Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Next Generation Jammer

From Wikipedia, the free encyclopedia
Airborne Electronic Warfare system

AnEA-18G Growler equipped with the Next Generation Jammer-Mid Band lands atNaval Air Station Point Mugu

TheNext Generation Jammer (NGJ) is a program to develop airborneelectronic warfare systems as replacements for theAN/ALQ-99 found on theEA-18G Growler andEA-6B Prowlerelectronic attack aircraft. Requirements for the system were outlined by theUS Navy in 2008 and development of the NGJ program began in 2010. The mid-band portion of the NGJ (NGJ-MB), designatedAN/ALQ-249, reachedInitial Operating Capability (IOC) in 2021.

In accordance with theJoint Electronics Type Designation System (JETDS), the "AN/ALQ-249" designation represents the 249th design of anArmy-Navy airborne electronic device for specialcountermeasures equipment. The JETDS system also now is used to name allDepartment of Defense and someNATO electronic systems.

History

[edit]

US Air ForceEF-111A Raven, US Navy EA-18G Growler,US Marine Corps and EA-6B Prowler aircraft, as well as aircraft of theRoyal Australian Air Force, all carried the AN/ALQ-99. In the primary role ofsuppression of enemy air defenses (SEAD), thisradar jamming and deception system provided modified escort jamming from outside the range of known surface to air missiles.[1] Poor reliability of the ALQ-99, in use since 1972, and frequent failures of itsBuilt In Test (BIT) often caused crews to fly missions with undetected faults. The ALQ-99 also interferes with the host aircraft'sActive Electronically Scanned Array (AESA) radar, reduces the top speed of the aircraft due to drag and imposes a high workload on EA-18G 2-person crew.[2]

Design

[edit]

In September 2008, the U.S. Navy outlined the basic requirements of the NGJ and stated that the design must be modular and use open architecture. The program is expected to consist of three development phases, one each for low-band (NGJ-LB), mid-band (NGJ-MB) and high-band (NGJ-HB) coverage.[3][4] The Navy selected four companies,BAE,ITT,Northrop Grumman andRaytheon in 2009 to submit designs for the Next Generation Jammer, each receiving aUS$6 million (equivalent to aboutUS$8.1 million in 2024) concept development contract.[5] The NGJ will havecyber attack capabilities using the AESA radar to insert tailored data streams into remote systems.[6]

By 2010, theOffice of Naval Research (ONR) started a Next-Generation Airborne Electronic Attack (NGAEA) project (ONR Project Code 31) developing technologies for the NGJ. NGAEA had four primary tasks: (1) improvingantenna array technologies, (2) improvingRF power amplifier technologies to cover wideRF bandwidths, (3) improvingbeam steering technologies, (4) improving exciter technologies providing ultra-wideband directdigital synthesis.[7] That same year, the U.S. Navy awarded prototype development contracts to the same four companies, BAE, ITT, Northrop Grumman and Raytheon totalingUS$168 million (aboutUS$242 million in 2024). At the time, the Navy was expected to invest over $4 billion into development of the NGJ project.[8]

In August 2012,Lockheed Martin said the company'sJoint Strike Fighter would be able to carry the NGJ.[9] However, on August 23, 2012,Marine Corps Commandant GeneralJames F. Amos, said the Marine Corps had no plans to pursue an electronic warfare variant of the F-35B Joint Strike Fighter. He explained saying, theAN/APG-81 AESA radar on the F-35 "already sets the fifth generation fighter apart as an electronic warfare platform".[10] The system was expected to be fielded on the Growler by 2020 with further expectations the EA-18G would remain in-service well into the 2030s,[11] but subsequent budget cuts pushed IOC to 2022 for the Mid Band pod.[12][13]

On July 8, 2013,Naval Air Systems Command (NAVAIR) announced that theUS$279.4 million (aboutUS$377 million in 2024) cost-plus-incentive-fee contract for a 22-month Technical Development (TD) phase had been awarded toRaytheon.[14][15] However, on 26 July 2013, the Navy issued Raytheon a stop-work order following a formal protest of the contract byBAE.[16] By November 2013, aGovernment Accountability Office investigation upheld the protest claiming they found that the Navy used improper procedures to select Raytheon. The Navy further examined the issue, making some corrections recommended by the GAO, and announced on January 24th Raytheon would continue as prime contractor.[17]

After a successful System Readiness Review in June 2014, Raytheon expected to move forward with flight testing in September 2014 and reach an IOC in late 2020. The test was flown in November 2014.[18] The NGJ-MB pod operates independently of other aircraft systems,[19] automatically responding to identified threats. One unique aspect of the NGJ is that its AESA array combinesEW, communications, radar, andsignals intelligence (SIGINT). AESA technology is known to perform EW and radar, but handling SIGINT and serving as a communications array are new capabilities. Other than dedicated EW aircraft, the pods can be installed on other platforms like theUCLASS with little modification.[20]

In a 2017memorandum of understanding (MOU), theRoyal Australian Air Force contributedA$250 million (aboutA$286 million in 2022) towards the NGJ-MB program,AN/ALQ-249, and is directly participating in its development.[21] The first flight test of the NGJ-MB version of the pod took place in August 2020 aboard an EA-18G out ofNaval Air Station Patuxent River,Maryland. This flight was intended to prove that the pod could be safely flown aboard the EA-18G. Initial Operating Capability is on the MB pod in FY 2022, with a Capability Block 1 contract awarded in the fall of 2020. The mid-band and then the low-band pods will supplement the legacy jamming system on the Growlers until the high-band, the last of the three increments, is fielded and the legacy system can be safely retired.[13]

In October 2018, the Navy awarded contracts toL3Harris and Northrop Grumman of more thanUS$35 million each for development of the NGJ low-band (NGJ-LB) pod.[22] L3Harris was selected in December 2020 as prime contractor, was awarded an additionalUS$496 million contract to deliver four prototype NGJ-LB test pods and eight operational pods.[23] However, the GAO discovered a problem that led to a contract recompete due to the appearance of conflict of interest.[24] After nearly four years, in August 2024, the NGJ-LB contract was again awarded to L3Harris.[25]

As of September 2024, funding and development timelines of the NGJ-HB (high-band) were still unknown.[26]

In December, 2024,Raytheon was awarded aUS$590 million follow-on production contract from the US Navy for the NGJ-MB system,[27] and in that same month, the US Navy declaredInitial Operating Capability for the system.[4][28] Then, in May 2025, Raytheon was awarded anotherUS$580 million to deliver Lot V shipsets of the NGJ-MB.[29]

Characteristics

[edit]

L3Harris and Northrop Grumman are developing the NGJ low-band (NGJ-LB) expected to operate from 0.1–2 GHz (299.79–14.99 cm) and high-band (NGJ-HB) expected to operate from 6–18 GHz (5.00–1.67 cm) complementing the NGJ-MB which reportedly operates from 2–6 GHz (14.99–5.00 cm).[30] By comparison, theAN/ALQ-99 being replaced by the NGJ operated from 0.064–20 GHz (468.43–1.50 cm).

Deployment

[edit]

The AN/ALQ-249(V)1 Next Generation Jammer Mid-Band deployed for the first time in combat sometime in 2024 with Electronic Attack Squadron 133 (VAQ-133), assigned to theUSS Abraham LincolnCarrier Strike Group (CSG), againstIran-backedHouthis inYemen.[31]

See also

[edit]

Related ECMs

[edit]

References

[edit]
  1. ^Sullivan, Michael J; Kaczmarek, Sarah (20 August 2013)."Next Generation Jammer: DOD Should Continue to Assess Potential Duplication and Overlap As Program Moves Forward GAO-13-642".United States Government Accountability Office. Retrieved23 August 2025.
  2. ^Sullivan, Michael J; Kaczmarek, Sarah (30 March 2010).GAO Report to Congress: Defense Acquisitions - Assessments of Selected Weapon Programs GAO-10-388SP(PDF) (Report).United States Government Accountability Office. pp. 59, 60. Retrieved23 August 2025.
  3. ^"Next Generation Jammer".NAVAIR.Patuxent River, Maryland. Retrieved26 August 2025.
  4. ^abPomerleau, Mark (9 January 2025)."Navy's Next Generation Jammer reaches critical milestone".DefenseScoop. Retrieved26 August 2025.
  5. ^"US Navy starts next-generation jammer bidding war".Flightglobal.com. 2 March 2009. Archived fromthe original on 21 February 2009. Retrieved23 November 2009.
  6. ^Fulghum, David A (23 March 2010)."U.S. Cyber-Combat Needs Rules".Integrator.Hanscom.AF.mil. Archived fromthe original on 12 December 2011. Retrieved4 December 2011.
  7. ^Craig, Dr Peter (November 2010)."ONR: Next Generation Airborne Electronic Attack".Office of Naval Research.Arlington, Virginia. Archived fromthe original on 10 July 2012. Retrieved10 November 2010.
  8. ^Staff Writers (15 July 2010)."Navy awards jammer contracts".Space War.com. Retrieved18 July 2010.
  9. ^Ellery, David (24 August 2012)."Growler obsolete in 5 years, expert says".Sydney Morning Herald. Retrieved23 August 2025.
  10. ^"No plans to build F-35 EW variant". 24 August 2012. Archived from the original on 27 August 2012.
  11. ^Majumdar, Dave (11 May 2012)."IN FOCUS: US Navy Next Generation Jammer proceeds, but F-35 integration deferred indefinitely".FlightGlobal. Retrieved23 August 2025.
  12. ^CNO's Position Report: 2014(PDF) (Report).US Navy. 2014. Archived fromthe original(PDF) on 22 January 2015. Retrieved26 November 2014.
  13. ^abEckstein, Megan (19 August 2020)."Flight Tests Begin on Next Generation Jammer Mid-Band Pods; Could Reach Milestone C This Fall".USNI News. Retrieved21 September 2020.
  14. ^"Navy awards contract for Next Generation Jammer technology development".NAVAIR News.Patuxent River, Maryland. 8 July 2013. Archived fromthe original on 25 December 2013.
  15. ^Warwick, Graham (8 July 2013)."Raytheon To Develop U.S. Navy's Next Generation Jammer".Aviation Week. Archived fromthe original on 25 December 2013.
  16. ^"US Navy issues NGJ TD contract stop-work order to Raytheon".Strategic Defense Intelligence. 26 July 2013. Archived fromthe original on 9 November 2013.
  17. ^"Raytheon to keep next-generation jammer contract- US Navy".Yahoo Finance. Reuters. 24 January 2014. Retrieved24 January 2014.
  18. ^"Jam Session: Prototype Electronic Warfare Pod Aces First Flight". 19 November 2014. Archived fromthe original on 21 November 2014.
  19. ^Davis, Jeff."You're Ultimate Guide to the Next-Gen Jammer (NGJ) Program".Intergalactic. Retrieved26 August 2025.
  20. ^Clark, Colin (14 July 2014)."The $10B Next Generation Jammer Is 'On Track, On Schedule'".BreakingDefense.com.London. Retrieved15 July 2014.
  21. ^"Australia and US sign Next Generation Jammer development MOU".Australian Aviation. 3 November 2017. Retrieved23 August 2025.
  22. ^Trevithick, Joseph (27 October 2018)."Navy's Next Gen Jammer Is Three Pods, Not One, And Competition For One Of Them Just Heated Up".The War Zone. Retrieved26 August 2025.
  23. ^Abott, Rich (21 December 2020)."Navy Picks L3Harris For Next Generation Jammer Low Band Award".Defense Daily. Retrieved26 August 2025.
  24. ^Wolfe, Frank (3 September 2021)."Next Generation Jammer-Low Band May See Recompete, As GAO Sustains Protest".Defense Daily. Retrieved26 August 2025.
  25. ^"Feature: USN's Next Generation Jammer aims to field digital-era electronic attack".Janes. 13 February 2025. Retrieved26 August 2025.
  26. ^Dardine, Andrew (17 September 2024)."Half-Billion Contract to L3Harris Highlights Next Generation Jammer Advancement".Defense and Security Monitor. Retrieved26 August 2025.
  27. ^Naval News Staff (10 December 2024)."Raytheon wins production contract for Next Generation Jammer Mid-Band".Naval News (Press Release). Archived fromthe original on 11 December 2024. Retrieved10 December 2024.
  28. ^Naval News Staff (7 January 2025)."US Navy declares IOC for the NGJ-MB - Next Generation Jammer Mid-Band system".Naval News. Retrieved7 January 2025.
  29. ^"RTX's Raytheon awarded $580 million production contract for Next Generation Jammer Mid-Band".RTX Corp (Press Release).McKinney, Texas. 16 May 2025. Retrieved26 August 2025.
  30. ^D'Urso, Stefano (7 January 2025)."Next Generation Jammer Mid-Band Achieves Initial Operational Capability".The Aviationist. Retrieved27 August 2025.
  31. ^Ziezulewicz, Geoff (11 February 2025)."How The EA-18G Growler's Next-Generation Jamming Pod Went To War On Its First Cruise".The War Zone. Retrieved13 June 2025.

External links

[edit]
Subsidiaries
Products
Related
Subsidiaries
Products
Antecedents &
former assets
People
Divisions and
subsidiaries
Products and
services
People
Places
Retrieved from "https://en.wikipedia.org/w/index.php?title=Next_Generation_Jammer&oldid=1322984437"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp