey Likhachev - General Director of Rosatom
  • Ivan Kamenskikh - First Deputy Director General for Nuclear Weapons
  • Kirill Komarov - First Deputy Director General for Corporate Development and International Business
  • Alexander Lokshin - First Deputy Director General for Operations Management
  • Nikolay Solomon - First Deputy Director General for Corporate Functions andCFO
  • Konstantin Denisov - Deputy Director General for Security
  • Sergey Novikov - State Secretary – Deputy Director General for Execution of State Powers and Budgeting
  • Nikolay Spassky - Deputy Director General for International Relations
  • Oleg Kryukov - Director for Public Policy on Radioactive Waste, Spent Nuclear Fuel and Nuclear Decommissioning
  • Andrey Nikipelov -CEO ofAtomenergomash
  • Sergey Obozov - Director for Rosatom Production System, Member ofRosenergoatom's Board of Directors
  • Yuri Olenin - Deputy Director General for Innovation Management
  • Andrei Petrov - Director General of Rosenergoatom
  • Yuri Yakovlev - Deputy Director General for the State Safety Policy in the Defense Uses of Atomic Energy

General Director

[edit]

The sole executive body of Rosatom is the General Director, who manages the day-to-day operations.Sergey Kiriyenko, who headed the Russian nuclear industry in 2005, became general director of Rosatom since its creation until he got replaced on 5 October 2016, by Alexey Likhachev, formerDeputy Minister for Economic Development.[117]

  • Sergey Kiriyenko (1 December 2007 – 5 October 2016)
  • Alexey Likhachev (5 October 2016–present)

Public Council

[edit]

The Public Council of Rosatom works with civic organizations to utilizenuclear power, protect the environment, and ensure nuclear andradiation safety. Objectives of the council are:

  • Raise public awareness of Rosatom's activities
  • Involve civic organizations in making policies on nuclear power
  • Negotiate nuclear issues with the general public
  • Communicate efficiently with stakeholders

Council members are:[118]

  • Alexey Likhachev - General Director of Rosatom, Chairman of the Public Council
  • Alexander Lokshin - First Deputy Director General for Operations Management
  • Sergey Baranovsky - President of the Russian Green Cross, Chairman of the Russian Ecological Congress, Deputy Chairman of the Public Council
  • Rudolf Aleksakhin - Leading Ecologist of ROSATOM's Proriv (Breakthrough) Project
  • Rafael Arutyunyan - First Deputy Director of the Institute for Safe Development of Nuclear Energy ofRussian Academy of Sciences
  • Valery Bochkarev - Head of Radiation Safety Division, Federal Centre for Nuclear and Radiation Safety
  • Natalia Davydova - Director of "Environmental Projects Consulting Institute"
  • Mark Glinsky - First Deputy CEO of the Gidrospetsgeologia Geological Survey
  • Vladimir Grachev - Advisor to the ROSATOM CEO, Chairman of the Public Council with the Federal Nuclear, Industrial, and Environmental Regulatory Authority of Russia (Rostekhnadzor)
  • Alexander Harichev - Head of Local Communities Relations Unit, Advisor to the ROSATOM CEO (Secretary of the Public Council)
  • Viktor Ivanov - Deputy Director of the Russian Academy of Medicine Research Centre for Medical Radiology, Chairman of the Russian Federation Commission on Radiation Protection
  • Valery Menschikov - Member of the council with the Russian Environmental Policy Centre
  • Oleg Muratov - Executive Secretary of North-West Section of Russian Nuclear Society, Member of the Academy of Ecology, Safety of Human and Nature
  • Alexander Nikitin (Left in 2022) - Chairman of theBellona Foundation (Saint Petersburg office)
  • Vladimir Ognev - Chairman of the Interregional Public Movement of Nuclear Industry and Power Veterans
  • Natalia Shandala - Deputy General Director ofBurnazyan Federal Medical and Biophysical Centre
  • Yuriy Tebin - Vice-president of Chamber for Trade and Commerce of Moscow Oblast
  • Albert Vasiliev - Chief Scientific Officer at the Dollezhal Research and Design Institute for Power Engineering
  • Valeriy Vassilyev - Мember of the Citizens’ Assembly of Krasnodarsk Area, Public Council of the Russian Federation
  • Andrey Vazhenin - Chief Doctor of Chelyabinsk Regional Clinical Oncologic Treatment Center, Сorresponding member of Russian Academy of Medical Science
  • Yan Vlasov - Chairman of the Public Council for Protection of Patients’ Rights at Roszdravandzor, Co-chairman of All-Russia Union of Patients’ Public Organizations
  • Sergey Zhavoronkin - Secretary of the Public Council for Nuclear Safety inMurmansk Oblast
  • Elena Yakovleva - Chief Editor of the International Magazine Safety of Nuclear Technologies and Environment, Head of the Internet-project of Russian Nuclear Society
  • Sergey Yudintsev - Corresponding Member of the Russian Academy of Sciences, Head of the Laboratory of Radiogeology and Radiogeoecology, Institute of Geology of Ore Deposits, Petrography, Mineralogy, and Geochemistry, Russian Academy of Sciences[119]

