Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Line 20 (Beijing Subway)

From Wikipedia, the free encyclopedia
Rapid transit line under planning in Beijing
Line 20
 20 
Overview
Other nameM20, R4 (planned name)
StatusPlanned
Termini
Stations5 (Phase 1)
Service
TypeRapid transit
SystemBeijing Subway
Depot(s)Zhuangtoucun
Rolling stock4-car Type A[1]
History
OpenedLate 2029 (Phase 1)[2]
Technical
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)

Line 20 of theBeijing Subway (Chinese:北京地铁20号线;pinyin:běijīng dìtiě èrshí hàoxiàn), orLine R4 (Chinese: 北京地铁R4线;pinyin:běijīng dìtiě R sì xiàn)[a] is arapid transit line under planning inBeijing.

The first phase of Line 20 will be 21.3 km in length with 5 stations. It runs fromGuanzhuang Lu Xikou on Line 3 in Chaoyang District toYanjing Qiao in Shunyi District.[5]

It is expected to open in late 2029.[2] There will be through service betweenLine 3 and Line 20.[6]

Stations (Phase 1)

[edit]
Station Name[2][7]Connections
EnglishChinese
Guanzhuang Lu Xikou管庄路西口Through service:[6]  3  (U/C)
Terminal 33号航站楼 Capital Airport 
Zhongde Chanyeyuan中德产业园
Linhe临河
Yanjing Qiao燕京桥

History

[edit]

In 2019, Liu Xuesong, representative of the Beijing Municipal People's Congress and general manager ofCapital Airport Holding, suggested building the northern section of the line in advance.

On November 10, 2020, the Shunyi Branch of the Beijing Municipal Planning and Natural Resources Commission released a notice to advance the preliminary work of rail transit, including the Shunyi section of Line 20.[8]

According to the information released on January 11, 2022, the first phase of the line is included in the "Beijing Rail Transit Phase III Construction Plan".[9] On 8 July 2022, the EIA of Phase III Plan announced that it will be a 19 km (12 mi) line, with 4 stations fromGuanzhuang Lu Xikou station in Chaoyang District toLinhe station in Shunyi District.[10]

On 17 June 2024, Beijing Infrastructure Investment published their first EIA analysis, confirmed that phase 1 of line 20 will have 5 stations.[11] Later on 27 August, their second EIA analysis said that there will introduce through trains with line 3 and line 12, as well as Linhe is an elevated station, the depot is tentatively named Zhuangtoucun Depot that located north ofChengbeijian River.[12][13]

On 7 January 2025, it was confirmed that the line will use 4-car Type A trains, which is similar to Line 3.[1]

Notes

[edit]
  1. ^R stands forRapid here.[3][4]

References

[edit]
  1. ^ab"关于轨道交通R4线一期北段工程项目可行性研究报告的批复". 2025-01-07.初期购置A型车(4辆编组)10列
  2. ^abc"20号线(R4线)一期临河站 精确位置及换乘市郊铁路方案曝光". 2 March 2023. Archived fromthe original on 2023-03-14.
  3. ^"北京R4线一期北段启动环评公示,全长21.3公里共设5站".其线路名称中的R(Rapid Line)线指的是大容量快速轨道交通线路
  4. ^"最新消息.共设5站,实现多线换乘!北京R4线一期北段启动环评公示".其线路名称中的R(Rapid Line)线指的是大容量快速轨道交通线路
  5. ^"北京市基础设施投资有限公司".www.bii.com.cn. Retrieved2024-05-03.
  6. ^ab"最全!北京今年所有地铁建设进展都在这里". 2022-03-09.
  7. ^"东六环改造工程迎来重大突破 从六环路可直达环球度假区". 2023-02-20.工程南起朝阳区管庄路西口站,途经首都机场站、中德产业园站,北至临河站,线路总长约21公里
  8. ^"区规自分局推进轨道交通前期工作".www.bjshy.gov.cn. Retrieved2022-01-27.
  9. ^"北京市轨道交通第三期建设规划环境影响评价第一次公示_信息公开_北京市基础设施投资有限公司".www.bii.com.cn. Retrieved2022-01-27.
  10. ^"北京轨道交通R4线一期北段线路一体化规划方案公示". 2024-04-26.
  11. ^"北京轨道交通R4线一期北段工程环境影响评价第一次公示".北京市基础设施投资有限公司. 2024-06-17.Archived from the original on 2024-06-18. Retrieved2024-06-18.
  12. ^"最新消息共设5站,实现多线换乘!北京R4线一期北段启动环评公示". 2024-06-20.新建车辆基地位于顺义仁和组团以北地区,城北减河以北,通顺路以西,占地约25公顷
  13. ^"北京轨道交通R4线一期北段工程环境影响报告书(征求意见稿)"(PDF).北京市基础设施投资有限公司. 2024-08-27. Retrieved2024-08-27.
Beijing SubwayBeijing SubwayBeijing Subway
Lines in operation
Under construction
Planned
  •  3  (Phase 2)
  •  7  (Phase 3)
  •  11  (Phase 2)
  •  12  (Phase 2)
  •  15  (Phase 2)
  •  17  (Branch)
  •  19  (Extension and Branch)
  •  20  (Phase 1)
  •  Fangshan  (Line 25 Phase 3)
  •  S6  (Phase 1)
Trams in BeijingTrams in Beijing
Lines in operation
CRS-train
(Beijing Suburban Railway)
Lines in operation
Under construction
CR C/G-train
(intercity railways)
Lines in operation
OtherCR railways
Corridors
Major railways
Other urban transit
Lines in operation
Transportation hubs
List of airports in China Airports
China Railway Railway stations
Retrieved from "https://en.wikipedia.org/w/index.php?title=Line_20_(Beijing_Subway)&oldid=1275197084"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp