| Line S5 | |
|---|---|
| S5 | |
| Overview | |
| Other names | Nanjing–Yangzhou intercity railway Nanjing–Yizheng–Yangzhou intercity railway |
| Status | Under construction |
| Locale | Nanjing andYangzhou,Jiangsu Province |
| Termini | |
| Stations | 16 |
| Service | |
| Type | Rapid Transit |
| System | Nanjing Metro |
| Operator(s) | Nanjing Metro |
| Rolling stock | 4-car Type A |
| Technical | |
| Line length | 57.61 km (35.8 mi) |
| Character | Elevated and underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line S5[1] is a plannedrapid transit line connectingNanjing andYangzhou. It will be 57.61 kilometres (35.80 mi) long and have a maximum operating speed of 160 kilometres per hour (99 mph).[2] Initially 4 car Type A trains will be used but the line is designed for expansion to 6 car trains in the future. The line will havepassing loops at select stations allowing for express and local services to be offered.[3][4] Local services are expected to take 45 minutes to run end to end and express services will shorten end to end travel times to 34 minutes.[2] Construction started on December 28, 2021.[5] The line is planned to open in 2026.[2]
| Station name | Connections | Distance km | Location | |||
|---|---|---|---|---|---|---|
| English | Chinese | |||||
| Xianlinhu | 仙林湖 | 4 2 | Qixia,Nanjing | |||
| Sheshan | 摄山 | 6 | ||||
| Jiangcheng | 江乘 | |||||
| Longtan | 龙潭 | |||||
| Longtanxincheng | 龙潭新城 | |||||
| Huayuanyingfang | 花园营防 | |||||
| Jing'an | 靖安 | Ningzhen ICR | ||||
| Huangtiandang | 黄天荡 | |||||
| Wannianlu | 万年路 | Yizheng | Yangzhou | |||
| Gongnonglu | 工农路 | |||||
| Tianningdadao | 天宁大道 | |||||
| Yizhengkaifaqu | 仪征开发区 | |||||
| Puxi | 朴席 | |||||
| Chahe | 汊河 | Hanjiang | ||||
| Zhannanlu | 站南路 | |||||
| Yangzhou West Railway Station | 扬州西站 | |||||
This Nanjing Metro article is astub. You can help Wikipedia byexpanding it. |