Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Nuclear power in Pakistan

From Wikipedia, the free encyclopedia

Electricity generation
in Pakistan
Nuclear power plants in Pakistan
  Commercial active plants
  Research active plants

InPakistan,nuclear power is provided by sixnuclear reactors in two commercialnuclear power plants with a net capacity of 3,545 MW frompressurized water reactors.[1][2] In FY2023, Pakistan's nuclear power plants (NPPs) produced a total of 24.054terawatt-hours of electricity, which accounted for roughly 18.65% of the nation's total electric energy generation.[1] Pakistan is the first country in theMuslim world to construct and operate commercial nuclear plants, with first being commissioned in1972.[3] As of 2025, there is one NPP (Chashma-V) that is under construction and expected to produce 1,200 MW of electricity.[4][5] Only one NPP,KANUPP-1 has been decommissioned, after a 50-year run in 2021.[6] Under itscurrent policy to address its energy security, the country plans on constructing 32 commercial NPPs by 2050, with a combined generation capacity of 40,000 MW to meet 25% of the nation's electricity demands.[7][8]

The nuclear power in Pakistan is regulated through thePakistan Nuclear Regulatory Authority (PNRA), which grants licenses and their renewals, while thePakistan Atomic Energy Commission (PAEC) manages the operations of the NPPs.[9][10] Due to the country's refusal to join theNuclear Non-Proliferation Treaty (NPT) and accept full-scope IAEA safeguards, the imports and access to thereactor technology has been restricted by theNuclear Suppliers Group (NSG). In the past,Canada partnered with Pakistan in providing the nation's first nuclear power plant in 1965 and later,China and the IAEA has provided support in providing the nuclear power plants since 1993 at address its challenges relating to energy security.[11][12]

History

[edit]

In 1960, the plans on the construction for nation's first nuclear power plant were submitted to theAyub administration by thePakistan Atomic Energy Commission, with support from theAbdus Salam who was serving in capacity asScience Advisor to theGovernment of Pakistan at that time.[13] In fact, it was Abdus Salam's efforts that led to the approval of the country's first commercial nuclear power plant at theParadise Point in Karachi, Sindh.[13][14] During this time, the Ayub administration successfully negotiated the Canadian government that allowed theGE Canada to work with the Pakistan Atomic Energy Commission in designing and constructing the country's first commercial nuclear power in 1965.: 54–55 [15]

In 1965, the Pakistan Atomic Energy Commission'sCentre for Nuclear Studies (CNS) was able to design and construct its own small reactor, known as thePakistan Atomic Research Reactor (PARR-I) inNilore.: 94–95 [15] The fuel bundles were for this reactor were, however, provided by the United States Atomic Energy Commission (USAEC) through the International Atomic Energy Agency (IAEA) for research and training purposes only.: 193 [15] The first commercial nuclear power plant was design on the basis ofCANDU-type which was earlier offered to India (in1955) but Canada had its priced atUS$ 10 million ($99.8 million in2024) which was too expensive for the country's taxpayers to afford.: 30–31 [15]

The Pakistan Atomic Energy Commission eventually negotiated with the GE Canada to redesign the reactor for Pakistan-specific needs, which resulted in a 137 MW (0.137 GW) CANDU-typepressurised heavy water reactor and it featured stark differences in the reactor designs supplied to India by Canada.: 110 [15]: 3–4 : 3–4 [16]

Start of commercial nuclear power

[edit]

On 28 November 1972, the country's first nuclear power plant, theKarachi Nuclear Power Plant (KANUPP), was commissioned and went online with nation's electric grid system.[17][18] Reportedly constructed at the taxpayer's cost of US$23 million ($173 million in2024), the commissioning of KANUPP reactor provided a distinction to Pakistan as a "first in theMuslim world to have an operating nuclear power station."[17]

In 1973, the Zulfikar Ali Bhutto's administration entered in several nuclear power agreements withFrance,Germany,Belgium, and theUnited Kingdom but Zulfikar Ali Bhutto administration's refusal to be a party of theNuclear Non-Proliferation Treaty (NPT) restricted any meaningful agreements with any of the European nuclear fuel suppliers.: 104–105 [15]

After the India'sfirst nuclear test in 1974, Canada and France became party of theNuclear Suppliers Group (NSG) that restricted any cooperation on nuclear power with the country unless the country becomes the party of the NPT.: 105–110 [15] In the absence of the foreign cooperation, the Pakistan Atomic Energy Commission worked on feasibility studies for its own power reactor and had secured funding for the nuclear power plant at theChashma Nuclear Power Plant from theZia administration in 1980.: 105–110 [15] In 1985, the project was delegated to the formerSoviet Union who later decided against participating in the project.[19] Benazir Bhutto's administration again held unsuccessful negotiations with France on participating in the Chashma Nuclear Power Plant in 1990.[20] Eventually, theSharif administration entered in successful negotiation with China for the construction of the Chashma Nuclear Power Plant in 1993.[21] On 14 September2000, theChashma Nuclear Power Plant was commissioned and went online with the country's grid electric grid system.[22]

Since 2000, Pakistan has signed multiple bilateral agreements with China in expanding its energy needs through nuclear power at the Karachi Nuclear Power Complex and the Chashma Nuclear Power Complex that has alleviated its economy and provided energy security to the country.[23] The agreement with China on acquiring the nuclear power reactor technology was entrusted and transferred through the International Atomic Energy Agency's remedial and its safeguards.[24]

International cooperation

[edit]

China

[edit]
Main article:People's Republic of China – Pakistan relations

Since 2000, Pakistan and China have signed multiple bilateral agreements on the issues of nuclear power under the IAEA's permission and safeguards.[25] Outside China, Pakistan is the only country that has commissioned and successfully operates the Chinesepressurized water reactors.[26] In 1993, China agreed on supplying the 324 MW (0.324 GW)CNP-300 reactor, which Pakistan Atomic Energy Commission had to conducted several lengthy safety and quality assurances tests.[25]

Cooperation of China and International Atomic Energy Agency (IAEA) with Pakistan's nuclear power expansion has been critical for Pakistan's energy security matters since the hydroelectricity has been a subject ofpolitical controversies between thefour provinces of Pakistan.[27] In 2005, theMinistry of Finance had approvedRs. 51.461 billion (US$178 million) for the construction of the second nuclear power plant in Chashma Nuclear Power Plant, alongside a separatesafeguard agreement between Pakistan and IAEA allowed the country to operate the nuclear power plants under the safe manner and only be used only for power generation. Under the 2005 Energy Security Agreement signed between Pakistan, China, and the IAEA, it is expected to increase power generation through nuclear power by 2030.[28]

Since 2000, Pakistan has commissioned Chinese-exported 1,000 MW (1.0 GW)pressurized water reactors at its sites inKarachi andChashma.[29][30] The cooperation between China and Pakistan on commercial nuclear power plants has attracted controversies due to Pakistan being nonsignatory to the NPT treaty.[31][32] The Pakistan and China have refuted and rebuffed the controversy with China informing the IAEA that the nuclear power reactors' exports are under the IAEA terms as all the nuclear power plant sites are placed under the IAEA inspections and international safeguards.[33]

India, which is also not a member of the Nuclear Suppliers Group, has been critical of Pakistan's nuclear power expansion and has criticized the safety design features incorporated into the nuclear power reactors exported to Pakistan from China.[34]

France

[edit]

In 2009, theGillani administration held talks with French government on cooperation relating to reactor technologies, which was said to be a "significant development" between two nations by the Gillani administration'sForeign ministry.[35] Contrary to the Gillani administration expectations, theSarkozy presidency was careful in its response, which was only interested in nonproliferation issues with Gillani administration."[35]