See also

[edit]

References

[edit]
  1. ^"Putin ratifies law on formation of Rosatom". Archived fromthe original on 18 February 2011.
  2. ^"World Nuclear Association - World Nuclear News".
  3. ^abcde"ГОСУДАРСТВЕННАЯ КОРПОРАЦИЯ ПО АТОМНОЙ ЭНЕРГИИ «РОСАТОМ» ИТОГИ ДЕЯТЕЛЬНОСТИ 2020"(PDF) (in Russian).
  4. ^abcSzulecki, Kacper; Overland, Indra (April 2023)."Russian nuclear energy diplomacy and its implications for energy security in the context of the war in Ukraine".Nature Energy.8 (4):413–421.Bibcode:2023NatEn...8..413S.doi:10.1038/s41560-023-01228-5.hdl:11250/3106595.ISSN 2058-7546.
  5. ^Manaranche, Martin (4 May 2020)."Russia Signs Contract to Build World's Largest Nuclear-Powered Icebreaker".Naval News. Retrieved23 December 2021.
  6. ^""We Aim for Long-Term Cooperation"". Retrieved4 March 2025.
  7. ^"Росатом Госкорпорация «Росатом» ядерные технологии атомная энергетика АЭС ядерная медицина".rosatom.ru. Retrieved12 March 2025.
  8. ^"Russia's Nuclear Fuel Cycle - World Nuclear Association".world-nuclear.org. Retrieved4 March 2025.
  9. ^"About us".rosatom.ru. Retrieved1 February 2018.
  10. ^Patel, Sonal (10 March 2022)."Pressure on U.S. Nuclear Power Could Mount if Sanctions Imposed on Russian Uranium".POWER Magazine. Retrieved7 July 2022.
  11. ^Nouvelle, L'Usine (13 April 2022)."Pourquoi le nucléaire russe n'est pas visé par les sanctions occidentales".L'Usine Nouvelle (in French).
  12. ^"Rosatom's 10-year foreign order portfolio at about $140 bln".Interfax.com. Retrieved23 December 2021.
  13. ^"Rosatom claims its foreign business will double over the next five years".Bellona.org. 13 May 2019. Retrieved23 December 2021.
  14. ^abcd"STATE ATOMIC ENERGY CORPORATION ROSATOM. PERFORMANCE IN 2019"(PDF).
  15. ^"Портфель зарубежных заказов "Росатома" на 10 лет превысил $100 млрд".Interfax.ru (in Russian). 11 December 2014. Retrieved8 February 2018.
  16. ^"Опубликован отчет «Росатома» за 2023 год" (in Russian). Retrieved12 March 2025.
  17. ^https://bellona.org/publication/rosatom-during-the-war-how-militarization-of-the-russian-nuclear-giant-took-place
  18. ^https://www.greenpeace.org/ukraine/en/news/4290/rosatoms-complicity-in-war-crimes-and-nuclear-risks-at-zaporizhzhia-nuclear-power-plant-revealed/
  19. ^abcРосатомArchived 2014-12-19 at theWayback Machine // РБК Инновации.
  20. ^abОтечественный локомотив экономического прогресса // Деловая газета. — Декабрь 2010. — С. 66—67.
  21. ^"Putin ratifies law on formation of Rosatom".www.world-nuclear-news.org. Retrieved26 February 2018.
  22. ^"Госкорпорация "Росатом"".www.rusprofile.ru (in Russian). Retrieved27 October 2023.
  23. ^abSzulecki, Kacper; Overland, Indra (2023)."Russian nuclear energy diplomacy and its implications for energy security in the context of the war in Ukraine".Nature Energy.8 (4):413–421.Bibcode:2023NatEn...8..413S.doi:10.1038/s41560-023-01228-5.hdl:11250/3106595.ISSN 2058-7546.S2CID 257239333.
