Green Line (Mumbai Metro)

From Wikipedia, the free encyclopedia
(Redirected fromLine 4 (Mumbai Metro))
Indian rail transit line under construction

Green Line
Overview
StatusUnder construction:Line 4,Line 4A Proposed:Line 10,Line 11[1]
OwnerMMRDA[a]
LocaleMumbai andThane,Maharashtra, India
Termini
Stations38 (Main Line)15 (Branch Line)
WebsiteLine 4
Service
TypeRapid Transit
SystemMumbai Metro
Depot(s)Mogharpada , Anik Nagar Bus Depot
Rolling stockAlstom
History
Planned openingDecember 2025; 1 month's time (2025-12)[2]
Technical
Number of tracks2
CharacterElevated & Underground
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
Operating speed90 km/h (56 mph)
Highest elevation3.90 m (12.8 ft)
Route map

Green Line
km
toRed Line
MiragaononRed Line
9.3709
Shivaji Chowk (Mira Road)
8.4980
Kashimira
5.8134
Varsova Char Phata
1.4711
Gaimukh Reti Bandar
0.0000
Gaimukh
Mogharpada Depot
1.2830
Gowniwada
2.6679
Kasarvadavali
3.7414
Vijay Garden
4.6502
Dongripada
6.1158
Tikuji-ni-wadi
6.8914
Manpada (Thane)
7.7567
KapurbawdionOrange Line
9.1459
Majiwada
9.9701
Cadbury Junction
10.7628
Mahapalika Marg
11.7987
RTO Thane
12.4772
Teen Haath Naka (Thane)
13.7135
Mulund Naka
15.0615
Mulund Fire Station
16.1744
Sonapur
17.5651
Shangrila
18.4087
BhandupCentral line
19.4575
Bhandup Mahapalika
20.2368
Naval Housing
20.9286
Gandhi Nagar (Kanjurmarg)
Kanjur Marg on
Central line
Kanjurmarg (West)onPink Line
21.9307
Surya Nagar
22.9354
Vikhroli
23.6585
Godrej Company
24.8213
Shreyas Cinema
Central line
25.4421
Laxmi Nagar (Ghatkopar)
26.5196
Pant Nagar
28.1522
Garodia Nagar
28.7507
Amar Mahal Junction
Santa Cruz–Chembur Link Road
Harbour line
30.0942
Siddharth ColonyYellow Line
31.1486
Suman Nagar
Kurla–Mahul BP Refinery line
32.2269
Anik Nagar Bus Depot
33.0885
Wadala Truck Terminal
34.0885
Bhakti Park (Wadala)
onLine 1 (Mumbai Monorail)
36.0605
Ganesh Nagar
36.7284
BPT Hospital
39.1174
SewrionHarbour line
39.9685
Hay Bunder
40.9929
Coal Bunder
42.1754
Darukhana
43.1529
Wadi Bunder
44.2993
Clock Tower
45.1886
Carnac Bunder
Indira Dock of
Mumbai Port Trust
on
Central line
andHarbour line
46.7731
Chhatrapati Shivaji Maharaj TerminusonAqua Line

Green Line is part of the Mumbai Metro rail network for the city of Mumbai, Maharashtra, India. During construction the line was divided into 3 smaller lines - Line 4 (Kasarvadavali toBhakti Park (Wadala)), Line 4A (Kasarvadavali toGaimukh), and Line 10 (Gaimukh toShivaji Chowk (Mira Road)). The line also has a proposed spur line called Line 11 fromAnik Nagar Bus Depot to Gateway of India. The line proposed to be of length 60.409km of which 35.2km is under construction. The line connects the regions of Mira Bhayandar to Wadala via Gaimukh and Kasarvadavali. Construction of Line 4 started in October 2018 while the during construction of Line 4A started in September 2019. Meanwhile, the proposed Line 10 is currently under environmental review while Line 11 is undergoing Soil testing. The line has a total of elevated 38 stations of which 34 are under construction. The main line is fully elevated and has zero underground stations. In addition, the proposed spur line (Line 11) has 16 stations of which 2 are elevated and the remaining 14 are proposed to be underground.

The line offers interchange with the under construction Orange Line atKapurbawdi, Pink Line atGandhi Nagar (Kanjurmarg), and the Yellow Line atSiddharth Colony. In addition the line has a proposed interchange with the Red Line atShivaji Chowk (Mira Road) and Aqua Line atChhatrapati Shivaji Maharaj Terminus.

Planning

[edit]
Green Line
Line NumberStationOpeningDistance
English
4KasarvadavaliCadbury JunctionDecember 202532.32 km (20.08 mi)
Cadbury JunctionGandhi Nagar (Kanjurmarg)December 2026
Gandhi Nagar (Kanjurmarg)Bhakti Park (Wadala)November 2027
4AKasarvadavaliGaimukhDecember 20252.88 km (1.79 mi)
10GaimukhShivaji Chowk (Mira Road)Proposed9.209 km (5.722 mi)
Total61.919 km (38.475 mi)

Line 4

[edit]

In June 2015, theMumbai Metropolitan Region Development Authority (MMRDA) proposed building a 32 km (19.88 mi) Wadala-Thane-Kasarvadavali metro line as part of a plan to build six new metro lines at a total estimated cost of64,000 crore (US$7.6 billion).[3] Line 4 was approved in June 2016,[4] and was estimated to cost14,549 crore (US$1.7 billion).[5]

The foundation stone for Metro 4 was laid by Prime Minister Narendra Modi on 24 December 2016.[6] The Maharashtra Coastal Zone Management Authority grantedCoastal Regulation Zone (CRZ) clearance to the project in February 2017. Over 1 km (0.62 mi) of the line passes over water bodies in Bhakti Park and Wadala, both areas classified as CRZ II, where regulations limit construction activities. A total of 48 piers are proposed to be built in the CRZ II zone. The MMRDA proposed building metro car depots for the line on a 30-hectare (74-acre) plot at Owala village in Thane district and another in Vikhroli.[7] The agency stated that the line would require two depots due to its length.[8]

The MMRDA used a drone to carry out survey work for Metro 4. The drones were fitted with 360 degrees camera that provide up to 3 millimetres (0.12 in) accuracy. The aerial survey takes less time than a regular survey, achieves greater accuracy and helps protect against false claims for compensation.[9]

The MMRDA appointed Systra MVA Consulting India Pvt. Ltd. as the detail design consultants for Line 4 on 9 November 2017.[10] A consortium of DB Engineering, Louis Berger and Hill International was awarded a project management and construction management services contract for the Metro 4 project in April 2018.[11][12] In October 2018, the MMRDA announced that it would construct Metro 4 along with three flyovers to minimize traffic disruption, with the metro running on the upper deck of the flyover. The three flyovers will be built at Bhayander Pada, Kasarvadavli and Anandnagar near Ghodbunder.[13][14]

In May 2019, MMRDA Metropolitan Commissioner R.A. Rajeev announced a modified plan to use Siddharth Colony as the interchange station with Line 2. The original plan had proposed to use the Eastern Express Highway station on Line 2B and Siddharth Colony on Line 4 as the interchange stations. However, the two stations are approximately 480 metres (1,570 ft) away from Siddharth Colony and the change was made to simplify passenger transfers.[15]

Line 4A

[edit]

In February 2017, the MMRDA said it was studying the feasibility of extending the corridor from Kasarvadavali to Gaimukh.[16] In March 2017, the agency said that it was conducting a pre-feasbility study on extending the line from Wadala to Mumbai General Post Office in South Mumbai, via the Mumbai Port Trust. The proposed 8 km (4.97 mi) extension is estimated to cost300 crore per kilometer.[17][18] The extension from Kasarvadavli to Gaimukh was approved by Fadnavis at the 144th meeting of the MMRDA on 12 January 2018. The 2.7 km (1.68 mi) extension is estimated to cost949 crore (US$110 million).[19][20]

Line 10

[edit]

In June 2015, the MMRDA announced Metro Master Plan covering over 300 km of metro lines to decongest roads and reduce pressure on the suburban railway system. As part of the master plan it announced a brand new line named Line 10, which would serve as an of the announced Line 4. The line would start inGaimukh and terminate inShivaji Chowk (Mira Road) where it would intersect with the Red Line. The line is proposed to add 4 brand new stations, all of which are proposed to be elevated despite the line having some underground sections.MMRDA later stated that the Line 4, 4A, and Line 10 would form the Green Line. In December 2022 MMRDA appointed SYSTRA MVA Consulting – DB Engineering & Consulting JV as the General Consultant responsible for the execution of the line. The line is currently awaiting environmental clearance for construction as it passes through the Sanjay Gandhi National Park.

