Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

New York City Board of Transportation

This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia
Municipal transit commission (1924–1953)

Not to be confused withNew York City Department of Transportation.

New York City Board of Transportation
The side of an R1–9 fleet car, an original IND subway car purchased by the BOT, bearing the name "City of New York".
The side of anR1–9 fleet car, an originalIND subway car purchased by the BOT, bearing the name "City of New York".
Overview
OwnerCity of New York
LocaleNew York City
Transit typeSubways,Elevated railway,Buses,Streetcars,Trolley coaches
Headquarters250Hudson Street,Manhattan,New York
385 Flatbush Avenue Extension,Brooklyn, New York
370 Jay Street,Downtown Brooklyn, New York
Operation
Began operationJune 1, 1924
Ended operationJune 15, 1953

TheNew York City Board of Transportation or theBoard of Transportation of the City of New York (NYCBOT orBOT) was a city transit commission and operator inNew York City, consisting of three members appointed by themayor.[1] It was created in 1924 to control city-owned and operatedpublic transportation service within theNew York City Transit System. The agency oversaw the construction and operation of the municipalIndependent Subway System (IND), which was constructed shortly after the Board was chartered. The BOT later presided over the major transfers of public transit from private control to municipal control that took place in the 1940s, including theunification of theNew York City Subway in 1940. In 1953, the Board was dissolved and replaced by thestate-operatedNew York City Transit Authority, now part of theMetropolitan Transportation Authority (MTA).

Background

[edit]
See also:History of the New York City Subway andNew York City Transit Authority

In 1874, theNew York State Legislature passed a bill allowing for the creation of a rapid transit commission in New York City, which was formed in 1875.[2][3] This commission mapped outelevated railway routes that would be built by private companies, but did not plan any underground lines.[2] In 1889, MayorHugh J. Grant created a five-member rapid transit board to lay out lines in the city.[2]

In 1891, the State Legislature passed the Rapid Transit Act, allowing thegovernment of New York City and all cities with a population of over one million to create a board of "rapid transit railroad commissioners", which would dictate the expansion ofrapid transit facilities within the city. The government could issue bonds in order to fund rapid transit for the city.[1][4][5][2] That year, a five-member rapid transit board was created for the city, called theBoard of Rapid Transit Railroad Commissioners. The board received bids for a municipal underground rail line, but no bids were selected.[1][2] The board was abolished in 1894 by the State Legislature due to its failure to create a subway line. It was replaced by a new board whose members included the Mayor of New York City.[2] That year, the New York City government issued a referendum stating that future rapid transit lines should be municipally operated, as opposed to issuing franchises to private operators.[1]

In spite of this, the initial subway lines to be operated in the city − the"first subway" opened in 1904, and the initial portion of theCentre Street Loop toEssex Street opened in 1908 − were privately operated by theInterborough Rapid Transit Company (IRT) and theBrooklyn Rapid Transit Company (BRT) respectively.[1][2][6][7][8] The initial 1890s transit board was replaced in 1907 by the state-runNew York Public Service Commission (PSC). This agency would oversee theDual Contracts subway expansion, which led to the construction of new lines for the IRT and BRT.[1][2][9]

Creation and subway unification

[edit]

Until 1924, municipal public transportation actions originated primarily from state-controlled agencies, including the 1891 and 1894 rapid transit boards, the PSC, and most recently the New York State Transit Commission which was created in March 1921.[1][2][6] Following the creation of the State Transit Commission and the reelection ofAl Smith asGovernor of New York in 1922, then-mayorJohn Francis Hylan and future mayorsJimmy Walker (then astate senator) andJohn P. O'Brien (the city's corporation counsel) sought to establish a city-controlled transit commission.[6] Hylan had been both an opponent of private transit operation, particularly that of theBrooklyn–Manhattan Transit Corporation (BMT; the successor to the BRT), and a political opponent of Smith. Hylan also had his ownplans for a city-operated subway system.[6][10]

In 1924, the New York City Board of Transportation was created by theNew York City Board of Estimate following a bill passed by New York State Legislature. The Board of Transportation would responsible for mapping and constructing new rapid transit lines, carrying out the powers dictated in the 1891 Rapid Transit Act, while the State Transit Commission would continue to oversee the privately operated systems.[1][2][6][11][12][13][14][15] The bill had been deadlocked in the State Assembly for two years until a compromise bill was introduced in February 1924[6][13] and passed on April 11 of that year.[15] Governor Smith signed the bill into law on May 2,[6] and the BOT assumed power on June 1.[6][16] The board's first chairman was John Hanlon Delaney, one of Hylan's top advisers who had been the transit construction commissioner since 1919.[6][16] The BOT would release the initial plans for what would become theIndependent Subway System (IND) on December 9, 1924, based largely off of Mayor Hylan's plans.[6][17] The first IND subway line and the system's trunk line, theIND Eighth Avenue Line, broke ground on March 14, 1925,[18] and was opened on September 10, 1932.[1][19] On August 29, 1929, the BOT released its first major plans for the expansion of the city-owned system still under construction.[6][20][21] A revision of this proposal was released almost ten years later on July 5, 1939.[6][22] These plans would later be called theIND Second System, and would go largely unbuilt due to theGreat Depression andWorld War II.[1][6][7]

Beginning on June 1, 1940 under the mayoral administration ofFiorello H. La Guardia, the Board of Transportation took over the assets of the IRT and BMT for municipal operations in an event referred to asunification. The event placed the three rapid transit systems − IRT, BMT, IND − under a single operator. The BOT also inherited the BMT's extensive surface transit network in Brooklyn and Queens, which consisted primarily ofstreetcar lines along with a fewelectric trolley coach anddiesel-powered bus routes.[1][2][6][7][11][12][23] The BOT proceeded to close the IRT-operatedSecond andNinth Avenue elevated lines in Manhattan, and the BMT-operatedThird and Fifth Avenue elevateds in Brooklyn.[2][7][24] On December 15, 1940, the IND's second Manhattan trunk line − theIND Sixth Avenue Line − was completed.[2][7][25] In 1941, the BOT began motorizing the former BMT streetcar lines in Brooklyn and Queens into diesel bus routes or trolley coach routes.[1][7][11] The further motorization of surface lines, and the completion of the IND system, however, was delayed due to World War II.[1][6][7][11][26][27][28] Unification made the Board of Transportation the largest public transit operator in North America, in addition to being one of the few systems under public ownership at the time.[7]

Following the end of World War II, the BOT resumed subway construction.[1][6][7][11][26][27] On February 23, 1947, the Board of Transportation assumed the bus routes of Isle Transportation in Staten Island. On March 30, 1947, the BOT took over theNorth Shore Bus Company in Queens. Both companies could not operate on the mandated five-cent fare and went bankrupt. This gave the city control of the majority of surface transit in Brooklyn, Queens, and Staten Island. It also created three distinct surface transit divisions: the Brooklyn Bus and Trolley Division, the Staten Island Bus Division, and the Queens Bus Division.[2][7][11][12][29][30][31][32][33][34] On September 24, 1948, the BOT took over the East Side Omnibus Corporation and Comprehensive Omnibus Corporation inManhattan.[2][35] At this time, the BOT resumed motorizing trolley lines, and proceeded to construct newstorage and repair facilities. It also purchased new buses, to either replace streetcars or the dilapidated buses inherited from private operators.[1][7][11]

Decline

[edit]
AGM "old-look" transit bus bearing the original green and white color scheme of the Board of Transportation, and a white circular BOT logo. The color scheme would be inherited by the Transit Authority.

Following an artificial operating surplus during World War II, brought on by gas and rubber rations leading to increased mass transit usage,[7][8] the Board of Transportation had its first operational deficit in 1947, amounting to $18 million.[8][11] On March 30, 1948, GovernorThomas E. Dewey signed legislation to allow the BOT to increase fares with the approval of the New York City mayor.[8] On July 1, 1948, the Board of Transportation raised the fare for its rapid transit system from five cents to ten cents, with the approval of MayorWilliam O'Dwyer. The nickel fare had been in place in the subway system since October 27, 1904, a period of 45 years, and was one of the main provisions of theDual Contracts. New York City was the last major city to have a five-cent fare.[6][7][8][11] The BOT also created 14 new free transfers between the formerly-separate subway divisions.[7][11] The fare increase was put forward due to increasing debt, inflation in the post-war period, expenditure on new subway routes, equipment and facilities, and maintenance of the existing system which was in disrepair.[6][7][11] In addition, city plannerRobert Moses pushed for the fare increase to allow more city funding to go towards highway development, whileTransport Workers Union of America leaderMichael J. Quill supported the fare hike in order to give transit workers a 30-cent per hour wage increase.[8] In 1950, the fare of BOT surface transit was also raised to ten cents.[7] Upon the initial 1948 increases, a twelve-cent fare had been put in place for a combined trip on the subway and either bus or trolley, but this was eliminated on July 1, 1952.[7][8]

The fare hikes did not effectively increase revenue for the Board of Transportation to offset increasing operation costs, while system ridership plateaued due to theAmerican car culture andincreasing migration to the suburbs.[7][8] After two years of financial surplus, the BOT experienced a $1.2 million deficit in 1950, and a $24.8 million deficit in 1952.[8] The BOT was also criticized due to the influence of politics on the organization, the direct control over the board by the mayor, and the use of the city's operating budget to subsidize transit operations.[7][8] In March 1953, the New York State Legislature created theNew York City Transit Authority (NYCTA), apublic authority without direct control from a political office, with members appointed by both the Governor and Mayor. Governor Dewey signed the bill approving the creation of the TA into law on March 20, 1953.[7][8] On June 15, 1953, operation of the New York City Transit System was turned over to the Transit Authority, with the Board of Estimate leasing the system to the TA for a period of ten years. The Board of Transportation, meanwhile, was dissolved.[2][7][8][36][37] The new Transit Authority was modeled after the existingPort Authority of New York and New Jersey andTriborough Bridge and Tunnel Authority, the latter of which is also now part of the MTA.[7][8][38]

Headquarters

[edit]
Main article:370 Jay Street
This entrance to theJay Street–MetroTech subway complex is adjacent to370 Jay Street, the former Board of Transportation Headquarters.

The Board of Transportation's final headquarters was located at370 Jay Street, at the northwest corner of Jay Street and Wiloughby Street in the modernMetroTech Center ofDowntown Brooklyn. The building is bound by Pearl Street to the west, and was formerly bound byMyrtle Avenue at its north end; this portion of the street has since been de-mapped.[11][39][40] The 14-story office building was designed by architectsWilliam Haugaard andAndrew J. Thomas in post-warmodernist style.[11][40][41][42][43][44] The building is L-shaped, the long side along Jay Street, and the short side along the former Myrtle Avenue.[44] The outer facade of the building consists of white limestone, with 420 square and uniformly-arrangedcasement windows.[43][44][45][46]

The building was intended to serve as the central headquarters of the BOT. The building housed 2,500 employees from several divisions of the board including its executive, legal, and engineering staff. The remainder of the building not used by the BOT would be rented out.[11][47] The ground level of the building at Jay and Wiloughby Streets is designed with numerous columns forming anarcade.[43] Haugaard, the lead designer, had drafted the design prior to World War II.[43] Within the arcade and adjacent to the building are several entrances to theJay Street–MetroTech subway complex, which consisted of two separate stations when the building was constructed. The location was selected in order to be in close proximity to the lines of all three subway divisions, in order to collect fares viamoney train. Passageways from the subway stations, including a visible door in the Jay Street IND station, lead to a money sorting room in the basement of the building.[11][41][42][48][49] Ground broke on the site on October 8, 1948.[50] The building was erected at a time when many other BOT transit facilities were also being built.[11] The headquarters opened on April 1, 1951,[39][42][47][50] just two years before the BOT ceased existence,[7][8] and after the death of Haugaard.[43] It cost $10 million to construct.[11][42][47][50] The BOT proceeded to vacate its former headquarters, one atHudson Street at the entrance to theHolland Tunnel inHudson Square, Manhattan, and the other in the formerParamount Theatre in Downtown Brooklyn.[11][42][47][50]

Following the dissolution of the BOT, the building was used by the Transit Authority as its headquarters, and later used by the MTA with some space rented out to other organizations including theNew York City Police Department.[39][40][48] In 1990, the Transit Authority moved its primary headquarters out of 370 Jay Street, to its current location on Livingston Street. Other MTA operations were moved to2 Broadway (now the headquarters ofMTA Bridges and Tunnels) in Manhattan in 1998.[39][43][48] In January 2006, the money train operations ended, after which the MTA largely vacated the site.[41][48][51][52] The building is currently being converted for use as part of theBrooklyn Campus ofNew York University.[39][44][48][53]

References

[edit]
  1. ^abcdefghijklmnoReport including analysis of operations of the New York City transit system for five years, ended June 30, 1945. New York City: Board of Transportation of the City of New York. 1945.
  2. ^abcdefghijklmnop"New York City Transit Facts & Figures: 1979"(PDF).La Guardia and Wagner Archives.Metropolitan Transportation Authority,New York City Transit Authority. 1979. RetrievedOctober 24, 2016.
  3. ^"The State Senate And Rapid Transit"(PDF).The New York Times. April 29, 1874. RetrievedNovember 1, 2016.
  4. ^"Board of Transportation : William Reid".WNYC (AM). September 3, 1948. RetrievedOctober 13, 2016.
  5. ^"The Rapid Transit Act. 1891".New York State Legislature. 1891. RetrievedOctober 13, 2016.
  6. ^abcdefghijklmnopqrRaskin, Joseph B. (2013).The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. New York, New York: Fordham University Press.doi:10.5422/fordham/9780823253692.001.0001.ISBN 978-0-82325-369-2.
  7. ^abcdefghijklmnopqrstuvwSparberg, Andrew J. (October 1, 2014).From a Nickel to a Token: The Journey from Board of Transportation to MTA. Fordham University Press.ISBN 978-0-8232-6190-1.
  8. ^abcdefghijklmnRoger P. Roess; Gene Sansone (August 23, 2012).The Wheels That Drove New York: A History of the New York City Transit System. Springer Science & Business Media.ISBN 978-3-642-30484-2.
  9. ^Derrick, Peter (April 1, 2002).Tunneling to the Future: The Story of the Great Subway Expansion That Saved New York. NYU Press.ISBN 9780814719541.
  10. ^"Mayor Explains His Plan:Gives Details of Proposal to Spend $600,000,000 for Transit"(PDF).The New York Times. August 28, 1922. RetrievedOctober 13, 2016.
  11. ^abcdefghijklmnopqrReport for the three and one-half years ending June 30, 1949. New York City Board of Transportation. 1949.hdl:2027/mdp.39015023094926.
  12. ^abcKenneth T. Jackson; Lisa Keller; Nancy Flood (December 1, 2010).The Encyclopedia of New York City: Second Edition. Yale University Press.ISBN 978-0-300-18257-6.
  13. ^ab"Republicans Offer Transit Home Rule; City to Pick Board"(PDF).The New York Times. February 7, 1924. RetrievedOctober 13, 2016.
  14. ^"Another Rapid Transit Bill"(PDF).The New York Times. February 20, 1924. RetrievedOctober 13, 2016.
  15. ^ab"City Transit Bill Passed by Assembly; Senate Will Concur"(PDF).The New York Times.Albany, New York. April 11, 1924. RetrievedOctober 13, 2016.
  16. ^ab"City Has $85,000,000 Available to Start Subway Work July 1"(PDF).The New York Times. April 13, 1924. RetrievedOctober 13, 2016.
  17. ^"Hylan Subway Plan Links Four Boroughs at $450,000,000 Cost".New York Times. December 10, 1924. p. 1.
  18. ^"Will Break Ground Today for New Uptown Subway".New York Times. March 14, 1925. p. 15.
  19. ^"Gay Midnight Crowd Rides First Trains in New Subway".New York Times. September 10, 1932. p. 1.
  20. ^Duffus, R.L. (September 22, 1929)."OUR GREAT SUBWAY NETWORK SPREADS WIDER; New Plans of Board of Transportation Involve the Building of More Than One Hundred Miles of Additional Rapid Transit Routes for New York".The New York Times. RetrievedAugust 19, 2015.
  21. ^Board of Transportation of the City of New York Engineering Department, Proposed Additional Rapid Transit Lines And Proposed Vehicular Tunnel, dated August 23, 1929
  22. ^Project for Expanded Rapid Transit Facilities, New York City Transit System, dated July 5, 1939
  23. ^"B.M.T. Lines Pass to City Ownership".New York Times. June 2, 1940. p. 1.
  24. ^"Two 'El' Lines End Transit Service".New York Times. June 12, 1940. p. 27.
  25. ^"New Subway Line on 6th Ave. Opens at Midnight Fete".The New York Times. December 15, 1940. p. 1. RetrievedOctober 7, 2011.
  26. ^abBlauvelt, Paul (June 9, 1946)."Shortages Snarl $50,000,000 Tube Links".Brooklyn Daily Eagle. p. 21. RetrievedOctober 9, 2015 – viaNewspapers.com.
  27. ^abLinder, Bernard (February 2006)."Fulton Street Subway".New York Division Bulletin.49 (2). Electric Railroader's Association: 2. RetrievedAugust 27, 2016.
  28. ^"Subway Contract Given to Boro Firm".Brooklyn Daily Eagle. September 12, 1940. p. 2. RetrievedAugust 27, 2016 – viaNewspapers.com.
  29. ^Conklin, William R. (March 28, 1947)."City to Take Over Bus Line That Failed on 5-Cent Fare: Will Begin Operation on 27 Routes of the North Shore Company Tomorrow to Assure Uninterrupted Service"(PDF).The New York Times. RetrievedSeptember 6, 2016.
  30. ^"City Studies S.I. Bus Co. Plea for Aid".Brooklyn Daily Eagle. February 14, 1947. p. 13. RetrievedSeptember 6, 2016 – viaNewspapers.com.
  31. ^"CITY TAKES OVER BUS LINE: O'Connor Selected to Operate North Shore System"(PDF).The New York Times. March 30, 1947. RetrievedMarch 27, 2016.
  32. ^"120-Passenger Vehicles Added For Next Week: 10 City Lines Will Have All New Equipment by Wednesday".Fultonhistory.com. Long Island Star-Journal. December 31, 1948. p. 2. RetrievedJanuary 9, 2016.
  33. ^"Major Improvements Ordered in Zone D".Long Island Star-Journal.Fultonhistory.com. April 10, 1947. p. 2. RetrievedFebruary 19, 2016.
  34. ^"Queens Bus Routes Taken Over by City".New York Times. September 19, 1926. p. 24.
  35. ^Crowell, Paul (September 24, 1948)."2 BUS COMPANIES OPERATING 6 LINES ARE BOUGHT BY CITY; Transportation Board Begins Operation at 12:01 A.M. Today on 7-Cent Fare"(PDF).The New York Times. p. 1. RetrievedMarch 27, 2016.
  36. ^Egan, Leo (June 2, 1953)."Authority Leases City Transit Lines; Fare Rise In Sight"(PDF).The New York Times. pp. 1, 33. RetrievedOctober 14, 2016.
  37. ^"Digest of Lease Agreement Between the City of New York and the Transit Authority"(PDF).The New York Times. June 2, 1953. RetrievedJuly 1, 2015.
  38. ^Suleiman Osman (March 9, 2011).The Invention of Brownstone Brooklyn: Gentrification and the Search for Authenticity in Postwar New York.Oxford University Press. p. 75.ISBN 978-0-19-983204-0. RetrievedOctober 14, 2016.
  39. ^abcde"370 Jay Street".New York University. Archived fromthe original on November 1, 2014. RetrievedOctober 14, 2016.
  40. ^abc"A Preservationist's List of 35 Modern Landmarks-in-Waiting".The New York Times. November 17, 1996.
  41. ^abcZimmerman, Alex (November 30, 2015)."Inside the Brooklyn Building that Held the Subway's Secrets".Atlas Obscura. RetrievedOctober 14, 2016.
  42. ^abcde"City Board Rushes Move to New Site: Transportation Unit Receives U.S. Order to Vacate and Speeds to Brooklyn"(PDF).The New York Times. March 31, 1951. RetrievedOctober 14, 2016.
  43. ^abcdefSpellen, Suzanne (January 16, 2013)."Building of the Day: 370 Jay Street".Brownstoner. RetrievedOctober 14, 2016.
  44. ^abcdAlberts, Hana R. (June 26, 2014)."How NYU Will Transform 'The Ugliest Building in Brooklyn'".Curbed New York. RetrievedOctober 14, 2016.
  45. ^McEnery, Thorton (June 26, 2014)."NYU revamps its plan for old MTA HQ: In a bow to cost and environmental factors, the school has opted to restore rather than makeover the 500,000-square-foot property at 370 Jay St. on the edge of downtown Brooklyn. Work is expected to begin in 2015".Crain Communications. RetrievedOctober 14, 2016.
  46. ^"'The Secret Life of 370 Jay Street' to be revealed in Downtown Brooklyn".Brooklyn Eagle. October 21, 2015. RetrievedOctober 14, 2016.
  47. ^abcd"Transit Board Now In Its New Building"(PDF).The New York Times. April 3, 1951. RetrievedOctober 14, 2016.
  48. ^abcde"Saying Farewell to an Old Friend".Metropolitan Transportation Authority. April 26, 2012. RetrievedOctober 14, 2016.
  49. ^Young, Michelle (February 12, 2016)."The MTA's Special Armored Money Train that Ran from 1951 to 2006 in NYC".Untapped cities. RetrievedOctober 14, 2016.
  50. ^abcd"New Home Ready for Transit Board"(PDF).The New York Times. March 25, 1951. RetrievedOctober 14, 2016.
  51. ^Olshan, Jeremy (January 16, 2006)."END OF THE LINE: SECRET CASH TRAIN RETIRED".New York Post. Archived fromthe original on January 18, 2006. RetrievedOctober 14, 2016.
  52. ^Chung, Jen (January 16, 2006)."Money Train Retires".Gothamist. Archived fromthe original on December 4, 2015. RetrievedOctober 14, 2016.
  53. ^"Capital Budget".New York University.
By topic
Boroughs
Government
Emergency services
Transportation
Culture
Education
History
Public transit
Private transit
Major
construction
projects
Currently operating
Canceled
Proposed/Future
Traffic proposals
Operators
Public
Current
Defunct
Private
Organizations
Other
Bus
Rapid transit
Commuter rail
Crossings
Law enforcement
Fleet
Other
Former services
Retrieved from "https://en.wikipedia.org/w/index.php?title=New_York_City_Board_of_Transportation&oldid=1306968771"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp