Ludendorff Bridge Ludendorff-Brücke | |
|---|---|
A view from the top of Erpeler Ley eight days before the bridge collapsed, killing 28 soldiers. | |
| Coordinates | 50°34′45″N7°14′39″E / 50.5792°N 7.2442°E /50.5792; 7.2442 |
| Carried | Railway |
| Crossed | Rhine |
| Locale | Rhineland-Palatinate |
| Official name | Ludendorff Bridge |
| Other name | Bridge atRemagen |
| Named for | Erich Ludendorff |
| Characteristics | |
| Design | Through arch bridge |
| Material | Iron |
| Total length | 325 m (1,066 ft) |
| Piers in water | Two |
| History | |
| Designer | Karl Wiener |
| Constructed by | Grün & Bilfinger |
| Construction start | 1916 |
| Construction end | 1919 |
| Construction cost | 2.1 millionmarks |
| Collapsed | 17 March 1945 |
| Location | |
![]() Interactive map of Ludendorff Bridge | |
TheLudendorff Bridge, also known as theBridge at Remagen, was a bridge across the riverRhine in Germany which was captured byUnited States Army forces in early March 1945 during theBattle of Remagen, in the closing weeks ofWorld War II, when it was one of the few remaining bridges in the region and therefore a critical strategic point. Built at the end ofWorld War I it was supposed to help deliver reinforcements and supplies to German troops on theWestern Front, but the adjacent tunnel under theErpeler Ley rocks and the railway spur line was only completed in 1919. The bridge connectedRemagen on the west (south) bank and the village ofErpel on the east (north) bank between two hills flanking the river. Due to a lack of demolition charges, the bridge was only damaged when retreating German forces tried to destroy it while already being attacked by US forces.
Midway throughOperation Lumberjack, on 7 March 1945, the troops of the1st U.S. Army approached Remagen and were surprised to find that the bridge was still standing.[1] Its capture, two weeks beforeField MarshalBernard Montgomery's plannedOperation Plunder, enabled the U.S. Army to establish abridgehead on the eastern side of the Rhine. After the U.S. forces captured the bridge, German forces tried to destroy it many times.
It finally collapsed on 17 March 1945, 10 days after it was captured; 28 Army engineers were killed in the collapse while a further 63 were injured. Of those who died, 18 were actually missing, but presumably had drowned in the swift current of the Rhine.[2] The bridge, while it stood, and newly establishedpontoon bridges, enabled the U.S. Army to secure a bridgehead of sixdivisions, about 125,000 troops, with accompanying tanks, artillery pieces, and trucks, across the Rhine. Capturing the bridge hastened the war's conclusion,[3] andV-E Day cameon May 8. After the war, the bridge was not rebuilt; the towers on the west bank were converted into a museum and the tunnel and towers on the east bank are now a performing-arts space.
A 2020 poll of local people found that 91% favoured rebuilding the bridge; without it there is no river crossing for 44 km (27 mi), and few ferries. In 2022 plans were initiated to build a suspension bridge for pedestrians and cyclists. Local communities indicated an interest to help fund the project and an engineer was commissioned to draw up plans.[4]

Remagen is located close to and south of the city ofBonn. The town of Remagen was founded by the Romans about 2,000 years earlier. It had been destroyed multiple times and rebuilt each time. Under theSchlieffen Plan, a bridge was planned to be built there in 1912, as well as bridges inEngers andRüdesheim am Rhein.
German GeneralErich Ludendorff was a key advocate for building this bridge duringWorld War I, and it was named after him.[5] It was designed byKarl Wiener to connect theRight Rhine Railway, theLeft Rhine Railway and theAhr Valley Railway (Ahrtalbahn)[6] and carry troops and supplies to theWestern Front. Constructed between 1916 and 1919, using Russianprisoners of war as labour, it carried two railway lines and a pedestriancatwalk on either side.[5] Work on the bridge pillars and arches was done by leading construction companiesGrün & Bilfinger[7][8] with the steel bridge built byMAN-Werk Gustavsburg.[9]
It was one of three bridges built to improve railroad traffic between Germany and France during World War I; the others were theHindenburg Bridge atBingen am Rhein and the Urmitz Bridge on theNeuwied–Koblenz railway nearKoblenz.
The railway bridge had three spans, two on either side 85 metres (279 ft) long and a central arch span of 156 metres (512 ft). It had dual tracks that could be covered with planks to allow vehicular traffic. The steel section was 325 metres (1,066 ft) long, and it had an overall length of 398 metres (1,306 ft). On the eastern bank the railway passed through Erpeler Ley, a steeply rising hill over 150 metres (490 ft) high. The tunnel was 383 metres (1,257 ft) long.[6][7] The arch at its highest measured 28.5 metres (94 ft) above the water. Its main surface was normally about 15 metres (48 ft) above the Rhine.[7]
The 4,640-tonne (5,110-short-ton) structure cost about 2.1 million marks when it was built during World War I. Since the bridge was a major military construction project, both abutments of the bridge were flanked by stone towers with fortified foundations that could shelter up to a full battalion of men.[6] The towers were designed with fighting loopholes for troops.[5] From the flat roof of the towers troops had a good view of the valley.[7] To protect the bridge, both anengineering unit and amilitary police unit were assigned to the site.