In 2013, the French Ambassador to Pakistan, Philippe Thiebaud, opened the option of "civil nuclear cooperation at request" between two nation in line of international obligations.[36] In spite of engagement between two nations in 2009 and 2013, no agreements have been reached between two nations owing to the France'sstrategic ties with India.[36]

United States

[edit]

In a U.S.–Pakistanstrategic dialogue on 24 March 2010, Pakistan pressed for a civil nuclear cooperationdeal similar to that with India, though the request was denied by the United States but the talks were held on nonproliferation matters.[37][38]

Japan

[edit]
See also:Pakistan–Japan relations

In 2011, PresidentAsif Ali Zardari unsuccessfully persuaded Japanese government on signing a civil nuclear agreement that reflected the similar contract between India and Japan on nuclear cooperation; this was denied by the Japanese government.[39]

Before the state visit of President Zardari, Japan held talks with Pakistan which was focused only on nonproliferation issues and stability in South Asia.[40]

Nuclear power plants

[edit]
Nuclear Power Plants in Pakistan[41]
Commercial Nuclear Power PlantsAcronymCommissionDecommissionLifetimeNet Capacity
Karachi Nuclear Power Complex
KANUPP
K1 in1971 (1971)
K2 in2021 (2021)
K3 in2022 (2022)
K1 in2021

50-years

137 MW
1100 MW
1110 MW
Chashma Nuclear Power Complex
CHASNUPP
C1 in2000 (2000)
C2 in2011 (2011)
C3 in2016 (2016)
C4 in2017



325 MW
325 MW
340 MW
340 MW
Total NPPs active6Total gross capacity3,540 MW (3.54 GW)

Nuclear Fuel cycle

[edit]
Main article:Uranium mining

After 1974, Pakistan has worked independently in its ability and capability to developed indigenousnuclear fuel cycle.: 114 [15] The front-end and the back-end of the nuclear fuel cycle technology was developed at itsPakistan Institute of Nuclear Science & Technology laboratory while the atomic energy commission conducted several studies with theGeological Survey of Pakistan for the prospect of uranium exploration.: 114 [15]

There are several uranium mining sites throughout Pakistan where the mineral excavation and refinement of ores took place, most of the which the reservations are owned by theMinistry of Energy (MoE) for nuclear fuel cycle.: 110–114 [15] Built in 1980, theKundian Nuclear Fuel Complex is a premier facility where nuclear fuel bundles for the Karachi Nuclear Power Plant are manufactured.: 114–115 [15] Theuranium conversion facility in Islamabad converts theyellowcake (uranium oxide orurania) into the uranium hexflouride (UF6) gas before commencing the industrial enrichment at Gadwal Enrichment Plant for nuclear power production for the nuclear power sites in Karachi and Chashma.: 100:102 [42]

In 2006, the Pakistan Atomic Energy Commission was approved for funding by the federal government to construct thePakistan Nuclear Power Fuel Complex to locally manufacture fuel bundles for the Chasma Nuclear Power Plant.[43] Unlike theKundian, Gadwal, andIslamabad, this facility is under IAEA safeguards with regular inspections and monitoring of its operations.[44]

In 2015, the Ministry of Energy sat a target of producing 350 tonnes (350,000 kg) oftriuranium octoxide (U3O8) per year from 2015 to meet one third of anticipated requirements then.[11]

Nuclear reprocessing

[edit]
See also:Reactor-grade plutonium

There are many nuclear processing sites in Pakistan that can produce the by-products of plutonium in varying qualities andgrades of plutonium.: 191–192 [15] The reactor-grade plutonium is produced at the Karachi Nuclear Power Plant and the Chashma Nuclear Power Plant, both of which, have separate plutonium separation facility and under the IAEA safeguard programs.: 103  Production of weapon-grade plutonium takes place in Nilore and Khushab, both of which, are separated from the nuclear power generation– therefore unsafeguarded from the IAEA inspections.[45]

At the back-end of the nuclear fuel cycle, the spent fuel undergoes of chemical process, reprocessing, to collect the reactor-grade plutonium and decaying uranium at the separate sites in Karachi and Chashma.: 103  At Karachi and Chashma, the plutonium extracted from thespent nuclear fuel which is monitored and requires the atomic energy commission to report the plutonium activities to IAEA.: 423  At Karachi and Chashma, the dismantling, storages, and separation of uranium and plutonium fuel rods from other impurities fromtributyl phosphate solvent are all reported in its solid form to as a nuclear fuel to run the nuclear power plants.[45] The heavy water to be used as a coolant in Karachi and Chashma nuclear power plants is produced at theheavy water facility in Multan, Punjab in Pakistan.: 192–198 [15]

Without the international cooperation, the atomic energy commission spent decades on learning the nuclear reprocessing as most studies were conducted at the secondPakistan Atomic Research Reactor located in Pinstech laboratory.[46] Under the IAEA guidelines and monitoring, the plutonium separation sites at the Karachi Nuclear Power Plant and the Chasma Nuclear Power Plant have expanded to increase the nuclear power generation and to address Pakistan's energy security issues.[47] The back-end nuclear fuel cycle is managed by the IAEA-authorized contractor, theChina-Pakistan Power Plant Corporation.[48]

Waste disposal

[edit]

The nuclear andhazardous waste is managed by the Pakistan's nuclear regulartory authority and has taken steps to ensure the safe disposal of the hazardous waste since 1972.[49] Monitoring of the waste management and federal regulatory oversights are provided by the Pakistan's nuclear regulatory authority in a series of guidelines at their Radioactive Waste Management Facility.[50]

The nuclear waste is stored at theBaghalchur-1 facility, which became a subject of political controversy when the residents filed a lawsuit against the atomic energy commission at theSupreme Court of Pakistan.[51] The case was eventually settled between the Pakistan's atomic energy commission and the legal firms representing the residents amid the intervention from the nuclear regulatory authority.[51]

In light of the lawsuit, the nuclear regulatory authority's guidelines were eventually signed into the law enacted by theParliament of Pakistan in 2010.[52]

There are four deep nuclear waste repositories inSouthern Pakistan.[53] The extremely high hazardous nuclear waste is being managed in themost-northern side of southern region while the low nuclear waste is being managed in thesouthern region of the country.[54]

Organizations

[edit]

Industry and academic

[edit]
Main article:Pakistan Nuclear Society

ThePakistan Nuclear Society (PNS) is a scientific and educational society that has both industry and academic members.[55] The nuclear society lobbies for the cause of the nuclear power generation by holding conferences and publishing papers on civilian nuclear technology at its journal.[56]

On the topic of nuclear engineering and reactor physics, the Pakistan's atomic energy commission has sponsors large publication in its quarterly magazine—The Nucleus.[57] The PAEC's academic scientists and engineers also publishes the newsletter—The PakAtom— concerning on nuclear technology and lobbying for the commercial nuclear power plants.[58] Education on nuclear engineering is provided at thePakistan Institute of Engineering and Applied Sciences in Nilore,NED University,Institute of Power Engineering in Karachi, and professional training and certifications at theCentre of Nuclear Training inChashma, and theCenter of Nuclear Power Training in Karachi.[10]

The other organizations that also the country's industry and the academics are part of included theCANDU Owners Group and theWorld Association of Nuclear Operators.[11]

Employment

[edit]

In 2021, the assessment compiled by the China'sNational Nuclear Corporation, the Karachi Nuclear Power Plant's construction works has promoted the development of related industries in Pakistan, providing more than 10,000 jobs for the local area.[59]

Nuclear Power Programme 2050

[edit]

TheNuclear Power Program 2050 is an official policy measure program of the federalGovernment of Pakistan to utilize thenuclear power to meet to increase itsenergy capacity to support thenational economy of Pakistan.[60][61][62][63]

The policy addresses the nation'senergy security matters by aiming to expand the self-sustaining nuclear power infrastructure all over the country by year 2050 with cooperation from China.[64] This program is seen as a direct response to theIndia–United States nuclear deal, as well as to counter the existing energy shortfalls and future requirements of a growing population and national economy.[64] The primary focus of this program is to promote scientific and socio-economic development of the people as a "foremost priority."[64]

This policy measure program was first announced on 14 July 2011 and enacted by the Gilani administration at theNational Command Authority by Prime ministerYousaf Raza Gillani.[60] The policy measures to regulate the nuclear power facilities, safe management ofwaste storage, along with an increase in power plant building to meet the target of producing 8,800 MW (8.8 GW) electricity in the country.[60][65] PAEC said an initial 1100 MWe plant would be built at Muzaffargarh, on the Taunsa-Panjnad canal near Multan in southwest Punjab. It was also reported that discussions with China were under way to supply three nuclear power units for about $13 billion.[citation needed]

Economics

[edit]
See also:Circular debt,Economics of nuclear power plants,National debt of Pakistan, andDebt-trap diplomacy

In Pakistan, theMinistry of Energy (MoE) has prioritized thehydropower over thenuclear power, mainly influenced from the budgetary point of view.[66] Furthermore, the facilities and infrastructure, which operates outside theIAEA safeguards, to support the nuclear power plants have been subjected to criticism at the international venue.[30]

However, the issue of building the larger earth-filled dams has always been subject ofpolitical controversy between thefour provinces of Pakistan where water is scarce and usually are installedin upcountry.[67][68] On both energy sources, Pakistan has spent billions of dollars from itstaxpayers funds, and initiated in capital loans from the international monetary banks to build the hydropower and nuclear power infrastructure to address itsenergy security.[68]

TheAsian Development Bank,World Bank,International Monetary Fund,United Nations Development Program, and theloans (also engineering assistance) from the United States subsequently helped Pakistan building itshydroelectric power stations anddams whereas the nuclear power plants were financed from the loans given to Pakistan by Canada (in past) and currently from China.[68]

In an absence of the international interaction and cooperation, federal Government of Pakistan has spent large financial capital from its federal budgets in investing on education and building the training resources locally on reactor and nuclear engineering to its general nuclearworkforce.[68]

See also

[edit]