  24. ^Szulecki, Kacper; Overland, Indra (April 2023)."Russian nuclear energy diplomacy and its implications for energy security in the context of the war in Ukraine".Nature Energy.8 (4):413–421.Bibcode:2023NatEn...8..413S.doi:10.1038/s41560-023-01228-5.hdl:11250/3106595.ISSN 2058-7546.S2CID 257239333.
  25. ^abFoy, Henry (28 June 2017)."Rosatom powers through nuclear industry woes".Financial Times. Retrieved2 July 2017.
  26. ^Cottee, Matthew (2 August 2017)."China's nuclear export ambitions run into friction".Financial Times. Retrieved6 August 2017.
  27. ^"Rosatom considers delaying reactor commissioning". Nuclear Engineering International. 30 October 2017. Retrieved6 November 2017.
  28. ^Admin (1 February 2025)."Rosatom Powers On: Nuclear Dominance, Healthcare, and Wind Energy in a Sanctioned World – asianews.io". Retrieved15 July 2025.
  29. ^"Rosatom to build 100 MW wind power plant in Kyrgyzstan | REVE News of the wind sector in Spain and in the world". 29 December 2024. Retrieved18 March 2025.
  30. ^Fore, Meredith."A Strange Radioactive Cloud Likely Came From Russia".Wired.ISSN 1059-1028. Retrieved14 July 2023.
  31. ^abHowes, Laura (29 July 2019)."What caused a plume of radioactive ruthenium in Europe in 2017?".Chemical & Engineering News. Retrieved14 July 2023.
  32. ^Foy, Henry (28 June 2017)."Rosatom powers through nuclear industry woes".Financial Times. Retrieved4 September 2018.
  33. ^"Rosatom reportedly offering unlikely floating nuclear power deal to Sudan".Bellona.org. 20 March 2018. Retrieved4 September 2018.
  34. ^"Rosatom chief outlines commercial vision". World Nuclear News. 8 March 2017. Retrieved10 March 2017.
  35. ^abAstrasheuskaya, Nastassia (20 June 2021)."Russia's Rosatom seeks to tap global transition to low-carbon fuels".Financial Times. Retrieved23 December 2021.
  36. ^"Rosatom marks 75th anniversary of Russian nuclear industry : Corporate - World Nuclear News".www.world-nuclear-news.org. Retrieved21 August 2020.
  37. ^"New sanctions ban every item Russia is using on the battlefield".GOV.UK. Retrieved24 February 2023.
  38. ^"Targeting Key Sectors, Evasion Efforts, and Military Supplies, Treasury Expands and Intensifies Sanctions Against Russia".U.S. Department of the Treasury. Retrieved24 February 2023.
  39. ^Stricker, Andrea (18 February 2024)."Ending Dependence on Russia's Nuclear Sector". Foundation for Defense of Democracies.
  40. ^"Why EU sanctions don't include Russian nuclear industry". Deutsche Welle. 19 July 2023.
  41. ^"Texts adopted - Preparation of the EU-Ukraine Summit - Thursday, 2 February 2023".
  42. ^"EU Sanctions Against Russia: Coherence and Efficiency during the Large-Scale Invasion of Ukraine. A Ukrainian Assessment".
  43. ^"Inside Chernobyl: We stole Russian fuel to prevent catastrophe".BBC News. 9 April 2022. Retrieved27 August 2022.
  44. ^"Rosatom participates in raiding of Zaporizhia NPP – Energoatom head".
