Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

MEMU

From Wikipedia, the free encyclopedia
Electric multiple unit trains in India
For other uses, seeElectric multiple unit.
MEMU
A 3rd-generation MEMU train produced by RCF rest at Bandel
A 3rd-generation MEMU train produced byRCF rest at Bandel
Overview
OwnerIndian Railways
Area servedIndia
Transit typeRegional rail/Commuter rail
Operation
Began operation1995
Operator(s)Indian Railways
Reporting marksIR
Train length12 coaches
Technical
Track gauge5 ft 6 in (1,676 mm)broad gauge
Electrification25 kV ACOverhead line
Top speed110 km/h (68 mph)

InIndian Railways, aMEMU is anelectric multiple unit (EMU) train that serves short and medium-distance routes in India, as compared to normal EMU trains that connect urban and suburban areas. The acronym stands forMainline Electric Multiple Unit.[1]

History

[edit]

Indian Railways (IR) started MEMU service on Asansol – Adra section on 15 July 1995 and on Kharagpur – Tata section on 22 July 1995. Delhi-Panipat MEMU service started on 27 September 1995. Raipur–Durg–Bhatapara–Raipur–Bilaspur MEMU service started on 17 October 1995. Arakkonam-Jolarpettai MEMU service on 22 May 2000. Bankura-Midnapore MEMU started on 30 June 2000. The first 20 coach MEMU ran between Surat to Virar in 2017. Since 2019, 3-phase MEMUs have started replacing existing MEMU rakes.[2]

New 3rd generation was rolled out from RCF Kapurthala with following features:

  1. Ethernet-based Train Control Management System which provides advanced control features
  2. designed for speeds of up to 110 kmph
  3. Energy efficient LED lights have been provided with 50 percent emergency lights in each coach
  4. train is equipped with the latest GPS-based public address and passenger information system in each coach to facilitate passengers with respect to railway stations enroute
  5. train is equipped with 3-phase IGBT-based converter and inverter designed and developed byBHEL
  6. train also features a technologically advanced regenerative braking system.

IR is progressively replacing all locomotive-hauled slow and fast passenger and intercity trains with EMUs. The upgraded trains are re-branded as MEMUs.

Operation

[edit]

The system uses multipleelectrical units[3][4] operating on25 kV AC drawn fromoverhead lines. The trailer coaches have two toilets for passengers and one for the crew.

The train can run up to 200 km (120 mi) between Eastern Ghat and Western Ghat. The rakes have a maximum permitted speed of 105 km/h (65 mph) on broad-gauge tracks. The motorcoaches use DC traction motors. These rakes use asynchronous traction motors and have a maximum designed speed of 110 km/h. These use astainless steel body. Two of them operate onSouth Central Railways.

ICF launched new MEMUs capable to operate at 110–130 km/h. The construction cost is 26 crore per unit and can carry 2,618 passengers. This train has a three phase traction motor and operates on 25 kV current which saves 35% energy. It offersGPS-based passenger information systems and announcement in coaches. It has double leaf sliding doors, gangways,CCTV cameras and aluminium luggage racks. The driver's cabin has AC and the coach has an emergency communication facility. It is designed to operate between cities 200–300 km (120–190 mi) away inUttar Pradesh. The train may start in February 2019.[5]

Manufacturing

[edit]
MEMU
MEMU Rakes built by BEML, Bangalore

MEMUs are manufactured atRail Coach Factory, Kapurthala, andIntegral Coach Factory,Chennai. Rakes are maintained in theTitlagarh coach maintenance shops.[citation needed]Marathwada Rail Coach Factory, Latur is currently trying to ramp up production capacity of 250 MEMU coaches per annum.

Maintenance

[edit]
MEMU Car Shed and Office inKollam Junction railway station premises

MEMU Car Sheds are functioning for the maintenance of MEMU rakes in most of the states where the services are operated. MEMU Car Sheds are operational in Avadi, Bangalore,Kollam,[6] Palakkad, Tambaram, Trichy and Vijayawada under Southern Railway.

Rolling stock

[edit]

MEMU usually uses 8,12 and 16 car coaches, but there are 14,18 and 20 coach configurations too. The trailer coaches have two toilets for passengers and one for the crew. This train can go either fast or slow.

