This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Mount Hood Freeway" – news ·newspapers ·books ·scholar ·JSTOR(April 2008) (Learn how and when to remove this message) |
Proposed Mount Hood Freeway corridor highlighted in red | |
Route information | |
Length | 6 mi[1] (9.7 km) |
History | Canceled in 1974 |
Major junctions | |
West end | ![]() ![]() |
Major intersections | ![]() ![]() |
East end | ![]() |
Location | |
Country | United States |
State | Oregon |
Highway system | |
TheMount Hood Freeway is a partially constructed but never to be completedfreeway alignment ofU.S. Route 26 and Interstate 80N (nowInterstate 84), which would have run through southeastPortland, Oregon. Related projects would have continued the route through the neighboring suburb ofGresham, out to the city ofSandy.
The original plans for the freeway were presented by theOregon State Highway Department as part of a 1955 report that proposed 14 new highways in thePortland metropolitan area. The freeway proposal was part of urban plannerRobert Moses’s original postwar infrastructure plan for Portland.[2]
The proposed route was to run parallel to the existing alignment of US 26 on Powell Boulevard, and would have required the destruction of 1,750 long-standing Portland homes and one percent of the Portland housing stock. Plans for the freeway triggered arevolt in Portland in the late 1960s and early 1970s, leading to its eventual cancellation. Plans for other proposed freeways in Portland were also scrapped, includingInterstate 505. Funds for the project (and other canceled freeways) were spent on other transportation projects, including the first section of theMAX Light Rail system.
When the freeway was canceled, a segment was already completed southeastwards from East Burnside Road and Southeast Powell Blvd in Gresham, continuing to Sandy, which remains in use today.[citation needed]
The freeway would have run from theWillamette River (at theMarquam Bridge) to about SE 50th Avenue adjacent to the south side of Division St. It would then have shifted to Powell Blvd. (Route 26) near SE 54th Avenue. By the initial plan, the freeway would have ended at SE 122nd Avenue, though extensions were considered.[3]
In 1962, this section was formally submitted for inclusion in the U.S.Interstate Highway System as part of Interstate 80N, today'sI-84.[citation needed]
I-205 was in the planning stages at the time the Mount Hood Freeway was first proposed. The I-205 routing was originally envisioned for the 52nd Avenue corridor, but ended up being built farther east at about 93rd Avenue. All plans for the Mount Hood Freeway allowed for a future I-205 connection at various spots.[citation needed]
Another segment of the proposal was called theMount Hood Expressway. It would have continued the Mount Hood Freeway alignment past astack interchange at I-205, continuing to follow Powell Blvd. before skirting Gresham to the south and connecting to the existing route.[citation needed]
The final segment of the proposal continued southeast from Gresham and ran to the outskirts of Sandy. This section was actually constructed (and is anexpressway-grade highway), with a single interchange at the junction withOregon Route 212.[citation needed]
The new highway would have carried US 26 along the entire alignment, while I-80N was to be re-routed along the portion between I-5 and I-205. The I-80N designation would have been removed from the Banfield Freeway, and the route would be duplexed over I-205 between the segments. US 26 would be taken off Powell Blvd, theRoss Island Bridge, and downtown Portland streets, continuing on I-5 andI-405 to theSunset Highway. The Banfield Freeway section would have been taken out of the Interstate system and signed only asU.S. Route 30.[citation needed][original research?]
This sectionneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources in this section. Unsourced material may be challenged and removed. Find sources: "Mount Hood Freeway" – news ·newspapers ·books ·scholar ·JSTOR(March 2019) (Learn how and when to remove this message) |
By the time planners began to think seriously about building the Mount Hood Freeway in the 1970s, the neighborhoods in and near its path mobilized grass-roots efforts against the freeway. The movements gained citywide and local support which changed the political landscape in local elections. Soon, it seemed as if theFederal government and some in the Oregon State Highway Department (now theOregon Department of Transportation) were the only ones who wanted the freeway.[original research?]
The freeway's promoted virtue of a speedy commute was debunked by the freeway's opponents. On one hand, it was seen as benefiting only suburbanGresham and EastMultnomah County at the expense of Portland's neighborhoods. On the other hand, many opponents stated thatthe freeway would be obsolete the minute it opened, jamming with traffic volumes that the freeway was not designed for.
Efforts to make the freeway more acceptable made their way into the later proposals. Among the proposals were increased landscaping and bike paths along the route as well as parks and community centers built over the freeway's "air rights" and a "transitway" with three-level stations (separate levels for local buses and express buses) for an expressbusway. These efforts, however, were not enough to sell the project.
Approval for the Mount Hood Freeway was withdrawn by the Multnomah County Board of Commissioners on February 21, 1974,[4] which was followed by a similar action from the Portland City Council in late July.[5] After the project's cancellation, local transportation planners began to look at completingI-205. Disputes with the new freeway-adverse Multnomah County Commission had left a 9-mile (14 km) gap between the two completed sections. I-205 ended in the south just across theClackamas County line and stopped at theColumbia River in the north. After the successful battle over the Mount Hood, activists were pushing for I-205's cancellation, while some neighborhoods and businesses wanted it further east or west (depending on the proposal).
After some negotiation, I-205's Multnomah County segment was finalized, reducing interchanges, eliminating a possible provision for a Mount Hood Freeway interchange, and resulting in the alignment of today's I-205. An unfinished, grade-separatedtransitway and a bike path were added to I-205, part of the Mount Hood Freeway ideas that actually influenced another freeway. The transitway is now being used as the route for the TriMetMAX Red Line and theMAX Green Line.
Since the completion of I-205, no major freeways have been built in thePortland metropolitan area.[original research?]
A total of 415 parcels in the future path of the Mount Hood Freeway were acquired by the state government, costing $7.8 million in 1975. They were gradually resold for re-integration after the proposal was defeated.[6]
Some[who?] believe the Mount Hood Freeway is one of the things most recognizable as a reason for the development and promotion of alternative forms of transportation in Portland. The MAX light rail system, thePortland Transit Mall, and the city's notable bicycle-friendly policies are said by some Portlanders[who?] to have stemmed from the freeway revolt.[original research?]
Only a few physical signs remain of the canceled freeway, mostly in the form of incomplete connecting ramps orramp stubs. Some previous evidence of the Mount Hood Freeway has been eliminated by new roadwork.