References

[edit]
Constructs such asibid.,loc. cit. andidem arediscouraged byWikipedia's style guide for footnotes, as they are easily broken. Pleaseimprove this article by replacing them withnamed references (quick guide), or an abbreviated title.(March 2024) (Learn how and when to remove this message)
  1. ^ab"Chapter 14: Energy | Pakistan Economic Survey 2023-24".finance.gov.pk. Retrieved7 June 2025.
  2. ^"Nuclear Power in Pakistan - World Nuclear Association".world-nuclear.org. Retrieved11 August 2025.
  3. ^Nuclear power in Pakistan, Dr. Zia H. Siddiqui and Dr. I.H. Qureshi, pp.31–33.
  4. ^"Chashma-5 Nuclear Power Plant to add 1,200 MW to national grid".Profit by Pakistan Today. 3 June 2025. Retrieved7 June 2025.
  5. ^Larson, Aaron (30 December 2024)."Pakistan Will Build Another Chinese-Designed Nuclear Power Unit".POWER Magazine. Retrieved7 June 2025.
  6. ^"Expansion in nuclear power generation hits snags". 31 January 2023.
  7. ^Dawn.com (17 September 2015)."Pakistan envisions 40,000MW of nuclear power generation capacity: PAEC".Dawn. Pakistan. Retrieved2 June 2021.
  8. ^Jalil, Ghazala Yasmin (9 June 2023)."Pakistan's Nuclear Journey: Security and Development".Centre for Strategic and Contemporary Research. Retrieved7 June 2025.
  9. ^"Nuclear Power Plants- PNRA".www.pnra.org. Retrieved16 March 2024.
  10. ^ab"Nuclear Power". Retrieved16 March 2024.
  11. ^abc"Nuclear Power in Pakistan - World Nuclear Association".world-nuclear.org. Retrieved16 March 2024.
  12. ^"The China-Pakistan Nuclear Deal: A Realpolitique Fait Accompli".The Nuclear Threat Initiative. 10 December 2011. Retrieved7 June 2025.
  13. ^abProfessor Riazuddin (13 October 2005)."Contribution of Abdus Salam as Member of PAEC"(PDF).The Nucleus.42 (1–2). Nilore, Islamabad: The Nucleus PINSTECH publication:31–34.ISSN 0029-5698. Archived fromthe original(PDF) on 27 June 2014.
  14. ^Siddiqui, Dr. Zia; Dr. Iqbal Hussain Qureshi (13 October 2005)."Nuclear power in Pakistan"(PDF).The Nucleus.42 (1–2). Nilore, Islamabad: The Nucleus PINSTECH publication:63–66.ISSN 0029-5698. Archived fromthe original(PDF) on 6 March 2012.
  15. ^abcdefghijklmnKhan, Feroz (7 November 2012).Eating Grass: The Making of the Pakistani Bomb. Stanford, CA, US: Stanford University Press. p. 552.ISBN 978-0-8047-8480-1. Retrieved16 March 2024.
  16. ^Ghoshroy, Subrata (10 October 2007)."Parvez Butt"(PDF).www./web.mit.edu. Cambridge, Mass. USA: Conference on Security and Cooperation in South Asia: A Global Perspective. p. 23. Retrieved13 August 2020.
  17. ^abNation's First Nuclear Power Plant Is Inaugurated in Karachi. Pakistan: Information Division, Embassy of Pakistan. 1972. Retrieved17 March 2024.
  18. ^"Pakistan Makes Achievements in Peaceful Use of Nuclear Energy".Xinhua General Overseas News Service. 27 October 1979. Archived fromthe original on 18 September 2011.
  19. ^"Soviet Ambassador Says Soviets Might Sell Pakistan A Nuclear Plant". 26 February 1990. Archived fromthe original on 8 November 2010.
  20. ^"Pakistan: Details on Bhutto-Mitterrand News Conference," Islamabad Domestic Service, 21 February 1990
  21. ^"Agreement with China on Power Plant: "Safeguarded" By IAEA," PTV Television Network (Islamabad), 12 August1992; Proliferation Issues, 20 August 1992, Pg. 16
  22. ^"Chashma Nuclear Power Plant 1".www.world-nuclear.org. Retrieved19 August 2020.
  23. ^"K-2 nuclear power plant connected to grid".Dawn. Pakistan. 19 March 2021. Retrieved2 June 2021.
  24. ^"PM Khan inaugurates Kanupp-2 Nuclear Power Plant in Karachi".The Nation. 21 May 2021. Retrieved2 June 2021.
  25. ^abShabbir, Usman (5 May 2004)."Remembering Unsung Heroes: Munir Ahmed Khan".www.defencejournal.com. Islamabad: Defense Journal.Archived from the original on 18 January 2005. Retrieved19 August 2020.
  26. ^https://www.uxc.com/smr/uxc_SMRDetail.aspx?key=CNP-300 Info on CNP-300 at Ux Consulting
  27. ^"Nuclear Power".paec.gov.pk. Retrieved2 June 2021.
  28. ^Ijaz, Muhammad, Director of Scientific Information and Public Relation (SIPR) (December 2010)."PAEC assigned 8,800 MWe nuclear power target by 2030:PAEC contributing to socio-economic uplift of the country"(PDF).PakAtom Newsletter.49 (1–2). Islamabad, Islamabad Capital Territory: Pakistan Atomic Energy Commission:1–8. Retrieved27 February 2011.{{cite journal}}: CS1 maint: multiple names: authors list (link)[permanent dead link]
  29. ^"With Chinese assistance: ECNEC set to approve three nuclear power plants – The Express Tribune".The Express Tribune. 4 July 2013. Retrieved1 April 2018.
  30. ^ab"Commitment for new Pakistan reactors". World Nuclear News. 11 July 2013. Retrieved30 September 2013.
  31. ^"China, Pakistan reach controversial deal on nuclear power plant, sources say". Fox News. 21 March 2013. Retrieved1 April 2018.
  32. ^"Germany Opposes United States on China-Pakistan Nuclear Deal".armscontrolnow.org. 21 June 2011. Retrieved1 April 2018.
  33. ^Samanta, Pranab Dhal (24 September 2010)."Out in open: China tells IAEA it'll sell n-reactors to Pakistan".The India Express. Archived fromthe original on 18 August 2011.
  34. ^Chari, P.R. (13 July 2011)."Why Indians are not welcome members at the NSG club".Daily News and Analysis (DNA). Retrieved1 August 2011.
  35. ^ab"Pakistan in 'French nuclear deal'". 15 May 2009. Retrieved22 April 2022.
  36. ^ab"Civil-nuclear cooperation: French govt says option can be explored at request".The Express Tribune. 2 October 2013. Retrieved22 April 2022.
  37. ^"Pakistan Pursues Nuclear Deal at High-Level Talks With U.S. – Analysis – NTI".gsn.nti.org. Retrieved1 April 2018.
  38. ^"Pakistan-United States nuclear deal long way off".State-owned Assets Supervision and Administration Commission.Xinhua News Agency. 29 March 2010. p. 1. Archived fromthe original on 9 June 2011.
  39. ^Michealson, David (27 February 2011)."Japan denied the civil nuclear power cooperation with Pakistan".Daily Jang (in Urdu). Tokyo, Japan:Jang Group of Newspapers. pp. 3–4. Archived fromthe original on 2 March 2011.[ Japan denied the civil power cooperation with Pakistan]
  40. ^"Pakistan and Japan signed Nuclear non-proliferation Agreement".Daily Jang (in Urdu). Tokyo, Japan:Jang Group of Newspapers. 2011. p. 1. Archived fromthe original on 20 January 2011.
  41. ^"List of Nuclear Power Plants".Pakistan Nuclear Regulatory Authority. Retrieved7 June 2025.
  42. ^"Pakistan's Growing Uranium Enrichment Program | Institute for Science and International Security".isis-online.org. Retrieved20 March 2024.
  43. ^Associate Press of Pakistan (APP) (25 April 2011)."IAEA declares nuclear energy programme safe".Dawn. Pakistan. Retrieved17 April 2012.
  44. ^(WNA), World Nuclear Association."Fuel cycle Management".Nuclear power consortium management desk. The Pakistan Atomic Energy Commission and World Nuclear Association.
  45. ^abKhan, Munir Ahmad (7 February 1998). "How Pakistan Made Nuclear Fuel".The Nation.
  46. ^Chaudhri, M. A. (May 2006). "Pakistan's Nuclear History: Separating Myth from Reality".Defence Journal.9 (10):14–50.
  47. ^"IAEA, Pakistan to enhance cooperation in nuclear technology uses in health and climate".gulfnews.com. 16 February 2023.
  48. ^(WNA), World Nuclear Association."Fuel cycle Management".Nuclear power consortium management desk. The Pakistan Atomic Energy Commission and World Nuclear Association.
  49. ^(NSD), Nuclear Safety Directorate (March 2010)."Nuclear Safety Policy of Pakistan Atomic Energy Commission".PAEC. Pakistan Atomic Energy Commission. Archived fromthe original on 12 November 2010.
  50. ^PNRA (March 2010)."Guidelines for the Management of Radioactive Waste (MRW) in hospitals/nuclear research and nuclear medical centers"(google docs).PAEC. Pakistan Atomic Energy Commission.
  51. ^abKaleem, Moosa (10 March 2014)."Herald Exclusive: Nuclear hazards".DAWN.COM. Retrieved21 March 2024.
  52. ^PNRA, Pakistan Nuclear Regulatory Authority (March 2010)."Regulations of Radioactive Waste Management"(google docs).PNRA. Pakistan Nuclear Regulatory Authority.
  53. ^"Radioactive Waste Management Facility".pnra.
  54. ^Ibid, Radtion Active Waste Management Facility
  55. ^(PNS), Pakistan Nuclear Society."Pakistan Nuclear Society". Archived fromthe original on 20 March 2012.
  56. ^(PNS), Pakistan Nuclear Society's affiliation,Related Links, archived fromthe original on 20 March 2012
  57. ^Qureshi, Riffat M.; Hussain, Nazar (2011),The Nucleus
  58. ^"SI & PR – Pak Atom".paec.gov.pk. Retrieved22 April 2022.
  59. ^"Fuel loading under way at first Pakistani Hualong One : New Nuclear – World Nuclear News".world-nuclear-news.org. Retrieved9 April 2021.
  60. ^abcGovernment of Pakistan, Prime minister Secretariat (14 July 2011)."Opening Remarks by the Prime Minister at the National Command Authority"(google docs).Pakistan Nuclear Command. Government of Pakistan. Retrieved23 November 2012.
  61. ^Raza Bashir Tarar, Acting Permanent Representative of Pakistan at the United Nations Security Council Meeting under Agenda Item Maintenance of International Peace and Security."Official Policy".Ministry of Foreign Affairs (Government of Pakistan. Ministry of Foreign Affairs. Retrieved23 November 2012.
  62. ^"Military Flair Up Between India and Pakistan See Both Sides Blaming One Another".Paktribune. Retrieved22 April 2022.
  63. ^"Pakistan wants to join Nuclear Suppliers Group".The Express Tribune. 14 July 2011. Retrieved22 April 2022.
  64. ^abc"NCA okays Nuclear Power Prog 2050, Space Prog 2040".geo.tv. Retrieved22 April 2022.
  65. ^Syed Yousaf, Raza (31 July 2012)."Current Picture of Electrical Energy In Pakistan".Pakistan Atomic Energy Commission. Directorate-General for Nuclear Power Generation. Retrieved28 November 2012.
  66. ^Khan, Rina Saeed (23 July 2013)."The untapped blessing of hydropower".DAWN.COM. Retrieved21 March 2024.
  67. ^Durrani, Musa Khan (9 November 2015)."Solar, nuclear, hydel? Pakistan's best power solution is..."DAWN.COM. Retrieved21 March 2024.
  68. ^abcdMuzamil, Hafiz (4 October 2015)."Pakistan's energy mix: power and politics".DAWN.COM. Retrieved21 March 2024.

Further reading

[edit]

External links

[edit]
Power plants
Facilities
Facilities under construction
National laboratories
Reservations
Fuel extractions
Agencies
Public policy
Organizations
Related
See also
Divisions
State-owned enterprises
Installations
Agencies
Programs
Related
GWe > 10
GWe > 5
GWe > 2
GWe > 1
GWe < 1
Planned
Abandoned plans
for new plants
Phasing-out
Science
Fuel
Neutron
Power
Medicine
Imaging
Therapy
Processing
Weapons
Topics
Lists
Waste
Products
Disposal
Debate
Light water
Heavy water
bycoolant
D2O
H2O
Organic
CO2
Water (LWGR)
H2O
Gas
CO2
He
Molten-salt
Fluorides
Generation IV
Others
Magnetic
Inertial
Other
Nuclear energy in Asia
Sovereign states
States with
limited recognition
Dependencies and
other territories
Ancient
Medieval
Modern
Pre-colonial
Colonial
Dominion
Republic
Features
Areas
Geology
Environment
Other topics
State
Government
Legislative
Judicial
Politics
Law
Military
Infrastructure
Industry
Commerce
Policy programmes
Society
Demographics
Arts
Lifestyle
Sports
Places
Portals:
Retrieved from "https://en.wikipedia.org/w/index.php?title=Nuclear_power_in_Pakistan&oldid=1320070294"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp