A map showing the major rivers that flow into the Bay of Bengal, including Padma.
ThePadma (Bengali:পদ্মা,romanized: PadmāPôdma) is a major river inBangladesh. It is the eastern and maindistributary of theGanges, flowing generally southeast for 356 kilometres (221 mi) to its confluence with theMeghna River near theBay of Bengal.[1] The city ofRajshahi is situated on the banks of the river.[2] Since 1966, over 66,000 hectares of land has been lost to erosion of the Padma.[3]
Eighteenth-century geographerJames Rennell referred to a former course of the Ganges north of its present channel, as follows:
Appearances favour very strongly the opinion, that the Ganges had its former bed in the tract now occupied by the lakes and morasses between Nattore and Jaffiergunge, striking out of the present course at Bauleah ... to a junction with the Burrampooter or Megna near Fringybazar; where the accumulation of two such mighty streams probably scooped out the present amazing bed of the Megna.[5]
Speedboat at Padma RiverHardinge Bridge in BangladeshSunset from Padma RiverA view of Padma river in summer nearRajshahi
Murshidabad District is situated on the western bank of the Padma. It flows dividing the Rajshahi andMurshidabad District ofWest Bengal and created a natural river border between India and Bangladesh.[6][7]Jalangi area of the district was seriously affected byriver bank erosion of the Padma.[8]
Sunset from the river Padma during monsoon, Rajpara, Rajshahi
After the construction of theFarakka Barrage on the Ganges River inWest Bengal, the maximum flows in the Padma River were reduced significantly. The flow reduction caused many problems in Bangladesh, including the loss of fish species, the drying of Padma's distributaries, increased saltwater intrusion from the Bay of Bengal, and damage to the mangrove forests of theSundarbans.[9]
ThePadma Bridge is Bangladesh's largest bridge and costed an estimated US$3 billion to complete. It was inaugurated on 25 June 2022.[10] It was supposed to be open to the public in 2013 but the project's future became uncertain when in June 2012 theWorld Bank cancelled its $1.2 billion loan over allegations of corruption.[11] In June 2014, the government of Bangladesh, proceeding without the loan and hired a Chinese firm to construct the 6.15-kilometre (3.82 mi) main part of the bridge. In October 2014, it hired a South Korean firm to supervise construction, with the aim of finishing the project by 2018.[12] The final (41st) span of the bridge was installed on 10 December 2020.[13][14] The last road slab was installed on the span that linked pillars 12 and 13 of the Padma bridge on 24 August 2021.[15][16]
Effect of climate change of Padma river in 2024
In 2009, government plans also included rail lines on both sides of the Padma with a connection via the new bridge.[17][needs update]
^abAllison, Mead A. (Summer 1998). "Geologic Framework and Environmental Status of the Ganges-Brahmaputra Delta".Journal of Coastal Research.13 (3). Coastal Education & Research Foundation, Inc.:826–836.JSTOR4298836.
^Hossain ML, Mahmud J, Islam J, Khokon ZH and Islam S (eds.) (2005) Padma, Tatthyakosh Vol. 1 and 2, Dhaka, Bangladesh, p. 182(in Bengali).