Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Line 19 (Beijing Subway)

From Wikipedia, the free encyclopedia
Metro line of Beijing Subway
Line 19
A Line 19 train leavingMudanyuan station
Overview
Other nameM19 / R3 (planned name)
StatusIn operation
Termini
Stations10
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Metro Operation Administration (BJMOA) Corp., Ltd.[1]
Depot(s)Xingong
Rolling stock8-car Type A (CCD5034 and SFM80)
History
Opened31 December 2021; 3 years ago (2021-12-31)
Technical
Line length20.9 km (13.0 mi)[2]
CharacterFully underground[3]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (62 mph) (Phase 1)[4]
Route map

planned extensions
Mudanyuan
Left arrow outer – innerRight arrow
Xiaoyue river
Beitaipingzhuang
North Hucheng river
Jishuitan
Left arrow outer – innerRight arrow
Ping'anli
Line 3 (Phase 2, long-term planning)
Left arrow Line 3Tiancun
Taipingqiao
Line 1 crossing
Line 2 crossing
Niujie
Line 7 crossing
South Hucheng river
Jingfengmen
Liangshui river
Left arrow Daxing Airport ExpressLize Shangwuqu
Ma'cao river
Caoqiao
Left arrow inner – outerRight arrow
Xinfadi
Xingong depot
Xingong
Daxing line (through operation toLine 4)
planned extensions

Line 19 of theBeijing Subway (Chinese:北京地铁19号线;pinyin:Běijīng Dìtiě shíjiǔ hàoxiàn) is arapid transit line inBeijing. It is 20.9 km (13.0 mi) in length and has 10 stations.[2] It is fully underground.[3] Line 19's color is lavender.

Description

[edit]

Phase 1 of Line 19 begins atMudanyuan station inHaidian District and ends atXingong station inFengtai District.[5] Phase 1 of Line 19 is 20.9 km (13.0 mi)[2] in length with 10 stations.[6] The line was envisioned as a major relief line for the overcrowdedLine 4 and more direct link to theBeijing Financial Street commercial area.

The line uses 8-car type A rolling stock.[4][7]

The trains have a maximum speed of 120 km/h (75 mph). However the speed limit of the first phase, which runs under the dense city center is 100 km/h (62 mph).[8][9] Phase II extensions north and south run through suburban areas and will be built to more generous alignments allowing for 120 km/h (75 mph) operations.

Opening timeline

[edit]
SegmentCommencementLengthStation(s)Name
Mudanyuan — Xingong31 December 2021[10]20.9 km (13.0 mi)[2]6Phase 1
Beitaipingzhuang, Ping'anli, Taipingqiao, Jingfengmen30 July 2022[11]4Infill stations of Phase 1

Stations

[edit]

Main

[edit]
Station Name[12][13][14]ConnectionsNearby Bus StopsDistance
km[15]
Location
EnglishChinese
Shengminggu Railway Station生命谷[13] Northeast Ring  (S7)
 S15 
Changping
Life Science Park South生命科学园南
Beijiaonongchang Qiao北郊农场桥[16] Northeast Ring  (S7)
 13  18 
Xisanqi西三旗Changping /Haidian
Qinghe Xiaoyingqiao清河小营桥 Changping Haidian
Shangqingqiaonan上清桥南 19  (North Branch)
Beishatan北沙滩 15 
Mudanyuan牡丹园 10 16 21 22 47 123 135 331 345快 425 508 510 579 601 606 618 620 645 653 658 夜40.0000.000Haidian
Beitaipingzhuang北太平庄 12 16 22 47 88 123 135 300 300快 302 315 331 345快 361 368 387 425 508 510 579 604 606 618 620 645 671 695 883 885 886 886区 921 快速直达专线66 快速直达专线148 夜4 夜30 夜380.9200.920Haidian / Xicheng
Jishuitan积水潭 2 5 22 27 44 47 55 80 88 135 143 200 331 344 345 345快 347 380 409 508 604 618 620 625 670 883 885 886 886区 919快 观光3 快速直达专线12 快速直达专线66 快速直达专线124 快速直达专线125 快速直达专线128 快速直达专线134 快速直达专线148 快速直达专线214 通医专线2 夜2 夜4 夜20 夜36 夜38 专31 专51 专1682.4503.370Xicheng
Ping'anli平安里 4  6 4 7 13 22 38 47 88 105 107 111 118 143 409 夜3 夜4 夜361.5904.960
Taipingqiao太平桥 1  2  (Out-of-system interchange viaFuxingmen)[17]7 10 15 38 47 52 88 快速直达专线17 快速直达专线168 夜1 夜362.7107.670
Niujie牛街 7  (Out-of-system interchange viaGuang'anmen Nei)[17]5 6 10 38 48 50 57 88 109 381 通医专线1 夜7 夜23 专131.2409.810
Jingfengmen景风门 14 14 48 88 377 454 474 专1552.96012.770Fengtai
Caoqiao草桥 10  Daxing Airport 381 410 423 434 456 483 497 529 676 679 夜22 专179 专2092.68015.450
Xinfadi新发地353 354 377 381 410 423 454 483 497 529 646 676 679 快速直达专线22 夜22 专1902.65018.100
Xingong新宫 Daxing 343 353 354 369 400 474 556 827 829 946 954 快速直达专线22 快速直达专线109 专59 专67 专190 专1992.74020.840
Xingongnan新宫南Fengtai
Xihongmendong西红门东Daxing
New Media Industrial Base新媒体产业基地
Guanyinsi观音寺
Cigezhuangxi磁各庄西[14]
Haizijiao海子角

North Branch

[edit]
Station NameConnectionsNearby Bus StopsDistance
km
Location
EnglishChinese
Qinghe railway station清河站Huairou–Miyun
 13  Changping 
Haidian
Shangqingqiaonan上清桥南 19  (Main)

History

[edit]

It was reported in February 2012 as one of six new lines under planning by the city's public transit planning authorities.[18] As of 2015, the line was renamed to Line 19[19] with the first phase starting construction in 2016.[5] The line opened on 31 December 2021.[10] Four infill stations opened on 30 July 2022.[11]

Future development

[edit]

Phase 2 of Line 19, which is under planning, consists of a northern extension toChangping District. Additionally, there will be a branch line of the northern extension, which will serve the newQinghe railway station, a station on theBeijing–Zhangjiakou intercity railway.[20] On 11 January 2022, the second phase of Line 19 was listed as one of the 10 construction projects in the "Beijing Rail Transit Phase III Construction Plan (2022-2027)".[21]

On 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) expanded the phase 2 planning. The northern extension will start from Mudanyuan and run to Life Valley as a 17.6 km (10.9 mi) long section with 6 new stations. A branch of the northern extension will run from Shangqingqiao South to Qinghe railway station for 6.8 km (4.2 mi) with one new station. Additionally, a southern extension was announced from Xingong to Haizijiao as a 12.6 km (7.8 mi) long section with 6 new stations along with a branch of the southern extension from Xinmeiti Chanye Jidi to Shengwu Yiyao Jidi West which will be 17.4 km (10.8 mi) long with 7 new stations.[22]

On 28 April 2024, Beijing Infrastructure Investment (BII) announced the northern extension and its branch, as well as southern extension.[23] On 29 July, BII published the first EIA analysis to confirm these 3 parts.[24]

References

[edit]
  1. ^"定了!地铁19号线,北京轨道运营公司运营". 2019-12-12.
  2. ^abcd"北京今日开通9条地铁线(段) 3条主干线贯通南北". 2021-12-31.今年开通的19号线一期全长20.9公里
  3. ^ab"北京地铁19号线一期首次披露10座车站及运行线路-新闻频道-手机搜狐".Sohu.
  4. ^ab北京地铁19号线无缝对接新机场线 10站中8站能换乘-千龙网·中国首都网.beijing.qianlong.com. Retrieved2017-03-24.
  5. ^ab"北京地铁19号线一期预计2020年完工 系首条南北地铁快线-新华网".www.xinhuanet.com. Archived fromthe original on July 18, 2018. Retrieved2018-07-21.
  6. ^"北京地铁19号线将设10座车站8座能换乘 年内开建 北京日报 2015-8-27" (in Simplified Chinese).
  7. ^北京地铁19号线一期全部车站开建 计划于2020年通车-千龙网·中国首都网.beijing.qianlong.com. Retrieved2018-05-29.
  8. ^"北京多条在建地铁完成铺轨". 2021-08-01.作为穿越中心城区的轨道快线,19号线最高时速达到100公里
  9. ^"北京地铁19号线一期预计2020年完工 系首条南北地铁快线". 2018-07-18. Archived fromthe original on 2019-05-24. Retrieved2019-05-24.一期工程受土建实施限制限速100km/h
  10. ^ab"大站快车!地铁19号线初期开通6站,从南到北仅需24分钟".北京日报. 2021-12-29. Archived fromthe original on 2022-03-25. Retrieved2021-12-29.此次开通初期运营共6座车站,自南向北为新宫站、新发地站、草桥站、牛街站、积水潭站、牡丹园站
  11. ^ab"地铁19号线剩余4站明日试运营!新宫至牡丹园只需半小时". 2022-07-29. Archived fromthe original on 2022-07-29.
  12. ^"JPG格式线路图下载 北京地铁官方网站". Archived fromthe original on 2025-02-14.
  13. ^ab"北京轨道交通19号线二期工程(北延及北延支线)环境影响报告书(征求意见稿)"(PDF). 2024-10-21.
  14. ^ab"北京轨道交通19号线二期工程(南延)环境影响报告书(征求意见稿)"(PDF). 2025-05-06.
  15. ^"19号线路网车站站间距信息". Retrieved2022-02-18.
  16. ^"地名公告".北京市规划和自然资源委员会. 2025-08-19. Archived fromthe original on 2025-08-19. Retrieved2025-08-19.位置:昌平区回龙观街道,沿规划回创路敷设 批准文号:2025(市)地名命字0004号 附加说明:得名原因:因北郊农场桥得名。发布时间:2025-08-18
  17. ^ab"地铁开通"虚拟换乘"之后,乘客的地面换乘体验如何?记者进行实地探访". 2022-08-01. Archived fromthe original on 2022-08-02.
  18. ^"北京6条地铁新线开始前期调研". 2012-02-13. Archived fromthe original on 2022-07-29.
  19. ^"北京地铁17号线二次环评公示 拟撤永安里北站_央广网".
  20. ^北京地铁19号线一期计划2020年底开通.www.bj.xinhuanet.com. Archived fromthe original on March 25, 2017. Retrieved2017-03-24.
  21. ^"北京市轨道交通第三期建设规划环境影响评价第一次公示_信息公开_北京市基础设施投资有限公司".www.bii.com.cn. Retrieved2022-01-28.
  22. ^"北京市轨道交通第三期建设规划(2022-2027年)环境影响报告书(征求意见稿).pdf"(PDF).China Academy of Railway Sciences Co., Ltd. 2022-07-08. Archived fromthe original(PDF) on 2022-07-08. Retrieved2022-07-08.
  23. ^"北京轨道交通19号线二期线路一体化规划方案公示".Beijing Infrastructure Investment Co., Ltd. 2024-04-28.Archived from the original on 2024-05-15. Retrieved2024-04-28.
  24. ^"北京轨道交通19号线二期工程环境影响评价第一次公示".北京市基础设施投资有限公司. 2024-07-29.Archived from the original on 2024-07-29. Retrieved2024-07-29.
Wikimedia Commons has media related toLine 19, Beijing Subway.
Beijing SubwayBeijing SubwayBeijing Subway
Lines in operation
Under construction
Planned
  •  3  (Phase 2)
  •  7  (Phase 3)
  •  11  (Phase 2)
  •  12  (Phase 2)
  •  15  (Phase 2)
  •  17  (Branch)
  •  19  (Extension and Branch)
  •  20  (Phase 1)
  •  Fangshan  (Line 25 Phase 3)
  •  S6  (Phase 1)
Trams in BeijingTrams in Beijing
Lines in operation
CRS-train
(Beijing Suburban Railway)
Lines in operation
Under construction
CR C/G-train
(intercity railways)
Lines in operation
OtherCR railways
Corridors
Major railways
Other urban transit
Lines in operation
Transportation hubs
List of airports in China Airports
China Railway Railway stations
Line 19
Stations that are unopened, disused, proposed, under planning or under construction are shown initalics.
Retrieved from "https://en.wikipedia.org/w/index.php?title=Line_19_(Beijing_Subway)&oldid=1320646259"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp