Proposed expansion of the New York City Subway

Route map:
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia

A 1929 plan
A 1939 plan
A 1969 plan
Current services

Since theopening of the originalNew York City Subway line in 1904, and throughout thesubway's history, various official and planning agencies have proposed numerous extensions to the subway system. The first major expansion of the subway system was theDual Contracts, a set of agreements between the City of New York and theIRT and theBRT. The system was expanded into the outer reaches of the Bronx, Brooklyn, and Queens, and it provided for the construction of important lines in Manhattan. This one expansion of the system provided for a majority of today's system.

Even with this expansion, there was a pressing need for growth. In 1922, MayorJohn Hylan put out his plan for over 100 miles of new subway lines going to all five boroughs. His plan was intended to directly compete with the two private subway operators, the IRT and the BMT. This plan was never furthered. The next big plan, and arguably the most ambitious in the subway system's history, was the "Second System". The 1929 plan by theIndependent Subway to construct new subway lines, the Second System would take over existing subway lines and railroad rights-of-way. This plan would have expanded service throughout the city with 100 miles of subway lines. A major component of the plan was theconstruction of theSecond Avenue Subway. TheStock Market Crash of 1929 put a halt to the plan, however, and subway expansion was limited to lines already under construction by the IND.

During the 1930s and 1940s, the plans were revised, with new plans such as a line toStaten Island and a revised line tothe Rockaways. In the late 1940s and 1950s, a Queens Bypass line via theLong Island Rail Road'sMain Line was first proposed as a branch of the still-planned Second Avenue Subway. In addition, capacity on existing lines became improved through the construction of strategic connections such as theCulver Ramp, the60th Street Tunnel Connection, and theChrystie Street Connection, and through the rebuilding ofDeKalb Avenue Junction. These improvements were the only things to come out of these plans. Eventually, these plans were modified to what became theProgram for Action, which was put forth by theNew York City Transit Authority in 1968. This was the last plan for a major expansion of the subway system. The plan included the construction of the Second Avenue Subway, a Queens Bypass line, a line replacing theThird Avenue El in the Bronx, and other extensions in the Bronx, Queens, and Brooklyn. While ambitious, very little of the plan was completed, mostly because of the financial crisis in the 1970s.

Until the 1990s, there was little focus on expansion of the system because the system was in a state of disrepair, and funds were allocated to maintaining the existing system. In the 1990s, however, with the system in better shape, the construction of the Second Avenue Subway was looked into again. Construction of the Second Avenue Subway started in 2007, and the first phase was completed in 2017. Since the 1990s, public officials and organizations such as theRegional Plan Association have pushed for the further expansion of the system. Projects such as the TriboroRx, a circumferential line connecting the outer boroughs, the reuse of theRockaway Beach Branch, and the further expansion of the Second Avenue Subway have all been proposed, albeit mostly unfunded.

Triborough System

[edit]
See also:Dual Contracts
A 1910 plan for anIRT expansion

The Triborough System was a proclamation for new subway lines to the Bronx and Brooklyn. The new lines include theIRT Lexington Avenue Line,IRT Pelham Line, andIRT Jerome Avenue Line. The Manhattan Bridge line described below later became theBMT West End Line,BMT Fourth Avenue Line, theBMT Sea Beach Line, and the Nassau Street loops.[1][2]

The route of the new subway ... comprises a main trunk north and south through Manhattan Borough on Lexington Avenue and Irving Place from the Harlem River to Tenth St. and on Broadway, Vesey and Church Sts. from Tenth St. to the Battery; two branches in Bronx Borough, one northeast via 138th St. Southern Boulevard and Westchester Ave. to Pelham Bay Park. the other northerly via River Ave. and Jerome Ave. to Woodlawn Road, connecting with the Manhattan trunk by a tunnel under the Harlem River; a Manhattan-Brooklyn line extending from the North River via Canal Street across the East River on the Manhattan Bridge to connect with the Fourth Avenue subway in Brooklyn now being built, which thus becomes an integral part of the larger system; two branches southerly from the Fourth Ave. line extending south to Fort Hamilton and southeast to Coney Island; and a loop feeder line in Brooklyn through Lafayette Ave. and Broadway, connecting with the Fourth Ave. line at one end. and at the other crossing the Williamsburg Bridge and entering the Centre Street Loop subway in Manhattan which is thus also incorporated in the system.

In 1911,William Gibbs McAdoo, who operated a competing subway company called theHudson & Manhattan Railroad, proposed building a line underBroadway betweenHudson Terminal andHerald Square.[3] He later proposed that the Broadway line be tied into the IRT'soriginal subway line in Lower Manhattan. The Broadway line, going southbound, would merge with the local tracks of the IRT Lexington Avenue Line in the southbound direction at 10th Street. A spur off the Lexington Avenue Line in Lower Manhattan, in the back ofTrinity Church, would split eastward underWall Street, cross theEast River toBrooklyn, then head down the Fourth Avenue Line in Brooklyn, with another spur underneath Lafayette Avenue.[4]

The Triborough System later became part of theDual Contracts, signed on March 19, 1913 and also known as the Dual Subway System. These were contracts for the construction and/or rehabilitation and operation of rapid transit lines in New York City. The contracts were "dual", in that they were signed between the City and the IRT and Municipal Railway Company, a subsidiary of the BRT (later BMT).[5]

Some lines proposed under the Contracts were not built, most notably an IRT line toMarine Park, Brooklyn (at what is nowKings Plaza) under eitherUtica Avenue, using a brand-new line, orNostrand Avenue andFlatbush Avenue, using the then-newIRT Nostrand Avenue Line. There were also alternate plans for the Nostrand Avenue Line to continue down Nostrand Avenue toSheepshead Bay.[6]

Mayor Hylan's plan

[edit]
A 1920 plan for expansion

On August 28, 1922, MayorJohn Francis Hylan unveiled his own plans for the subway system, which was relatively small at the time. His plan included building over 100 miles (160 km) of new lines and taking over nearly 100 miles (160 km) of existing lines. By the end of 1925, all of these routes were to have been completed. The lines were designed to compete with the IRT and BMT.[7][8]

Hylan's plan contained the following lines:[9]

  • A line running along Manhattan's West Side, stretching from the edge of the city atYonkers to 14th Street. It would be a two-track line south to Dyckman Street, a three-track line to 162nd Street, and then-on it would be a four-track line. The line would have two southern branches that would diverge at 14th Street. A connection to the BMT Canarsie Line would use a pair of the tracks, while the other pair would go toAtlantic Avenue and Hicks Street in Brooklyn through an East River tunnel. Then it would turn down to Red Hook. There would also be a loop at Battery Park. Another branch would be built; it would consist of two tracks, and would go between 162nd Street and 190th Street via Amsterdam Avenue.
  • AFirst Avenue line, consisting of four tracks, would stretch from the Harlem River to City Hall. At 10th Street, the line would cease to be a four-track line, with the line splitting into two branches. One branch would run to a loop near City Hall, while the other would go to a new Lafayette Avenue line in Brooklyn, running viaThird Avenue and theBowery. On the northern end, at161st Street, the line would split into two 3-track lines. One of the lines would go to Southern Boulevard and Fordham Road; the other would continue to 241st Street after merging with the existing IRT White Plains Road Line at Fordham Road and Webster Avenue.
  • A line fromAstoria, Queens, likely connecting to theBMT Astoria Line, across theEast River and via125th Street (near today'sHenry Hudson Parkway).
  • A line running from Hunters Point in Queens heading southeast to Lafayette Avenue in Brooklyn. The line would consist of between two and four tracks, and at Lafayette Avenue, the line would split. Two of them would continue as a Lafayette Avenue, but would then become four tracks. The remaining two tracks would run to Franklin and Flatbush Avenues.
  • A new 4-track trunk line along Lafayette Avenue in Brooklyn fromBorough Hall toBedford Avenue. The line would narrow to three tracks toBroadway. Then the line would have continued underneath theBMT Jamaica Line to168th Street. By running underneath the Jamaica Line, the line would directly compete with the BMT. A two-track connection would also be provided to a First Avenue line.
  • A new line running underUtica Avenue toFlatlands Avenue. The line would be a branch of theIRT Eastern Parkway Line.[10]: 120 
  • A four-track Flatbush Avenue line to Emmons Avenue in Sheepshead Bay, before turning west to Surf Avenue inConey Island via Emmons Avenue. Service toFloyd Bennett Field would be provided with a branch via Flatbush Avenue.
  • TheBMT Canarsie Line would be extended past 121st Street in Queens to the BMT Jamaica Line.
  • A new line, which would run from 90th Street to Prospect Avenue, that would go via Fort Hamilton Parkway and 10th Avenue would be used byBMT Culver Line trains.
  • Extension of theBMT Fourth Avenue Line in Brooklyn, south toBay Ridge–95th Street.
  • Extension of the BMT Fourth Avenue Line east to the Fort Hamilton Parkway Line and theBMT West End Line.
  • A two-track line from the BMT Fourth Avenue Line at 67th Street to Staten Island via theStaten Island Tunnel.[10]: 120–125 
  • Extension of theIRT New Lots Line from New Lots Avenue to Lefferts Boulevard.
  • The IRT Flushing Line would be extended eastward to Bell Boulevard inBayside viaMain Street,Kissena Boulevard, andNorthern Boulevard.
  • AtRoosevelt Avenue a branch would be constructed off the IRT Flushing Line to Jamaica.

Only some of Hylan's planned lines were built to completion. Completed lines included:[9][11][12]

  • An extension of the Fourth Avenue Line to 95th Street.
  • Two major trunk lines in midtown Manhattan, with one running underEighth Avenue and one underSixth Avenue, which already had an elevated line.
  • A crosstown subway under 53rd Street (connecting with the Eighth and Sixth Avenue subways) running under theEast River to Queens Plaza (Long Island City), meeting with aBrooklynQueens crosstown line, and continuing underQueens Boulevard and Hillside Avenue to179th Street, where bus service would converge.
  • A subway under theGrand Concourse inthe Bronx, diverging from the Eighth Avenue Line in Manhattan at 145th Street andSaint Nicholas Avenue.

Major Phillip Mathews disagreed with theBoard of Transportation's plan, and in response, he published a report, on December 24, 1926, titled "Proposed Subway Plan for Subway Relief and Expansion". He said that that congestion would not be addressed for Brooklyn and the Bronx; only the planned Grand Concourse line would alleviate congestion, in this case congestion on theIRT Jerome Avenue Line. There would be little relief on the two lines jointly-operated between the IRT and the BMT. He came up with his own plan. He proposed that the Eighth Avenue Line, through a connection from Fulton or Wall Streets to Chambers Street, be connected to the BMT's lines to Coney Island, with a possible connection at theManhattan Bridge's south side.[9]

In Manhattan, he proposed a new four-track line running down Third Avenue from City Hall, with connections to the White Plains Road and Pelham Lines in the Bronx. The line would therefore have to be built to IRT clearances. At the line's southern end, a connection would be built to the Eastern Parkway Line nearFranklin Avenue via a new set of tubes under the East River. To alleviate congestion on the Queens lines, a new trunk line would run from Eighth Avenue in Manhattan to Jamaica, with transfers to the north–south lines in Manhattan and to Brooklyn Crosstown service. This would later be built as theIND Queens Boulevard Line.[9]

To round out expansion in Manhattan, he proposed that an extension of theBMT Canarsie Line toEighth Avenue. This was built at a later date. To connect the outer boroughs, a four-track Brooklyn-Queens crosstown line would be designed, with the possibility for future extensions into the Bronx and Staten Island.[9]

Subways to New Jersey

[edit]

In 1926, a loop subway service was planned to be built toNew Jersey. The rationale given was:[13]

Principal features of a comprehensive plan for passenger transportation between communities in the nine northern counties of New Jersey and the city of New York are outlined in a report submitted on Jan. 15 to the Legislature of the state by the North Jersey Transit Commission. A preliminary report presented about a year ago was abstracted inElectric Railway Journal for Feb. 7, 1925... The ultimate object of the program recommended is the creation of a new electric railway system comprising82.6 miles [132.9 km] of route, and the electrification of399 route-miles [642 km] of railroad now operated by steam. As the first step it is proposed to construct an interstate loop line17.3 miles [27.8 km] in length connecting with all of the north Jersey commuters' railroads and passing under the Hudson River into New York City by two tunnels, one uptown and one downtown. A new low-level subway through Manhattan would complete the loop. Construction costs of this preliminary project are estimated at $154,000,000, with $40,000,000 additional for equipment. The cost of power facilities is not included in this estimate.[13]

Because it would be utilized in both directions, the capacity of the proposed interstate loop line would be equivalent, it is said, to two 2-track lines or one 4-track line from New Jersey to New York City due to its having two crossings between New Jersey and New York. The loop was said to be able to carry 192,500 passengers per hour, or 4.62 million daily passengers, had it been built. The estimate was based on the operation of 35 trains per hour in each direction, and each train would be eleven cars long and would carry 100 passengers per car. It was to be built as a multi-phase project, wherein the IRT and BMT would work together to build that system to New Jersey. Extensions of theIRT Flushing Line andBMT Canarsie Line were both considered; the Canarsie Line was to be extended toHoboken nearthe Palisades, while the Flushing Line was to be extended to Franklin Street between Boulevard and Bergenline Avenues inUnion City. Ultimately, the cost was too great, and with theGreat Depression, these ideas were quickly shot down.[13]

In 1954, Regional Plan Association advocated for an extension of the BMT Canarsie Line from Eighth Avenue to Jersey City under the Hudson River. The tunnel under the Hudson would have cost $40 million. The extension would have provided access to commuter railroads in New Jersey as most lines converged there, and the lines that didn't would be rerouted to stop there. The RPA also suggested having a parking lot there for access from the Pulaski Skyway and the New Jersey Turnpike. It was suggested that either the New York City Transit Authority, the Port Authority of New York and New Jersey or the Bi-State Metropolitan Rapid Transit Commission would do the construction.[14]

In 1963, three major commuter groups in New Jersey made expansion proposals. One of them would have involved an extension of the IRT Flushing Line under the Hudson River with a three-track tunnel and then connect with theNew York, Susquehanna and Western Railroad.[15]

In 1986, theRegional Plan Association suggested extending the IRT Flushing Line to New Jersey'sMeadowlands Sports Complex.[16]

On November 16, 2010, the plan was revisited yet again, asThe New York Times reported that MayorMichael Bloomberg's administration had been working on a plan to extend the 7 service across the Hudson River toHoboken and continue toSecaucus Junction inNew Jersey, where it would connect with mostNew Jersey Transit commuter lines. It would offer New Jersey commuters a direct route toGrand Central Terminal on the East Side of Manhattan and connections to most other New York City subway routes. This was being planned as an extension of the already-under construction7 Subway Extension (seebelow).[17]

In April 2012, citing budget considerations, the director of theMTA,Joe Lhota, said that it was doubtful the extension would be built in the foreseeable future, suggesting that theGateway Project was a much more likely solution to congestion at Hudson River crossings.[18] A feasibility study commissioned by the city and released in April 2013 revived hope for the project, however, with Mayor Bloomberg saying "Extending the 7 train to Secaucus is a promising potential solution ... and is deserving of serious consideration."[19][20]

In 2017, a further extension of the 7 train to New Jersey was suggested once again, this time as an alternative to constructing a replacement for the Port Authority Bus Terminal.[21] An alternative would include a new terminal at Secaucus Junction in conjunction with the 7 extension.[22] In February 2018, it was revealed that the Port Authority of New York and New Jersey had advertised for consultants to write a feasibility study for such an extension, and that it had received bids from several companies. This extension was being planned along with the Gateway Project and, if built, would be able to accommodate a projected 38% increase in the number of people commuting between the two states. The 18-month study would include input from the Port Authority, the MTA, andNJ Transit.[23] If the New Jersey subway extension were to be constructed, it could complement the Gateway Project, which might become overcrowded by 2040.[24][25]

1929–1939 plans

[edit]
IND Second System plan: route miles by borough
BoroughNumber of route miles
Queens
52.37
The Bronx
19.04
Brooklyn
16.84
Manhattan
11.87

Before unification in 1940, the government ofNew York City made plans for expanding the subway system, under a plan referred to in contemporary newspaper articles as theIND Second System (due to the fact that most of the expansion was to include new IND lines, as opposed to BMT/IRT lines). The first one, conceived in 1929, was to be part of the city-operatedIndependent Subway System (IND). By 1939, with unification planned, all three systems were included. Very few of these far-reaching lines were built, though provisions were made for future expansion on lines that intersect the proposals.[26]

The core Manhattan lines of the expansion were theSecond Avenue Line (with an extension intothe Bronx) and theWorth Street Line, connecting tothe Rockaways. The Rockaways were eventually served by the subway via a city takeover of theLong Island Rail Road'sRockaway Beach Branch. A segment of the proposedSecond Avenue Subway opened for passenger service in January 2017. The majority of the proposed lines were to be built as elevated subways, likely a cost-cutting measure. The majority of the expansion was to occur in Queens, with the original proposal suggesting 52 miles (84 km) of track be built in Queens alone.[26]

Details

[edit]

The first plan was made on September 15, 1929 (before the IND even opened), and is detailed in the table below.[26] Cost is only for construction, and does not include land acquisition or other items.[27]

LineStreetsFromToTracksRoute milesTrack milesCostNotes
Manhattan
East Manhattan trunk line (Second Avenue Line)Water Street – New Bowery – Chrystie StreetPine StreetHouston Street2 from Pine Street to Chambers Street
4 to Houston Street
1.344.68$11,300,000subway
Second AvenueHouston StreetHarlem River4 to 61st Street
6 to 125th Street
4 to Harlem River
6.5532.84$87,600,000subway
61st Street LineSixth Avenue – 61st Street52nd StreetSecond Avenue21.12.2$6,700,000subway
(Rockaway Line)Worth Street – East Broadway – Grand StreetChurch StreetEast River21.953.9$13,300,000subway
(Utica Avenue Line)Houston StreetEssex StreetEast River2.931.86$7,900,000subway
Manhattan subtotal11.8745.48$126,800,000
Bronx
Bronx trunk lineAlexander Avenue – Melrose Avenue – Boston RoadHarlem RiverWest Farms43.9715.88$40,400,000subway, with a portal between Vyse Avenue and 177th Street, then elevated into the existingIRT White Plains Road Line near 180th Street
White Plains Road LineMorris Park Avenue – Wilson AvenueGarfield StreetBoston Road23.57.9$13,700,000branching off the existing elevatedIRT White Plains Road Line, and then going into subway
IRT Lafayette Avenue Line163rd Street – Hunts Point – Lafayette Avenue – 177th StreetWashington Avenue at Brook AvenueEast Tremont Avenue25.0210.04$12,900,000subway to near Edgewater Road and Seneca Avenue, then elevated
Concourse Line ExtensionBurke Avenue – Boston RoadWebster AvenueBaychester Avenue22.154.3$8,900,000extension of theConcourse Line
White Plains Road Line 180th Street241st Street 4.4013.2$2,100,000owned byIRT, to be taken over ("recaptured") by IND
Bronx subtotal19.0451.32$77,000,000
Brooklyn
Broadway Branch Line (Rockaway Line)BroadwayEast RiverHavemeyer Street at South Fourth Street23.1613.5$34,800,000subway
Utica Avenue Line (and Rockaway Line from Havemeyer Street to Stuyvesant Avenue)Grand Street – South Fourth Street – Beaver StreetEast RiverStuyvesant Avenue2 to Driggs Avenue
4 to Union Avenue
8 to Bushwick Avenue
4 to Stuyvesant Avenue
subway
Stuyvesant Avenue – Utica AvenueBroadwayFlatbush Avenue45.8523.4$39,300,000subway to Avenue J, then elevated
Avenue SUtica AvenueNostrand Avenue21.12.2$2,000,000elevated
Nostrand AvenueAvenue SVoorhies Avenue41.35.2$3,200,000elevated
Rockaway LineMyrtle AvenueBushwick AvenuePalmetto Street41.345.36$14,300,000subway
Fulton Street LineLiberty AvenueFulton Street and Eastern ParkwayGrant Avenue41.847.36$13,500,000subway extending theFulton Street Line to a portal at Liberty Avenue and Crescent Street, then elevated to connect to theBMT Liberty Avenue Line (now part of theFulton Street Line) atGrant Avenue
Nostrand Avenue Extension Flatbush AvenueAvenue S22.254.5$7,400,000Extension ofNostrand Avenue Line as subway to Kings Highway, then elevated
Brooklyn subtotal16.8461.52$114,500,000
Queens
Rockaway LineMyrtle Avenue – Central AvenuePalmetto Street78th Street42.18.4$17,300,000subway to Central Avenue near 73rd Place, then along the surface or elevated
98th Street – 99th Street – Hawtree Street78th StreetHammels Station4 to Howard Beach
2 to Hammels
9.226.2$20,200,000along the surface or elevated
Rockaway Beach BoulevardBeach 116th StreetMott Avenue25.010.0$7,400,000along the surface or elevated
Newport Avenue Line
(Rockaway Line Extension)
Newport AvenueBeach 116th StreetBeach 149th Street21.63.2$2,400,000along the surface or elevated
Winfield SpurGarfield Avenue – 65th Place – Fresh Pond RoadBroadway and 78th StreetCentral Avenue23.346.68$10,100,000subway to 45th Avenue, then elevated to Fresh Pond Road, then subway;
terminal station partially-built as part ofRoosevelt Avenue-Jackson Heights station, with short trackways leading to the spur.
Brinckerhoff - Hollis Avenue Line
(Fulton Street Line Extension)
Liberty Avenue – 105th Avenue – Brinckerhoff Avenue – Hollis AvenueLefferts BoulevardSpringfield Boulevard26.213.3$10,700,000elevated extension of theBMT Liberty Avenue Line (now part of theFulton Street Line)
includes branch connection toBMT Jamaica Line (BMT) at 168th Street, via 180th Street and Jamaica Avenue
Van Wyck Boulevard Line137th Street – Van Wyck Boulevard87th AvenueRockaway Boulevard22.34.6$6,600,000subway to about 116th Avenue, then elevated
120th Avenue Line120th Avenue – Springfield BoulevardHawtree Street near North Conduit BoulevardFoch Boulevard
(nowLinden Boulevard)
4 to Van Wyck Boulevard
2 to Foch Boulevard
5.2313.92$9,500,000elevated
Bayside LineRoosevelt Avenue – First Street – Station Road – 38th AvenueMain Street221st Street3 to 147th Street
2 to 221st Street
3.67.78$9,600,000extends theBMT/IRTFlushing Line as a subway to 155th Street, then elevated
College Point and Whitestone Line149th Street – 11th AvenueRoosevelt Avenue and 147th Street11th Avenue and 122nd Street23.46.8$6,000,000subway to 35th Avenue, then elevated
Long Island City-Horace Harding Boulevard LineDitmars Avenue – Astoria Boulevard – 112th Street – Nassau Boulevard (Long Island Expressway)Second AvenueCross Island Boulevard2 to Astoria Boulevard
4 to Parsons Boulevard
2 to Cross Island Boulevard
8.126.71$17,700,000extends theBMT/IRTAstoria Line as an elevated, except that part of it may be depressed near Nassau Boulevard (Long Island Expressway)
Liberty Avenue Line Grant AvenueLefferts Boulevard32.36.9$1,600,000owned byBMT, to be taken over ("recaptured") by IND
now part of theFulton Street Line
Queens subtotal52.37136.49$119,100,000
Total100.12294.81$438,400,000

Other plans during the same time

[edit]

Revised 1932 plan

[edit]
1932 plan: Route miles by borough
BoroughNumber of route miles
Queens
23.21
Brooklyn
13.14
Manhattan
12.49
The Bronx
12.09

The IND expansion plan was revised in 1932. It differs from the 1929 plan, but there are60.93 route‑miles (98.06 km), of which 12.49 miles (20.10 km) are in Manhattan, 12.09 miles (19.46 km) in the Bronx, 13.14 miles (21.15 km) in Brooklyn, and 23.21 miles (37.35 km) in Queens. It would include a new34th Street crosstown line, aSecond Avenue Subway line, a connection to theNew York, Westchester and Boston Railway, and extensions of theIRT Nostrand Avenue Line,IRT Flushing Line, andBMT Astoria Line. It would have created a subway loop bounded by 2nd and 10th Avenues, and 34th and 125th Streets. This plan included no extensions toWhitestone, Queens, however, with the plan to instead serve more densely populated areas such asAstoria and theRoosevelt Avenue corridor.[28]

The plan would also take over the local tracks of the New York, Westchester and Boston Railway, and theRockaway Beach Branch of theLong Island Rail Road.[28]

The table of route miles is as follows:[28]

LineStreetsFromToRoute milesNotes
Manhattan
Second Avenue LineWater Street,Bowery,Chrystie Street,2nd AvenueWater StreetAlexander Avenue (Bronx)8.64
34th Street Line34th Street2nd Avenue10th Avenue1.39
Worth Street, East Broadway and Grand Street LineWorth Street,East Broadway, andGrand StreetChurch StreetLewis Street1.53
Houston Street LineHouston StreetEssex StreetEast River0.89
Manhattan subtotal12.49
The Bronx
Alexander Avenue, Third Avenue, Boston Road, Melrose Road and East 172nd Street LineAlexander Avenue,Third Avenue,Boston Road, Melrose Road and East 172nd StreetHarlem RiverEast 180th Street and Morris Park Avenue4.41
Morris Park Avenue LineMorris Park Avenue and Wilson AvenueMorris Park Avenue, East 180th StreetBoston Road3.35
143d Street–Garrison Avenue and Lafayette Avenue Line143rd Street, Garrison Avenue, and Lafayette AvenueBrook AvenueSound View Avenue2.48
Burke Avenue–Boston Road LineWestchester Avenue, Brook AvenueBurke AvenueBaychester Avenue2.48
Bronx subtotal12.09
Brooklyn
Stuyvesant Avenue–Utica Avenue LineStuyvesant Avenue,Utica AvenueEast RiverSheepshead Bay10.71
Fulton Street and Rockaway Boulevard LineFulton StreetRockaway AvenueBorough line withQueens2.43
Brooklyn subtotal13.14
Queens
Rockaway Peninsula LineRockaway Beach BranchQueens BoulevardThe Rockaways (Rockaway Park andFar Rockaway)14.92LIRR tracks south ofLiberty Avenue were purchased by the NYCTA and converted for subway use in 1956.
Van Wyck Boulevard LineVan Wyck BoulevardHillside AvenueRockaway Boulevard2.30Eventually partially-built (~0.4 mi) and connects to theIND Archer Avenue Line.
Hillside Avenue LineHillside Avenue178th StreetSpringfield Boulevard2.48
Fulton Street and Rockaway Boulevard LineRockaway Boulevard, 120th AvenueBorough line withBrooklynSpringfield Boulevard3.51
Queens subtotal23.21
Total60.93

Smaller plans

[edit]

Other plans, proposed during the same time as the IND Second System plans, included the following:

  • (1931 plan) A line splitting from the Second Avenue Line north of Houston Street, running southeast under East 16th Street, turning southwest under Avenue C, merging with the Houston Street Line, and crossing the East River from Stanton Street towards the huge line under South Fourth Street.
  • (1931 plan) A line splitting from the Crosstown Line where it turns from Lafayette Avenue to Marcy Avenue, continuing under Lafayette Avenue and Stanhope Street to a junction with the line under Myrtle Avenue.
  • (1932 plan) A rapid transit shuttle operating from a terminal adjacent to theIRT Flushing Line andWhitestone Landing operating over theLong Island Rail Road'sWhitestone Branch. The line would have been under private operation and would have had a five-cent fare.[29]
  • (1939 plan) A line splitting from the South Brooklyn (Culver) Line atFort Hamilton Parkway or Church Avenue, and running under Fort Hamilton Parkway to 86th Street. A branch would split to run under Ovington Avenue and Senator Street, with a tunnel under the Narrows toStaten Island at theSt. George Terminal. The line would split, with the north branch ending atWestervelt Avenue around Hamilton Avenue, and the south branch ending at Grant Street around St. Pauls Street. It was presumably designed this way to provide future service to both the Main Line and North ShoreStaten Island Railway lines.[30][31] TheStaten Island Tunnel commenced construction in 1923 to serve the BMT Fourth Avenue Line, but was not completed.[32][33]
  • (1940 plan, revised 1945) The IND Fulton Street Line would connect to what is now theIND Rockaway Line. A branch of the IND Fulton Street Line would run to a stub-end terminal at 105th Street. The line, east of Euclid Avenue, would be four tracks until Cross Bay Boulevard, where the two branches would split.[34]
  • (unknown date) A third two-track tunnel under the East River, from the north side of the South Fourth Street/Union Avenue station (as built for six tracks) west to Delancey Street.
  • (unknown date) A line splitting from the Stuyvesant Avenue line, going southeast under Broadway.
  • (unknown date) A line under Flushing Avenue from the huge line under Beaver Street to Horace Harding Boulevard (Long Island Expressway).
  • (unknown date) A four-track subway under Bedford Avenue in Brooklyn connecting to the Worth Street Subway and Second Avenue Subway.

An earlier plan in 1920 had an even more expansive plan, with several dozen subway lines going across all five boroughs.[35]

Provisions for new lines

[edit]
AtEast Broadway on the IND Sixth Avenue Line (shown), part of a two-track station was built for the IND Worth Street Line under East Broadway, above the existing line. The indent for the never-built line is seen at the top of the picture, crossing the ceiling.
TheLexington Avenue–63rd Street subway station has two island platforms split across two levels. Their northern sides were walled off until the first phase of the Second Avenue Subway was opened. This is the station's lower level.

The following provisions were made for connections and transfers to the new lines. It is of note that only four of these provisions were completed.

  • AtSecond Avenue on theIND Sixth Avenue Line, the ceiling drops at the west end. Above the ceiling is a provision for a four-trackIND Second Avenue Line. The future Second Avenue Line will not utilize this provision; it will instead be built under the station, if a transfer station is ever built.
  • AtEast Broadway on the IND Sixth Avenue Line (under Rutgers Street at this station), part of a two-track station was built for the IND Worth Street Line under East Broadway, above the existing line. Most of the constructed portion is now part of themezzanine, with a small unused section blocked by a door.
  • AtBroadway on theIND Crosstown Line, traces of passageways are visible going towards a six-track station on the line to Utica Avenue, as well as a stair to an upper mezzanine on top of the unfinished station.
  • AtUtica Avenue on theIND Fulton Street Line, a four-track station above can be seen in the ceiling of the existing station. This portion of the Utica Avenue Line was built with the construction of the Fulton Street Line. Ramps were built from the mezzanine to the platforms because the normal vertical distance of ten feet from the mezzanine floor to the platforms was increased to 25 feet in anticipation of the Utica Avenue Line. The existing mezzanine passes over the unused space.[36][37]
  • AtRoosevelt Avenue on theIND Queens Boulevard Line, a two-track upper level was built for the Winfield Spur towards the line to the Rockaways. Unlike the other stations, this one was completed, except for track.
  • Hillside Avenue considerably widens between 218th Street and 229th Street in Queens Village, and gains a very widemedian. This section was widened in the 1930s to accommodate construction of the proposed eastern terminus of theIND Queens Boulevard Line atSpringfield Boulevard and Rocky Hill Road (Braddock Avenue) and to accommodate an underpass for Hillside Avenue underneath Springfield Boulevard and Braddock Avenue.[38][39][40] Six station entrances would have been provided at Springfield Boulevard and Braddock Avenue. The station would have stretched as far east as 88th Avenue. The two tracks would have continued to 229th Street.[41]
  • The center tracks on the IND Sixth Avenue Line dead end at the curve fromHouston Street toEssex Street; these were planned to continue through a new East River tunnel to Williamsburg and south to the proposed Utica Avenue line towards Sheepshead Bay.
  • The tracks that theIND 63rd Street Line uses to split from the IND Sixth Avenue Line were built for a similar proposed line under 61st Street, connecting to theSecond Avenue Subway.
  • TheLexington Avenue–63rd Street subway station has two island platforms, which were originally built with now-demolished walls on their northern sides. The platforms were designed to provide across-platform interchange to the Second Avenue Subway.
  • The upper level relay tracks east of179th Street on theIND Queens Boulevard Line were intended to continue towardFloral Park, and the tunnel is designed to allow for such a future extension.[42]: 123 
  • The relay tracks east ofEuclid Avenue on theIND Fulton Street Line were intended to continue towardCambria Heights in Queens.
  • TheNevins Street station on theIRT Eastern Parkway Line has an unused center trackway and an unused lower level intended for expansion into northern or southern Brooklyn.
  • South of the36th Street station on theBMT Fourth Avenue Line, there are three trackways that diverge from the line at aflying junction. These trackways end under the eastern curb of Fourth Avenue.
  • The BMT Fourth Avenue Line has provisions for two more tracks south of 59th Street, where the line becomes double-tracked:
    1. There are four trackways on the BMT Fourth Avenue Line bridge over the LIRRBay Ridge Branch despite the fact that only the northernmost two tracks are in use.
    2. The86th Street station on the BMT Fourth Avenue Line appears to have "escapes" in the wall bricked over along the Manhattan-bound track, for the never-built fourth tracks.[9]
    3. The northboundside platforms ofBay Ridge Avenue and77th Street do not have platform pillars because the platforms were supposed to be temporary; the southbound platforms do have pillars, however.
  • Bellmouths for uncompleted lines are scattered in numerous stations, including21st Street–Queensbridge,59th Street,63rd Drive–Rego Park,Bowery,Canal Street, andWoodhaven Boulevard:
    1. East of21st Street–Queensbridge, before theIND 63rd Street Line connects to the IND Queens Boulevard Line, the tracks veer left while the tunnel wall goes straight. The bellmouths were part of a proposed super-express bypass running under the LIRR mainline betweenQueens Boulevard andForest Hills. This plan was not in the original Second System plan, but rather, as part of the Program for Action plan that had the tracks from 21st Street–Queensbridge go straight to Forest Hills.[43]
    2. There are bellmouths and space for two additional trackways (for a total of six) on the BMT Fourth Avenue Line south of59th Street. These provisions were for theStaten Island Tunnel, which would have intersected with the line south of 59th Street.[9]
    3. East of63rd Drive–Rego Park on theIND Queens Boulevard Line, bellmouths were built for a proposed connection to the LIRR'sRockaway Beach Branch. They may be used if the northern portion of the Rockaway Beach Branch were ever reused for subway service.
    4. A line to the Rockaways would have split from theIND Eighth Avenue Line (underChurch Street at this point), east underWorth Street. The junction was built and is used by the local tracks toWorld Trade Center. The branch to the Rockaways was purchased from the LIRR and connected to theIND Fulton Street Line in 1956.
  • Two bellmouths have since been completed, but were previously unused.
    1. The completedIND 63rd Street Line, which theF and <F>​ trains uses to cross theEast River, was designed and built with bellmouths to allow for the construction of connections to the planned Second Avenue Subway for service to/from the north and south along Second Avenue. The bellmouths to/from the north were completed and opened in 2017, while the bellmouths to/from the south will be completed during Phase 3 of the Second Avenue Subway.
    2. A junction was built on the IND Queens Boulevard Line for the line under Van Wyck Boulevard. The junction was completed and has been connected to theIND Archer Avenue Line.

Shells built

[edit]

The South Fourth Street shell, if complete, was supposed to handle service as follows:

South Fourth Street shell (plan 1)[44]
Level 1Northbound← Broadway line westbound
Island platform
Southbound Broadway line eastbound →
Level 2Northbound← Utica Avenue express to Sixth Avenue
Island platform
Northbound← Flushing/Utica Avenues local (termination platform)
Island platform
Northbound← Flushing Avenue express to Eighth Avenue
Southbound Flushing Avenue express from Eighth Avenue →
Island platform
Southbound Flushing/Utica Avenues local →
Island platform
Southbound Utica Avenue express from Sixth Avenue →
Level 3Southbound Utica Avenue local →
Island platform
Island platform
Southbound Utica Avenue local →

Note: The locals would have short-turned here. There would have been two tunnels under the East River: East Houston Street and Grand Street.

Another plan for the South Fourth Street shell was simpler (and was the plan that was partially completed):

South Fourth Street shell (plan 2)[45]
Level 1Northbound← Flushing Avenue express to Eighth Avenue
Island platform
Northbound← Utica Avenue express to Sixth Avenue via East Houston Street
Island platform
Northbound← Utica Avenue local to Sixth Avenue via Stanton Street
Southbound Utica Avenue local from Sixth Avenue via Stanton Street →
Island platform
Southbound Utica Avenue express from Sixth Avenue via East Houston Street →
Island platform
Southbound Flushing Avenue express from Eighth Avenue →

Note: The Flushing Avenue local would have diverged off to theIND Crosstown Line. There would have been three tunnels under the East River: East Houston Street, Stanton Street, and Grand Street.

The Utica Avenue station shell, if complete, would be in the standard local-express-express-local platform configuration.

TheJackson Heights–Roosevelt Avenue shell, a two-trackbed island-platformed station, would have been for local trains terminating at the station. Express trains would have stopped at the lower level (IND Queens Boulevard Line) platforms.

1940–1999 plans

[edit]

AfterWorld War II and up until the late 1990s, the New York City Subway did not expand much. Only 28 stations opened in that time, compared to the remaining 393 stations, which opened from the 1880s to before World War II. As such, there have been many plans to expand the system during this time period.

1938–1940

[edit]
TheStaten Island Tunnel, started in 1912, was to be complete as per the 1940 plan.
TheCulver Ramp was the only completed Brooklyn proposal put forth in 1940. It opened in 1955.

TheNew York City Board of Transportation revised its plans for subway expansion, and released them in 1938 and 1940.

  • The remnant of theIRT Ninth Avenue Line at155th Street would connect with theIRT Lenox Avenue Line, giving riders of the Jerome Avenue Line service to Manhattan's West Side.[42]: 123  This project was never undertaken because of the high cost of modifying the third rail in theSedgwick Avenue andAnderson–Jerome Avenues tunnel section to accommodate new subway cars.[9]
  • TheNew York, Westchester and Boston Railway's abandoned right-of-way would have been rehabilitated and connected to theIRT Pelham Line.[9]
  • TheIND Concourse Line would have been extended eastward toGun Hill Road from 205th Street.[9]
  • TheSecond Avenue Subway would originate at Harding Avenue in the Bronx, and connect into theCourt Street station in Brooklyn as a two-track and four-track line.[9] A yard would have been constructed to store the line's equipment.[46]: 703  The first phase would end the line at East 139th Street. The Main Line and its connections to other subway lines was to have cost $213.95 million, while the future Bronx extension would have cost $130.16 million.[47]: 212 
  • An extension of theIRT Lenox Avenue Line would have been built so it could connect with theIRT Ninth Avenue Line.[48]
  • Two express tracks would be built on theIND Sixth Avenue Line between West 9th Street and West 31st Street for $19.27 million. This was viewed as a requirement for a Second Avenue Line.[49]: 371 
  • The Seventh Avenue Line Extension would extend the Broadway Line north from 59th Street via a tunnel under Central Park to 72nd Street, before turning east into Queens via Northern Boulevard to Jackson Heights. It was to have been built as a two-track and four-track line, and it would have cost $89 million. The second phase would extend the line as a two-track line along Corona Avenue and Horace Harding Boulevard from Jackson Heights to Marathon Parkway. A storage yard would be built. This phase would have cost $51.82 million. A connection between the new line and the Crosstown Line was to have been built at 23rd Street (Ely Avenue) for $10.95 million.[48][49]: 371 
  • A connection between the Seventh Avenue Extension and the Rockaway Line would be built at 99th Street, costing $9.2 million.[49]: 371 TheRockaway Beach Branch of the LIRR would be purchased and converted for subway operation. Service to the Rockaway would be provided through a connection to the IND Queens Boulevard Line. The extension would have cost $42.38 million. In addition, $2.55 million would be spent on a two-track subway an open-cut connection between the Rockaway Line and the Fulton Street Line.[47]: 213  Only the portion south ofLiberty Avenue was completed.[9]
  • An extension of theBMT Broadway Line, from57th Street–Seventh Avenue to 145th Street, would run viaCentral Park andMorningside Drive.[9]
  • A crosstown line viaWorth Street would serve as a branch of theIND Eighth Avenue Line's local tracks. The line would have branched off at Church Street, from where it would run via Worth Street and East Broadway to Lewis Street. This two-tracks segment would have cost $15.2 million.[49]: 371  The line would then tunnel under the East River between Lewis Street to Driggs Avenue. This section would have cost $18.5 million.[49]: 372  The South Fourth Street junction would be completed.[9]
  • The IND Queens Boulevard Line and BMT Broadway Line would be connected through the construction of aconnection at 11th Street. The connection would be between the Queens Boulevard Line's local tracks atQueens Plaza and the BMT60th Street Tunnel.[9]
  • The IND Queens Boulevard Line would be extended from178th to 184th Streets.[48]
  • TheIRT Flushing Line would be extended from Main Street to Bell Boulevard, as a two-track and a four-track line, along Roosevelt Avenue. The line would be constructed in a tunnel, embankment, and an open cut, costing $12.07 million. An additional extension would be constructed toCollege Point, running along 149th Street and 11th Avenue as an elevated line from Roosevelt Avenue to 122nd Street, costing $14.1 million.[9][49]: 371 
  • Subway service would be extended eastward along Hillside Avenue toLittle Neck Parkway. The line would be an extension of theIND Queens Boulevard Line as a four-track line to 212th Street, and then as a 2-track line to its terminus at Little Neck Parkway.[9][49]: 371  The segment to 184th Street was to have cost $3.455 million, while the segment to 212th Street was to have cost $16.355 million.[50]
  • The provision atVan Wyck Boulevard for a future line would be completed, and a new two-track line would be built toRockaway Boulevard.[9]
  • TheIND Fulton Street Line would get an eastward extension; it would first be extended to 106th Street as a four-track line,[48][49]: 371  where it would connect to theIND Rockaway Line. Afterwards, the line would stretch along Linden Boulevard to 229th Street in Eastern Queens. The line was to go to a two-track terminal at 105th or 106th Streets, with intermediate stops at75th or 76th Streets and at 84th or 85th Streets (both proposed local stops), as well as at Cross Bay Boulevard (a proposed express stop).[10]: 137, 142 [51] In 1951, these relay tracks east of Euclid Avenue were still planned to go as far as 105th Street, with a connection to theIND Rockaway Line east ofCross Bay Boulevard.[34] In May 2004, this idea resurfaced, with an attached track map drawn up.[52] If the line were ever built, Pitkin Avenue would have been routed to the east rather than to the southeast at 80th Street, andLinden Boulevard between Conduit and Rockaway Boulevards would have been built to facilitate the line.
  • A new IND line would run from the Lower East Side toAvenue U in Brooklyn, with a possible extension toFloyd Bennett Field.[48] The new line would run viaHouston Street andEssex Street in Manhattan, and viaUtica Avenue andFlatbush Avenue.[9]
  • Service on theIRT Nostrand Avenue Line would be extended down Nostrand Avenue to Voorhies Avenue inSheepshead Bay as a two-track line. The extension would be constructed as a subway until Avenue T, where it would emerge as an elevated line to Voorhies Avenue.[9] It would have cost $22.7 million.[49]: 372 
  • The IND would be extended to South Brooklyn with a connection at Cortelyou Road between itsSouth Brooklyn Line and the BMT'sCulver Line. This was the only completed Brooklyn proposal.[9]
  • Dyker Heights would get service with the construction of a branch of theBMT Culver Line via 37th Street, Fort Hamilton Parkway and 10th Avenue to 86th Street. In the vicinity of Fort Hamilton Parkway, a connection would be constructed between the BMT West End Line and the IND South Brooklyn Line.[9] Extension work was approved sometime before 1940, and plans were drawn up.[53]
  • A connection between theBMT Franklin Avenue Line and theIND Crosstown Line would be built through the construction of a line under Lafayette Avenue.[9]
  • Subway service would be provided toStaten Island for the first time, with the construction of a tunnel underthe Narrows connecting at 68th Street to the BMT Fourth Avenue Line and with theStaten Island Railway atNew Brighton andTompkinsville.[9]

The IND Concourse Line got funding to be extended eastward past205th Street, but Bronx residents wanted to rehabilitate theNew York, Westchester and Boston Railway right-of way. This funding was reallocated, and the old NYW&B line became theIRT Dyre Avenue Line in December 1941, and the IND Concourse Line extension was not brought up again until 1968.[9]

1940s: Smaller plans

[edit]

In 1942, Mayor Benjamin F. Barnes of Yonkers proposed that the Getty Square Branch of the New York Central's Putnam Division be acquired for an extension of the IRT Broadway–Seventh Avenue Line from Van Cortlandt Park. This service would replace the service operated by the New York Central, which was slated to be discontinued by the New York Central.[54]

A rail link toLaGuardia Airport was proposed in 1943, when the city Board of Transportation proposed an extension of theBMT Astoria Line (currently served by theN and ​W trains) from its terminus atDitmars Boulevard.[55][56] The line would have run along Ditmars Boulevard, and would have cost $10.5 million.[49]: 371 

In 1946, the Board of Transportation issued a $1 billion plan that would extend the subway to the farthest reaches of the outer boroughs.[57][58]

  • A branch of theBMT Fourth Avenue Line at 59th Street under the Narrows to Saint Nicholas Street and Grent Street inStaten Island.
  • A branch of theIND Fulton Street Line running via Utica Avenue to Avenue U.
  • An extension of theIRT Nostrand Avenue Line from Flatbush Avenue to Voohries Avenue.
  • A line branching off of theIND Crosstown Line running via Franklin Avenue connecting with theBMT Brighton Line. This would have replaced theBMT Franklin Avenue Line.
  • The extension of the IND Fulton Street Line to Euclid Avenue would continue to be built, and would be extended to 229th Street and Linden Boulevard.
  • The completion of the Culver Ramp, connecting theIND Culver Line with the BMT Culver Line.
  • A branch of the IND Culver Line running via Tenth Avenue and Fort Hamilton Parkway to 86th Street, with a connection to theBMT West End Line. West End service would run via the Culver Line and would alleviate congestion at DeKalb Avenue Junction. In order to provide access to the BMT Fourth Avenue Line, the Culver Shuttle would be extended to 36th Street.

Even though the Board of Transportation did not approve these ideas, they were still proposed.

  • A line branching off of theIND Eighth Avenue Line running via Worth Street and East Broadway and running under theEast River to Driggs Avenue.
  • A new trunk line built alongSecond Avenue with a connection atCourt Street to theIND Fulton Street Line.
  • Lines in Queens to the Rockaways, LaGuardia Airport, Idlewild Airport (now called JFK Airport), College Point, Bayside, Little Neck, Douglaston, Saint Albans and Bellerose.

In 1949, the Board of Transportation issued a $504 million plan to increase capacity on several subway lines through the construction of a new trunk line under Second Avenue.[59]

  • The rebuilding ofDeKalb Avenue that would remove the bottleneck and increase capacity by 18 tph.[59]
  • IND Sixth Avenue Line express tracks between West Fourth Street and 34th Street.[59]
  • A new subway line under 57th Street connecting the IND Sixth Avenue Line and the proposed Second Avenue trunk line.[59]
  • A four-trackSecond Avenue Subway would originate from a connection to theIRT Pelham Line at 138th Street, the Bronx, to Grand Street, Manhattan. The connection to the Pelham Line would allow for eight additional trains per hour operating between Manhattan and the Pelham Line. It would then be possible to operate 10-car trains via the line and it would also be possible to operate full express service via the line's center express track. The trains operating viaNassau Street would go to Brooklyn via the Montague Tunnel. During non-rush hours trains would terminate atBroad Street. There would be a passageway built from Grand Central via 43rd Street to Second Avenue to permit transfers.[59]
  • The IRT Pelham Line would be rebuilt to accommodate the wider BMT-IND cars to operate via the Second Avenue Line. The connection would provide the Pelham Line with direct service to Sixth Avenue, Second Avenue and Brooklyn.[60]: 1200  The station platforms, and third rail would have had to be adjusted as they were put in place for the narrower IRT trains. The line was built with this conversion in mind, however.Westchester Yard would have been expanded to accommodate the additional trains added to the line. Since trains to the Pelham Line would no longer use theLexington Avenue Line, there would be additional capacity for trains to run via theIRT White Plains Road Line and theIRT Jerome Avenue Line. Improved service on the Pelham Line was projected to stimulate growth in the areas of the East Bronx served by the line. The East Bronx was seen to have great potential for industrial growth and other areas suitable for development as residential and recreational areas.[59]
  • An improved connection between the IRT Lexington Avenue Line and the IRT White Plains Road Line would be built using the tunnel under the Harlem River used by the IRT Pelham Line, and would allow for the full use of the capacity on the White Plains Road Line and the Jerome Avenue Line. Eight additional trains per hour would be added to the White Plains Road Line and fourteen additional trains per hour would be added to the Jerome Avenue Line. The additional service on the Jerome Avenue Line would make use of the third track for express service.[59]
  • The Second Avenue Line trunk would be extended to 149th Street to allow for a transfer to the Third Avenue Elevated. This would permit the demolition of the Third Avenue Elevated south of 149th Street, which was seen as uneconomical to operate, ugly and a hindrance of the avenue below it.[59]
  • Connection of theIRT Dyre Avenue Line to the IRT White Plains Road Line. The direct service was predicted to stimulate growth along its route.[59]
  • Connections would be made to theBMT Nassau Street Line, theWilliamsburg Bridge, and theManhattan Bridge. The Sixth Avenue Line would also be connected to the Williamsburg and Manhattan Bridges. The connection between the Nassau Street Line and the Manhattan Bridge south tracks would be eliminated. This would allow for thirty additional trains to operate between Midtown Manhattan and Brooklyn.[59]
  • The lengthening of platforms on the BMT lines in Brooklyn would increase capacity and would allow 10-car trains from Second Avenue to run over any section of the BMT and IND.[59]
  • Increase in capacity on theBMT Brighton Line,BMT Sea Beach Line,BMT West End Line, and theBMT Fourth Avenue Line by 8 tph in total by adding a connection from the BMT Culver Line to theIND Culver Line atDitmas Avenue. The additional capacity would result from the fact that trains operating via the former BMT Culver Line would not run through DeKalb Avenue Junction.[59]
  • Aconnection between theIND Queens Boulevard Line atQueens Plaza to theBMT 60th Street Tunnel that would increase capacity between Queens and Manhattan by 20 tph. This connection would permit the full use of the capacity of the Queens Boulevard local tracks.[59]
  • The construction of a ramp connecting theIND Fulton Street Line with theFulton Street Elevated on Liberty Avenue. Six stations on the elevated would have their platforms extended to accommodate 10-car trains. This would make possible the demolition of the BMT Fulton Street Line between Grant Avenue and Rockaway Avenue and the demolition of theBMT Lexington Avenue Line.[59]

1950–1951

[edit]

On June 21, 1950, a plan was created by the Board of Transportation and sent to Mayor O'Dwyer concerning rapid transit expansions in Queens. The total cost of the plan would have been $134.5 million. Many things were planned:[61]

On September 13, 1951, the Board of Estimate approved a plan put forth by the New York Board of Transportation that would cost $500 million.[62][63] Many things were planned:

The Board of Estimate requested that the Board of Transportation evaluate a spur of theIRT Pelham Line toThroggs Neck in the Bronx.

1954

[edit]

The Board of Estimate accepted the following items into its 1954 budget from the New York City Transit Authority:

In March 1954, the Transit Authority issued a $658 million construction program including the following projects:[65]

In 1954, Regional Plan Association advocated for an extension of theBMT Canarsie Line fromEighth Avenue toJersey City under theHudson River. The tunnel under the Hudson would have cost $40 million. The extension would have provided access to commuter railroads in New Jersey as most lines converged there, and the lines that didn't would be rerouted to stop there. The RPA also suggested having a parking lot there for access from thePulaski Skyway and theNew Jersey Turnpike. It was suggested that either the New York City Transit Authority, thePort Authority of New York and New Jersey or the Bi-State Metropolitan Rapid Transit Commission would do the construction.[14]

1961

[edit]

John T. Clancy, aDemocratic incumbent running forQueens Borough President in 1961 proposed third tracking theBMT Jamaica Elevated Line to provide express service, and reactivating theRockaway Beach Branch from Rego Park to Liberty Avenue.[66]

1962–1963

[edit]

In July 1962, the NYCTA announced that it had asked the city for money to build a $190 million high-speed, non-stop subway line from Midtown to the Bronx. The line would have only operated during rush hours. It was estimated that if the funds were given to the project, it would be completed in 1970. The line would be a two-track line running from 59th Street between Fifth and Seventh Avenues to the Bronx, running under Central Park. Running non-stop for 6.5 miles, it would have been the longest continuous run in the subway system. The line, on its southern end, would connect to the BMT Broadway Line at Seventh Avenue near 59th Street and to the IND Sixth Avenue Line near 58th Street and Sixth Avenue.[67]

The line would then run through a deep tunnel under Central Park until 110th Street. There would be provisions for a future crosstown line under 76th Street to Queens. The line would then turn east and run along Madison Avenue to 138th Street. One branch would connect to the express track of the IRT Pelham Line, which would be converted to accommodate larger B Division trains. In the morning rush hour, trains from Pelham Park would only make express stops. A new stop would be built at 138th Street and Grand Concourse where transfers would have been available to theIRT White Plains Road andIRT Jerome Avenue Line trains.[68]

The second branch would continue under the Grand Concourse until 161st Street where it would connect to theIND Concourse Line at 161st Street. This connection would allow for the diversion of Concourse Line express trains onto the new line, allowing for the addition of an equal number of trains to theIND Central Park West express service and provide relief to that line. The construction of this line was viewed as necessary to relieve the IRT Lexington Avenue Line.[69]

In February 1963, the New York City Transit Authority issued a preliminary proposal for rapid transit expansion in the borough of Queens. The plan was designed to relieve congestion on the IRT Flushing Line and IND Queens Boulevard, to deal with expected population growth, and to provide service to areas of the borough without transit service. To expand service to other areas of the borough a new trunk line would be built to provide the necessary capacity. The planned extensions were expected to relieve crowding on the IRT Flushing Line by 22 percent and on the IND Queens Boulevard Line by 19 percent.[70]

The first phase of the transit expansion would build a trunk line connecting the IND Queens Boulevard Line's local tracks at Steinway Street and Broadway using existing provisions with the IND Sixth Avenue Line and BMT Broadway Line in Manhattan. The new line would have run under 34th Avenue, a new tunnel under the East River, and 76th Street before turning south under Central Park. Connections would be made to the IND Sixth Avenue Line at 58th Street and to the BMT Broadway Line's stub tracks at 59th Street and Seventh Avenue. In Manhattan, there would have been a transfer connection to the 77th Street station on the IRT Lexington Avenue Line and a station in Central Park at 70th Street.[70]

Provisions would be built for a planned extension to the Bronx. At Steinway Street, switches would be constructed to all GG trains from Brooklyn to terminate there. The new 4.5 miles (7.2 km) line would have provided an additional 30 trains per hour between Queens and Manhattan with a future northern extension. Initially, the line would be used for 15 trains per hour running to the IND Sixth Avenue Line from the IND Queens Boulevard Line. The construction of the trunk line was expected to cost $138.6 million, of which $37.4 million would be spent for the section south of 76th Street. The earliest possible date for the completion of the line would have been 1970.[70]

To provide service to unserved areas of Queens, three additional routes were considered. The first route would have served northern and northeastern Queens, running along 34th Avenue, Northern Bouelvard, Main Street, Kissena Boulevard, Parsons Boulevard, and one of the Horace Harding Expressway service roads to Springfield Boulevard. The 10.3 miles (16.6 km)-line would have consisted of two tracks and would have cost $219.4 million. The second route would be a branch of the IND Fulton Street Line heading under Linden Boulevard and Merrick Boulevard to Springield Boulevard.[70]

Two options were considered for this line. The first option would have branched off of the Fulton Street Line near Pitkin Avenue and Euclid Avenue using existing provisions in the tunnel. The second option would have extended the Liberty Avenue Elevated from Lefferts Boulevard. This option would have required the acquisition of private property to widen Liberty Avenue so that the line could transition from an elevated line to a subway line and to make the turn from Liberty Avenue and Linden Boulevard. The subway option would have been 6.6 miles (10.6 km) long and would have cost $116 million while the elevated/subway option would have been 4.5 miles (7.2 km) and would have cost $80.8 million.[70]

The third route would have connected the IND Rockaway Line to the IND Queens Boulevard Line using the Rockaway Beach Branch and an existing provision in the tunnel east of 63rd Drive. The Rockaway Beach Line had been abandoned by the Long Island Rail Road on June 8, 1962. A new stop would be built at Linden Boulevard to connect with a new subway line. This line was expected to cost $39.9 million.[70]

In addition to expanding service to Queens, service to the Bronx would have been expanded as well. The new trunk line connecting the BMT Broadway Line and IND Sixth Avenue Line to Queens south of 76th Street would have been used for the new line to the Bronx. This line would have run under the center of Central Park and then running via Fifth Avenue once out of the park at 110th Street, and would continue under the East River with a branch connecting to theIRT Pelham Line, which would have been modified in order to fitB Division subway cars, and a branch continuing up the Grand Concourse and then connecting to theIND Concourse Line.[71][72]

In May 1963, theNew York City Planning Commission proposed the following in response to the NYCTA's proposal:[71]

Rail Transit ServicesPresent Population Served1985 Projected Population Served
NumberPercentNumberPercent
Existing Line900,00050985,00049
Long Island Lines305,00017360,00018
Transit Authority Proposal140,0008185,0009
Total Queens Population1,810,000*1002,000,000100
* Based on 1960 Census
  • A two-track Madison Avenue Line would have run from the proposed 59th Street tunnel via Madison Avenue and would have tied into the then-underutilizedBMT Broadway Line in the vicinity of Madison Square.[71][72]
  • In the vicinity of City Hall Park in Lower Manhattan, a connection between the BMT Nassau Street and Broadway Lines would have carried the Madison Avenue service through the financial district at Wall Street and Broad Street.[71][72] Another connection in Lower Manhattan would have been built connecting the IND Eighth Avenue Line and the BMT Broadway Line in the area of the former Hudson Terminal (today's World Trade Center).[71][72]
CPC ProposalTA Proposal
Route MilesCost
$ Million
Route MilesCost
$ Million
Queens Tunnel and Connections2.3$754.5$139
Madison Avenue Line1.986
Downtown Improvements2.723
Queens Extension25.011420.7375
Bronx Tunnel6.61796.0163
Total38.5$47731.2$677

1968

[edit]

Proposed lines

[edit]
TheIND Concourse Line would have been extended toWhite Plains Road.
Main article:Program for Action

Similar plans were made by theNew York City Transit Authority in 1968.[73][74] They included:

Completed lines

[edit]

TheArcher Avenue Lines are two lines, split between the BMT and IND, mostly running under Archer Avenue in theJamaica neighborhood ofQueens. Conceived as part of these 1968 expansion plans, they opened on December 11, 1988.[77] There are stub-end tunnels east of the line's northern terminus,Jamaica Center–Parsons/Archer, on both levels, which extend past the station for possible future extensions.[78]

The63rd Street Lines are two lines also split between the BMT and IND. The short BMT line connects the express tracks of theBMT Broadway Line from57th Street–Seventh Avenue toLexington Avenue–63rd Street, where it now runs through to the Second Avenue subway. The IND line runs from theIND Sixth Avenue Line at57th Street inManhattan east under 63rd Street and theEast River through the63rd Street Tunnel to theIND Queens Boulevard Line inQueens.[79] There is a stub-end tunnel at the northern terminus of the IND line that is intended for the Queens super-express bypass.[80]

1970s

[edit]

In Lower Manhattan, plans were made for the following:[81]: 7 

  • A new terminal forIRT Seventh Avenue locals toSouth Ferry
  • A track connection between theHudson Terminal (now World Trade Center) on theIND Eighth Avenue Line andCortlandt Street on theBMT Broadway Line, both in Manhattan.
    • RR trains would be discontinued south ofCity Hall, as the station would permanently become a terminal. The City Hall station is located one block east of Hudson Terminal. The segment between City Hall in Manhattan andBay Ridge–95th Street would be replaced by two other services.
    • B Sixth Avenue express trains would be rerouted to the Eighth Avenue Lines, replacing theAA andCC Eighth Avenue locals. B trains would run south through the connection and continue through theMontague Street Tunnel andBMT Fourth Avenue Line, thereby replacing the RR between Cortlandt Street in Manhattan and59th Street in Brooklyn.
    • JJ trains would operate via the Montague Street Tunnel and Fourth Avenue line, with an extension to Bay Ridge–95th Street.
  • ASecond Avenue Subway would operate along Second Avenue in Manhattan, connecting New Jersey with both Queens and the Bronx.
    • T and Y would run the entire length of the Second Avenue line from New Jersey, then run toward Queens and the Bronx respectively.
    • EE trains would be rerouted onto the southernmost section of the subway into New Jersey via the BMT Broadway express tracks, which turn eastward toward theManhattan Bridge. The EE would then diverge southward, merging with the Second Avenue main line.

1986

[edit]

In 1986, theRegional Plan Association suggested extending theIRT Flushing Line across theHudson River to theMeadowlands Sports Complex inEast Rutherford, New Jersey.[16]

In 1986, the MTA issued a study on expanding transit options on the west side of Manhattan. It was proposed to use theWest Side Line viaduct (today'sHigh Line), and various means of transportation were proposed, including monorail, passenger rail trains, or subway trains. It also proposed to extend the IRT Flushing orBMT Canarsie Lines (7 and <7>​ andL, respectively).[82]

1990

[edit]

In 1990, the MTA proposed a rail line connectingLaGuardia Airport andJohn F. Kennedy International Airport. The line would have operated over theGrand Central Parkway and theVan Wyck Expressway. There would be stations atShea Stadium andJamaica. The system was proposed to cost $2 billion. The MTA estimated that the rail link would take 30 minutes from Kennedy to LaGuardia, and the frequency of service would initially be every 15 minutes. There would be a two-track alignment with one track for each direction, as well as at least two trains heading in each direction at all times. If the link were built, the average travel time from Manhattan to Kennedy would have been about 45 minutes using theLong Island Rail Road, including transfers. To LaGuardia, the average travel time from theGrand Central station using theIRT Flushing Line would be 47 minutes.[83]

1998–99

[edit]
The AirTrain viaduct overVan Wyck Expressway would have been used by the subway under the "MetroLink" plan.

In 1998, an extension of theBMT Astoria Line to LaGuardia Airport was planned, but the plan was canceled in 2003 following community opposition.[84][85]

In 1999, theRegional Plan Association considered a full-length Second Avenue Subway from Broad Street to 125th Street, along with the LIRREast Side Access. It also planned the following extensions:[86]

  • a Co-op City extension of the Second Avenue Subway via the Amtrak right-of-way through the northeast Bronx
  • a Grand Central Terminal spur of the Second Avenue Subway
  • a super-express bypass from theAtlantic Terminal via the LIRRAtlantic Branch
  • an extension to JFK Airport via the Van Wyck Expressway
  • an extension to Laurelton via the LIRR Atlantic Branch
  • a branch off the Second Avenue Subway at 14th Street to Avenue C, to merge with theIND Sixth Avenue Line at Essex Street
  • a connection to theBMT Nassau Street Line near Delancey Street
  • a super-express bypass of the Queens Boulevard Line from east of21st Street–Queensbridge to east ofForest Hills–71st Avenue
  • a new interlocking atPrince Street to allow easy switching of trains between local and express tracks

The new set of extensions proposed by the RPA, dubbed "MetroLink", would make use of existing commuter rail infrastructure, so as to make it interoperable with the New York City Subway. Nine hundred fifty "Rx" hybrid railcars would be ordered, with yard expansions and new yards being built. MetroLink, consisting of 31 new metro stations (not counting three recycled commuter rail stations) and 19 new route‑miles of track (31 km) (not including existing commuter rail and then-under constructionAirTrain JFK route miles) would have reduced the load on theIRT Lexington Avenue Line, theIRT Broadway–Seventh Avenue Line, and theIND Queens Boulevard Line. Two of these stations would be in Brooklyn, three in Queens, nine in the Bronx, and twenty in Manhattan. Five services would be run:[86]

  1. The Co-op City–Second Avenue–Broadway–Whitehall Street service
  2. The 125th Street–Second Avenue–Atlantic Terminal Bypass–Jamaica Center service
  3. The Grand Central–Second Avenue–Atlantic Terminal Bypass–JFK Airport service
  4. The Grand Central–Second Avenue–Fourth Avenue–West End Line to Coney Island service
  5. The Laurelton–Jamaica Center–Queens Bypass–Second Avenue–Lower East Side–Culver Express to Avenue X service

Stations would have been located at:

The AirTrain JFK,Atlantic Branch,Main Line ROW, andNortheast Corridor would all be "recycled" to accommodate subway service under this plan. TheNostrand Avenue andEast New York LIRR stations would also have been closed under MetroLink.[86]

21st-century expansion

[edit]

The New York City Subway has opened five subway stations since 2009, and up to 15 more subway stations are planned. However, the 21st-century expansion plans pale in comparison to some of the subway system's other previous plans.

Current or completed plans

[edit]

7 Subway Extension

[edit]
Main article:7 Subway Extension
The34th Street station on theIRT Flushing Line, which opened in September 2015, was toured by then-MayorMichael Bloomberg in 2013.

The7 Subway Extension was devised in the late 1990s to extend theIRT Flushing Line, which carries the7 local and<7> express services, further westward intoManhattan.[87] The extension stretches a total of 1 mile (1.6 km) from its former terminus atTimes Square to anew western terminus at 34th Street and 11th Avenue.[87] The tunnels are actually 1.5 miles (2.4 km) long.[88] A second station at10th Avenue–41st Street was dropped from the plans in October 2007, but could be restored if funding can be found.[89] The extension's opening had been delayed to June 2014, with the rest of the 34th Street station to open at the end of 2015.[90]

Michael Horodniceanu, chief of MTA Construction Company, toldThe New York Times that complications in the installation of theinclined elevator would likely cause a further delay of about three months, bringing the opening date to very late summer or early fall of 2014.[91] Further complications in February 2014 brought the projected date of the opening to November 2014,[92] then to February 2015,[93] then spring 2015,[94] and to summer 2015.[95] The station opened in September 2015.[96]

As proposed under the RPA's Fourth Regional Plan,[97] a second 7 Subway Extension would be built, serving23rd Street before connecting with the existing14th Street/Eighth Avenue station.[98]

Second Avenue Subway

[edit]
Main articles:Second Avenue Subway andConstruction of the Second Avenue Subway
72nd Street station cavern on theIND Second Avenue Line in January 2012.

TheSecond Avenue Subway was repeatedly delayed and shaved back from a six-track combined local/express line to a two-track superexpress line since 1919 (with occasional construction between 1972 and 1976).Construction of the Second Avenue Subway began in 2007. Atunnelling contract was awarded to the consortium of Schiavone/Shea/Skanska (S3) by theMetropolitan Transportation Authority (MTA) on March 20, 2007.[99] This followed preliminary engineering and a final tunnel design completed by ajoint venture betweenAecom andArup.[100][101]Parsons Brinckerhoff was the construction manager of the project. This contract, and the full funding grant agreement with theFederal Transit Administration, which was received in November 2007, is for Phase I of the project, a new line between the existing63rd Street Line and96th Street andSecond Avenue.[102] The total cost of the 8.5-mile (13.7 km) line is expected to top $17 billion.[103]

A ceremonial ground-breaking for the Second Avenue Subway was held in April 2007.[104] Thetunnel boring machine (TBM) began digging the tunnels for Phase I in May 2010[105][106][107] and completed its excavations in September 2011.[108] Phase I, consisting of two miles (3.2 km) of tunnel and three stations, was opened in January 2017.[109][110][111] It cost $4.45 billion.[112] A 1.5-mile (2.4 km), $6 billion second phase is in planning;[113] land acquisition for Phase 2 started in April 2022.[114] As of October 2023[update], Phase 2 was set to open in early 2032.[115][116]

The RPA's Fourth Regional Plan proposed two northward extensions. Phase 2B would be an extension of Phase 2 under125th Street fromLexington Avenue toBroadway. Phase 2C would be a spur toThird Avenue–149th Street, connecting with theIND Concourse Line.[98]

Proposals

[edit]

Triboro RX

[edit]
See also:New York Connecting Railroad andBay Ridge Branch
The Triboro RX, if built, would need to share a right-of-way with theBay Ridge Branch.

A proposal for the LIRR Bay Ridge Branch would have the New York City Subway use the tracks to linkBrooklyn,Queens (both already linked by theG train) andthe Bronx via theHell Gate Bridge. Based on Paris'sRER commuter rail system, the Triboro RX proposal would create a partial loop around the city.[117] In 1996, theRegional Plan Association conducted a study to determine the feasibility of the rail link.[118] The original proposal would have terminated atYankee Stadium.[119] The proposed line, discussion of which was revived in 2012, would connect to all non-shuttle subway services at 12 stations.[119][120]

The line in this proposal would have terminated atHunts Point.[117] The line was brought back in the 2015 report "The Overlooked Boroughs" by the Regional Plan Association. The line would be 24 miles (39 km) long and would consist of 22 stations, would cost $1 billion and is projected to have more than 100,000 daily riders.[121][122] Plans for the line date back to 1995.[123]

Obstacles for the proposal include the proposedCross-Harbor Rail Tunnel, the lack ofelectrification on the line, as well as thesingle-tracking in some parts of the line. The current iteration of the plan would have its northern terminus be Co-Op City South using the Hell Gate Branch.[124] The LIRRBay Ridge Branch and theNew York Connecting Railroad have freight operating along them, and are regulated by theFederal Railroad Administration (FRA). FRA rules require a certain distance between freight and passenger trains that share rights-of-way, and as a result it is uncertain whether the right-of-way is wide enough or if more durable train cars are needed to be able to share the same tracks.[119] The RPA's 2015 plan considered having FRA compliant light rail vehicles run over the line. In addition to providing transfer opportunities, the line would provide transit access to areas without it in Glendale and Middle Village in Queens, as well as in Flatlands and Canarsie in Brooklyn.[125]

Interborough Express

[edit]
Main article:Interborough Express

In mid-October 2019, the MTA announced that it would study the feasibility of restoring passenger service on the Bay Ridge Branch portion of the route.[126] In early January 2022, as part of herState of the State address New York governorKathy Hochul announced that the state would move forward with the Bay Ridge Branch Line by conducting an environmental study on theInterborough Express (IBX), a 14-mile (23 km) corridor using the existing Bay Ridge Branch and Fremont Secondary fromBay Ridge, Brooklyn, toJackson Heights, Queens.[127] End-to-end travel times are expected to be less than 40 minutes, and weekday ridership is projected to be 115,000.[128] The route would connect up to 17 subway lines and the Long Island Rail Road.[129][130][131] The MTA indicated in September 2022 that it wanted to construct the IBX as a light rail line,[132] and Hochul announced in January 2023 that the project would proceed as a light rail corridor.[133][134]

Rockaway Line

[edit]
The LIRRRockaway Beach Branch would need to be renovated in order to be reused.

TheLong Island Rail Road (LIRR) abandoned theRockaway Beach Branch in 1962; ever since it has been sought after for reactivation for train service. The line has not been reactivated due to local opposition, specifically the homeowners who live along the right-of-way. One group,QueensLink, wants the line to be reactivated between the63rd Drive–Rego Park station on theIND Queens Boulevard Line to the north and theIND Rockaway Line to the south, providing a north-south connection in Queens.[135] A second group would use the right-of-way as a linear park, known as theQueensway, a proposal inspired by the success of theHigh Line in Manhattan. A third group consists of homeowners who would have nothing done, keeping the line as is.[136]

Talks of reactivating the line were publicly endorsed in February 2012 by AssemblymenPhillip Goldfeder andMichael G. Miller. Goldfeder commented "The commute for people here is only going to go from bad to worse. You can't talk about a convention center without talking about transportation." Goldfeder and Miller said they are not opposed to turning sections of the line into a park, but said people who live inthe Rockaways,Ozone Park and other areas have no quick or easy way to get into Manhattan. TheGenting Group, which operates Resorts World casino and have been asked to construct the convention center, are evaluating several plans to increase transportation access. Genting is committed to paying for part of the transportation improvements. Advocates of the Queensway, a proposed public park along the branch's route, are against resumption of rail service, stating that current bus service fills current transportation needs in the area.[137] U.S. RepresentativesHakeem Jeffries andGregory Meeks added their support for the project in March 2013. Both representatives will push to allocate federal transportation subsidies to study a plan for restored passenger service.[138]

The line would cost $1 billion, if built in its full length with a connection to theIND Queens Boulevard Line, and would stretch across 3.5 miles (5.6 km), providing connections to several subway services as well as the LIRR.[139][140] Another possible option would have Long Island Rail Road service restored with service to seven stations along the right-of-way, with service ending in Howard Beach.[141] The line would serve upwards of 250,000 passengers per day and would provide access toJFK Airport fromMidtown Manhattan.[142] In February 2015, the Regional Plan Association suggested having someF trains, after running through the63rd Street Tunnel, be rerouted to operate over theLower Montauk Branch of the LIRR running through underservedMaspeth andGlendale and then meeting up with the Rockaway Beach Branch inRego Park.[125]

LaGuardia Airport extension

[edit]
See also:LaGuardia Airport subway extension andAirTrain LaGuardia

TheBMT Astoria Line extension toLaGuardia Airport was suggested as part of LaGuardia's long-range expansion/renovation plan. Currently, no New York City Subway routes service the airport directly, but provisions for a subway connection are part of a 2014 long range rebuilding plan by the MTA.[143] TheNew York Daily News' editorial board came out in support of this extension on February 21, 2017, detailing why this route is superior to GovernorAndrew Cuomo’s plan for anAirTrain from LaGuardia toWillets Point.[144]

Utica Avenue and Nostrand Avenue Lines

[edit]

In April 2015, New York City MayorBill de Blasio announced a new plan for building a subway line underUtica Avenue inBrooklyn. Previous plans, most recently theProgram for Action, had provisions for such a line. It would branch off from theIRT Eastern Parkway Line (2, ​3, ​4, and ​5 trains) atCrown Heights–Utica Avenue. The new line being proposed is part of de Blasio's "One New York" plan, which aims to improve transit, reduce emissions, and fight poverty. If built, the line would go toFlatbush Avenue, nearKings Plaza. Since theMetropolitan Transportation Authority had budget shortages as of April 2015[update], however, it is unclear how the line would be funded or built.[145][146]

The MTA Board allocated $5 million for a feasibility study, the Utica Avenue Subway Extension Study, for this proposal in the MTA's 2015–2019 Capital Program.[147] In August 2016, it was reported that the MTA was looking into an extension of theIRT Nostrand Avenue Line along Flatbush Avenue toMarine Park, which would allow trains to serve Kings Plaza.[148] Both the Utica Avenue and Nostrand Avenue proposals for extensions to Kings Plaza have been proposed since the 1910s.[6] Planning on the Utica Avenue Line stalled[149][150] because it was no longer viewed as a priority by the MTA.[151] Planning resumed in April 2019 when New York City Transit joined city agencies in launching the Utica Avenue Transit Improvement Study. The study looked into a subway extension, improved bus rapid transit, and a new light rail line.[152] Since the study occurred concurrently with the 2020 redesign of Brooklyn bus routes, the MTA decided to prioritize the Utica Avenue transit study,[153] and the 2025-2044 Needs Assessment compares these options, determining bus rapid transit to be the most cost effective option.[154]

In November 2017, the RPA suggested building both lines as part of its fourth plan. The Nostrand Line was envisioned as a three-stop extension to Avenue Z, while the Utica Line was planned as a five-stop spur to Kings Plaza.[98]

RPA plans

[edit]

TheRegional Plan Association (RPA) released its fourth Regional Plan in November 2017, twenty-one years after its previous Regional Plan had been published. The fourth plan included several lists of suggestions on how to improve the city's transit system, of which subway expansion was a major component.[155] Under the RPA's plan, theSecond Avenue Subway would be completed to its full length within Manhattan and then extended to the Bronx. The7 Subway Extension would expand in scope, with the IRT Flushing Line being extended to14th Street and Eighth Avenue.[98]

Both theUtica Avenue and Nostrand Avenue Lines in Brooklyn would be realized. Queens would see three subway expansions, including two new Queens lines: one alongNorthern Boulevard toFlushing orCollege Point and one along Jewel Avenue toAlley Pond Park. A one-stop extension of the Astoria Line would be built to serve western Astoria.[98] Ultimately, the plan included eight extensions with at least 40 stations in total.[98]

Subway station in Red Hook

[edit]

In January 2018, then-GovernorAndrew Cuomo ordered the MTA to conduct a study on the feasibility of building a subway station inRed Hook, Brooklyn, in order to redevelop the area. If approved, the station would likely be built as part of an extension of theIRT Broadway–Seventh Avenue Line pastSouth Ferry in Lower Manhattan with a station atGovernors Island possible, but unlikely due to cost and benefit.[156][157]

As of 2022[update], a potential extension of theBMT Broadway Line to Red Hook (to be served by theW train) is being evaluated as part of the MTA's 2025–2044 20-Year Needs Assessment.[158]

Other proposals

[edit]

As of 2022[update], a potential extension of theIRT New Lots Line (to be served by the3 train) toSpring Creek, Brooklyn, is being evaluated as part of the 2025–2044 20-Year Needs Assessment.[158]

As part of the 2025–2044 20-Year Needs Assessment, the MTA is also evaluating the possibility of extending the Second Avenue Subway westward under125th Street following the completion of Phase 2. The line might be extended westward toBroadway and 125th Street, connecting with the IRT Broadway–Seventh Avenue Line's125th Street station; to Broadway and 137th Street, connecting with the IRT Broadway–Seventh Avenue Line's137th Street–City College station; toRiverside Drive and 137th Street; or toSt. Nicholas Avenue and135th Street, merging with theIND Eighth Avenue Line.[158]

Discontinued plans

[edit]

PATH-Lexington Avenue connection

[edit]

After thePATH'sWorld Trade Center station was destroyed during theSeptember 11 attacks, there was a proposal to connect the PATH and the New York City Subway. Whereas the original World Trade Center station consisted of five north-southballoon loops that sent eastward trains back west to New Jersey, the rebuilt PATH station would have been built in an east–west alignment. The tracks would have extended eastward by 3,000 feet (910 m) to theBrooklyn Bridge-City Hall station on the New York City Subway'sIRT Lexington Avenue Line.[81]: 6  The benefits of this connection, called PATH-Lex by its supporters, would have consisted of a one-seat ride from Newark and Jersey City through Lower Manhattan, the East Side of Manhattan, and the Bronx.[81]: 5  While theMetropolitan Transportation Authority was interested in the plan, thePort Authority of New York and New Jersey dismissed the idea altogether, due to the complexity of connecting the two separate systems.[159][160]

References

[edit]
  1. ^"A New Subway Line for New York City, The Triborough System: Its History (1910)". www.nycsubway.org. RetrievedMarch 25, 2014.
  2. ^"The Dual System of Rapid Transit (1912)". www.nycsubway.org. RetrievedMarch 25, 2014.
  3. ^"M'Adoo Would Build A West Side Subway".The New York Times. September 16, 1910. p. 10. RetrievedJuly 19, 2011.
  4. ^"M'ADCO READY TO RUN TRIBOROUGH; Giving a 5-Cent Ride from the Bronx to the End of the Brooklyn Extension".The New York Times. November 19, 1910.ISSN 0362-4331. RetrievedApril 26, 2018.
  5. ^nycsubway.org—The Dual Contracts
  6. ^ab"Transit Outlook Bright in Brooklyn – First Branch Lines on Assessment Plan Likely to be Built in That Borough".The New York Times. March 6, 1910.ISSN 0362-4331. RetrievedAugust 9, 2016.
  7. ^"Two Subway Routes Adopted by City".The New York Times. August 4, 1923. p. 9.
  8. ^"Plans Now Ready to Start Subways".The New York Times. March 12, 1924. p. 1.
  9. ^abcdefghijklmnopqrstuvwxynycsubway.org—History of the Independent Subway
  10. ^abcRaskin, Joseph B. (2013).The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. New York, New York: Fordham University Press.doi:10.5422/fordham/9780823253692.001.0001.ISBN 978-0-82325-369-2.
  11. ^"Three Rapid Transit Contracts are Let"(PDF).The New York Times. December 29, 1922. RetrievedJune 28, 2015.
  12. ^"95th St. Subway Extension Opened at 2 P.M. Today".Brooklyn Daily Eagle. Newspapers.com. October 31, 1912. RetrievedJune 29, 2015.
  13. ^abcnycsubway.org—Extensive Rapid Transit Plan Proposed for North Jersey (1926–1927)
  14. ^ab"City Subway Link to New Jersey At 14th St. Urged to Ease Traffic"(PDF).The New York Times. June 14, 1954. p. 23. RetrievedFebruary 8, 2016.
  15. ^"Commuters Offer Transit Proposals"(PDF).The New York Times. June 12, 1963. RetrievedAugust 17, 2015.
  16. ^ab"Study Suggests IRT Extension to New Jersey".The New York Times. March 21, 1986. RetrievedAugust 17, 2015.
  17. ^Charles V., Bagli (November 17, 2010)."Take the No. 7 to Secaucus?".The New York Times. RetrievedJuly 3, 2013.
  18. ^Haughney, Christine (April 3, 2012)."MTA Chief rules out subway line to New Jersey".The New York Times. RetrievedApril 4, 2012.
  19. ^Plan to extend No. 7 subway from NYC to New Jersey could be back on track, Mike Frassinelli, The Star-Ledger, April 10, 2013
  20. ^Brinkerhoff, Parsons (April 2013).No 7 Secaucus Extension Feasibility Analysis Final Report(PDF) (Report). NYCEDC. p. III–X. Archived fromthe original(PDF) on November 5, 2013. RetrievedApril 10, 2013.
  21. ^Higgs, Larry (April 21, 2017)."New York subway extension to N.J. may not be dead after all".NJ.com. RetrievedFebruary 28, 2018.
  22. ^Smith, Sandy (April 26, 2017)."On-Again, Off-Again New Jersey Bus Terminal May Be On Again". Next City. RetrievedMay 5, 2017.
  23. ^Barone, Vincent (February 27, 2018)."Cross-Hudson study options include 7 line extension into NJ".am New York. RetrievedFebruary 28, 2018.
  24. ^McGeehan, Patrick (February 27, 2018)."A Subway Ride to New Jersey? It Could Happen, Officials Say".The New York Times.ISSN 0362-4331. RetrievedFebruary 28, 2018.
  25. ^"Transit study will look into running No. 7 train into New Jersey".NY Daily News. February 13, 2018. RetrievedFebruary 28, 2018.
  26. ^abcnycsubway.org—IND Second System – 1929 Plan
  27. ^100 Miles of Subway in New City Project; 52 of them in Queens,The New York Times September 16, 1929, p. 1. Retrieved June 11, 2014
  28. ^abc"New Links Planned For Subway System – Revised City Program Includes Acquisition of Rockaway Division of Long Island – Recapture of a B.M.T. Line – Use of Local Tracks of Boston & Westchester Road in Bronx Also Is Contemplated – Based on 2d Av. Project – Crosstown Tube at 34th St. Part of Plan to Be Offered Soon – No Construction for at Least a Year".The New York Times. February 29, 1932. RetrievedMay 27, 2017..
  29. ^"Whitestone Group Has Shuttle Plan: Board of Estimate is Asked to Back Private Operation of Abandoned Line"(PDF).The New York Times. March 9, 1932. RetrievedAugust 17, 2015.
  30. ^"Tunnel Prospects Bright".Brooklyn Daily Eagle. Newspapers.com. July 19, 1933. RetrievedJune 29, 2015.
  31. ^"DC: A Tunnel from SI to Brooklyn?". Daniel Convissor. RetrievedDecember 16, 2010.
  32. ^Leigh, Irvin; Matus, Paul (January 2002)."State Island Rapid Transit: The Essential History".thethirdrail.net. The Third Rail Online. RetrievedJune 27, 2015.
  33. ^Niebuhr, Robert E. (November 27, 1964)."They Called The 1923 Narrows Tunnel: 'Hope And A Hole In The Ground'".brooklynrail.net. Home Reporter and Sunset News,Brooklyn Historic Railway Association. RetrievedJune 27, 2015.
  34. ^abTrack diagram of the revised plan
  35. ^"Transit Maps". Transitmaps.tumblr.com. April 5, 2013. Archived fromthe original on March 18, 2014. RetrievedMarch 25, 2014.
  36. ^"Drawing of Stair Layout at Utica Avenue Station : IND Fulton Line".nytm.pastperfectonline.com. Board of Transportation. RetrievedNovember 5, 2017.
  37. ^Bulletin. General Contractors Association of New York. 1934. p. 89.
  38. ^"Queens Interlaced with New Arteries: New Boulevards, Parks and Parkways Important Factors in Growth of Borough".The New York Times. May 13, 1928. RetrievedJuly 8, 2015.
  39. ^*"1931 Hillside Av Widening Queens Village Bellerose SUBWAY Map NYC New York Map – #494116324".Worthpoint. December 17, 2013. RetrievedFebruary 5, 2017.
  40. ^"In The Matter Of The Widening of Hillside Avenue Queens Boro. Petition For Relief From Assessment". November 19, 1937. RetrievedAugust 9, 2018.
  41. ^*"Route 108 Section 13 Springfield Boulevard Station June 19, 1931". New York City Board of Transportation. June 19, 1931. RetrievedAugust 9, 2018.
  42. ^abTransportation, New York (N Y. ) Board of; Spinrad, Isidor (1945).Report, Including Analysis of Operations of the New York City Transit System: For Five Years Ended June 30, 1945. The Board.
  43. ^"63rd Street Connector Contracts Map".nycsubway.org. Metropolitan Transportation Authority. RetrievedOctober 28, 2016.
  44. ^"Display Document".thejoekorner.com. RetrievedFebruary 17, 2015.
  45. ^"Display Document".thejoekorner.com. RetrievedFebruary 17, 2015.
  46. ^Proceedings. New York (N Y. ) Board of Transportation. 1939.
  47. ^abTransportation, New York (N Y. ) Board of (1945).Proceedings.
  48. ^abcde"CENTRAL PARK TUBE URGED BY BOARD; Delaney Proposes Extension of B.M. T.'s 7th Ave. Line to 145th Street HINGES ON UNIFICATION Project Is Last in List of 20 Given in Capital Budget of $860,080,200 for 6 Years"(PDF).The New York Times. August 10, 1939.ISSN 0362-4331. RetrievedJanuary 16, 2018.[dead link]
  49. ^abcdefghijTransportation, New York (N Y. ) Board of (1943).Proceedings. The Board.
  50. ^Bulletin. General Contractors Association of New York. 1939. pp. 169–170.
  51. ^Roess, Roger P.; Sansone, Gene (2012).The Wheels That Drove New York: A History of the New York City Transit System. Springer Science & Business Media. pp. 416–417.ISBN 978-3-642-30484-2.
  52. ^Electric Railroaders' Association May 2004 bulletin, pp. 5-6.
  53. ^"Urge Bay Ridge Subway Work".The New York Times. May 19, 1940.ISSN 0362-4331. RetrievedAugust 15, 2016.
  54. ^"Wants Subway Extended: Yonkers Mayor to Ask City to Take Over N.Y.C. Branch"(PDF).The New York Times. June 27, 1942. RetrievedAugust 17, 2015.
  55. ^"Post-War Plans List 2 Subway Links for Boro".Brooklyn Daily Eagle. Newspapers.com. August 8, 1943. RetrievedJuly 19, 2015.
  56. ^"Outlay of Billion for Transit Line Proposed for City"(PDF).The New York Times. November 17, 1945. RetrievedJuly 5, 2015.
  57. ^"Borough Subway Relief Still 2 to 3 Years Off".Brooklyn Daily Eagle. Newspapers.com. December 6, 1946. p. 5. RetrievedJanuary 22, 2016.
  58. ^"Borough Subway Relief Still 2 to 3 Years Off".Brooklyn Daily Eagle. Newspapers.com. December 6, 1946. p. 1. RetrievedJanuary 22, 2016.
  59. ^abcdefghijklmnReport for the three and one-half years ending June 30, 1949. New York City Board of Transportation. 1949.hdl:2027/mdp.39015023094926.
  60. ^Transportation, New York (N Y. ) Board of (1948).Proceedings.
  61. ^"$134,500,00 Asked For Queens Transit: Bingham Proposal to Mayor Includes Buying Rockaway Line, Linking it to 2d Ave"(PDF).The New York Times. June 22, 1950. RetrievedJanuary 26, 2016.
  62. ^abcdefgh"Board of Transportation - 1951". Thejoekorner.com. Archived fromthe original on February 24, 2021. RetrievedMarch 25, 2014.
  63. ^Crowell, Paul (September 14, 1951)."$500,000,000 Voted For 2d Ave. Subway By Estimate Board: Program Including Connections to Existing Lines Depends on Public's Exemption of Bonds: Offer to L.I.R.R. Backed: Authorization Comes After Quill Admits That He Cannot Support 'Steal' Charge"(PDF).The New York Times. RetrievedJanuary 25, 2016.
  64. ^abcde"Assurance of Nostrand Avenue Spur Is a Great VIctory for Brooklyn".Brooklyn Daily Eagle. Newspapers.com. January 17, 1954. RetrievedAugust 19, 2015.
  65. ^abcdefghijklm"Improvements That Are Planned for Subways"(PDF).The New York Times. March 24, 1954. RetrievedFebruary 8, 2016.
  66. ^"3 Candidates Vie Again in Queens – Borough President Clancy Faces Tougher Battle"(PDF).The New York Times. November 1, 1961. RetrievedFebruary 8, 2016.
  67. ^Perlmutter, Emanuel (July 18, 1962)."New Subway Line to Bronx Asked for Rush Hours – Authority Seeks 197 Million for Non-Stop Service to 59th Street District".The New York Times.ISSN 0362-4331. RetrievedJanuary 8, 2017 – via New York Times Archive.
  68. ^Perlmutter, Emanuel (July 18, 1962)."New Subway Line to Bronx Asked for Rush Hours – Authority Seeks 197 Million for Non-Stop Service to 59th Street District".The New York Times.ISSN 0362-4331. RetrievedJanuary 8, 2017 – via New York Times Archive.
  69. ^Perlmutter, Emanuel (July 18, 1962)."New Subway Line to Bronx Asked for Rush Hours – Authority Seeks 197 Million for Non-Stop Service to 59th Street District".The New York Times.ISSN 0362-4331. RetrievedJanuary 8, 2017 – via New York Times Archive.
  70. ^abcdef*"Complete Text of TA's Queens Subway Plan".Long Island Star–Journal. April 1, 1963. RetrievedApril 24, 2018.
  71. ^abcdefghijkBetter Rapid Transit for New York City – A Report and Program by the New York City Planning Commission, map insert between pages 18 and 19. May 1, 1963. RetrievedMay 27, 2017.
  72. ^abcdefghiBetter Rapid Transit for New York City – A Report and Program by the New York City Planning Commission. May 1, 1963. RetrievedMay 27, 2017.
  73. ^"1968 NYCTA Expansion Plans (Picture)". Second Avenue Sagas. RetrievedDecember 1, 2013.
  74. ^Program for Action maps from thejoekorner.com
  75. ^abcdefg"Archived copy". Archived fromthe original on December 8, 2013. RetrievedAugust 19, 2015.{{cite web}}: CS1 maint: archived copy as title (link)
  76. ^Kihss, Peter (April 13, 1967)."3 Routes Proposed to Aid Growing Queens Areas"(PDF).The New York Times. RetrievedJune 27, 2015.
  77. ^Johnson, Kirk (December 9, 1988)."Big Changes For Subways Are to Begin".The New York Times. RetrievedJuly 5, 2009.
  78. ^Archer Ave Route (proposed) Construction, Queens: Environmental Impact Statement.Urban Mass Transit Administration,United States Department of Transportation. August 1973.Archived from the original on August 20, 2020. RetrievedAugust 6, 2016.
  79. ^Darlington, Peggy."IND 6th Ave./63rd St. Line".www.nycsubway.org. RetrievedOctober 20, 2011.
  80. ^Caitsith810 (December 17, 2008)."Railfan Window Of An R32 F Train From 57th Street to 36th Street, Queens Part Two (The bellmouth for the intended super-express bypass can be seen toward the right, at the 3:09 mark into the video.)". Youtube.Archived from the original on December 12, 2021. RetrievedSeptember 1, 2013.{{cite web}}: CS1 maint: numeric names: authors list (link)
  81. ^abc"PATH-Lex Connection"(PDF).rrwg.org. April 14, 2004. RetrievedApril 24, 2018.
  82. ^"West Side Transit: Officials Take A Look Ahead".The New York Times. January 18, 1986. RetrievedAugust 17, 2015.
  83. ^"M.T.A. Proposes Rail Line to Link Major Airports".The New York Times. March 18, 1990. RetrievedAugust 17, 2015.
  84. ^Toscano, John (July 16, 2003)."N Train Extension To LaG Scrapped".Queens Gazette. Archived fromthe original on May 25, 2009. RetrievedJuly 26, 2009.
  85. ^"Flashback To 1999 | www.qgazette.com | Queens Gazette". www.qgazette.com. June 27, 2007. Archived fromthe original on March 22, 2016. RetrievedMarch 25, 2014.
  86. ^abcdefgMetrolinkArchived August 2, 2010, at theWayback Machine
  87. ^ab"Work to Begin Under Last Major Contract Needed to Extend the 7".MTA.info. September 14, 2011. Archived fromthe original on August 17, 2012. RetrievedSeptember 16, 2011.
  88. ^"7 Line Extension".MTA.info. RetrievedNovember 10, 2013.
  89. ^Hogarty, Dave (October 20, 2007)."The Shrinking 7 Line Extension".Gothamist. Archived fromthe original on June 6, 2009. RetrievedFebruary 26, 2017.
  90. ^"MTA's 7 Line Extension Project Pushed Back Six Months".NY1. June 5, 2012. Archived fromthe original on July 11, 2012. RetrievedJune 5, 2012.
  91. ^"More Delays and Rising Cost for Project Connecting L.I.R.R. to Grand Central Terminal".The New York Times. January 27, 2014.
  92. ^Kabak, Benjamin (February 27, 2014)."7 line extension opening now projected for November". Second Avenue Sagas. RetrievedMarch 5, 2014.
  93. ^Mueller, Benjamin (June 23, 2014)."Transit Hub and Work on No. 7 Line Face Delays".The New York Times.
  94. ^"New York will have to wait till spring for No. 7 subway extension".NY Daily News. December 15, 2014. RetrievedDecember 15, 2014.
  95. ^Emma G. Fitzsimmons (March 24, 2015)."More Delays for No. 7 Subway Line Extension".The New York Times. RetrievedMarch 29, 2015.
  96. ^Fitzsimmons, Emma G. (September 12, 2015)."Subway Station to Open This Weekend, Bringing 7 Line to Far West Side".The New York Times. RetrievedSeptember 13, 2015.
  97. ^See also§ RPA plans)
  98. ^abcdef*"Fourth Regional Plan: Transportation". Regional Plan Association. RetrievedNovember 30, 2017.
  99. ^MTA Press Release March 20, 2007
  100. ^"Arup to design new Second Avenue Subway, New York".Arup. November 20, 2001. Archived fromthe original on February 5, 2009. RetrievedJune 9, 2013.
  101. ^"Second Avenue Subway – Transport Consulting". Arup. Archived fromthe original on February 2, 2009. RetrievedJune 9, 2013.
  102. ^"Second Avenue Subway – A Status Report"(PDF). RetrievedAugust 2, 2009.
  103. ^Sargent, Greg (March 29, 2004)."The Line That Time Forgot – Second Avenue Subway". Nymag.com. RetrievedAugust 2, 2009.{{cite journal}}:Cite journal requires|journal= (help)
  104. ^Neuman, William (April 13, 2007)."Was There a Ghost? No, Just a Tunnel at the Latest Subway Groundbreaking".The New York Times.ISSN 0362-4331. RetrievedJune 12, 2017.
  105. ^" "Blasting on Second Avenue". thelaunchbox.blogspot.com. March 22, 2010.
  106. ^Siff, Andrew (May 14, 2010)."2nd Ave. Subway Tunnel Dig Begins".WNBC. RetrievedMay 14, 2010.
  107. ^"Tunneling Begins Under Second Avenue".MTA. May 14, 2010. Archived fromthe original on August 17, 2012. RetrievedMay 17, 2010.
  108. ^Various (September 23, 2011)."Second Avenue Subway has a breakthrough moment; several billion more are all the M.T.A. wants". Capital New York. Archived fromthe original on March 31, 2014. RetrievedMarch 31, 2014.
  109. ^Slotnik, Daniel E.; Wolfe, Jonathan; Fitzsimmons, Emma G.; Palmer, Emily; Remnick, Noah (January 1, 2017)."Opening of Second Avenue Subway: Updates".The New York Times.ISSN 0362-4331. RetrievedJanuary 1, 2017.
  110. ^Rivoli, Dan; Sandoval, Edgar; Brown, Stephen Rex (January 1, 2017)."New Yorkers take historic first ride on Second Ave. subway".New York Daily News. RetrievedJanuary 1, 2017.
  111. ^Nessen, Stephen (January 1, 2017)."See Inside: The 2nd Avenue Subway Opens to All".WNYC. RetrievedJanuary 1, 2017.
  112. ^"Drone takes tour of NYC's 2nd Avenue subway line".CBS News. September 16, 2015. RetrievedOctober 27, 2016.
  113. ^"New York City 2nd Ave Subway Phase 2 Profile"(PDF).FTA. December 27, 2016. Archived fromthe original(PDF) on January 5, 2017. RetrievedJanuary 4, 2017.
  114. ^Garber, Nick (April 19, 2022)."125th Street Building Seized By MTA For Second Avenue Subway".Harlem, NY Patch. RetrievedApril 19, 2022.
  115. ^Stallone, Michael (October 31, 2023)."2nd Avenue subway Harlem extension due to open in 2032: What to know". FOX 5 New York. RetrievedNovember 1, 2023.
  116. ^Simko-Bednarski, Evan (October 30, 2023)."Second Ave. subway's Harlem extension due in 2032: documents".New York Daily News. RetrievedNovember 1, 2023.
  117. ^ab"How About a Subway Linking Brooklyn, Queens & The Bronx WITHOUT Manhattan?".Gothamist. August 21, 2013. Archived fromthe original on August 21, 2013. RetrievedAugust 22, 2013.
  118. ^"Third Regional Plan Summary".rpa.org. Archived fromthe original on July 28, 2013. RetrievedFebruary 17, 2015.
  119. ^abcRubinstein, Dana (April 25, 2012)."The surprising return of the three-borough 'X line' subway". Capital New York. RetrievedMarch 25, 2014.
  120. ^"RPA: Growing Outer Boroughs Need New Generation of Transit Investment | Streetsblog New York City". RetrievedFebruary 9, 2016.
  121. ^"R.P.A. calls, again, for outer-borough X line".www.capitalnewyork.com. RetrievedFebruary 8, 2016.
  122. ^"RPA Reiterates Their Triboro Rx Outer Borough Subway Plan in Updated Report".Viewing NYC. April 16, 2015. RetrievedFebruary 9, 2016.
  123. ^"The Brooklyn–Queens Rail Link: A Plan to Connect the Boroughs of Brooklyn and Queens By Using the Bay Ridge Freight Line As A New Light Rail Link". Committee For Better Transit. April 1995. RetrievedMay 29, 2017.
  124. ^"Manhattan-Centric Transit System Falls Short in Other Boroughs".Regional Plan Association. RetrievedFebruary 9, 2016.
  125. ^ab"Overlooked Boroughs Where New York City's Transit Falls Short and How to Fix It Technical Report"(PDF). Regional Plan Association. February 2015. Archived fromthe original(PDF) on March 4, 2016. RetrievedFebruary 8, 2016.
  126. ^"Advocates Push to Revive Three Old Rail Lines in City".www.ny1.com. RetrievedOctober 16, 2019.
  127. ^WABC (January 5, 2022)."Proposed transit line would connect Brooklyn, Queens to 17 subway lines, LIRR".ABC7 New York. RetrievedJanuary 6, 2022.
  128. ^"Interborough Express".
  129. ^Gold, Michael (January 20, 2022)."Transit Line Connecting Brooklyn and Queens Moves Step Closer to Reality".The New York Times.ISSN 0362-4331. RetrievedJanuary 21, 2022.
  130. ^Duggan, Kevin (January 20, 2022)."Hochul unveils more details about Interborough Express in new study".amNewYork. RetrievedJanuary 21, 2022.
  131. ^Interborough Express (IBX)—Feasibility Study and Alternatives Analysis, Interim Report, MTA, January 2022
  132. ^Guse, Clayton (September 23, 2022)."MTA officials see light rail as easiest option for Brooklyn-Queens Interborough Express - final choice months away".New York Daily News. RetrievedJanuary 11, 2023.
  133. ^Martinez, Jose (January 10, 2023)."Hochul Calls MTA 'Lifeblood' of New York, but Transit Plans Lack Meat".The City. RetrievedJanuary 11, 2023.
  134. ^Marybeth Luczak (January 11, 2023)."Light Rail Selected for New York's Interborough Express Project". Railway Age.
  135. ^Jose Martinez (October 8, 2019)."Rockaway Branch Rail Reboot Study Finally Lands".The City. RetrievedJuly 12, 2021.
  136. ^Colangelo, Lisa L. (February 13, 2012)."Lawmakers: southern Queens commuters need a new railway more than the Queensway".Daily News. New York. RetrievedFebruary 14, 2012.
  137. ^Colangelo, Lisa L. (February 13, 2012)."Lawmakers: southern Queens commuters need a new railway more than the Queensway".Daily News. New York. RetrievedFebruary 14, 2012.
  138. ^Rafter, Domenick (March 21, 2013)."Rockaway Beach rail plan to be backed by Reps. Jeffries, Meeks".Queens Chronicle. RetrievedMarch 21, 2013.
  139. ^Kabak, Benjamin (March 31, 2015)."Samuelsen: Reactivate the Rockaway Beach Branch ROW".Second Avenue Sagas. RetrievedFebruary 9, 2016.
  140. ^Kabak, Benjamin (May 7, 2012)."Making the case for the Rockaway Beach Branch".Second Avenue Sagas. RetrievedFebruary 9, 2016.
  141. ^Colangelo, Lisa L. (February 13, 2012)."Lawmakers: southern Queens commuters need a new railway more than the QueensWay Local legislators don't oppose greenway, but want to see abandoned Rockaway Beach line rehabbed for rail service".New York Daily News. RetrievedFebruary 8, 2016.
  142. ^"New York State Assembly | Phillip Goldfeder".assembly.state.ny.us. Archived fromthe original on February 16, 2016. RetrievedFebruary 9, 2016.
  143. ^"A Revamped La Guardia Airport Could Look Like This In 2021".Curbed NY. March 19, 2014. RetrievedFebruary 17, 2015.
  144. ^"The right train to the plane".NY Daily News. February 21, 2017. RetrievedFebruary 22, 2017.
  145. ^Emma G. Fitzsimmons (April 22, 2015)."Mayor de Blasio Revives Plan for a Utica Avenue Subway Line".The New York Times. RetrievedApril 23, 2015.
  146. ^Jennifer Fermino (April 22, 2015)."De Blasio unveils 'One New York' plan combining efforts to fight poverty, improve environment, add transit".New York Daily News. RetrievedApril 23, 2015.
  147. ^"MTA Capital Program 2015-2019 Renew. Enhance. Expand.Amendment No. 2 As Proposed to the MTA Board May 2017"(PDF).mta.info. May 24, 2017. RetrievedMay 24, 2017.
  148. ^"MTA looks into possible new subway line to Marine Park".news12.com. News 12 Brooklyn. August 8, 2016. Archived fromthe original on August 12, 2016. RetrievedAugust 9, 2016.
  149. ^"Is Mayor Bill de Blasio's Utica Avenue Brooklyn subway extension dead?".Metro US. December 27, 2017. RetrievedJanuary 4, 2018.
  150. ^Burger, Elena (February 21, 2017)."Little Progress on Utica Avenue Subway Expansion".Gotham Gazette. RetrievedJanuary 4, 2018.
  151. ^Jacobson, Savannah (March 25, 2019)."City Transportation Commissioner on Managing the Streets, Expanding the Subway, & More".Gotham Gazette. RetrievedApril 7, 2019.
  152. ^Rivoli, Dan (April 5, 2019)."MTA to Study if a Utica Avenue Subway Extension is Worth Pursuing".ny1.com. RetrievedApril 7, 2019.
  153. ^"Utica Avenue transit study to inform MTA leading into Brooklyn Bus Redesign".amNewYork. February 13, 2020. RetrievedFebruary 14, 2020.
  154. ^"MTA 20-Year Needs Assessment".future.mta.info. RetrievedAugust 13, 2025.
  155. ^*Siff, Andrew; Price, R. Darren (November 30, 2017)."No 24/7 Subways? Move MSG? Radical Transit Proposal Released".NBC New York. RetrievedDecember 1, 2017.
  156. ^Barone, Vincent (January 2, 2018)."Subway extension to Red Hook proposed by Cuomo".am New York. RetrievedJanuary 3, 2018.
  157. ^Warerkar, Tanay (January 2, 2018)."Cuomo proposes subway extension from Lower Manhattan to Red Hook".Curbed NY. RetrievedJanuary 3, 2018.
  158. ^abc"MTA's 2025-2044 20-Year Needs Assessment".MTA. RetrievedJuly 27, 2022.
  159. ^"The Port Authority's Missed Connection: The PATH-Lex Line That Never Was".New York YIMBY. September 12, 2014. RetrievedApril 24, 2018.
  160. ^Port Authority of New York and New Jersey (2007).Permanent WTC PATH Terminal: Environmental Impact Statement.United States Department of Transportation;Federal Transit Administration. pp. S.8 to S.9.

External links

[edit]
Template:Attached KML/Proposed New York City Subway expansion (1929–40)
KML is from Wikidata
Current
services
  • "1" train
  • "2" train
  • "3" train
  • "4" train
  • "5" train
  • "6" train
  • "7" train
  • "A" train
  • "B" train
  • "C" train
  • "D" train
  • "E" train
  • "F" train
  • "G" train
  • "J" train
  • "L" train
  • "M" train
  • "N" train
  • "Q" train
  • "R" train
  • "W" train
  • "Z" train
shuttle trainShuttles
Planned
"T" train
Defunct
services
1985–present
  • "9" train
  • "H" train
  • "K" train
  • "V" train
  • JFK Express
Pre-1985
Shuttles
BMT numbers
Unused labels
Stations (List)
By borough
By type
Divisions
Other lists
History
Early history
Expansions
Notable crashes
Strikes
Service
disruptions
Other major
incidents
Infrastructure
Arts and
culture
Miscellaneous
Other rapid
transit in NYC
Historical
Public transit
Private transit
Major
construction
projects
Currently operating
Canceled
Proposed/Future
Traffic proposals
Operators
Public
Current
Defunct
Private
Organizations
Other