National Solar Mission

From Wikipedia, the free encyclopedia
Initiative of the Government of India

Global Horizontal Irradiance in India.[1] The potential solar power in the country has been assessed to be around 748 GWp.[2]

TheNational Solar Mission(NSM) is a major initiative of theGovernment of India with active participation from States, to meet its growing energy demands while addressingclimate change.

The NSM was launched as theJawaharlal Nehru National Solar Mission[3] byMinistry of New and Renewable Energy on January 11, 2010 underNational Action Plan on Climate Change[4] with the objective to establish India as a global leader in solar energy by creating the policy conditions for solar technology diffusion across the country as quickly as possible.[5]

To achieve this goal, the mission targets were:

  • To create an enabling policy framework to reduce the cost of solar power generation enabling large scale deployment
  • To create favourable conditions for solar manufacturing capability through aggressive R&D and the domestic production of critical raw materials, components and products.[6]
NSM adopted 3 phase approach[7]
PhasesTimelinesCapacity Targets
Phase 12010-131100 MW
Phase 22013-1710 GW
Phase 32017-22100 GW

Initially, the phase 3 target was 20 GW capacity by 2022.[8] It was later revised to 100 GW.[9] Timelines for which was later extended to March 2026.[10]

Achievements

[edit]
India's Cumulative Solar Capacity
India's Solar Capacity Additions

India reached the 100 GW milestone on Jan 31 2025.[11]

Installed Solar Capacity as on Mar 31 of listed year[11][12]
YearCumulative Capacity (MW)Capacity Added in FY (MW)
201011
20113625
20121030994
20131686656
20142631.93945.9
20153743.971112.04
20166762.853018.88
201712288.835525.98
201821651.489362.65
201928180.716529.23
202034627.826447.11
202140085.375457.55
202253996.5413911.17
202366780.3412783.8
202481813.615033.26
2025105646.4923832.89

Phase 1 (2010–13)

[edit]

At the time, many investors were willing to set up solar power plants in India, but sale of power by theIPPs was an issue due to the high cost of power and realization of tariff for the same from the distribution companies.

It was decided tobundle solar power along with power out of the cheaper unallocated quota of Central stations and selling this bundled power to state distribution utilities at the CERC regulated price. This brought down the gap between average cost of power and sale price of power.

For the purpose of bundling, power was to be purchased by an entity and re-sold to the state power distribution utilities. Such function can be done only by a trading company/Discoms, as per the existing statutory provisions.

NTPC had a wholly owned subsidiary company engaged in the business of trading of Power – NTPC Vidyut Vyapar Nigam Ltd. (NVVN).NVVN was designated as nodal agency for entering into aPPA with Solar Power Developers.[13]

The first phase of NSM aimed to commission 1100 MW of grid-connectedsolar power projects by 2013. This included:

  • 500 MW ofsolar thermal
  • 500 MW ofsolar PV
  • 100 MW of rooftop and small solar plants
  • 200 MW of off-grid solar applications
  • 7 million sq. meters of solar thermal collector area (for SWHs, solar cooking, solar cooling, Industrial process heat applications, etc.)[14]

NVVN laid outGuidelines for selection of developers for commissioning grid connected solar power projects in India. It issued Request for Selection document outlining criteria for selection:Solar Thermal RFS,Solar PV RfS. To avoid allocating entire capacity to a select few corporate, guidelines required no two projects to have the same parent company or common shareholders. In case of over subscription, areverse bidding process was to be used to select the final IPPs based on lowest tariff they offer.

Phase 1 Implementation
StagesPolicy[15]ScopeAvg Tariff[16]
Migration SchemeOn-going projects under advanced stage of implementation in different States were provided an option to migrate from their existing arrangements to JNNSM, subject to the consent of distribution licensee, state government and willingness of the developer.PV- 54 MWRs. 17.91
Thermal- 30 MWRs. 15.31
Batch 1Modules based on crystalline silicon must be manufactured in India.PV- 150 MWRs. 12.12
Thermal- 470 MWRs. 11.48
Batch 2Projects had to use cells and modules manufactured in India.

Modules made from thin film technologies or concentrator PV cells may be sourced from any country, provided the technical qualification criterion is fully met.

PV- 350 MWRs. 8.77

NVVN would sign PPAs with the developers and sell the purchased power to different state utilities which had to fulfill their mandatoryRenewable Purchase Obligation.

Key Government Measures:

  • Concessional Import duty, excise duty exemption, accelerated depreciation and tax holiday.
  • Generation Based Incentive and facility for bundled power for Grid connected Solar Power Projects through various interventions announced from time to time.
  • Awareness programmes such as exhibitions, training workshops etc. were conducted.
  • Provision for renewable purchase obligation for solar was made in the National Tariff Policy.
  • A payment security mechanism was created to ensure payment to project developers.[17]

Phase 2 (2013-17)

[edit]

After having built an initial momentum of solar projects in the country through setting up domestic manufacturing, demand and fiscal incentives during Phase 1, the next phase was focused on supporting projects throughViability Gap Funding (VGF).

The cumulative capacity targets for March 2017 were:

  • 10 GW of grid-connected solar PV plants
  • 1 GW of Off-grid solar applications
  • 15 million sqm of Solar Thermal Collector Area[7]
Phase 2 Implementation[18]
StagesSchemes InvolvedScopeMaximum VGF
Batch 1[19]VGF Scheme:

Implemented by SECI in close association with NVVN. Projects were selected through open competitive reverse bidding on VGF sought by bidders. SECI would purchase at a levelized tariff of Rs 5.45 / unit and would sell to willing buyers at Rs 5.5 / unit for 25 years

375 MW with DCR30% of the project cost upto Rs 2.5 Cr / MW
375 MW with no DCR restriction
Batch 2[20](Tranche-I of 15 GW project)[21]

Bundling Scheme: Implemented by NVVN. 3 GW Solar power would be bundled in ratio of 2:1 with 1.5 GW unallocated coal based thermal power

3 GW
Batch 3[22]State Specific VGF Scheme: Implemented by SECI. Projects were selected through reverse bidding on VGF sought by bidders. SECI would purchase at levelized tariff of Rs 5.79 / unit and would sell to willing buyers at Rs 5.5 / unit for 25 years.DCR category: 250 MWDCR category: 1.31 Cr/MW
Open category: 1750 MWOpen category: Rs.1Cr/MW
Batch 4[23]State Specific VGF Scheme: Implemented by SECI. Projects were selected through reverse bidding on VGF sought by bidders. SECI would purchase at levelized tariff of Rs 4-4.5 / unit[24] and would sell to willing buyers at Rs 5 (or less) / unit for 25 years.5 GWDCR category: Rs. 1.25 Cr/MW
Open category: Rs. 1 Cr/MW
Batch 5[25]Scheme for CPSU with VGF: Implemented by SECI. Scheme for setting up PV projects on government buildings with VGF support.1 GWProjects using domestic cells and modules: Rs. 1 Cr/ MW
Projects using domestic modules: Rs. 50 Lakh / MW

Phase 3 (2017-25)

[edit]

The 100 GW cumulative capacity target was further broken down into following categories.[26] Original timeline of March 2022 was later extended to March 2026,[10] but were achieved by Jan 2025.[11]

CategoriesTarget (GW)
Rooftop Solar40
Scheme for Decentralized Generation of Solar Energy Projects by Unemployed youths, Village Panchayats, Small Scale Industries (SSI) Units10
Public Sector Undertakings10
Large Private Sector5
SECI5
Under State Policies20
Ongoing programmes10

2025 and Beyond

[edit]

As per the target announced by India in theCOP26,[27] 500 GW of non fossil based capacity is proposed to be achieved by 2030. TheOptimal Generation Mix 2030 Report of CEA estimates a cumulative capacity of around292 GW for solar PV by 2029-30.

This is planned to be achieved through various schemes such as:[28]

  • Pradhan Mantri Surya Ghar - Muft Bijli Yojana
  • Pradhan Mantri - Kisan Urja Suraksha evam Utthaan Mahaabhiyan (PM-KUSUM)
  • Scheme for Development of Solar Parks and Ultra-Mega Solar Power Projects
  • CPSU Scheme for Grid Connected Solar PV Power Projects, etc.

Other government measures included: Concessional Import duty, Excise duty exemption, Tax holidays, Viability Gap Funding, Generation Based Incentive, Renewable Purchase Obligation, Green Energy Corridor, Permitting FDI up to 100% under the automatic route, etc

Domestic Content complaint

[edit]

Guidelines for the solar mission mandated cells and modules for solar PV projects based on crystalline silicon to be manufactured in India. That accounts to over 60% of total system costs. For solar thermal, guidelines mandated 30% project to have domestic content. A vigorous controversy emerged between power project developers and solar PV equipment manufacturers. The former camp prefers to source modules by accessing highly competitive global market to attain flexible pricing, better quality, predictable delivery and use of latest technologies.[29] The latter camp prefers a controlled/planned environment to force developers to purchase modules from a small, albeit growing, group of module manufacturers in India.[30] Manufacturers want to avoid competition with global players and are lobbying the government to incentivise growth of local industry[citation needed].

Market responded to domestic content requirement by choosing to procure thin film modules from well established international players. A significant number of announced project completions are using modules from outside India.[31][32]

US Trade Representative has filed a complaint atWorld Trade Organization challenging India's domestic content requirements in Phase II of this Mission, citing discrimination against US exports and that industry in US which has invested hugely will be at loss. US insists that such restrictions are prohibited by WTO. India however claims that it is only an attempt to grow local potential and to ensure self sustenance and reduce dependence[33]

See also

[edit]

References

[edit]
  1. ^"Global Solar Atlas". Retrieved4 December 2018.
  2. ^"India's solar energy potential is estimated to be 748 GWp". February 2024.
  3. ^JNNSM Inauguration
  4. ^"India's National Action Plan on Climate Change – Highlights". Archived fromthe original on 23 February 2012. Retrieved7 June 2012.
  5. ^"Energy Security in India". February 2025.
  6. ^"MNRE: 2016 Year End Review". December 2016.
  7. ^ab"MNRE- Jawaharlal Nehru National Solar Mission". July 2014.
  8. ^"Use of Solar and Wind Energy". August 2013.
  9. ^"MNRE: Year End Review". December 2015.
  10. ^ab"MNRE- Extension of Phase 2 of Grid Connected Rooftop Solar Programme"(PDF). October 2022. Archived fromthe original(PDF) on 22 June 2023.
  11. ^abc"Installed Capacity Reports". August 2025.
  12. ^"3019 MW of Solar Energy Capacity Added in 2015-16". November 2016.
  13. ^"JNNSM- Towards Building SOLAR INDIA"(PDF). 2014.
  14. ^"MNRE- Use of Solar and Wind Energy". August 2013.
  15. ^"MNRE- Jawaharlal Nehru National Solar Mission". April 2012.
  16. ^"MNRE allotted Grid connected solar power plants of 1172 MW aggregate capacity under different schemes". February 2013.
  17. ^"Jawaharlal Nehru National Solar Mission sets target of 20,000 MW of grid connected solar power by 2022". December 2022.
  18. ^"Schemes launched by the Government to promote Solar Energy in the country". December 2017.
  19. ^"Approval for Implementation of Scheme for Setting up of 750 MW of Grid-connected Solar PV Power projects under Batch 1 of Phase 2 of JNNSM with VGF support from NCEF"(PDF). October 2013. Archived fromthe original(PDF) on 1 November 2013.
  20. ^"Implementation of Project for setting up of 15,000 MW of Grid-connected Solar PV Power plants through NTPC/ NTPC Vidyut Vyapar Nigam Limited under National Solar Mission". February 2015.
  21. ^"Project for setting up of 15,000 MW of Grid-connected Solar PV Power plants through NTPC/ NVVN". February 2015.
  22. ^"Scheme for Setting up of 2000 MW Grid-connected Solar PV Power Projects under Batch-III"(PDF). August 2015.
  23. ^"Guidelines for implementation of Scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with VGF under Batch-IV"(PDF). March 2016.
  24. ^"Solar Tariff under implementation of Scheme for setting up of over 5000MW of Grid-Connected SPV Power Projects with VGF"(PDF). August 2016. Archived fromthe original(PDF) on 9 September 2016.
  25. ^"Implementation of Scheme for Setting up 1000 MW of Grid-connected solar PV power projects by CPSUs with VGF"(PDF). January 2015. Archived fromthe original(PDF) on 18 March 2015.
  26. ^"New Solar Power Policy". August 2015.
  27. ^"India's Stand at COP-26". February 2022.
  28. ^"MNRE Annual Report 2024-25"(PDF). March 2025.
  29. ^[Kevin Roebuck,Solar PPA: High-impact Strategies – What You Need to Know: Definitions, Adoptions, Impact, Benefits, Maturity, Vendors, pg. 87]
  30. ^domesticPro
  31. ^"First Solar to supply modules for an Indian Solar PV developer".
  32. ^"Trina supplying modules for an Indian Solar PV plant".
  33. ^"US challenges India's Domestic Rules in National Solar Mission". news.biharprabha.com. Indo-Asian News Service. Retrieved11 February 2014.

External links

[edit]
Power plants
Ultra Mega (>500 MW)
Above 100 MW
Below 100 MW
Policies/programmes
Agencies
Companies
India Energy ministries and departments of India
Power
Statutory bodies
Autonomous bodies
PSUs
Emblem of India
New and
Renewable Energy
Ministry of Coal
Petroleum and
Natural Gas
Academic
Other
Operational
Defunct
Other
Department of
Atomic Energy
Apex board
Regulatory board
R&D
PSUs
Industrial
Academic
Active
Schemes
Missions
Projects
Campaigns
Identity
State
Closed/subsumed
Schemes