PATCO Speedline

Route map:
From Wikipedia, the free encyclopedia
Rapid transit system in New Jersey and Pennsylvania

PATCO Speedline
PATCO Speedline train at theLindenwold station in 2017
Overview
OwnerDelaware River Port Authority
LocalePhiladelphia, Pennsylvania, andCamden County, New Jersey
Termini
Stations14
Websitehttps://www.ridepatco.org/
Service
TypeRapid transit
Operator(s)Port Authority Transit Corporation
Rolling stock120electric multiple units
Daily ridership19,400 (weekdays, Q2 2025)[1]
Ridership5,640,600 (2024)[2]
History
OpenedJanuary 4, 1969; 56 years ago (1969-01-04)
Technical
Line length14.2 mi (22.9 km)
CharacterUnderground, surface, and elevated (grade separated)
Track gauge4 ft 8+12 in (1,435 mm)standard gauge
ElectrificationThird rail750 V DC
Operating speed30 mph (48 km/h) (avg.)
65 mph (105 km/h) (top)
Route map

ThePATCO Speedline, signed as theLindenwold Line in Philadelphia and commonly referred to as thePATCO High Speed Line,[5][6][7] is arapid transit route operated by thePort Authority Transit Corporation (PATCO), connectingPhiladelphia, Pennsylvania, withLindenwold inCamden County, New Jersey.

The line runs underground in Philadelphia, crosses theDelaware River on theBenjamin Franklin Bridge, continues underground through Downtown Camden, and then operates predominantly at grade or on elevated track between Camden and Lindenwold. Both PATCO and the Speedline are owned and operated by theDelaware River Port Authority. Service began on January 4, 1969, between Lindenwold and Camden, with full service to Philadelphia commencing on February 15, 1969. The Speedline integrates the historicBridge Line, originally opened in 1936 between Philadelphia and Broadway Station in Camden, with newly constructed infrastructure along a former commuter rail corridor between Camden and Lindenwold.

While the PATCO Speedline is one of the few U.S. mass transit systems to operate 24 hours a day,[a] it will be temporarily suspending weekday overnight service on September 1st, 2025.[8] In 2024, the line recorded 5,640,600 total rides, or about 19,400 per weekday in the second quarter of 2025.

History

[edit]

Crossing the Delaware

[edit]
Main article:Benjamin Franklin Bridge

The present-day PATCO Speedline follows the path of several 19th-century railroads that once terminated at a station in Camden on the bank of theDelaware River, where passengers would transfer to a ferry to reach Philadelphia. In 1919, the states of Pennsylvania and New Jersey formed the Delaware River Bridge Commission to build a fixed crossing between the two cities.[9]

The result was the Delaware River Bridge—later renamed theBenjamin Franklin Bridge—which opened on July 1, 1926. The bridge was designed with two outboard structures beside the main roadway to carry rapid transit tracks, along with six vehicle lanes and two streetcar tracks on the main deck, although no streetcars ever ran across the bridge and the space was eventually converted to additional vehicle lanes.[10][11][12]

Bridge Line

[edit]
An original Bridge Line car preserved at theSeashore Trolley Museum inKennebunkport, Maine
Main article:Bridge Line (Delaware River)

To make use of the bridge's rail capacity, the South Jersey Transit Commission, established in 1929, proposed a rapid transit line that would run along the outboard structures.[13] Instead of transferring to a ferry, passengers arriving in Camden could transfer atBroadway station to this new rail line and ride directly to8th–Market station in Philadelphia, where they could continue on theMarket–Frankford Line or theBroad–Ridge Line.[13] The platform at 8th–Market would be shared with the Broad–Ridge Line and had actually been constructed in 1917 as part of an unrealized Center City subway loop.[14] The commission also recommended consolidating regional rail operations, which led to the formation of thePennsylvania–Reading Seashore Lines, serving Broadway station.[13] However, the Pennsylvania Railroad did not discontinue its ferry service until March 31, 1952.[15]

In 1931, the Delaware River Bridge Commission was reorganized as the Delaware River Joint Commission (DRJC), which was given the authority to build a high-speed transit line. Construction on the new line began in 1932, and theBridge Line officially opened on June 7, 1936, with four stations: 8th–Market andFranklin Square in Philadelphia, andCity Hall and Broadway in Camden. The DRJC owned the line and contracted with the Philadelphia Rapid Transit Company to operate it. Following the operator's bankruptcy, the reorganizedPhiladelphia Transportation Company (PTC) assumed control in 1940.[16] In June 1949, to lower operating costs, PTC began through-routing Bridge Line trains with the Broad–Ridge Line, reversing direction at 8th–Market and offering one-seat service between Camden andBroad–Girard station in North Philadelphia.[17]

Locust Street Subway

[edit]

As part of the earlier subway loop plans, the City of Philadelphia had begun tunneling from 8th Street to Locust Street, then west along Locust to 16th Street. Construction began in 1917 but was halted byWorld War I, resumed briefly in 1931, and was again suspended due to theGreat Depression.[18] Work finally resumed in 1950,[18] and on February 14, 1953, the Bridge Line was extended to15–16th & Locust station, with intermediate stops at12–13th & Locust and9–10th & Locust.[19][20] The Broad–Ridge Line would also use the same tracks. This extension, still owned by the City of Philadelphia,[21] marked the last major addition to the Bridge Line before its transformation.

Despite the extension, the Bridge Line suffered from low ridership due to high fares and its failure to extend into the South Jersey suburbs.[22] By January 1954, off-peak and Saturday service was cut back to operate only between Girard and Camden, with a shuttle train running between 8th and 16th stations. Sunday service west of 8th Street was suspended entirely due to minimal demand.[23] By 1962, only 1,900 passengers used the western segment of the line daily.[24]

Conversion to the PATCO Speedline

[edit]
A train at theLindenwold station inLindenwold, New Jersey, on the first day of service in January 1969

From the time the Bridge Line opened, local advocacy groups called for a more comprehensive transit system linking Camden to South Jersey suburbs. In 1951, the states of Pennsylvania and New Jersey established theDelaware River Port Authority (DRPA) to succeed the DRJC and expand its mandate to regional transportation planning. To operate the transportation service, the DRPA established the Port Authority Transit Corporation (PATCO).[25][26]

To chart a path forward, the DRPA commissionedParsons, Brinckerhoff, Hall & MacDonald to study possible high-speed transit corridors. Their plan recommended constructing three new lines in South Jersey: Route A toMoorestown, Route B toLindenwold/Kirkwood, and Route C toWoodbury Heights that would feed into a new tunnel under the Delaware River at an estimated cost of $242 million (equivalent to $2.5 billion in 2024).

A later study by Louis T. Klauder & Associates proposed a more cost-effective alternative: reusing the existing Bridge Line to reach Philadelphia and extending service east along the former Pennsylvania–Reading Seashore Lines corridor to Lindenwold (Route B) as it had the highest projected ridership. This reduced the projected cost to $94 million (equivalent to $1 billion in 2024), ultimately shaping the system that was built.[25]

Over the weekend of August 23–27, 1968, the Broad–Ridge Line was realigned to a new upper-level terminal platform, becoming the Broad–Ridge Spur, which allowed conversion of the lower-level platforms into a high-speed service. During the conversion period, service was split between 16th–8th Street and 8th Street–Camden, with a cross-platform transfer at 8th.[27] Bridge Line service was suspended on December 29, 1968, for final conversion of the line.[28][29] Service from Lindenwold to Camden began on January 4, 1969. Full service into Center City Philadelphia over the Benjamin Franklin Bridge commenced on February 15, 1969, officially inaugurating the PATCO Speedline.[30][31][32] The final cost of the project was $92 million.[29]

An infillpark and ride station,Woodcrest, was added on February 1, 1980, coinciding with the introduction of the PATCO II railcars.[33] Subsequently, Ferry Avenue Local trains were replaced with Woodcrest Local trains on September 20, 1980.[34]

In 2005, PATCO officials initiated plans for a new route along the corridor originally proposed for Route C, intended to serveGloucester County and terminate inGlassboro on the campus ofRowan University.[35] On May 12, 2009, New Jersey GovernorJon Corzine formally endorsed the development of adiesel light rail system along an existing Conrail right-of-way. This alignment was selected for its lower capital and operating costs. The proposedGlassboro–Camden Line would require passengers to transfer to the Speedline at theWalter Rand Transportation Center (Broadway station) for service to Philadelphia.[36]

The renovatedFranklin Square station shortly after reopening in 2025, after being closed since 1979

Franklin Square station, originally constructed in 1936 and closed since 1979, was proposed for reopening in the early 2000s.[37] The $29.3 million renovation, got underway in 2022 and updated the station to modern standards and accessibility with a surface structure built atFranklin Square.[38][39] The station reopened on April 3, 2025.[40][41]

In 2021, the City of Philadelphia proposed a westward expansion of the PATCO system to the rapidly growingUniversity City district. The plan includes a new rail tunnel beneath theSchuylkill River, with the40th Street Trolley Portal station identified as a potential western terminus near theUniversity of Pennsylvania and several major hospitals. A proposed connection atPenn Medicine Station would facilitate direct transfers to theSEPTA Regional Rail network. The next phase of the project includes a comprehensive feasibility study and cost analysis.[42]

Due to theCOVID-19 pandemic, PATCO implemented limited service beginning March 28, 2020, temporarily bypassing the12–13th & Locust,City Hall,Westmont, andAshland stations.[43][44] All four stations reopened on September 14, 2020.[45] In March 2025, PATCO announced a six-month suspension of overnight service to allow for enhanced cleaning of stations.[46]

Rolling stock

[edit]
An original PATCO I car at Lindenwold station in 1969

PATCO originally operated a fleet of 121 railcars, each 67 feet (20.42 m) in length, acquired in two orders designated PATCO I and PATCO II.

The PATCO I cars were designed and manufactured by the Budd Company of Philadelphia in 1968. Cars 101–125 were single units, while 201–250 were delivered as permanently coupledmarried pairs sharing motors motor andautomatic train operation (ATO) control systems.[47] Early cars used WABCO Model N-2 MU couplers, later replaced with Tomlinson couplers due to reliability issues. The unreliable electrical systems on PATCO I cars was later upgraded to match the PATCO II cars.[47] Both fleets used camshaft resistancemotor controllers and Budd Pioneer III trucks, producing a lightweight but less stable ride. The design informed later railcars, including theLong Island Rail Road'sM1 and M3 railcars.[47] Single-unit cars included an single-leaf door behind each cab, intended for onboard fare collection during late-night service before the fare system was finalized.[47]

Delivered in 1980 alongside the opening of theWoodcrest station, the PATCO II cars (numbered 251–296) were manufactured byVickers Canada under license from Budd. They closely resembled the earlier PATCO I units, with minor differences such as a fixed partition behind the operator's cab and the absence of a stainless steel shroud below the doors, allowing easier maintenance access.[35]

The interior of an original 1968 PATCO car

From 1969 until 2018, PATCO cars retained their original cream-and-avocado green interior, with vinyl seats featuring cloth inserts in a 2+2 layout—half forward-facing, half backward-facing. Vestibule areas were located at each door, with grab handles along seatbacks for standees.[47]

The interior of a rebuilt PATCO car

In 2009, PATCO launched a $194.2 million fleet-wide refurbishment program, awarding the contract toAlstom.[48][49] Starting in 2011, cars were transported to Alstom's facility inHornell, New York facility for rebuilding.[50] Updates included modernized interiors with bright white walls, all-vinyl dark gray and navy blue seating, improved fluorescent lighting, updated HVAC systems, wheelchair-accessible areas with folding seats, digital signage, and automated announcements recorded byBernie Wagenblast. Full-width operator cabs were introduced for enhanced safety, eliminating four passenger seats per car.

Mechanical upgrades included new solid-state propulsion and train control systems, replacing the original camshaft resistance controllers and relay-based ATO. General Electric traction motors and Budd Pioneer III trucks were retained but rebuilt. Additional spare motors were sourced from retired Metro-North M-1A cars.

The first rebuilt cars were delivered in late 2013 and entered service on May 28, 2015.[50] Rebuilt units were renumbered in the 1000 series, with former single units converted into married pairs. The program, intended to extend car life by 20 years, proceeded at a rate of 4–6 cars per month.

The final unrefurbished train made its last run on June 10, 2018, during a public farewell event.[51] By March 2019, 120 of the original 121 cars had been rebuilt. Car 116, damaged beyond repair in a 1997 arson incident, was excluded and used for parts.

Operation

[edit]
The15–16th & Locust station inCenter City Philadelphia (above), including below ground (left) and the station street exit (right)

PATCO was one of the first transit systems to implementautomatic train operation (ATO) in regular service. The system uses an analog architecture based onpulse code cab signaling supplied byUnion Switch & Signal. Cab signals transmit one of five speed commands—20 mph (32 km/h), 30 mph (48 km/h), 40 mph (64 km/h), 65 mph (105 km/h) or full stop—which the onboard ATO system responds to by applying maximum acceleration or braking to maintain the target speed. Track-mounted transponders manage automatic station stops, although operators can override these on express trains.[47]

The ATO system struggles in low-adhesion conditions, such as rain or snow, requiring operators to switch to manual control during inclement weather. Operators are also required to operate at least one trip manually per day for proficiency and may opt to run in manual mode at any time. In practice, most prefer automatic operation due to its lower workload and faster run times.[47]

PATCO was designed forone-person operation by utilizingisland platforms and having operators sit on the left side of the cab, enabling them to open a window to monitor boarding. At the stations where passengers may board on the side opposite of the operators, mirrors are installed to provide visibility. Operators remain responsible for opening and closing doors, sounding the horn, starting trains from station stops, and taking manual control when needed.[47]

Trains operate at a maximum speed of 65 mph (105 km/h) on surface segments, 40 mph (64 km/h) over the Benjamin Franklin Bridge, and 30 mph (48 km/h) in subway sections. The original maximum speed was 75 mph (121 km/h), but this was reduced to 65 mph (105 km/h) in the 1970s due to excessive wear on the traction motors.[47]

Train lengths

[edit]
A PATCO train eastbound at 8th and Market station

PATCO typically operates trains in 2-, 4-, or 6-car configurations. Prior to the Alstom fleet rebuild, single-unit trains were occasionally used during late-night hours, while 3- or 5-car trains appeared infrequently, generally due to equipment shortages.[47] Although all stations can accommodate 7- or 8-car trains, these lengths have only been used during testing or for special events such as the annual "Santa Train."

Historically, PATCO adjusted train lengths dynamically in response to ridership, rather than using fixed trainsets. Single-car trains were sometimes operated overnight until the rebuild eliminated single-unit cars.[47] In recent years, service patterns have shifted due to capital improvement projects and reduced mid-day and weekend frequency. As a result, 4- and 6-car trains have become more common during off-peak periods. The COVID-19 pandemic further contributed to this trend, as longer trains were used to support social distancing.

Overnight service

[edit]

Since December 2019, late-night service operates with 4-car trains (with doors remaining closed on the front and back cars where the operator is seated) on a 60-minute headway, replacing the previous 45-minute interval. A PATCO police officer is typically present on all trains between 12:00 a.m. and 4:00 a.m. on weekdays, and from 2:00 a.m. to 5:00 a.m. on weekends.[52] Due to low ridership, City Hall station in Camden and 9–10th & Locust and Franklin Square stations in Philadelphia are closed during overnight hours.[53]

Signaling

[edit]

PATCO trains are governed by aPulse code cab signaling system which transmits signal codes to the trains via the running rails. Wayside signals are located only atinterlockings.[47] Even when the Automatic Train Operation System is not in use, the cab signal speed control function is still enabled and if an operator goes above the permitted speed, the power is cut and the brakes are applied until the speed is back within the limit.[47] The entire PATCO system is run from Center Tower, centrally located above a substation near theBroadway station in Camden.[47] DPRA is constructing a modern control room in Lindenwold Shop and Yard Complex to replace the Center Tower, which will become a backup, at an estimated cost of $19.4 million.[54]

Power

[edit]

All PATCO trains are electrically powered. Power comes from a top contact coveredthird rail at 750 VDC. There are two feeds from the commercial power grid, one located in Philadelphia fromPECO Energy for the old Bridge Line tunnel segments and the other in New Jersey fromPSE&G for the new mainline segments. In New Jersey power is distributed via wayside AC transmission lines in the 26.4 kV range and a series of 7 substations, located approximately every 2 miles (3.2 km).[47]

Fare collection

[edit]

PATCO was one of the first transit systems to employ automated fare collection and tickets with magnetically stored data. It uses two types of farecards: reusablecontactless smart cards for frequent riders, known as aFreedom Card, andmagnetic stripe paper cards, valid for three days. PATCO has five different fare zones, and one must retain one's ticket (or card) to exit the station in the proper zone. There is no discount for using the stored value Freedom Card or multi-ride paper tickets. There are also no unlimited ride pass options, however, a reduced fare Freedom Card is available for senior citizens and disabled riders.

Magnetic back tickets (1969–2006)

[edit]

At the start of service in 1969, PATCO used a system of plastic tickets with an oxide layer on the entire back side for the magnetic encoding of data. Tickets were pre-encoded with a number of rides and a destination zone and sold from ticket vending machines in each station. These machines only accepted coins sobill changers were placed in stations to support paper currency. Each ticketvending machine could sell two types of tickets, which the rider chose by pushing a button after inserting the correct fare. Because the system has multiple fare zones, several machines were needed in each station. Stations in New Jersey had machines selling one-way or round-trip tickets to Philadelphia and machines selling tickets to other stations in New Jersey. Ticket machines in Philadelphia would sell single ride tickets to each of the four New Jersey fare zones, with the Camden zone tickets also used for intra-Philadelphia travel. Used tickets with no remaining rides were retained by the faregates, re-encoded at a PATCO facility, and returned for use in the vending machine. Ten-trip tickets could also be purchased through mail order or from ticket windows at select suburban stations.[47]

At its inception, this system was state-of-the-art, but became increasingly problematic as it aged. Tickets were vulnerable to damage from magnetic sources, and the equipment needed to read and code the farecards began to suffer from reliability problems, with little replacement part availability. More importantly, the fare system could not acceptpayment cards and the reliance on change machines created an extra step for those needing to pay with paper currency.

Smart cards (2006–present)

[edit]
Main article:Freedom Card

In July 2006, PATCO announced that it would start the transition from a magnetic ticket fare system to acontactless smart card system designed, built and integrated byCubic Corporation, the firm responsible for the 1969 magnetic card system.[55] Magnetic tickets are still sold, however, they are now in the form of disposable paper magnetic stripe cards that expire after 3 days. The new computer vending machines support payment cards. Additional ticket vending machines were installed at each station inside of fare control so that if a rider has purchased the wrong fare, they may pay the remaining fare to exit.

Connections to other transit systems

[edit]

NJ Transit connections

[edit]
Further information:NJ Transit

NJ Transit buses connect to most PATCO stations in New Jersey. The New Jersey TransitAtlantic City Line also stops at Lindenwold Station, and theRiver Line connects at Broadway Station (Walter Rand Transportation Center).

SEPTA connections

[edit]
Further information:SEPTA

TheSEPTAMetroL connects to PATCO at the8th & Market Station, which is two blocks away from SEPTA'sJefferson Station, where allbut one of SEPTA'sRegional Rail trains stop.

The SEPTA MetroB connects to PATCO at theWalnut–Locust station via a short underground walkway to PATCO's 12th–13th & Locust, and 15–16th & Locust stations. TheB3 spur connects to PATCO at the 8th & Market Station via a pedestrian walkway.

Formerly, a special "SEPTA Transfer" ticket could be purchased from the unpaid side of any New Jersey station. These tickets were sold for $3.50 ($1.75 per ride, a savings compared to a single $2.25 cash fare or a token for $2.00) and dispensed two paper receipts, one good for a ride within one hour of the time of purchase and another good for a ride within 24 hours of the time of purchase. Originally, both transfers were going to be valid for 24 hours, however, PATCO changed the time limit to prevent the unauthorized sale of PATCO transfers at Pennsylvania stations.

With the release ofSEPTA Key, a new type of Freedom card is now required to purchase a transfer to the SEPTA system. With this system, the cost of a transfer is $2, and it is debited directly from an account-based Freedom Card account, provided a new Freedom Share card is used, which is compatible with both PATCO Freedom and SEPTA Key card systems.

Stations

[edit]
StateLocationStationConnectionsNotes
PACenter City,
Philadelphia
15–16th & LocustDisabled accessAccess to Downtown Link concourse
12–13th & Locust
9–10th & Locust Disabled accessSEPTA City Transit Division surface routesSEPTA City Bus:12,47MStation closed between approximately 12:05am–4:15am[56]
8th & Market Disabled access
Franklin SquareStation closed between approximately 12:15am-4:20am[57]
Reopened in 2025[58]
NJCamdenCity HallNJ Transit Bus OperationsNJ Transit Bus:452,453Station closed between approximately 12am–5am[59][60]
Broadway Disabled access Car parkingAll connections viaWalter Rand Transportation Center
Ferry Avenue Disabled access Car parkingNJ Transit Bus OperationsNJ Transit Bus:453
CollingswoodCollingswood Disabled access Car parkingNJ Transit Bus OperationsNJ Transit Bus:451
Haddon Twp.Westmont Disabled access Car parkingNJ Transit Bus OperationsNJ Transit Bus:450,451
HaddonfieldHaddonfield Disabled access Car parkingNJ Transit Bus OperationsNJ Transit Bus:451,455,457
Cherry HillWoodcrest Disabled access Car parking
VoorheesAshland Disabled access Car parking
LindenwoldLindenwold Disabled access Car parking

See also

[edit]

Notes

[edit]
  1. ^The others are theNew York City Subway,Staten Island Railway, theRed andBlue Lines of theChicago "L", and thePATH system.

References

[edit]
  1. ^"Transit Ridership Report Second Quarter 2025"(PDF).American Public Transportation Association. August 27, 2025. RetrievedAugust 29, 2025.
  2. ^"Transit Ridership Report Fourth Quarter 2024"(PDF).American Public Transportation Association. February 19, 2025. RetrievedFebruary 25, 2025.
  3. ^PATCO Pennsylvania map
  4. ^PATCO New Jersey map
  5. ^Graham, Troy (January 7, 2011)."Man attacked, robbed in Mellon Center concourse".The Philadelphia Inquirer. Archived fromthe original on July 26, 2011. RetrievedJanuary 27, 2011. The concourse connects to the Market-Frankford Line, the Ridge Avenue spur line, and thePATCO High Speed Line.
  6. ^Stillwell, Eileen (January 20, 2011)."Google Transit features PATCO schedule".Courier-Post. RetrievedJanuary 27, 2011. "If you're not a regular user of thePATCO Hi-Speedline"
  7. ^Barna, John (January 6, 2011)."DRPA to look at sale of PATCO".Gloucester County Times. Archived fromthe original on April 14, 2016. RetrievedJanuary 27, 2011. "Exploring the sale or privatization of thePATCO High Speed Line"
  8. ^"PATCO | News".www.ridepatco.org. RetrievedJuly 23, 2025.
  9. ^"DRPA :: Delaware River Port Authority".drpa.org. Archived fromthe original on March 26, 2009. RetrievedJune 7, 2009.
  10. ^DeNardo, Mike (September 15, 2014)."Thousands Cross Ben Franklin Bridge Daily, But How Many Know Its Secret?".CBS Philadelphia. RetrievedOctober 18, 2022.
  11. ^Stuart, Sarah Clark (August 9, 2018)."Touring the inside of the Ben Franklin Bridge Anchorage".Bicycle Coalition of Greater Philadelphia. RetrievedOctober 18, 2022.
  12. ^Caroulis, John (March 15, 2019)."The art museum that's also a bridge".PhillyVoice. RetrievedOctober 18, 2022.
  13. ^abcKramer, Frederick A. (2011).Pennsylvania-Reading Seashore Lines: An Illustrated History of Southern New Jersey's Jointly-Owned Railroad. Palmyra, New Jersey: West Jersey Chapter, National Railway Historical Society. pp. 38–54.
  14. ^"First Cash Riders Aboard As Locust Subway Opens".The Philadelphia Inquirer. February 16, 1953. p. 21 – via Newspapers.com.
  15. ^Kramer, Frederick A. (2011).Pennsylvania-Reading Seashore Lines: An Illustrated History of Southern New Jersey's Jointly-Owned Railroad. Palmyra, New Jersey: West Jersey Chapter, National Railway Historical Society. p. 88.
  16. ^Tinkcom, Margaret B. (1982). "Depression and War, 1929–1946". InWeigley, Russell F.; Wainwright, Nicholas B.;Wolf, Edwin II (eds.).Philadelphia: A 300 Year History. New York: W. W. Norton. p. 625.ISBN 978-0-393-01610-9.
  17. ^"PTC to Link Camden and Girard Ave".The Philadelphia Inquirer. June 23, 1949. p. 23. RetrievedMay 15, 2025.
  18. ^ab"Subway Bids Due for Work On Locust St".The Philadelphia Inquirer. April 10, 1950. p. 21 – via Newspapers.com.
  19. ^"Mere 150 Miles of Cable Stalls Locust Subway Start".The Philadelphia Inquirer. January 5, 1953. p. 19 – via Newspapers.com.
  20. ^Philadelphia Transportation Company (February 13, 1953)."Beginning Sunday, February 15: New Highspeed Rail Service to and through Central Philadelphia via Bridge Line and Locust St. Subway (advertisement)".Courier-Post. p. 19 – via Newspapers.com.
  21. ^DRPA."DRPA-04-125"(PDF). DRPA.org. Archived fromthe original(PDF) on January 14, 2005.
  22. ^"Locust St. Subway Opening Emphasizes the Need for South Jersey Speed Lines".Courier-Post. March 13, 1953. p. 12 – via Newspapers.com.
  23. ^"Lack of Riders to Cut Service On Locust Street Subway: Full Shutdown On Sundays Listed by PTC".The Philadelphia Inquirer. January 6, 1954. p. 19 – via Newspapers.com.
  24. ^"Locust St. Stations Are Spick-And-Span And Nearly Empty".The Philadelphia Inquirer. April 4, 1962. pp. 1,10 – via Newspapers.com.
  25. ^abPATCO."PATCO: A History of Commitment".
  26. ^Vigrass, J. William (1990).The Lindenwold Hi-Speed Line: The First Twenty Years of the Port Authority Transit Corporation. Palmyra, New Jersey: West Jersey Chapter, National Railway Historical Society.OCLC 22980222.
  27. ^"Ridge Ave. Subway Halted for Weekend; Buses to Substitute".The Philadelphia Inquirer. August 21, 1968. p. 41 – via Newspaper.com.
  28. ^Baer, Christopher T. (April 2015)."A GENERAL CHRONOLOGY OF THE SUCCESSORS OF THE PENNSYLVANIA RAILROAD COMPANY AND THEIR HISTORICAL CONTEXT: 1968"(PDF). Pennsylvania Railroad Technical and Historical Society.
  29. ^abDeGraw, Ronald (January 26, 1969)."Full High-Speed Line Cannot Open Because Of Signal Troubles".The Philadelphia Inquirer. p. 26 – via Newspapers.com.
  30. ^"Service Begins Today on Lindenwold Line".The Philadelphia Inquirer. January 4, 1969. p. 10 – via Newspapers.com.
  31. ^Baer, Christopher T. (April 2015)."A GENERAL CHRONOLOGY OF THE SUCCESSORS OF THE PENNSYLVANIA RAILROAD COMPANY AND THEIR HISTORICAL CONTEXT: 1969"(PDF). Pennsylvania Railroad Technical and Historical Society.
  32. ^DeGraw, Ronald (February 14, 1969)."High-Speed Transit Opens Saturday From Lindenwold to Phila".The Philadelphia Inquirer. p. 1 – via Newspapers.com.
  33. ^Hoh, David (February 1, 1980)."PATCO station opens – late".Courier-Post. p. C1 – via Newspapers.com.
  34. ^Curran, Karen (August 27, 1980)."Authority increases High-Speed Line service".Courier-Post – via Newspapers.com.
  35. ^ab"DRPA.org". Archived fromthe original on December 1, 2005.
  36. ^"白菜网站专业推荐".blenderu.com.
  37. ^"Franklin Square Ghost Station". WHYY. October 15, 2024. RetrievedOctober 20, 2024.
  38. ^Murphy, Darryl (December 22, 2020)."PATCO still on track to reopen Franklin Square Station despite pandemic hit". WHYY. RetrievedFebruary 23, 2021.
  39. ^Moselle, Aaron (July 1, 2022)."Closed for over 40 years, Franklin Square PATCO station ramps up construction". WHYY. RetrievedMarch 13, 2023.
  40. ^Pileggi, JoAnn (April 3, 2025)."PATCO's modernized Franklin Square Station reopens". FOX 29 Philadelphia. RetrievedApril 7, 2025.
  41. ^"Philadelphia leaders open new PATCO Franklin Square station". CBS News. April 3, 2025. RetrievedApril 7, 2025.
  42. ^"The Philadelphia Transit Plan: A Vision for 2045"(PDF). City of Philadelphia Office of Transportation, Infrastructure and Sustainability. February 2021. pp. 138, 143. RetrievedFebruary 23, 2021.
  43. ^"SEPTA Transit Network Lifeline Service Schedule"(PDF).SEPTA. April 2020. Archived fromthe original(PDF) on April 16, 2020. RetrievedApril 14, 2020.
  44. ^"PATCO Announces Temporary Station Closures and Additional Schedule Modifications" (Press release). PATCO. March 26, 2020.
  45. ^"PATCO Reopens Four Stations, Increases Service" (Press release). PATCO. September 8, 2020.
  46. ^Fitzgerald, Thomas (March 19, 2025)."PATCO will stop running overnight trains to clean its stations".Philadelphia Inquirer. RetrievedApril 7, 2025.
  47. ^abcdefghijklmnopVigrass, J. William (1990).The Lindenwold Hi-Speed Line: The First Twenty Years of the Port Authority Transit Corporation. West Jersey Chapter, National Railway Historical Society.ASIN B0006EV7AW.
  48. ^"SJ Magazine Articles your South Jersey source". RetrievedApril 9, 2023.[permanent dead link]
  49. ^"Bombardier objects to Alstom-PATCO contract".Trains Magazine. November 23, 2010. RetrievedNovember 23, 2010.
  50. ^abComegno, Carol (May 28, 2015)."New PATCO cars make first runs".Courier-Post. RetrievedMay 29, 2015.
  51. ^"Throwback: The last four PATCO 'legacy' trains make final run". June 10, 2018.
  52. ^"PATCO".
  53. ^"PATCO Timetable"(PDF).ridepatco.org. August 15, 2022. RetrievedApril 9, 2023.
  54. ^"DRPA | Projects | PATCO Lindenwold Control Center".www.drpa.org. RetrievedAugust 6, 2025.
  55. ^Stilwell, Eileen (July 11, 2006)."Card makes change for PATCO riders".Courier-Post. RetrievedJuly 11, 2006.[permanent dead link].
  56. ^"PATCO | Stations | 9/10th & Locust St. Station".www.ridepatco.org. RetrievedAugust 14, 2025.
  57. ^"Archived copy"(PDF). Archived fromthe original(PDF) on March 28, 2025.{{cite web}}: CS1 maint: archived copy as title (link)
  58. ^"PATCO | Projects".www.ridepatco.org. RetrievedSeptember 22, 2018.
  59. ^"PATCO – Alerts".www.ridepatco.org. Archived fromthe original on September 8, 2022. RetrievedSeptember 8, 2022.
  60. ^"PATCO – City Hall".www.ridepatco.org. Archived fromthe original on September 8, 2022. RetrievedSeptember 8, 2022.

External links

[edit]
Template:Attached KML/PATCO Speedline
KML is from Wikidata
Wikimedia Commons has media related toPATCO Speedline.
Lines
Stations
Infrastructure
Rolling Stock
Fares
Related
Transit buses
Commuter rail
Rapid transit andlight rail
Aviation
Intercity bus
Intercity rail
Currently operatingheavy railrapid transit systems in the United States
Bridges
Rail
Former/cancelled
Administration
Affiliations
Crossings of theDelaware River
Upstream
Delair Bridge
Conrail and NJ Transit
Benjamin Franklin Bridge
PATCO Speedline
Downstream
RiverLink Ferry