You can helpexpand this article with text translated fromthe corresponding article in Chinese. (January 2023)Click [show] for important translation instructions.
|
| Line S1 | |
|---|---|
| S1 | |
An S1 train atHuifeng Lu station | |
| Overview | |
| Locale | Taizhou,Zhejiang, China |
| Termini | |
| Stations | 15 |
| Service | |
| Type | Rapid transit |
| System | Taizhou Rail Transit |
| Operator(s) | Taizhou Rail Transit Corporation |
| History | |
| Opened | 28 December 2022; 2 years ago (2022-12-28) |
| Technical | |
| Line length | 52.4 km (32.6 mi)[1] |
| Number of tracks | 2 |
| Character | Underground and Elevated |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | Overhead lines, AC 25 kV 50 Hz |
| Operating speed | 140 km/h (maximum speed)[1] |
Line S1 of theTaizhou Rail Transit (Chinese:台州轨道交通S1线;pinyin:Tāizhōu Guǐdào Jiāotōng S-Yī Xiàn) is a suburbanrapid transit line in Taizhou, Zhejiang Province, China. It runs fromTaizhou Huochezhan to Chengnan. The line started operation on 28 December 2022.[2] The line is 52.396 kilometres (32.557 mi) in length with 15 stations, including 7 underground stations and 8 elevated stations.[3]
| Station name | Transfer | Distance km | Location | ||
|---|---|---|---|---|---|
| Pinyin | Chinese | ||||
| Taizhou Huochezhan | 台州火车站 | Jiaojiang | |||
| Xueyuan Lu | 学院路 | ||||
| Guobo Zhongxin | 国博中心 | ||||
| Huifeng Lu | 汇丰路 | ||||
| Jintai | 锦泰 | Luqiao | |||
| Enze Yiyuan | 恩泽医院 | ||||
| Taizhou Qiche Nanzhan | 台州汽车南站 | ||||
| Zeguo | 泽国 | Wenling | |||
| Wenling Huochezhan | 温岭火车站 | ||||
| Huichuanwang | 汇川王 | ||||
| Wenling Di 1 Renmin Yiyuan | 温岭第一人民医院 | ||||
| Jiulong Dadao | 九龙大道 | ||||
| Wanchang Lu | 万昌路 | ||||
| Nanping | 南屏 | ||||
| Chengnan | 城南 | ||||
全长近52.4公里,总投资228亿元,设计最高行车速度140公里/小时,全线设车站15座,平均站间距3.5公里
This Chinese rapid transit article is astub. You can help Wikipedia byexpanding it. |