Line 11

[edit]

Initially, Line 11 was announced as an extension from the Line 4 to theChhatrapati Shivaji Maharaj Terminus, with a proposal for 2 elevated stations and 8 underground sections running fromWadala to theCSMT. The Maharashtra government assigned the task of executing the project toMMRDA. However, very early on, the project was transferred from the MMRDA to the MMRCL.[21] This change in implementing agency saw the line being completely reworked. MMRCL announced a new alignment for the line, taking a more central route south of Byculla. The rework saw the line being converted to that of a spur line rather than a natural extension of the Green Line. It also saw the addition of new stations and the extension of the line beyondCSMT. The line construction estimates were also doubled from Rs.8,739 crore to Rs.16,000 crore.[22][23]

In May 2025, as part of theDharavi redevelopment project, it was proposed that the northern spur of Line 11 be extended fromAnik Nagar Bus Depot to Dharavi viaSion. This proposal was part of theDharavi redevelopment project, which included efforts to turnDharavi into a transportation hub in Mumbai.[24]

Depot

[edit]

The MMRDA considered plots in Wadala, Aarey Colony and Gaimukh Nagar in Thane to build a depot for the line.[25] On 16 October 2023, the state urban development allotted a 174-hectare (430-acre) plot of land at Mogharpada in Thane to the MMRDA at no cost. Nine hectares of the plot is reserved for use by the BMC for theCoastal Road and a further 29 hectares (72 acres) is protectedmangrove land. The MMRDA will utilize a portion of the remaining plot to build a depot that serves Lines 4, 4A & 10. The land left over after building the depot is zoned for residential and commercial use.[26][27]

Construction

[edit]

Tendering

[edit]
Civil Work
PackageSectionLengthSuccessful bid/costContractorAward
CA-08Wadala – Amar Mahal Junction6.29 km (3.91 mi)540.00 crore (US$64 million)Reliance – Astaldi JV03 Mar 2018
CA-09Amar Mahal Junction – Surya Nagar6.41 km (3.98 mi)538.03 crore (US$64 million)TPL – CHEC JV03 Mar 2018
CA-10Surya Nagar – Sonapur6.68 km (4.15 mi)513.00 crore (US$61 million)Reliance – Astaldi JV03 Mar 2018
CA-11Sonapur – Majiwada6.10 km (3.79 mi)510.22 crore (US$60 million)TPL – CHEC JV03 Mar 2018
CA-12Majiwada – Kasarvadavali6.84 km (4.25 mi)531.00 crore (US$63 million)Reliance – Astaldi JV03 Mar 2018
CA-54Kasarvadavali – Gaimukh2.88 km (1.79 mi)342.00 crore (US$40 million)J Kumar13 Sept 2019
Total35.20 km (21.87 mi)2,974.25 crore (US$350 million)
Architectural Finishing Works
PackageSectionSuccessful bid/costContractorAward
CA-194Majiwada – Mulund Fire Station245.64 crore (US$29 million)Eagle Infra08 Feb 2024
CA-222Surya Nagar – Garodia Nagar251.02 crore (US$30 million)Godrej and Boyce29 Feb 2024
CA-243Hiranandani Estate – KapurbawdiBidding Underway
CA-257Gaimukh – Vijay GardenBidding Underway
Total496.66 crore (US$59 million)
Multi Modal Integration
PackageSectionSuccessful bid/costContractorAward
MMI1Bhakti Park – Shreyas Cinema139.71 crore (US$17 million)NA Construction – J Kumar JV24 Jun 2025
MMI2Godrej Company – Shangrila128.84 crore (US$15 million)Dev Engineers – PRS Infra JV24 Jun 2025
MMI3Sonapur – Majiwada140.25 crore (US$17 million)NA Construction24 Jun 2025
MMI4Kapurbawdi – Gaimukh126.26 crore (US$15 million)NA Construction – SARE JV24 Jun 2025
Total535.06 crore (US$63 million)
Miscellaneous
PackageContractSuccessful bid/costContractorAward
CA-160Moghapada Depot Construction905.77 crore (US$110 million)SEW – VSE26 Sept 2023
CA-161Track Work for Mulund Fire Station – Gaimukh121.55 crore (US$14 million)Apurvakriti Infra26 Sept 2023
CA-168Track Work for Bhakti Park – Mulund Fire Station188.59 crore (US$22 million)Larsen & Toubro24 Jun 2025
CA-234Rolling Stock, Platform Screen Door & Signaling Contract4,788 crore (US$570 million)Larsen & Toubro – Alstom24 Jun 2025
CA-237Automated fare collection system249.97 crore (US$30 million)Aurionpro Solutions24 Jun 2025
CA-236Power Supply & Traction, E&M, Lifts & EscalatorsTo Be ConfirmedIRCON – JaksonTo Be Confirmed
Total6,253.88 crore (US$740 million)
Total Cost10,232.85 crore (US$1.2 billion)


Line 4 & Line 4A

[edit]
A construction barricade along the Line 4 route

The MMRDA invited bids for civil work on the corridor on 4 January 2017.[28][29][30] The tenders for construction of viaducts and stations were divided into five packages - Wadala to Amar Mahal Junction, Garodia Nagar to Surya Nagar, Gandhi Nagar to Sonapur, Mulund Fire Station to Majiwada and Kapurbawdi to Kasarvadavali.[31][32] Metro 4 was tendered alongside Metro 2B. L&T, Afcons Infrastructure, Tata, NCC and JMC, Reliance Infrastructure-RdE, JKumar Group, ITD Cementation, CHEC-TPL bid for packages on both Metro 2B and Metro 4. A total of 10 firms and/or consortia submitted bids for the two lines, two of whom (Simplex Infrastructure and a consortium of GHEC-RCC-JV-China) bid exclusively for Metro 2B packages.[33][34]

The construction work was awarded through the engineering, procurement and construction (EPC) model in April 2018. A joint venture between Reliance Infrastructure and Italian firm Astaldi S.p.A. was awarded three packages between Kasarwadavali and Wadala worth1,584 crore (US$190 million).[35] The contract for the remaining two packages, worth a combined1,048 crore (US$120 million), was awarded to a joint venture between Tata Projects Limited and China Harbour Engineering Company.[36] The civil work was expected to be completed in 30 months.[37] Construction began in October 2018.[38] About 80% of soil-investigation works and 66% of utility works had been completed by 3 June 2019.[39]

In September 2019, the MMRDA awarded a342 crore (US$40 million) contract to J Kumar Infraprojects to build the viaduct and two stations for the Metro 4A extension from Kasarvadavli to Gaimukh.[40][41] In August 2020, the Bombay High Court granted the MMRDA permission to carry out construction in a mangrove buffer zone.[42] Survey work on the land for a depot at Mogharpada began in January 2022.[43]

The MMRDA stated that 37% of total work on Lines 4 and 4A had been completed by June 2022. The agency stated that 43.44% of viaducts and 25.20% of work on stations on Line 4 had been completed. On Line 4A, 39.03% of viaducts and 19.82% of work on stations was completed.[44] By November 2022, 41% of civil works on Line 4 and 45% of work on Line 4A had been completed.[45][46]

TheBombay High Court dismissed two petitions filed by Indo Nippon Chemical Co. Ltd. and Shree Yashwant Co-operative Housing Society Ltd. challenging the alignment for Line 4 in March 2023.[47] In September 2023, the MMRDA awarded a905 crore (US$110 million) contract to a joint venture between SEW Infrastructure and Vishwa Samudra Engineering to build the depot at Mogharpada. It also awarded a121 crore (US$14 million) to Apurvakriti Infrastructure Pvt Ltd. lay ballastless railway tracks connecting Mulund Fire Station with Gaimukh and the depot.

Stations

[edit]

32 stations are being planned on Line 4. Most of them were either in the stage of planning or under early stages of construction (as of November 2018)[48] 2 stations are being planned on Line 4A. Connected to wordGaimukh to Kasarvadavali also connect Metro 10.

Main Line

[edit]
Green Line - Main Line
#Station NameOpening[49]ConnectionsLayout
EnglishMarathi
1Shivaji Chowk (Mira Road)शिवाजी चौक (मिरा रोड)ApprovedLine 9 (Under Construction)Elevated
2KashimiraकाशिमिराApprovedNoneElevated
3Varsova Char Phataवर्सोवा चार फाटाApprovedNoneElevated
4Gaimukh Reti Bandarगायमुख रेती बंदरApprovedNoneElevated
5GaimukhगायमुखApril 2026NoneElevated
6GowniwadaगोवनीवाडाApril 2026NoneElevated
7KasarvadavaliकासारवडवलीApril 2026NoneElevated
8Vijay Gardenविजय गार्डनApril 2026NoneElevated
9DongripadaडोंगरीपाडाApril 2026Thane Metro (Under Construction)Elevated
10Tikuji-ni-wadiटिकूजी-नी-वाडीApril 2026NoneElevated
11Manpada (Thane)मानपाडा (ठाणे)April 2026NoneElevated
12KapurbawdiकापूरबावडीApril 2026Line 5 (Under Construction)Elevated
13MajiwadaमाजिवडाApril 2026NoneElevated
14Cadbury Junctionकॅडबरी जंक्शनApril 2026NoneElevated
15Mahapalika Margमहापालिका मार्गOctober 2026NoneElevated
16RTO Thaneआरटीओ ठाणेOctober 2026NoneElevated
17Teen Haath Naka (Thane)तीन हात नाका (ठाणे)October 2026Thane Metro (Under Construction)Elevated
18Mulund Nakaमुलुंड नाकाOctober 2026NoneElevated
19Mulund Fire Stationमुलुंड अग्निशमन केंद्रOctober 2026NoneElevated
20SonapurसोनापूरOctober 2026NoneElevated
21Shangrilaशांग्रीलाOctober 2026NoneElevated
22BhandupभांडुपOctober 2026NoneElevated
23Bhandup Mahapalikaभांडुप महापालिकाOctober 2026NoneElevated
24Naval Housingनौदल गृहनिर्माणOctober 2026NoneElevated
25Gandhi Nagar (Kanjurmarg)गांधी नगर (कांजुर मार्ग)October 2026Line 6 (Under Construction. Operational Dec 2026Elevated
26Surya Nagarसूर्य नगरOctober 2027NoneElevated
27Vikhroliविक्रोळीOctober 2027NoneElevated
28Godrej Companyगोदरेज कंपनीOctober 2027NoneElevated
29Shreyas Cinemaश्रेयस सिनेमाOctober 2027NoneElevated
30Laxmi Nagar (Ghatkopar)लक्ष्मी नगर (घाटकोपर)October 2027Line 1Elevated
31Pant Nagarपंत नगरOctober 2027NoneElevated
32Garodia Nagarगरोडिया नगरOctober 2027Line 8(proposed)Elevated
33Amar Mahal Junctionअमर महल जंक्शनOctober 2027NoneElevated
34Siddharth Colonyसिद्धार्थ कॉलनीOctober 2027Line 2B (Under Construction)Elevated
35Suman Nagarसुमन नगरOctober 2027NoneElevated
36Anik Nagar Bus Depotआणिक नगर बस आगारOctober 2027NoneElevated
37Wadala Truck Terminalवडाळा ट्रक टर्मिनलOctober 2027NoneElevated
38Bhakti Park (Wadala)भक्ती पार्क (वडाळा)October 2027Mumbai MonorailElevated

Branch Line

[edit]
Green Line - Branch Line
#Station NameOpeningConnectionsLayout
EnglishMarathi
1Anik Nagar Bus Depotअनिक नगर बस डेपोProposedNoneAt Grade
2Wadala Depotवडाळा आगारProposedMumbai MonorailUnderground
3CGS Colonyसीजीएस कॉलनीProposedNoneUnderground
4Ganesh Nagarगणेश नगरProposedNoneUnderground
5BPT Hospitalबीपीटी हॉस्पिटलProposedNoneUnderground
6SewriशिवडीProposedHarbourUnderground
7Hay Bunderगवत बंदरProposedNoneUnderground
8DarukhanaदारुखानाProposedNoneUnderground
9BycullaभायखळाProposedCentralUnderground
10Nagpada Junctionनागपाडा जंक्शनProposedNoneUnderground
11Bhendi Bazaarभेंडी बाजारProposedNoneUnderground
12Chhatrapati Shivaji Maharaj Terminusछत्रपती शिवाजी महाराज टर्मिनसProposedAqua Line

CentralHarbour

Underground
13Horniman Circleहॉर्निमन सर्कलProposedNoneUnderground
14Gateway of Indiaगेटवे ऑफ इंडियाProposedNoneUnderground

Cost

[edit]

Line 4 is estimated to cost14,549 crore (US$1.7 billion),[50] and Line 4A is estimated to cost949 crore (US$110 million).[20] The Maharashtra Government signed an545 million (₹4,000 crore) loan agreement with German development bankKfW to fund construction of Metro 4 and 4A in November 2020.[51]

Infrastructure

[edit]

Rolling stock

[edit]

The MMRDA awarded a1,854 crore (US$220 million) contract toAlstom to supply 234 metro coaches for Line 4 and 4A in March 2021.[52] This was Alstom's first order after acquiringBombardier Transportation in January 2021.[53][54] However, the company initially cancelled the order in March 2022, citing delays in completing the project.[55] In February 2025,Larsen & Toubro (L&T), in collaboration with Alstom, has been awarded a significant contract to supply critical systems for the line. This contract encompasses the provision of 39 six-coach trains, Communication-Based Train Control (CBTC) signaling and train control systems, telecommunications, platform screen doors, and depot machinery and plant for the Mogharpada Depot.[56]

Depot

[edit]

The depot for the line is located at Mogharpada in Thane. It will also serve as the depot for Line 10 and Line 11. The depot has a maximum capacity for 64 stabling lines, half of which are reserved for future use, in addition to 10 inspection bays lines and 10 workshop lines. The depot also houses the operational control centre, administrative building, maintenance and workshop building, auxiliary substation, and staff quarters.[57]

Pocket track

[edit]

The Bhakti Park station will have apocket track to enable trains to park off the main line. Line 4's depot at Mogharpada also serves Line 10 and Line 11 which creates the possibility of trains having to run without passengers from the depot to Chhatrapati Shivaji Terminus during morning hours. The pocket track enables trains to park off the main line without traveling to the last station on the line.[58]

Notes

[edit]
  1. ^Except Line 11 (under MMRC since 2023)

References

[edit]
  1. ^"Mumbai Metro 4A".Archived from the original on 26 November 2018. Retrieved26 November 2018.
  2. ^"Mumbai: Metro Lines 2A & 7 likely to be fully opened on August 15 | Mumbai News - Times of India".
  3. ^"Over 130 km of Metro lines to criss-cross city by 2020".The Indian Express. 16 June 2015. Retrieved9 July 2023.
  4. ^"Maharashtra Cabinet Gives Go-Ahead For Two Metro Lines".NDTV.com.Archived from the original on 18 October 2016. Retrieved14 October 2016.
  5. ^"Mumbai to get two more Metro Rails".Business Standard India. 27 September 2016.Archived from the original on 18 October 2016. Retrieved14 October 2016.
  6. ^"MMRDA invites civil work bids for two Metro projects".The Times of India.Archived from the original on 12 February 2017. Retrieved10 February 2017.
  7. ^"Wadala-Thane metro line clears CRZ hurdle - Mumbai Mirror -".Mumbai Mirror.Archived from the original on 28 February 2017. Retrieved27 February 2017.
  8. ^"Mumbai: MMRDA to acquire private land in Thane for Metro 4 car shed".The Indian Express. 11 November 2018. Retrieved10 July 2023.
  9. ^"MMRDA plans drone survey for other Metro lines".The Indian Express. 7 March 2017.Archived from the original on 7 March 2017. Retrieved7 March 2017.
  10. ^"MMRDA's Executive Committee Meeting held today Contractors, consultants appointed for MTHL, Metro-4, Wadala Truck Terminal and flyover on NH-4".MMRDA. 9 November 2017. Retrieved10 July 2023.
  11. ^Berger, Louis."Louis Berger awarded Mumbai Metro Line 4 contract in India".GlobeNewswire News Room.Archived from the original on 9 October 2018. Retrieved9 October 2018.
  12. ^"DB Engineering-Louis Berger bags contract for Mumbai Metro 4".dna. 10 April 2018.Archived from the original on 9 October 2018. Retrieved9 October 2018.
  13. ^"Metro-4, 9 to be built along with flyovers".The Asian Age. 1 October 2018.Archived from the original on 9 October 2018. Retrieved9 October 2018.
  14. ^"Mumbai: MMRDA to build Metro 4 & 9 corridors along with flyovers".Free Press Journal. 4 October 2018.Archived from the original on 9 October 2018. Retrieved9 October 2018.
  15. ^Naik, Yogesh (21 May 2019)."MMRDA redrafts plans for better connectivity between Mumbai Metro corridors".Mumbai Mirror.Archived from the original on 6 June 2019. Retrieved6 June 2019.
  16. ^"Mumbai Metro Phase 4 may cover entire Ghodbunder Road stretch in Thane".Hindustan Times. 2 February 2017. Retrieved10 July 2023.
  17. ^"MMRDA plans to extend Metro-IV route from Wadala to GPO".The Times of India.Archived from the original on 16 March 2017. Retrieved17 March 2017.
  18. ^"Mumbai Metro's Thane-Wadala line likely to be extended to CST/GPO | Latest News & Updates at Daily News & Analysis".dna. 16 March 2017.Archived from the original on 17 March 2017. Retrieved17 March 2017.
  19. ^"Mumbai Metro 4 will now reach Thane's Ghodbunder Road".Hindustan Times. 12 January 2018. Retrieved10 July 2023.
  20. ^ab"Kasarvadavali-Gaikmukh metro project in Thane approved".Mumbai Mirror. 27 December 2018. Retrieved10 July 2023.
  21. ^"MMRC to Execute Mumbai Metro's Line-11 (Wadala - CSMT)".The Metro Rail Guy. 31 January 2023. Retrieved31 May 2025.
  22. ^"Mumbai: Work on Metro 11, connecting Wadala-Regal Cinema, begins".The Times of India. 6 August 2024.ISSN 0971-8257. Retrieved31 May 2025.
  23. ^"MMRC Publishes Mumbai Metro Line 11's Revised Alignment Map".The Metro Rail Guy. 28 July 2024. Retrieved31 May 2025.
  24. ^"Dharavi to be a major Metro interchange with 2nd station".The Times of India. 22 May 2025.ISSN 0971-8257. Retrieved31 May 2025.
  25. ^"Mumbai: MMRDA to acquire private land in Thane for Metro 4 car shed".The Indian Express. 11 November 2018. Retrieved10 July 2023.
  26. ^"Integrated Metro car shed on 435 acres at Thane for Metro Line 4, 4A, 10 & 11".The Times of India. 16 October 2023.ISSN 0971-8257. Retrieved4 November 2023.
  27. ^"One car shed for 4 Metro lines to come up in Thane".The Times of India. 17 October 2023.ISSN 0971-8257. Retrieved4 November 2023.
  28. ^"MMRDA invites bids for 2 metro projects".dna. 5 January 2017.Archived from the original on 8 January 2017. Retrieved10 February 2017.
  29. ^"MMRDA invites tenders for design, construction of stations, viaducts for new Metro routes".The Indian Express. 5 January 2017.Archived from the original on 11 February 2017. Retrieved10 February 2017.
  30. ^"Racing against 2021 deadline, Maharashtra opens bids for two more Metro lines".Hindustan Times. 5 January 2017.Archived from the original on 11 February 2017. Retrieved10 February 2017.
  31. ^Correspondent, Special."MMRDA invites tenders for Metro-2B and 4".The Hindu.Archived from the original on 6 January 2017. Retrieved12 February 2017.{{cite web}}:|last1= has generic name (help)
  32. ^"Mumbai commute to get faster, firms queue up to build two more Metro lines".Hindustan Times. 13 May 2017.Archived from the original on 14 May 2017. Retrieved13 May 2017.
  33. ^"MMRDA receives interest from domestic, foreign firms for metro".India Today.Archived from the original on 14 June 2017. Retrieved13 May 2017.
  34. ^"R Infra, 10 others bid for Metro-2B, Metro-4 corridors".Asian Age. 13 May 2017.Archived from the original on 24 May 2017. Retrieved13 May 2017.
  35. ^"Reliance Infra bags three packages of Mumbai Metro Line 4".The Economic Times. 13 April 2018.Archived from the original on 9 October 2018. Retrieved9 October 2018.
  36. ^"Tata Projects bag Rs 1,048 crore Mumbai Metro packages".The Economic Times. 13 April 2018.Archived from the original on 9 October 2018. Retrieved9 October 2018.
  37. ^Pillay, Amritha (14 April 2018)."Reliance Infrastructure, Tata Projects win bids for Mumbai Metro project".Business Standard India.Archived from the original on 9 August 2018. Retrieved9 August 2018.
  38. ^"Metro Lines 4, 5 connecting Thane to different cities to be completed only by 2025, says MMRDA official".Hindustan Times. 3 June 2022. Retrieved10 July 2023.
  39. ^"Metro lines 4 and 5 to be linked at station in Thane".Hindustan Times. 17 June 2019. Retrieved10 July 2023.
  40. ^"Contractor for Metro 4A named".The Times of India. 10 September 2019.ISSN 0971-8257. Retrieved10 July 2023.
  41. ^"Mumbai Metro 4A bags civil contracts".Archived from the original on 13 October 2019. Retrieved30 November 2020.
  42. ^"High Court gives nod for Metro Line 4 in Mumbai's mangrove buffer zone".Business Standard. Retrieved10 July 2023.
  43. ^"Hurdles for Wadala to Thane Metro Line 4 cleared; survey of car shed land begins".Hindustan Times. 28 January 2022. Retrieved10 July 2023.
  44. ^"Four years on, Mumbai-Thane Metro Line 4 still only 37% complete".Free Press Journal. Retrieved10 July 2023.
  45. ^"Mumbai: Here is latest update of more than dozen Metro projects in the city".Free Press Journal. Retrieved10 July 2023.
  46. ^"State of the Mumbai Metro: 14 lines in the works, two nearing completion".The Indian Express. 4 November 2022. Retrieved10 July 2023.
  47. ^"Mumbai: Bombay HC dismisses plea challenging Metro Line 4".Free Press Journal. Retrieved4 November 2023.
  48. ^"Mumbai Metro 4 – Wadala–Ghatkopar-Mulund–Teen Hath Naka–Kasarvadavali Station".Archived from the original on 5 October 2017. Retrieved7 June 2017.
  49. ^"Mumbai Metro on fast track to hit 2025 completion goal".Mid-day. 5 April 2025. Retrieved11 April 2025.
  50. ^"Non-confirmation of depot land: Fate of 3 new Mumbai Metro lines hangs in balance".The Indian Express. 8 February 2023. Retrieved10 July 2023.
  51. ^"German bank extends credit line for 2 lines of Mumbai Metro".The Indian Express. 7 November 2020. Retrieved10 July 2023.
  52. ^"Alstom to make 39 rakes for Metro 4, 4A for Rs 2k cr in Mumbai".The Times of India. 31 March 2021.ISSN 0971-8257. Retrieved10 July 2023.
  53. ^"Alstom wins €220-million contract to manufacture 234 metro cars for Mumbai Metro Lines 4, 4A".www.thehindubusinessline.com. 30 March 2021. Retrieved10 July 2023.
  54. ^"Mumbai Metro-4 coaches: Bombardier lowest bidder, Chinese manufacturer 'non-responsive'".Hindustan Times. 19 January 2021. Retrieved10 July 2023.
  55. ^"Alstom cancels order bagged from MMRDA for supply of coaches for Mumbai Metro 4".Moneycontrol. 4 March 2022. Retrieved10 July 2023.
  56. ^"L&T, in partnership with Alstom, has secured Mumbai Metro Line 4's rolling stock and signaling contract. T". 16 February 2025. Retrieved25 February 2025.
  57. ^"Mum-Thane Metro depot construction: Contractor appointed".The Times of India. 27 September 2023.ISSN 0971-8257. Retrieved4 November 2023.
  58. ^"MMRDA to construct pocket track at Mumbai's Bhakti Park Metro Line 4 station".The Indian Express. 17 March 2023. Retrieved4 November 2023.
Line 4
Depot(s)
  • * Stations initalics are under construction.