Services

[edit]

Diesel Electric Multiple Units (DEMU)

[edit]
ServiceLocaleDistanceAverage speedTravel timeStopsFrequencyRef
Ambala–Amb AndauraHaryana andHimachal Pradesh213 km (132 mi)41 km/h (25 mph)06h 10m22Twice a day[7]
Amritsar–AttariPunjab24 km (15 mi)32 km/h (20 mph)00h 45m13Daily[8]
Ara–SasaramBihar97 km (60 mi)28 km/h (17 mph)03h 30m26Daily[9]
Banihal–Baramula DEMUJammu and Kashmir135 km (84 mi)58 km/h (36 mph)02h 35m12Daily[10]
Indore–Dr. Ambedkar NagarMadhya Pradesh21 km (13 mi)23 km/h (14 mph)0h 55m12Daily[11]
Indore–RatlamMadhya Pradesh115 km (71 mi)44 km/h (27 mph)02h 40m13Daily[12]
Jalandhar City–AmritsarPunjab79 km (49 mi)39 km/h (24 mph)01h 50m13Daily[13]
Mahesana–Abu Road DEMUGujarat andRajasthan117 km (73 mi)37 km/h (23 mph)00h 55m15Daily[14]
Nizamabad–KachegudaTelangana166 km (103 mi)40 km/h (25 mph)04h 10m12Thrice a day[15]
Raichur–Gadwal–KachegudaKarnataka andTelangana60 km (37 mi)60 km/h (37 mph)01h 00m8Daily[16]
Rajgir–BakhtiyarpurBihar54 km (34 mi)22 km/h (14 mph)02h 25m5Daily[17]
Ratlam–Laxmibai NagarMadhya Pradesh115 km (71 mi)45 km/h (28 mph)02h 45m14Daily[18]
Rohtak–RewariHaryana81 km (50 mi)40 km/h (25 mph)02h 00m13Daily[19]
Sabarmati–MahesanaGujarat63 km (39 mi)47 km/h (29 mph)01h 20m7Daily[20]
Sabarmati–PatanGujarat103 km (64 mi)40 km/h (25 mph)02h 35m7Daily[21]
Vasai Road–DivaMaharashtra40 km (25 mi)46 km/h (29 mph)00h 52m5Daily[22]

Electric Multiple Units (EMU)

[edit]
ServiceLocaleDistanceAverage speedTravel timeStopsFrequencyRef
Chennai–TirupatiAndhra Pradesh andTamil Nadu147 km (91 mi)37 km/h (23 mph)04h 00m25Daily[23]
Dahod–RatlamGujarat andMadhya Pradesh114 km (71 mi)47 km/h (29 mph)03h 05m12Daily[24]
Falaknuma–BhuvanagiriTelangana46 km (29 mi)24 km/h (15 mph)01h 50m15Daily[25]
Panvel–Dahanu Road MEMUMaharashtra136 km (85 mi)41 km/h (25 mph)03h 25m19Daily[26]
Panvel–Vasai RoadMaharashtra63 km (39 mi)46 km/h (29 mph)01h 35m10Daily[27]
Rajgir–DanapurBihar109 km (68 mi)24 km/h (15 mph)04h 35m21Daily[28]
Sealdah–Berhampore CourtWest Bengal186 km (116 mi)44 km/h (27 mph)04h 15m23Daily[29]
Ujjain–NagdaMadhya Pradesh56 km (35 mi)39 km/h (24 mph)01h 25m6Daily[30]
Virar–BharuchGujarat andmaharashtra267 km (166 mi)37 km/h (23 mph)06h 45m39Daily[31]
Whitefield–KSR Bengaluru CityKarnataka23 km (14 mi)35 km/h (22 mph)00h 40m12Daily[32]

Gallery

[edit]
  • An older MEMU set with the initial blunt nose design.
    An older MEMU set with the initial blunt nose design.
  • New Generation of MEMU trainsets manufactured by RCF Kapurthala
    New Generation of MEMU trainsets manufactured byRCF Kapurthala

See also

[edit]

