| Line 5 | |
|---|---|
| Overview | |
| Status | Operational |
| Owner | Changsha Government |
| Locale | Changsha,Hunan,China |
| Termini | |
| Stations | 18 |
| Service | |
| Type | Rapid transit |
| System | Changsha Metro |
| Services | 1 |
| Operator(s) | Changsha Metro Corporation |
| History | |
| Opened | 28 June 2020; 5 years ago (2020-06-28) |
| Technical | |
| Line length | 22.5 km (13.98 mi)[1] |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 5 of theChangsha Metro (Chinese:长沙地铁五号线;pinyin:Chǎngshā Dìtiě Wǔ Hào Xiàn) is arapid transit line inChangsha. The line opened on 28 June 2020 with 18 stations.[2][3]
Construction started on the line in November 2015, with trial running beginning on 30 December 2019. The line was opened to the public on 28 June 2020.[3]
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Maozhutang — Shuiduhe | 28 June 2020 | 22.5 km (13.98 mi)[1] | 18 | Phase 1 |
The line is operated by 14 six-car Type B trainsets with permanent-magnet traction motors.[3]
| Section | Station name | Connections | Distance km | Location | ||
|---|---|---|---|---|---|---|
| English | Chinese | |||||
| Phase 1 | Maozhutang | 毛竹塘 | ||||
| Bantangchong | 板塘冲 | |||||
| Datang | 大塘 | |||||
| Yuhua District Government | 雨花区政府 | |||||
| Muqiao | 木桥 | |||||
| Guitang | 圭塘 | 4 | ||||
| South Gaoqiao | 高桥南 | |||||
| North Gaoqiao | 高桥北 | |||||
| Furong District Government | 芙蓉区政府 | 6 | ||||
| Wanjiali Square | 万家丽广场 | 2 | ||||
| Mawangdui | 马王堆 | |||||
| Huojucun | 火炬村 | |||||
| Yazipu | 鸭子铺 | |||||
| Malanshan | 马栏山 | |||||
| North Yuehu Park | 月湖公园北 | 3 | ||||
| Baimaopu | 白茅铺 | |||||
| Tuqiao | 土桥 | |||||
| Shuiduhe | 水渡河 | |||||
This Changsha Metro-related article is astub. You can help Wikipedia byexpanding it. |