Anuclear power phase-out is the discontinuation of usage ofnuclear power for energy production. Often initiated because ofconcerns about nuclear power, phase-outs usually include shutting downnuclear power plants and looking towardsfossil fuels andrenewable energy. Three nuclear accidents have influenced the discontinuation of nuclear power: the 1979Three Mile Island partial nuclear meltdown in the United States, the 1986Chernobyl disaster in the USSR (nowUkraine), and the 2011Fukushima nuclear accident in Japan.
As of 2025[update], only three countries have permanently closed all of their formerly functioning nuclear plants: Italy by 1990, Germany by 2023 and Taiwan by 2025.Lithuania andKazakhstan have shut down their only nuclear plants, but plan to build new ones to replace them, whileArmenia shut down its only nuclear plant but subsequently restarted it.Austria never used its first nuclear plant that was completely built.Cuba,Libya,North Korea andPoland never completed the construction of their first nuclear plants due to financial, political and technical reasons. Spain and Switzerland plan nuclear phase-outs.[2][3][4][5]
Nuclear shut-downs after Fukushima have significantly set back emissions reductions goals in several countries. A 2019 study of the impacts of the German and Japan closures concludes that by continuing to operate their nuclear plants "these two countries could have prevented 28,000air pollution-induced deaths and 2400 Mt CO2 emissions between 2011 and 2017. By sharply reducing nuclear instead of coal and gas after Fukushima, both countries lost the chance to prevent very large amounts of air pollution-induced deaths and CO2 emissions".[6]
Several countries formerly opposed to opening nuclear programs or planning phaseouts have reversed course in recent years due to climate concerns and energy independence includingBelgium,[7] thePhilippines,[8]Greece,[9] Sweden[10] andSouth Korea.[11]


Apopular movement against nuclear power exists in the Western world, based on concerns about morenuclear accidents and concerns aboutnuclear waste. Anti-nuclear critics see nuclear power as a dangerous, expensive way to boil water to generate electricity.[14] The 1979Three Mile Island accident and the 1986Chernobyl disaster played a key role in stopping new plant construction in many countries. Majoranti-nuclear power groups includeFriends of the Earth,Greenpeace,Institute for Energy and Environmental Research,Nuclear Information and Resource Service, andSortir du nucléaire (France).
Several countries, especially European countries, have abandoned the construction of new nuclear power plants.[15]Austria (1978), Sweden (1980) and Italy (1987) voted in referendums to oppose or phase out nuclear power, while opposition in Ireland prevented a nuclear program there. Countries that have no nuclear plants and have restricted new plant constructions comprise Australia,Austria,Denmark,Greece, Italy, Ireland,Norway andSerbia.[16][17]Poland stopped the construction of a plant.[16][18]Belgium, Germany, Spain, and Sweden decided not to build new plants or intend to phase out nuclear power, although still mostly relying on nuclear energy.[16][19]
New reactors under construction in Finland and France, which were meant to lead a nuclear new build, have been substantially delayed and are running over-budget.[20][21][22] Despite these delays the Olkiluoto reactor is now online and delivering low-emissions power to the grid as of 12 March 2022. "When Olkiluoto 3 reaches full output, around 90% of Finland's electricity generation will come from clean, low-carbon electricity sources, with nuclear generation supplying around half of that."[23] In addition, China has 11 units under construction[24] and there are also new reactors being built in Bangladesh, Belarus, Brazil, India, Japan, Pakistan, Russia, Slovakia, South Korea, Turkey, United Arab Emirates, United Kingdom and the United States of America. At least 100 older and smaller reactors will "most probably be closed over the next 10–15 years".[25]
Countries that wish to shut downnuclear power plants must find alternatives for electricity generation; otherwise, they are forced to become dependent on imports. Therefore, the discussion of a future for nuclear energy is intertwined with discussions aboutfossil fuels or anenergy transition torenewable energy.
| Operating reactors, considering phase-out Civil nuclear power is illegal. |
Status:Abandoned plans for commercial nuclear power
A nuclear power station was built during the 1970s atZwentendorf,Austria, but its start-up was prevented bya referendum in 1978. On 9 July 1997, theAustrian Parliament voted unanimously to maintain the country's anti-nuclear policy.[26] The built but never used reactor was converted into a museum and has also been used as a movie set and to train people involved in various aspects of nuclear power and safety. It is uniquely suitable for this purpose as it includes every aspect of an actual nuclear power plantexcept the radiation.[27][28]



Status:Phase-out complete
In 2000, theFirst Schröder cabinet, consisting of theSPD andAlliance '90/The Greens, officially announced its intention to phase out the use of nuclear energy. The power plants inStade andObrigheim were turned off on 14 November 2003, and 11 May 2005, respectively. The plants' dismantling was scheduled to begin in 2007.[30]
TheRenewable Energy Sources Act, passed in 2000, provided for afeed-in tariff in support of renewable energy. The German government, declaringclimate protection as a key policy issue, announced acarbon dioxide reduction target by the year 2005 compared to 1990 of 25%.[31] In 1998, the use of renewables in Germany reached 284 PJ of primary energy demand, which corresponded to 5% of the total electricity demand. By 2010, the German government wanted to reach 10%;[32] in fact, 17% were reached (2011: 20%, 2015: 30%).[33]
Anti-nuclear activists argued the German government had been supportive of nuclear power by providing financial guarantees for energy providers. Also, there were, as yet, no plans for the final storage ofnuclear waste. By tightening safety regulations and increasing taxation, a faster end to nuclear power could have been forced. A gradual closing of nuclear power plants had come along with concessions in questions of safety for the population with transport of nuclear waste throughout Germany.[34][35] This latter point was disagreed with by the Minister of Environment, Nature Conservation and Nuclear Safety.[36]
In 2005, critics of a phase-out in Germany argued that the grid energy contribution from the nuclear power stations may not be adequately compensated in the short term, possibly causing anenergy crisis. They also predicted that only coal-powered plants could compensate for nuclear power in general, and that CO2 emissions would increase tremendously as a result. A possible mitigating factor would be energy imported from France's lower carbon, (and primarily nuclear), power facilities.Russian natural gas would be an additional, perhaps necessary option.[37][38][39] Numerous factors, including progress inwind turbine technology andphotovoltaics, reduced the need for conventional alternatives.[40][failed verification]
In 2011,Deutsche Bank analysts concluded that "the global impact of the Fukushima disaster is a fundamental shift in public perception with regard to how a nation prioritizes and values its population's health, safety, security, and natural environment when determining its current and future energy pathways". There were manyanti-nuclear protests and, on 29 May 2011, Angela Merkel's government announced that it would close all of Germany's nuclear power plants by December 2022.[41][42]
Galvanised by the first anniversary of the Fukushima nuclear accident, anti-nuclear demonstrations were held in Germany in March 2012. Organisers said more than 50,000 people in six regions took part.[43]
The GermanEnergiewende designates a significant change inenergy policy from 2010. The term encompasses atransition by Germany to alow carbon, environmentally sound, reliable, and affordable energy supply.[44]
On 6 June 2011, following the Fukushima accident, the government removed the use of nuclear power as a bridging technology as part of their policy.[45]
In September 2011, German engineering giantSiemens announced it would withdraw entirely from thenuclear industry, as a response to theFukushima nuclear accident in Japan, and said that it would no longer build nuclear power plants anywhere in the world. The company's chairman,Peter Löscher, said that "Siemens was ending plans to cooperate withRosatom, the Russian state-controlled nuclear power company, in the construction of dozens of nuclear plants throughout Russia over the coming two decades".[46][47] Also in September 2011, IAEA Director GeneralYukiya Amano said the Japanese nuclear disaster "caused deep public anxiety throughout the world and damaged confidence in nuclear power".[48]
A 2016 study shows that during the nuclear phaseout, the security of electricity supply in Germany stayed at the same high level compared to other European countries and even improved in 2014. The study was conducted near the halfway point of the phaseout, 9 plants having been shut and a further 8 still in operation.[49][50]
In early October 2016, Swedish electric power companyVattenfall began litigation against the German government for its 2011 decision to accelerate the phase-out of nuclear power. Hearings took place at theWorld Bank'sInternational Centre for Settlement of Investment Disputes (ICSID) in Washington, DC and Vattenfall claimed almost €4.7 billion in damages. The German government has called the action "inadmissible and unfounded".[51] These proceedings were ongoing in December 2016, despite Vattenfall commencing civil litigation within Germany.[52]
On 5 December 2016, theFederal Constitutional Court (Bundesverfassungsgericht) ruled that the nuclear plant operators affected by the accelerated phase-out of nuclear power following the Fukushima accident were eligible for "adequate" compensation. The court found that the nuclear exit was essentially constitutional but that the utilities were entitled to damages for the "good faith" investments they made in 2010. The utility companies were authorised to sue the German government under civil law. E.ON, RWE, and Vattenfall were expected to seek a total of €19 billion under separate suits.[53][54][55] Six cases were registered with courts in Germany, as of 7 December 2016[update].[52][56]
A scientific paper released in 2019 found that the German nuclear shutdown led to an increase in carbon dioxide emissions around 36.2 megatons per year, and killed 1100 people a year through increased air pollution. As they shut down nuclear power, Germany made heavy investments in renewable energy, but those same investments could have "cut much deeper into fossil fuel energy" if the nuclear generation had still been online.[57][58]
Aligning with the end of the 2021COP26 climate talks, the operators of Germany's six remaining nuclear power stations, utilitiesE.ON,RWE, andEnBW, rejected calls to keep the plants in operation beyond their scheduled shutdowns at the end of 2022.[59] However, in reaction to the 2022Russian invasion of Ukraine the debate about whether to extend the life of the three remaining reactors or whether to restart operation in the three reactors shut down at the end of 2021 (whose dismantling hadn't yet started) once more came to the forefront and operators said that it would be possible to extend the life of those reactors under certain conditions.[60][61]
In July 2022, faced with a looming energy crisis, the German parliament voted to reactivate closed coal power plants.[62]

In 2022, of the 17 nuclear power plants Germany had at its peak, three remained in operation: Isar 2, Emsland and Neckarwestheim 2, which were operated by German energy firms E.ON (EONGn.DE), RWE (RWEG.DE) and EnBW (EBKG.DE), respectively. According to federal legislation, these operators lost the right to operate their plants on 31 December 2022, the effective end-date for the stations. Germany's network regulator (part of the Economy Ministry), had the ability to decide that they were critical to the security of power supply (both electricity andnuclear transmutation) and allow them to run for longer.[63]
The last three nuclear power plants in Germany—Emsland,Isar II andNeckarwestheim II—were shut down on 15 April 2023.[64][65]
In April 2024, a controversy emerged relating to the decommissioning of Germany's nuclear power plants.[66][67] German magazineCicero claimed that German Economy MinisterRobert Habeck had misled the public in 2022 and ignored the advice of experts who said nuclear facilities were still safe to operate.[68]
In an opinion poll taken in Germany in March 2025, 55% of those polled were in favour of the country restarting its closed nuclear power plants, with 36% against such a proposal, and 9% unsure.[69] However, only 32% were in favour of the construction of new reactors.[69]
Status:Phase-out complete, considering reversal
Nuclear power phase-out commenced in Italy in 1987, one year after theChernobyl disaster. Followinga referendum in that year, Italy'sfour nuclear power plants were closed, the last in 1990. A moratorium on the construction of new plants, originally in effect from 1987 until 1993, has since been extended indefinitely.[70]
In recent years, Italy has been an importer of nuclear-generated electricity, and its largest electricity utilityEnel S.p.A. has been investing in reactors in both France and Slovakia to provide this electricity in the future, and also in the development of theEPR technology.
In October 2005, there was aseminar sponsored by thegovernment about the possibility of reviving Italiannuclear power.[71] Thefourth cabinet led bySilvio Berlusconi tried to implement a new nuclear plan but areferendum held in June 2011 stopped any project.
In February 2025, the Italian government approved a law to begin the process of overturning the ban on new nuclear power in the country. The law requires confirmation by theItalian Parliament and further implementing decrees are necessary in order to fully reverse the phase-out.[72]
Status:Phase-out in progress, considering postponement
In Spain amoratorium was enacted by the socialist government in 1983[73][74] and in 2006 plans for a phase-out of seven reactors were being discussed anew.[75]
In December 2023, the government of Spain confirmed a policy of phasing out nuclear power generation in the country, with the first reactor to shut down in 2027, and the last in 2035.[76] However, in April 2025, the government subsequently indicated it would consider proposals from operators of its nuclear power plants to extend the closure dates of their plants, if any such proposals were submitted.[77]
Status:Phase-out in progress, considering reversal
As of 2013[update], the five operationalSwiss nuclear reactors wereBeznau 1 and 2,Gösgen,Leibstadt, andMühleberg—all located in the German speaking part of the country. Nuclear power accounted for 36.4% of the national electricity generation, while 57.9% came from hydroelectricity. The remaining 5.7% was generated by other conventional and non-hydro renewable power stations.[78]
On 25 May 2011, theFederal Council decided on a slow phase-out by not extending running times or building new power plants.[79] The first power plant,Mühleberg, was shut down on 20 December 2019, the last will stop running in 2034.[80]
In 2018, theInternational Energy Agency has warned that Switzerland's phased withdrawal from nuclear power presents challenges for maintaining its electricity security. They caution that Switzerland will be increasingly relying on imports from its European neighbours to meet electricity demand, especially during the winter months when low water levels impact production from hydro plants.[81]
There have been many Swissreferendums on the topic of nuclear energy, beginning in 1979 with acitizens' initiative for nuclear safety, which was rejected. In 1984, there was a vote on an initiative "for a future without further nuclear power stations" with the result being a 55% to 45% vote against. On 23 September 1990, Switzerland had two more referendums about nuclear power. The initiative "stop the construction of nuclear power stations", which proposed a ten-yearmoratorium on the construction of new nuclear power plants, was passed with 54.5% to 45.5%. The initiative for a phase-out was rejected with by 53% to 47.1%. In 2000, there was a vote on agreen tax for support ofsolar energy. It was rejected by 67% to 31%. On 18 May 2003, there were two referendums: "Electricity without Nuclear", asking for a decision on a nuclear power phase-out, and "Moratorium Plus", for an extension of the earlier-decided moratorium on the construction of new nuclear power plants. Both were turned down. The results were: Moratorium Plus: 41.6% Yes, 58.4% No; Electricity without Nuclear: 33.7% Yes, 66.3% No.[82]
The program of the "Electricity without Nuclear" petition was to shut down all nuclear power stations by 2033, starting with Unit 1 and 2 of Beznau nuclear power stations, Mühleberg in 2005, Gösgen in 2009, and Leibstadt in 2014. "Moratorium Plus" was for an extension of the moratorium for another ten years, and additionally a condition to stop the present reactors after 40 years of operation. To extend the 40 years by ten more years, another referendum would have to be held (at high administrative costs). The rejection of the Moratorium Plus had come as a surprise to many, as opinion polls before the referendum had showed acceptance. Reasons for the rejections in both cases were seen as the worsened economic situation.[83]
In August 2024, the Federal Council, led by Energy MinisterAlbert Rösti, proposed lifting the nuclear power plant construction ban that had been in place since 2017. Citing concerns over energy security and fossil fuel phase-out, the government seeks to amend the Nuclear Energy Act (Kernenergiegesetz) to allow the construction of new nuclear plants and extend the operational life of the existing ones.[84] Such an amendment would require the consent of theFederal Assembly and possibly confirmation via a referendum.[85]
Status:Phase-out complete
Taiwan had 3 active nuclear power plants as of 2016.[86] Active seismic faults run across the island, and some environmentalists argue Taiwan is unsuited for nuclear plants.[87]
Construction of theLungmen Nuclear Power Plant using theABWR design encountered public opposition and a host of delays, and in April 2014 the government decided to halt construction.[88] Construction was stopped in July 2015.[89]
The2016 general election was won by a government with stated policies that included phasing out nuclear power generation by 2025. The formal phase-out plan was announced in October 2016.[86][90] A proposal to complete construction of the Lungmen plant was rejected in a referendum in 2021.[91]
The last operating nuclear power station in Taiwan,Maanshan Nuclear Power Plant, was shut down in May 2025.[92]A referendum was held on 23 August 2025 on the issue of restarting the Maanshan plant but fell short of the threshold of 25% in favour needed of eligible voters to be successful, coming in at 21.7% (74.2% of voters).[93][94]
The United States, as of 2013, was undergoing a practical phase-out independent of stated goals and continued official support. This was not due to concerns about the source or anti-nuclear groups, but due to the rapidly falling prices of natural gas and the reluctance of investors to provide funding for long-term projects when short term profitability of turbine power is available.
Through the 2000s, a number of factors led to greatly increased interest in new nuclear reactors, including rising demand, new lower-cost reactor designs, and concerns aboutglobal climate change. By 2009, about 30 new reactors were planned, and a large number of existing reactors had applied for upgrades to increase their output. In total, 39 reactors had their licences renewed, three Early Site Permits had been applied for, and three consortiums had applied for Combined Construction-Operating Licences under theNuclear Power 2010 Program. In addition, theEnergy Policy Act of 2005 contains incentives to further expand nuclear power.[95]
However, by 2012 the vast majority of these plans were cancelled, and several additional cancellations followed in 2013. Currently only three new reactors are under construction, and one, at Watts Bar, was originally planned in the 1970s and only under construction now. Construction of the new AP1000 design is underway at one location in the United States inGeorgia. Plans for additional reactors in Florida were cancelled in 2013.
Some smaller reactors operating in deregulated markets have become uneconomic to operate and maintain, due to competition from generators using low priced natural gas, and may be retired early.[96] The 556 MWeKewaunee Power Station is being closed 20 years before licence expiry for these economic reasons.[97][98]Duke Energy'sCrystal River 3 Nuclear Power Plant in Florida closed, as it could not recover the costs needed to fix its containment building.[99]
As a result of these changes, after reaching peak production in 2007, US nuclear capacity has been undergoing constant reduction every year.
In 2021,Indian Point Energy Center, the last remaining nuclear power plant in theNew York City metropolitan area, was shut down.[100] Environmental groups celebrated the decision to close the plant, while critics pointed to the sites generation being replaced by two gas fired power plants resulting in an increase of fossil fuel consumption and carbon dioxide emissions.[101][102]
Renewable energy, mainlyhydropower, is gaining share.[103][104]
ForNorth Korea, twoPWRs at Kumho were under construction until that was suspended in November 2003. On 19 September 2005, North Korea pledged to stop building nuclear weapons and agreed to international inspections in return for energy aid, which may include one or more light water reactors – the agreement said "The other parties expressed their respect and agreed to discuss at an appropriate time the subject of the provision of light-water reactor" [sic].[105] North Korea has since continued with its nuclear weapons development program.
In July 2000, the Turkish government decided not to build four reactors at the controversialAkkuyu Nuclear Power Plant, but later changed its mind. The official launch ceremony took place in April 2015, and the first unit was expected to be completed in 2020.[106]
India has 20 reactors operating, 6 reactors under construction, and is planning an additional 24.[107]
Vietnam had developed detailed plans for 2 nuclear power plants with 8 reactors, but in November 2016 decided to abandon nuclear power plans as they were "not economically viable because of other cheaper sources of power."[108]

Once a nuclear proponent, Prime MinisterNaoto Kan became increasinglyanti-nuclear following theFukushima nuclear disaster. In May 2011, he closed the ageingHamaoka Nuclear Power Plant over earthquake and tsunami fears, and said he would freeze plans to build new reactors. In July 2011, Kan said that "Japan should reduce and eventually eliminate its dependence on nuclear energy ... saying that the Fukushima accident had demonstrated the dangers of the technology".[112] In August 2011, the Japanese government passed a bill to subsidise electricity fromrenewable energy sources.[113] A 2011 Japanese Cabinet energy white paper says "public confidence in safety of nuclear power was greatly damaged" by the Fukushima disaster, and called for a reduction in the nation's reliance on nuclear power.[114] As of August 2011[update], the crippled Fukushima nuclear plant was leaking low levels of radioactivity and areas surrounding it could remain uninhabitable for decades.[115]
By March 2012, one year after the disaster, all but two of Japan's nuclear reactors were shut down; some were damaged by the quake and tsunami. The following year, the last two were taken off-line. Authority to restart the others after scheduled maintenance throughout the year was given to local governments, and in all cases local opposition prevented restarting.
Prime MinisterShinzo Abe's government, reelected on a platform of restarting nuclear power, plans to have nuclear power account for 20 to 22 per cent of the country's total electricity supply by 2030, compared with roughly 30 per cent before the disaster at the Fukushima complex.
In 2015 two reactors atSendai Nuclear Power Plant have been restarted.[116] In 2016Ikata-3 restarted and in 2017Takahama-4 restarted. In 2021Mihama Nuclear Power Plant unit 3 was restarted.[117]
In 2023, Japan's Cabinet approved a policy to allow new nuclear power reactors to be constructed and operation of existing reactors to be extended from 40 to 60 years.[118]
In thePhilippines, in 2004, PresidentGloria Macapagal Arroyo outlined herenergy policy. Regarding nuclear energy, she made public plans to convert the (completed but never commissioned)Bataan Nuclear Power Plant (BNPP) into a gas-powered facility.[119] These plans did not come to fruition, and by 2024, the government of PresidentBongbong Marcos signed an agreement withKorea Hydro & Nuclear Power, for the latter to conduct a feasibility study on refurbishing the BNPP and commissioning it into service in its originally intended configuration of a nuclear power station.[120]
In 2017, responding to widespread public concerns after theFukushima Daiichi nuclear disaster in Japan, the high earthquake risk in South Korea, and a2013 nuclear scandal involving the use of counterfeit parts, the new government of PresidentMoon Jae-in had decided to gradually phase outnuclear power in South Korea. Such decision, however, was met with widespread criticism regarding its political transparency and various doubts regarding its process. This was especially highlighted when the construction of Shin Gori units 5 and 6 were unilaterally stopped by the government. Being faced with stark criticism, the construction of Shin Gori units 5 and 6 were eventually restarted.
Later into the administrative period, the Moon Jae-in government and its nuclear phase-out policy is facing heavier criticism than before, from both the opposing parties as well as general public due to lack of realistic alternative, consequential increase in electricity price, negative effects on the related industries, public consensus of needs to reduce carbon footprint and the decrease of popularity due to other political and economic failures. Surveys from 2021 show that the support for nuclear phase out has drastically reduced, although the details differ from majority support to majority disapproval depending on the survey.[121][122] President Moon reversed his government's nuclear phaseout policy just before the election in February 2022.[123]
In the 2022 election, candidate Yoon Seok-Yeol promised to cancel the phase out if elected and continue running all plants as long as they safely could be operated, develop new technology and become a global export powerhouse. Yoon went on to win a close election in what was seen as a big win for the nuclear sector.[124]
Belgium's nuclear phase-out legislation was agreed in July 1999 by theLiberals (VLD andMR), theSocialists (SP.A andPS) and theGreens party (Groen! andEcolo). The phase-out law called for each ofBelgium's seven reactors to close after 40 years of operation with no new reactors built subsequently. When the law was being passed, it was speculated it would be overturned again as soon as an administration without the Greens was in power.[32]
In thefederal election in May 2003, there was anelectoral threshold of 5% for the first time. Therefore, the Green parties, theECOLO, got only 3.06% of the votes, so ECOLO obtained no seat in theChamber of Representatives. In July 2003,Guy Verhofstadt formedhis second government. It was a continuation of theVerhofstadt I Government but without the Green parties. In September 2005, the government partially overturned the previous decision, extending the phase-out period for another 20 years, with possible further extensions.
In July 2005, theFederal Planning Bureau published a new report, which stated thatoil and otherfossil fuels generated 90% of Belgian energy use, while nuclear power accounted for 9% andrenewable energy for 1%. Electricity amounted to 16% of total energy use, and while nuclear-powered electricity amounted to 9% of use in Belgium, in many parts of Belgium, especially inFlanders, it made up more than 50% of the electricity provided to households and businesses.[125] This was one of the major reasons to extend the earlier phase-out, since it was difficult to provide more than 50% of the electricity by 'alternative' energy-production, and a revert to the classical coal-driven electricity would mean inability to adhere to theKyoto Protocol.
In August 2005, French companySuez S.A. offered to buy the BelgianElectrabel, which owns both of Belgium's operating nuclear power stations.[126] At the end of 2005, Suez had some 98.5% of all Electrabel shares. Beginning in 2006, Suez announceda merger withGaz de France.
After thefederal election in June 2007, apolitical crisis began and lasted until the end of 2011.
In the2010–2011 Belgian government formation negotiations, the phase-out was emphasised again, with concrete plans to shut off three of the country's seven reactors by 2015.[127]
Before theFukushima nuclear disaster, the plan of thegovernment was for all nuclear power stations to shut down by 2025.[128] Although intermediate deadlines have been missed or pushed back, on 30 March 2018 the Belgian Council of Ministers confirmed the 2025 phase-out date and stated draft legislation would be brought forward later in the year.[129]
In March 2022, thegovernment decided to allow Doel 4 and Tihange 3 to continue operating until 2035 to allow the country to "strengthen its independence of fossil fuels in turbulent geopolitical times".[130][131] Belgium's two newest nuclear plants are operated by French utilityEngie and account for almost half of the country's electricity production.[7]
Following approval by theBelgian Federal Parliament, an act waspromulgated on 17 May 2025 repealing the 2003 phase-out law and reversing the country's nuclear power phase-out.[132][133][134]
Belgium also continues to be active in nuclear research and is buildingMYRRHA, the world's first large scale demonstration of anaccelerator-driven subcritical reactor that is to be used fornuclear transmutation ofhigh level radioactive waste.[135]
TheFolketing passed a resolution in 1985 banning the construction of nuclear power plants in the country. However by 2025, Denmark was reported to be considering scrapping this prohibition.[136]
Greece operates only a single small nuclear reactor in the Greek National Physics Research Laboratory inDemokritus Laboratories for research purposes.
In Ireland, a nuclear power plant was first proposed in 1968. It was to be built during the 1970s atCarnsore Point in County Wexford. The plan called for first one, then ultimately four plants to be built at the site, but it was dropped after strong opposition from environmental groups, and Ireland has remained without nuclear power since.
Despite opposing nuclear power (and nuclear fuel reprocessing atSellafield), Ireland imports electricity from the United Kingdom via severalinterconnectors, which is, in some part, the product of nuclear power.
In theNetherlands, in 1994, theDutch parliament voted to phase out nuclear power generation after a discussion of nuclear waste management.Dodewaard nuclear power plant was shut down in 1997. In 1997 the government decided to endBorssele Nuclear Power Station's operating licence, at the end of 2003. In 2003 theSecond Balkenende cabinet postponed the shutdown to 2013.[137][138]
In 2005 the decision was reversed and research in expanding nuclear power was initiated. The reversal was preceded by the publication of theChristian Democratic Appeal's report on sustainable energy.[139] Other coalition parties then conceded. In 2006 the government decided that Borssele nuclear power station would remain open until 2033, if it could comply with the highest safety standards. The owners,Essent andDELTA were to invest 500 million euros in sustainable energy, together with the government, money which the government claims otherwise should have been paid to the plants owners as compensation.
In December 2021, theFourth Rutte cabinet stated that it wanted to both extend the service life of the Netherlands' sole operational nuclear power reactor at Borssele nuclear power station, and prepare for the construction of two new nuclear power plants, in order to reduce CO2 emissions and meet the European Union goals for responding to climate change.[140] Part of this preparation is the launch of a feasibility study, looking at the advantages and disadvantages of the use of nuclear power to respond to climate change.[141]
Serbia currently operates a single nuclear research reactor in theVinča Institute. Previously, the Vinča Institute had two active reactors: RA and RB. In a 1958 nuclear incident, six workers received a critical amount of radiation and one of them died. These workers received thefirst bone marrow transplants in Europe. After theChernobyl disaster in 1989, a moratorium on the use of nuclear energy was in established. Later, the law prohibited the use of nuclear energy. To this day, the Directorate for Nuclear and Radiation Safety (Srbatom) is strongly opposed to any kind of nuclear energy use in Serbia or neighbouring countries.
Krško Nuclear Power Plant in Slovenia (co-owned withCroatia) was originally scheduled to be closed by 2023. The debate on whether and when to close the Krško plant was somewhat intensified after the2005/06 winter energy crisis. In May 2006, the Ljubljana-based dailyDnevnik claimed Slovenian government officials internally proposed adding a new 1000 MW block into Krško after the year 2020. In 2023, the service life of the Krško plant was extended to 2043,[142] and as of 2024, the construction of a second reactor at the plant was being considered.[143]
A year after theThree Mile Island accident in 1979, the1980 Swedish nuclear power referendum was held. It led to the Swedish parliament deciding that no further nuclear power plants should be built, and that a nuclear power phase-out should be completed by 2010. On 5 February 2009, theGovernment of Sweden effectively ended the phase-out policy.[144] In 2010, Parliament approved for new reactors to replace existing ones.[145]
Thenuclear reactors at theBarsebäck Nuclear Power Plant were shut down between 1999 and 2005. In October 2015, corporations running the nuclear plants decided to phase out two reactors at Oskarshamn[146] and two at Ringhals,[147] reducing the number of remaining reactors from 12 in 1999 to 6 in 2020.
An opinion poll in April 2016 showed that about half of Swedes want to phase out nuclear power, 30 per cent want its use continued, and 20 per cent are undecided.[148] Prior to theFukushima Daiichi nuclear disaster in 2011, "a clear majority of Swedes" had been in favour of nuclear power.[148] In June 2016, the opposition parties and thegovernment reached an agreement on Swedish nuclear power.[149] The agreement is to phase out the output tax on nuclear power, and allow ten new replacement reactors to be built at current nuclear plants.[150]
Since then, public support of nuclear energy has grown, with a majority of people in favour of nuclear power in 2019.[151] Those in favour of decommissioning nuclear has dropped to a record low of 11 per cent.
In 2023, plans were announced by the Swedish government andVattenfall for both extending the service life of the country's existing nuclear power reactors,[152] and the construction of a fleet of new reactors.[153]
Thenuclear power debate is about the controversy[154][155][156][157][158] which has surrounded the deployment and use ofnuclear fission reactors to generate electricity fromnuclear fuel for civilian purposes. The debate about nuclear power peaked during the 1970s and 1980s, when it "reached an intensity unprecedented in the history of technology controversies", in some countries.[159][160]
Proponents of nuclear energy argue that nuclear power is asustainable energy source which reducescarbon emissions and can increaseenergy security if its use supplants a dependence on imported fuels.[161] Proponents cite scientific studies affirming the consensus that nuclear power produces virtually no air pollution,[162] in contrast to the chief dispatchable alternative of fossil fuel. Proponents also believe that nuclear power is the only viable course to achieveenergy independence for most Western countries. They emphasise that the risks of storing spent fuel are small and can be further reduced by using the latest technology in newer reactors,fuel recycling, and long-lived radioisotope burn-up. For instance, spent nuclear fuel in the United States could extend nuclear power generation by hundreds of years[163] because more than 90% of spent fuel can be reprocessed.[164] The operational safety record in the Western world is excellent when compared to the other major kinds of power plants.[165]
Over 10,000 hospitals worldwide use radioisotopes in medicine, and about 90% of the procedures are for diagnosis. The radioisotope most commonly used in diagnosis istechnetium-99, which is employed in about 40 million procedures per year, thereby accounting for about 80% of all nuclear medicine procedures and 85% of diagnostic scans in nuclear medicine worldwide. The main radioisotopes such as Tc-99m cannot effectively be produced without reactors.[166][167] Most smoke detectors useamericium-241, meaning every American home uses these common radioisotopes to improve their safety from fire.[168]
Opponents say that nuclear power poses many threats to people and the environment. These threats include health risks and environmental damage fromuranium mining, processing and transport, the risk ofnuclear weapons proliferation or sabotage, and the problem of radioactivenuclear waste management.[169][170][171] They also contend that reactors themselves are enormously complex machines where many things can and do go wrong, and there have been seriousnuclear accidents.[172][173] Critics do not believe that these risks can be reduced through new technology.[174] They argue that when all the energy-intensive stages of thenuclear fuel chain are considered, from uranium mining tonuclear decommissioning, nuclear power is not a low-carbon electricity source.[175][176][177] This criticism has however been partially quelled by theIPCC which indicated in 2014 that nuclear energy was a low carbon energy production technology, comparable to wind and lower than solar in that regard.[178]
Theeconomics of new nuclear power plants is a controversial subject, since there are diverging views on the topic, and multi-billion dollar investments ride on the choice of an energy source.Nuclear power plants typically have high capital costs for building the plant, but low direct fuel costs (with, however, much of the costs of fuel extraction, processing, use and long term storage externalised). Therefore, comparison with other power generation methods is strongly dependent on assumptions about construction timescales and capital financing for nuclear plants. Cost estimates also need to take into accountplant decommissioning andnuclear waste storage costs. On the other hand, measures tomitigate global warming, such as acarbon tax orcarbon emissions trading, may favour the economics of nuclear power versus fossil fuels.
In recent years there has been a slowdown of electricity demand growth and financing has become more difficult, which affects large projects such as nuclear reactors, with very large upfront costs and long project cycles which carry a large variety of risks.[179] In Eastern Europe, a number of long-established projects are struggling to find finance, notably Belene in Bulgaria and the additional reactors at Cernavoda in Romania, and some potential backers have pulled out.[179] Where cheap natural gas is available and its future supply relatively secure, this also poses a major problem for nuclear projects.[179]
Analysis of the economics of nuclear power must take into account who bears the risks of future uncertainties. To date, all operating nuclear power plants were developed bystate-owned orregulatedutility monopolies[180] where many of the risks associated with construction costs, operating performance, fuel price, and other factors were borne by consumers rather than suppliers. Many countries have now liberalised theelectricity market where these risks, and the risk of cheaper competitors emerging before capital costs are recovered, are borne by plant suppliers and operators rather than consumers, which leads to a significantly different evaluation of the economics of new nuclear power plants.[181]
Following the 2011Fukushima Daiichi nuclear disaster, costs are likely to go up for currently operating and new nuclear power plants, due to increased requirements for on-site spent fuel management and elevated design basis threats.[182]

Theenvironmental impact ofnuclear power results from thenuclear fuel cycle, operation, and the effects ofnuclear accidents.
Thegreenhouse gas emissions from nuclear fission power are small relative to those associated with coal, oil, gas, and biomass. They are about equal to those associated with wind and hydroelectric.[183]
The routine health risks from nuclear fission power are very small relative to those associated with coal, oil, gas, solar, biomass, wind and hydroelectric.[184]
However, there is a "catastrophic risk" potential if containment fails,[185] which in nuclear reactors can be brought about by over-heated fuels melting and releasing large quantities of fission products into the environment. The public is sensitive to these risks and there has been considerablepublic opposition to nuclear power. Even so, in comparing the fatalities for major accidents alone in the energy sector, it is still found that the risks associated with nuclear power are extremely small relative to those associated with coal, oil, gas and hydroelectric.[184] For the operation of a 1000-MWe nuclear power plant, the complete nuclear fuel cycle, from mining to reactor operation to waste disposal, the radiation dose is cited as 136 person-rem/year. The dose is 490 person-rem/year for an equivalent coal-fired power plant.[186]
The 1979Three Mile Island accident and 1986Chernobyl disaster, along with high construction costs, ended the rapid growth of global nuclear power capacity.[185] A further disastrous release of radioactive materials followed the 2011 Japanese tsunami which damaged theFukushima I Nuclear Power Plant, resulting inhydrogen gas explosions and partial meltdowns classified as aLevel 7 event. The large-scale release of radioactivity resulted in people being evacuated from a 20 km exclusion zone set up around the power plant, similar to the 30 km radiusChernobyl Exclusion Zone remains in effect. Subsequent scientific assessment of the health impacts of radiation has shown that these evacuations were more damaging than the radiation could have been, and recommend that the population be advised to remain in place in all but the most severe radiological release events.[187]
In May 2023, the Washington Post wrote, "Had Germany kept its nuclear plants running from 2010, it could have slashed its use of coal for electricity to 13 percent by now. Today’s figure is 31 percent... Already more lives might have been lost just in Germany because of air pollution from coal power than from all of the world’s nuclear accidents to date, Fukushima and Chernobyl included."[188]
The effect of nuclear accidents has been a topic of debate practically since the firstnuclear reactors were constructed. It has also been a key factor inpublic concern about nuclear facilities.[189] Some technical measures to reduce the risk of accidents or to minimise the amount ofradioactivity released to the environment have been adopted. Despite the use of such measures,human error remains, and "there have been many accidents with varying effects as well near misses and incidents".[189][190]
Benjamin K. Sovacool has reported that worldwide there have been 99 accidents at nuclear power plants.[191] Fifty-seven accidents have occurred since the Chernobyl disaster, and 57% (56 out of 99) of all nuclear-related accidents have occurred in the USA.[191] Seriousnuclear power plant accidents include theFukushima Daiichi nuclear disaster (2011),Chernobyl disaster (1986),Three Mile Island accident (1979), and theSL-1 accident (1961).[192] Stuart Arm states, "apart fromChernobyl, no nuclear workers or members of the public have ever died as a result of exposure toradiation due to a commercialnuclear reactor incident."[193]
TheInternational Atomic Energy Agency maintains a website reporting recent accidents.[194]
Nuclear safety and security covers the actions taken to preventnuclear and radiation accidents or to limit their consequences. This coversnuclear power plants as well as all other nuclear facilities, the transportation of nuclear materials, and the use and storage of nuclear materials for medical, power, industry, and military uses.
Although there is no way to guarantee that a reactor will always be designed, built and operated safely, the nuclear power industry has improved the safety and performance of reactors, and has proposed safer reactor designs, though many of these designs have yet to be tested at industrial or commercial scales.[195] Mistakes do occur and the designers of reactors atFukushima in Japan did not anticipate that a tsunami generated by an earthquake would disable the backup systems that were supposed to stabilise the reactor after the earthquake.[196][197] According toUBS AG, theFukushima I nuclear accidents have cast doubt on whether even an advanced economy like Japan can master nuclear energy safety.[198] Catastrophic scenarios involving terrorist attacks are also conceivable.[195]
An interdisciplinary team from MIT have estimated that given the expected growth of nuclear power from 2005 to 2055, at least four serious nuclear accidents would be expected in that period.[199][200] To date, there have been five serious accidents (core damage) in the world since 1970 (one atThree Mile Island in 1979; one atChernobyl in 1986; and three atFukushima-Daiichi in 2011), corresponding to the beginning of the operation ofgeneration II reactors. This leads to on average of one serious accident happening every eight years worldwide.[197] Despite these accidents and public opinion, the safety record of nuclear power, in terms of lives lost (ignoring nonfatal illnesses) per unit of electricity delivered, is better than every other major source of power in the world, and on par with solar and wind.[184][201][202]



Energy transition is the shift by several countries to sustainable economies by means ofrenewable energy,energy efficiency andsustainable development. This trend has been augmented by diversifying electricity generation and allowing homes and businesses with solar panels on their rooftops to sell electricity to the grid. In the future this could "lead to a majority of our energy coming from decentralized solar panels and wind turbines scattered across the country" rather than large power plants.[204] The final goal of German proponents of a nuclear power phase-out is the abolishment of coal and other non-renewable energy sources.[205]
Issues exist that currently prevent a shift to 100% renewable technologies. There is debate over theenvironmental impact of solar power, and theenvironmental impact of wind power. Some argue that the pollution produced and requirement ofrare-earth elements offsets many of the benefits compared to other alternative power sources such as hydroelectric, geothermal, and nuclear power.[206]
It will then be debated by Parliament and it is possible that there will be a referendum against it...