Incomplete monorail system in Putrajaya, Malaysia
Putrajaya Monorail Line
14
Putrajaya Monorail Suspended Bridge
TheMonorail Suspension Bridge in Putrajaya since 2004
Overview
Native nameLaluan Monorel Putrajaya
StatusShelved in 2004 due to federal budget constraints.
(Under feasibility study)[1]
Line number14
Termini
Stations25 stations
Service
TypeStraddle-beam single rail trackmonorail
Rolling stockTBD
Daily ridershipNot Available
RidershipNot Available
History
Planned openingTBD
OpenedTBD
Last extensionTBD
Technical
Line length18 km (11 mi)
Line 1: 13.2 km (8.2 mi)
Line 2: 6.8 km (4.2 mi)
Electrification750 V DC Third rail
Conduction systemTBD
Operating speed100 km/h (62mph)
Route map

S16D
KajangParking
S16C
Reko Sentral
S16B
Bandar Baru Bangi
possibile extension
to HSR and MRT
S16A
Kampung Dato' Abu
Abu Bakar Baginda
 HSR 
S16
Presint Diplomatik
S15
Alamanda Putrajaya
S14
Lebuh Perdana Timur
S13
Taman Putra Perdana
S12
Laman Perdana
S11
Dataran Putra
Depot
S01
S10
Dataran Wawasan
Presint 11
S02
S09
Lebuh Bestari
Presint 9
S03
S08
Dtrn Putrajaya
ParkingPutrajaya Sentral
S04
Line 2 stabling
S21
Presint 17
Parking
Presint 7
S05
Presint 8
S06
S20
Presint 18
Dataran Rakyat
S07
S19
Dataran Gemilang
S18
PICC
S17
Presint 6
Parking
This diagram:

ThePutrajaya Monorail is an incompletemonorail system inPutrajaya,Malaysia. Construction has been stalled since 2004, and while revivals have been proposed periodically,[2] as of 2024 there are no plans to revive the project.[3]

Putrajaya was originally planned to include alight rail system, but plans were changed, and a monorail plan was selected instead, after the construction of tunnels for aforementioned system began.It called for two sublines;Line 1, which is a 12 km (7.5 mi) monorail route with 17 stations andLine 2, which is a 6 km (3.7 mi) monorail route with 6 stations.[4][5] In 2019, the government proposed a newlight rapid transit (LRT) system may be built to revive the incomplete monorail project.[6]

The monorail will include theMonorail Suspension Bridge, currently incomplete,[7] and thePutra Bridge.[8]

The monorail line would allow transfers to the existingKLIA Transit, connecting toKuala Lumpur andKuala Lumpur International Airport, and the now opened MRTPutrajaya line atPutrajaya Sentral station. The project originally cost RM400 million.[9]

Project Status

[edit]
Monorail tracks with newly-built MRT elevated track

Construction was halted in 2004; 22 years ago (2004), and will probably resume as the city becomes more populated.[10]

In 2016, theMMC Corporation Berhad (MMC) submitted a proposal to the Economic Council (EC) to revive the stalled monorail project. TheLand Public Transport Commission (SPAD) was due to conduct a feasibility study for monorail and tram services for both Putrajaya and Cyberjaya.[11]

In October 2020, the government announced it had opened a request for proposals process to complete the project, within three months.[12] As of 2021, the RFP has not yet opened.

In June 2023, the Ministry of Transport confirmed that the government is not planning to revive the project.[3]

Putrajaya Tram Proposal

[edit]

Federal Territories Minister,Datuk Seri Tengku Adnan Tengku Mansor, had hoped to gettram infrastructure construction going within three years.Now under the jurisdiction of the Economic Council, the minister saw the development of the tram system as an alternative solution to the abandonedmonorail projects and recommended it be built due to cost considerations.[13][14][15]

SPAD had hoped to open up tenders for the tram system between Putrajaya and Bangi in 2018 after getting the green light from EC. This move was announced by SPAD during their annual review of public transportation for 2017. The tram system was selected due to its relatively cheaper price of construction and operation compared to conventional rail systems.

The tram system is expected to be integrated with the existing and future rail lines between Putrajaya and Bangi and will also cover the distance between Cyberjaya and Kajang. The MRTKajang Line only reaches Kajang but MRTPutrajaya Line will reachPutrajaya Sentral station which is currently in operation. The future HSR station located at Kampung Abu Bakar Baginda will be one of the expected stops along the planned tram route.

The stretch between Putrajaya and Bangi has been selected as the first phase to be constructed due to their wide roads, allowing the tram system to share the traffic.[16]

Putrajaya Tram
Proposed route
KajangParking
 ETS 19
Kajang 2
Bandar Baru Bangi
Kampung Dato' Abu Bakar Baginda
 HSR 
Alamanda Putrajaya
Putrajaya Sentral
Parking
Cyberjaya City Centre
Bandar Cyberjaya
Parking
Map
Proposed route for the Putrajaya monorail as of 2022.

See also

[edit]

References

[edit]
  1. ^"Putrajaya Monorail back on track?". Retrieved23 September 2016.
  2. ^"Long-abandoned Putrajaya monorail set for completion by 2025". 10 January 2020.
  3. ^abSallehuddin, Qistina (27 June 2023)."No plans to revive the suspended monorail project".New Straits Times. Retrieved27 June 2023.
  4. ^"Transportation Study for the Putrajaya Monorail Project - Perunding Trafik Klasik".ptk.my.
  5. ^"Putrajaya". Archived fromthe original on 18 April 2007. Retrieved30 April 2007.
  6. ^"Kajang-Putrajaya rail link may be revived".
  7. ^"Putrajaya Monorail Construction - August 13, 2005 Page Two of Two". Retrieved30 April 2007.
  8. ^"Development Databank". Archived fromthe original on 27 September 2007. Retrieved30 April 2007.
  9. ^"Utusan Malaysia Online - Home News". Archived fromthe original(asp) on 30 September 2007. Retrieved30 April 2007.
  10. ^"Fresh bid to get Putrajaya monorail project back on track". Archived fromthe original on 2 April 2007. Retrieved30 April 2007.
  11. ^"MMC proposes Putrajaya monorail"(asp). Retrieved23 September 2016.
  12. ^"Putrajaya: Monorail RFP opens in three months". The Malaysian Reserve. 1 October 2020. Retrieved4 July 2021.
  13. ^"Tram service for Putrajaya within three years"(asp). 21 February 2016. Retrieved21 February 2016.
  14. ^"Putrajaya and Cyberjaya to have tram service in three years"(asp). Retrieved21 February 2016.
  15. ^"Trams for Putrajaya, Cyberjaya in three years?"(asp). Retrieved21 February 2016.
  16. ^"Tram service for Putrajaya in the works"(asp). Retrieved6 March 2018.

External links

[edit]
Overview
Fares and ticketing
Statutory authority
Major Operators
Inter-city rail
Main Lines
Current
Future
Planning
Services
Commuter rail
Suburban
Current
Planning
Airport Link
Current
Metro rail
LRT
Current
Future
Planning
MRT
Current
Planning
ART
Future
Planning
Monorail
Current
Planning
Border link
Current
Future
Other rail
People mover
Funicular
Gondola lift
Rolling stock
& manufacturers
Inter-city
Commuter
Airport link
LRT
MRT
ART
Monorail
Others
Depots
Current
Future
Related articles
Opening
Q2 2026
Opening
2028–2030
Stations and services initalics are planned or under construction
Rail
Klang Valley Integrated
Transit System
Commuter rail
LRT
MRT
Monorail
Airport rail link
High speed rail
Inter-city rail
Operators
Bus
BRT
Others
Taxi
Transit Hubs
Services initalics are planned or under construction
Annual
Riderships
by cities
1 billion or more
500 million – 999 million
100 million – 499 million
50 million – 99 million
10 million – 49 million
5 million – 9.9 million
1 million – 4.9 million
Note: Under construction & planned lines are inItalics
Retrieved from "https://en.wikipedia.org/w/index.php?title=Putrajaya_Monorail&oldid=1334584709"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2026 Movatter.jp