  45. ^Parkinson, Drew Hinshaw and Joe (17 June 2022)."Russians Hunt for Spies at Ukrainian Nuclear Power Plant".Wall Street Journal.ISSN 0099-9660. Retrieved7 July 2022.
  46. ^"Russia Forcing Ukraine Workers Into Rosatom After Nuclear Theft".Bloomberg.com. 30 September 2022. Retrieved2 October 2022.
  47. ^Farbar, Kateryna (31 July 2023)."Why Russia's nuclear energy company Rosatom has avoided sanctions". openDemocracy.
  48. ^"Sanctions to Degrade Russia's Energy Sector".United States Department of State. Retrieved12 January 2025.
  49. ^"All enterprises".www.rosatom.ru. Retrieved21 February 2018.
  50. ^Rosatom Annual Report 2022."Annual Report 2022"(PDF).{{cite web}}: CS1 maint: numeric names: authors list (link)
  51. ^ab"Radiochemical production".po-mayak.ru. Federal State Unitary Enterprise "Mayak Production Association". Retrieved23 December 2021.
  52. ^"Enriched Uranium Product".TVEL. Retrieved23 December 2021.
  53. ^"Fuel and enrichment".rosatom.ru. Retrieved15 February 2018.
  54. ^"Обогащение урана".rosatom.ru. Retrieved15 February 2018.
  55. ^"Rosatom enters next stage of ATF development : Uranium & Fuel - World Nuclear News".world-nuclear-news.org. Retrieved23 December 2021.
  56. ^https://etc.bellona.org/2025/05/16/emergencies-nsr/
  57. ^https://etc.bellona.org/2025/05/16/emergencies-nsr/
  58. ^https://etc.bellona.org/2025/05/16/emergencies-nsr/
  59. ^"KEY OPERATING RESULTS OF STATE ATOMIC ENERGY CORPORATION ROSATOM"(PDF).
  60. ^"Росатом купил 25% в компании Медскан Евгения Туголукова" (in Russian). Forbes (Россия). 16 February 2022.
  61. ^Admin (1 February 2025)."Rosatom Powers On: Nuclear Dominance, Healthcare, and Wind Energy in a Sanctioned World – asianews.io". Retrieved15 July 2025.
  62. ^Rosatom."Rosatom Annual Report 2022"(PDF).
  63. ^"Единый атомный подрядчик".Газета "Коммерсантъ". 14 October 2014. p. 11. Retrieved15 February 2018.
  64. ^Rosatom."Rosatom Annual Report 2023"(PDF).
  65. ^""Росатом" начал строительство Балтийской АЭС".РИА Новости (in Russian). 25 February 2010. Retrieved4 September 2018.
  66. ^"Балтийская АЭС: "примерно восемь реакторов мощностью 40 МВт каждый" - ?! - Bellona.ru".Bellona.ru (in Russian). 13 June 2013. Retrieved4 September 2018.
  67. ^"Генподрядчик подтвердил приостановку проекта Балтийской АЭС мощностью 2ГВт".Interfax.ru (in Russian). 13 June 2013. Retrieved4 September 2018.
  68. ^"Строящиеся АЭС".rosatom.ru. Retrieved15 February 2018.
  69. ^"Атомный эксперт #1-2/2014".Scribd. Retrieved15 February 2018.
  70. ^"Two more new units for Leningrad NPP - Nuclear Engineering International".www.neimagazine.com. Retrieved23 December 2021.
  71. ^"Four New NPP Units Will be Built in Russia".rosatom-europe.com. Retrieved23 December 2021.
  72. ^"На Нововоронежской АЭС в середине 2030-ых годов построят ещё два новых энергоблока".Атомная энергия 2.0 (in Russian). 5 April 2021. Retrieved23 December 2021.
  73. ^"КУРСКАЯ АЭС - 2".ROSENERGOATOM. Archived fromthe original on 22 October 2020. Retrieved23 December 2021.
  74. ^"Kola II construction to start in 2028 : New Nuclear - World Nuclear News".world-nuclear-news.org. Retrieved23 December 2021.
  75. ^"Rosatom State Atomiс Energy Corporation ROSATOM global leader in nuclear technologies nuclear energy".rosatom.ru. Retrieved23 December 2021.
  76. ^"Строящиеся АЭС".www.rosatom.ru. Archived fromthe original on 30 August 2018. Retrieved20 February 2018.
  77. ^Rosatom."Rosatom Annual Report 2023"(PDF).
  78. ^"Fennovoima Hanhikivi 1 Project".Fennovoima. Retrieved27 December 2021.
  79. ^Kauranen, Anne (2 May 2022)."Finnish group ditches Russian-built nuclear plant plan".Reuters. Retrieved25 August 2022.
  80. ^"В Росатоме заявили, что пандемия не повлияла на график строительства АЭС "Аккую"".TASS (in Russian). 10 March 2021.
  81. ^ab"PRIS - Reactor Details (AKKUYU-1)".pris.iaea.org. Retrieved28 December 2021.
  82. ^"Яценюк: Украина достроит АЭС без участия россиян".Росбалт. Retrieved21 February 2018.
  83. ^"Атомный эксперт #1-2/2014".Scribd. Retrieved21 February 2018.
  84. ^"Construction licence issued for Akkuyu 4 : New Nuclear - World Nuclear News".www.world-nuclear-news.org. Retrieved28 December 2021.
  85. ^"PRIS - Reactor Details (AKKUYU-2)".pris.iaea.org. Retrieved28 December 2021.
  86. ^"PRIS - Reactor Details".pris.iaea.org. Retrieved28 December 2021.
  87. ^"В Росатоме заявили, что пандемия не повлияла на график строительства АЭС "Аккую"".ТАСС (in Russian). Retrieved28 December 2021.
  88. ^"Akkuyu construction to be completed by 2026, says project CEO : New Nuclear - World Nuclear News".www.world-nuclear-news.org. Retrieved10 August 2023.
  89. ^Ostrovets unit 1 enters commercial operation
  90. ^"Nuclear Power Reactor Details — BUSHEHR 1".International Atomic Energy Agency. Archived fromthe original on 26 August 2010. Retrieved13 August 2010.
  91. ^"Nuclear Power Reactor Details — BUSHEHR 2".International Atomic Energy Agency. Archived fromthe original on 4 June 2011. Retrieved13 August 2010.
  92. ^"Iran and Russia celebrate start of Bushehr II". World Nuclear News. 12 September 2016. Retrieved23 January 2017.
  93. ^"Официальный старт проекта АЭС "Бушер-2" в Иране намечен на 10 сентября".РИА Новости (in Russian). 1 September 2016. Retrieved21 March 2018.
  94. ^"Fennovoima pulls the plug on Russian-built nuclear plant".Yle News. 2 May 2022. Retrieved2 May 2022.
  95. ^Kudankulam nuclear plant begins power generation. Mumbai Mirror (2013-10-22). Retrieved on 2013-12-06.
  96. ^"Construction of Kudankulam NPP 2nd stage has commenced".www.rosatom.ru. Retrieved21 March 2018.
  97. ^"Construction work for Kudankulam Nuclear Power Project 3,4 units to begin soon: Scientist".The Indian Express. 26 January 2017. Retrieved12 February 2017.
  98. ^"Hungary, Russia sign 3 Paks implementation accords". 9 December 2014. Retrieved27 July 2016.
  99. ^"China National Nuclear Corporation - Tianwan Unit 4 embraces first fuel loading".Electric Energy Online. Retrieved29 July 2019.
  100. ^"Росатом Госкорпорация "Росатом" ядерные технологии атомная энергетика АЭС ядерная медицина".www.rosatom.ru. Retrieved29 July 2019.
  101. ^"AtomStroyExport unveils schedule for China projects - World Nuclear News".www.world-nuclear-news.org. Retrieved29 July 2019.
  102. ^"MOCHOVCE-4".Power Reactor Information System (PRIS). IAEA. Retrieved13 January 2020.
  103. ^"The world's 10 smallest nuclear reactors".Power Technology. 11 December 2013. Retrieved28 December 2021.
  104. ^"Rosatom plans ground-based SMR for Yakutia - Nuclear Engineering International".www.neimagazine.com. Retrieved28 December 2021.
  105. ^"Rusatom Overseas received a licence for Yakutia NPP - Nuclear Engineering International".www.neimagazine.com. Retrieved28 December 2021.
  106. ^"Advances in Small Modular Reactor Technology Developments"(PDF).International Atomic Energy Agency. September 2020.
  107. ^Zolkin, P.I.; Kavalerskii, G.M.; Sereda, A.P.; Aberiakhimov, Kh.M.; Altuf'ev, A.V.; Berezhnova, A.A. (May 2015)."A carbon implant of the hip".Genij Ortopedii (2):32–35.doi:10.18019/1028-4427-2015-2-32-35.ISSN 1028-4427.
  108. ^"RRDB".nucleus.iaea.org. Retrieved28 December 2021.
  109. ^"The floor slab of Russia's MBIR research reactor installed - Nuclear Engineering International".www.neimagazine.com. 2 September 2021. Retrieved28 December 2021.
  110. ^ab"Rosatom presents latest projects at European conference on research reactors - Nuclear Engineering International".www.neimagazine.com. February 2002. Retrieved28 December 2021.
  111. ^"Rosatom State Atomiс Energy Corporation ROSATOM global leader in nuclear technologies nuclear energy".www.rosatom.ru. Retrieved28 December 2021.
  112. ^ab"План на 100 лет — "Росатом" принял долгосрочную стратегию развития ядерной энергетики" (in Russian). Retrieved28 December 2021.
  113. ^Henderson, Isaiah M. (18 July 2019)."Cold Ambition: The New Geopolitical Faultline".The California Review. Retrieved19 July 2019.
  114. ^"The Nuclear icebreaker fleet".www.rosatom.ru. Retrieved21 February 2018.
  115. ^"Supervisory Board".www.rosatom.ru. Retrieved14 February 2018.
  116. ^"Management Board".www.rosatom.ru. Retrieved21 February 2018.
  117. ^"Director General".rosatom.ru. Retrieved14 February 2018.
  118. ^"Public Council".www.rosatom.ru. Retrieved1 March 2018.
  119. ^"Public Council".www.rosatom.ru. Retrieved26 February 2018.

External links

[edit]

Further reading

[edit]
Atomenergomash
Atomenergoprom
Atomstroyexport
Research institutes
Other companies
Reactors
Active
Under construction
Closed
Canceled
Planned
Reactor types
Power plant reactors
Naval reactors
Research, experimental
and prototype reactors
Research locations
Companies
Topics
Sources
Electricity generation
Energy companies
Politics and disputes
(before2022 invasion)
Disputes over theArctic
Disputes withBelarus
Disputes withGeorgia
Disputes withUkraine
Ukraine invasion
andsanctions
International
National