The designers built cavities into the concretepiers where demolition charges could be placed.[5] During theOccupation of the Rhineland after World War I from 1918 to 1930, the French filled these cavities with concrete. It was one of the four bridges that were guarded by Americans during the occupation.
In 1938, after theGermans reacquired the Rhineland and control of the bridge, they attached 60 zinc-lined boxes at key structural points to the bridge girders, each capable of containing 3.66 kg (8.1 lb) of explosives. The system was designed to detonate all 60 charges at once. The engineers connected the charges in the piers and the zinc boxes by electrical cable protected by steel pipe to a control panel inside the rail tunnel under Erpeler Ley, where engineers could safely detonate the charges.[5] As a backup, engineers laidprimer cord that could be manually ignited. They believed they could destroy the bridge when necessary with minimal preparation.[5]
On 14–15 October 1944, an American bomb had struck a chamber containing the demolition charges of theMülheim Bridge in Cologne, destroying the bridge. German leaderAdolf Hitler reacted by demanding that demolition charges on bridges could only be set when the enemy was within a specific distance, and only exploded by written order. He ordered those "responsible" for the destruction of the Mülheim Bridgecourt-martialed. This left officers responsible for destroying bridges, in the event that the enemy approached, nervous about both blowing it too soon and the consequences if they failed.[6] In keeping with Hitler's orders, by 7 March 1945, the charges on the Ludendorff Bridge had been removed and were stored nearby.[10]
In March 1945, about 5,100 people lived in Remagen. On the western shore, the Allied bombing campaign had destroyed more than half of Erpel's buildings, including all the buildings between Erpel's marketplace and the bridge, which had been built during the 17th and 18th centuries.[7]
The Rhine near Remagen is about 300 m (980 ft) wide.[5] DuringOperation Lumberjack, on 7 March 1945, troops of theU.S. Army's9th Armored Division reached the bridge during the closing weeks of World War II and were surprised to see that the railroad bridge was still standing.[1] It was one of very few bridges remaining across the Rhine, because the Germans had systematically destroyed all of the others in advance of the Allies' attack. Although the bridge was wired with demolition charges, the weak civilian-grade "Donarite" explosives damaged the bridge but failed to bring it down, and Allied engineers risked their lives manually removing the remaining charges before the bridge was captured.[1]
The ability to quickly establish abridgehead on the eastern side of the Rhine and to get forces into Germany allowed the U.S. forces to envelop the German industrial area of theRuhr.[1]: 1430–1 Six Allied divisions crossed the damaged bridge, then it was closed for repairs, and a pontoon bridge that had been built across the river was used. The Germans sent several bombing missions to destroy the Remagen bridge; it collapsed due to cumulative damage from the unsuccessful detonation and the bombs on 17 March 1945, 10 days after it was captured.[8] The collapse killed 28 and injured 93[11] U.S. Army Engineers.
The unexpected availability of the first major crossing of the Rhine, Germany's last major natural barrier and line of defence, causedAllied high commanderDwight D. Eisenhower to alter his plans to end the war. Hitler'sNero Decree of 19 March ordered the destruction of any infrastructure that could aid the Allied advance, but the order was not carried out due to opposition from German generals and the rapid Allied advance.[1]: 1432–4 Instead, U.S. forces advanced rapidly through Germany, and by 12 April theNinth United States Army had crossed theElbe.[1]: 1434


After the war, the railway crossing was not deemed important enough to justify rebuilding the bridge. Parts of the land used for the approaching railway spur lines are now used as an industrial estate on the western bank and a park on the eastern bank.
Since 1980, the surviving towers on the western bank of the Rhine have housed a museum called "Peace Museum Bridge at Remagen" containing the bridge's history and 'themes of war and peace'.[12] This museum was partly funded by selling rock from the two piers as paperweights, the two piers having been removed from the river in the summer of 1976 as they were an obstacle to navigation.
In the middle of 2018, the two eastern towers of the bridge were announced to be for sale. Three bids were submitted, but due to the poor condition of the building and expected costs of approximately 1.4€ million for its restoration, the sale was expected to be difficult.[13]
Plans were announced to rebuild a pedestrian and cycle bridge on the site of the original railway bridge in 2022.[4]
In the filmIt's a Wonderful Life, during the World War II montage, the narrator, Joseph, says of the character Marty Hatch, "Marty helped capture the Remagen Bridge."[14]
The bridge is featured in the 1996 DOS WWII strategy gameOffensive. In the Allied campaign, it needs to be captured intact; in the Axis campaign, it needs to be destroyed to slow the Allied advance.
The final three missions in the 2004 PS2 gameCall of Duty: Finest Hour ("Road to Remagen", "Last Bridge Standing" and "Into the Heartland") are based around the battle of Remagen, the second-to-last mission specifically based around the bridge.
The final mission in the 2017 video gameCall of Duty: WWII involves the player in helping take the bridge.
The Bridge at Remagen is a 1969DeLuxe Colorwar film inPanavision starringGeorge Segal,Ben Gazzara andRobert Vaughn. The film, made inCzechoslovakia in 1968 at the smallerold bridge ofDavle, is a highly fictionalized version of actual events during the last months ofWorld War II when the9th Armored Division approachedRemagen and captured the still intact Ludendorff Bridge during theBattle of Remagen.
The World War II gameHell Let Loose features Ludendorff Bridge in the "Remagen" map where players fight for control of the bridge.[15]