References

[edit]
  1. ^TTI."MEMU Trains in India".Total Train Info. Retrieved2021-02-08.
  2. ^"3-phase MEMU to replace conventional DC rakes soon".The Hindu. 3 October 2019.
  3. ^"SCR starts 2 Memu trains".The Times of India. July 20, 2011.Archived from the original on June 1, 2013. RetrievedDecember 10, 2011.
  4. ^Express News Service (December 9, 2011)."Corporation adamant on saving MEMU dream".CNN-IBM. Archived fromthe original on March 18, 2013. RetrievedDecember 10, 2011.
  5. ^New Train 18-like MEMU for North India! Indian Railways rolls out 130 kmph train for short-distance travel
  6. ^"MEMU to be extended to Malabar; Passenger trains to be replaced with MEMU".english.mathrubhumi.com. 2019-10-28. Retrieved2019-10-28.
  7. ^"10 trains including Shatabdi to remain off-tracks on oct 5". Dailypost. 1 September 2019.
  8. ^Press Trust of India (12 October 2015)."Punjab Chief Minister to Hold Talks With Protesting Farmers".NDTV.
  9. ^"आरा-सासाराम के लिए दो नई पैसेंजर ट्रेन आज से -".Jagran (in Hindi). Retrieved2024-02-01.
  10. ^Ministry of Railways (4 September 2015)."Shri Suresh Prabhu Flags Off Andaman Express Through Remote Control From Jammu Tawi to Shri Mata Vaishno Devi Katra".Press Information Bureau, Government of India (Press release).
  11. ^"WR declare closure of Fatehabad-Indore & Fatehabad-Ujjain MG Section for GC works".RailNews. 24 February 2014.
  12. ^"All DEMU train will go to Indore from June 14".Freepress Journal. Archived fromthe original on 29 May 2016. Retrieved18 March 2016.
  13. ^"Didn't see, feel anything amiss during mishap near Amritsar, say passengers on same train".Indian Express. 25 October 2018.
  14. ^Shah, Jay."79437/Mahesana - Abu Road DEMU - Mahesana to Abu Road WR/Western Zone - Railway Enquiry".indiarailinfo.com. Retrieved2024-02-01.
  15. ^"NZB/Nizamabad to KCG/Hyderabad Kacheguda: 23 Trains". India Rail Info. Retrieved2015-10-10.
  16. ^"Raichur-Kacheguda railway line inaugurated by minister".The Times of India. 2013-10-13.ISSN 0971-8257. Retrieved2024-02-01.
  17. ^"73253/Rajgir–Bakhtiyarpur DEMU".India Rail Info. Retrieved11 February 2020.
  18. ^F P News Service (2 October 2015)."Indore Ratlam DEMU to start today".The Free Press Journal. Archived fromthe original on 29 May 2016.
  19. ^"India's first CNG train for the Rewari-Rohtak section - India's first CNG train".The Economic Times. Retrieved2024-02-01.
  20. ^"Demand For Train And Rail Facilities In Jalore-Sirohi Is Impractical – जालोर-सिरोही में रेलगाड़ी और रेल सुविधाओं की मांग 'अव्यावहारिक' | Patrika News".patrika.com. Retrieved1 April 2020.
  21. ^Himansh."09369/Sabarmati - Patan DEMU Special - Sabarmati BG to Patan WR/Western Zone - Railway Enquiry".indiarailinfo.com. Retrieved2024-02-01.
  22. ^"Several new trains proposed in Railway Budget".The Times of India. Retrieved2017-09-04.
  23. ^"Rail Budget 2013: Andhra Pradesh to get 8 express trains, 4 new lines".The Times of India. 27 February 2013. Archived fromthe original on 2 March 2013.
  24. ^"मेमू का बे्रक फेल, रेड सिग्नल क्रॉस -".Nai Dunia (in Hindi). 2017-07-12. Retrieved2024-02-01.
  25. ^"Meagre allocation for projects in Telangana".The New Indian Express. 27 February 2013. Retrieved30 October 2016.
  26. ^"Vasai-Panvel track nod by September end | mumbai news".Hindustan Times. Retrieved2017-09-05.
  27. ^"Several new trains proposed in Railway Budget".The Times of India. 2011-02-25.ISSN 0971-8257. Retrieved2024-02-01.
  28. ^Anand, Siddharth."63339/Rajgir - Danapur MEMU - Rajgir to Danapur ECR/East Central Zone - Railway Enquiry".indiarailinfo.com. Retrieved2024-02-01.
  29. ^PATRANABIS, SREERUP."63105/Sealdah - Lalgola MEMU - Sealdah to Berhampore Court ER/Eastern Zone - Railway Enquiry".indiarailinfo.com. Retrieved2024-02-01.
  30. ^Jayashree."69185/Nagda - Ujjain MEMU - Nagda to Ujjain WR/Western Zone - Railway Enquiry".indiarailinfo.com. Retrieved2024-02-01.
  31. ^"19102/Bharuch–Virar MEMU".India Rail Info.
  32. ^M, Yash."66541/Whitefield - KSR Bengaluru MEMU - Whitefield to Bangalore SWR/South Western Zone - Railway Enquiry".indiarailinfo.com. Retrieved2024-02-01.

External links

[edit]
Wikimedia Commons has media related toMainline Electric Multiple Units.
Authority
Related
organisations
Zones
Rolling stock
Coaching Stock
Trainsets
Manufacturing
units
Railway
depots
Diesel Loco
Electric Loco
Steam Loco
Multiple Unit
DEMU/DMU
EMU
MEMU
Kolkata Metro
Lines
Main
High-speed
Suburban
Mountain
Passenger
trains
Semi-High speed
Premium
Express
Luxury
Special
Others
Stations
Major
Chennai
Delhi
Kolkata
Mumbai
Others
Others
Training
institutes
Trade unions
Related articles
Retrieved from "https://en.wikipedia.org/w/index.php?title=MEMU&oldid=1280263163"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp