| Line 17 | |
|---|---|
| 17 | |
Line 17 train enteringHuangshi station | |
| Overview | |
| Status | Operational |
| Owner | City of Chengdu |
| Locale | Chengdu,Sichuan |
| Termini | |
| Stations | 21 |
| Service | |
| Type | Rapid transit |
| System | Chengdu Metro |
| Operator(s) | Chengdu Metro Corporation |
| Depot(s) | Wutongmiao Depot (五桐庙停车场) |
| History | |
| Opened | 18 December 2020; 4 years ago (2020-12-18)[1] |
| Technical | |
| Line length | 30.286 km (18.8 mi) (in operation) |
| Number of tracks | 2 |
| Character | underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in)standard gauge |
| Electrification | Overhead line, 25 kV 50 Hz AC |
| Operating speed | 140 km/h[2] |
Line 17 of theChengdu Metro is ametro line inChengdu. The whole line is 30.286 km when Phase 2 opens. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.[3]
Phase 1 runs from Jinxing station inWenjiang District to Jitouqiao station inWuhou District. Phase 1 is 26.145 km long with 5.5 km running elevated and 20.6 km running underground. There are 9 stations with 2 elevated stations and 7 underground stations.[4][5]
Phase 2, opened on September 17th 2025, extended the line west across central Chengdu to Gaohong station. It is 24.8 km long, all underground with 18 additional stations.[6]
Line 17 Phase 1 and Line 19 Phase 1 were running in connection as one route.
Original Line 17 Phase 1: (Jinxing -Jitouqiao) split into Line 19 Phase 1: (Jinxing -Jiujiang North) and new Line 17: (Jiujiang North -Jitouqiao), and 4-Car A-Train starts operation on Line 17. All passengers must transfer at the same platform atJiujiang North between line 17 and line 19.[30][31]
As Line 17 Phase 2 and Line 19 Phase 2 are finished, the operation plan since November 28th is:[32]Line 17 Section:Jiujiang North -Baifoqiao -Jitouqiao
Line 19 Section:Jinxing -Huangshi -Chengdu Fifth People's Hospital-Fengxihe -Wenquan Avenue -Mingguang -Jiujiang North
Line 17 Phase 2 and Phase 1 section going to operate together since September 17th, the route is going to operate from Jiujiang North - Jitouqiao - People's Park - Gaohong
| Station № | Station name | Transfer | Distance km | Location | ||
|---|---|---|---|---|---|---|
| English | Chinese | |||||
| 1701 | Gaohong | 高洪 | Chenghua | |||
| 1702 | Weiling | 威灵 | ||||
| 1703 | Hangtian Road | 航天路 | ||||
| 1704 | Renmintang | 人民塘 | 8 (OSI:Shengdeng Park) | |||
| 1705 | Jichechang | 机车厂 | ||||
| 1706 | Erxianqiao | 二仙桥 | 7 | |||
| 1707 | Tashui Bridge | 踏水桥 | ||||
| 1708 | Jianshe North Road | 建设北路 | 6 | |||
| 1709 | Hongxing Bridge | 红星桥 | 3 | Jinniu | ||
| 1710 | Chenghuangmiao | 城隍庙 | ||||
| 1711 | Xidajie Street | 西大街 | Qingyang | |||
| 1712 | People's Park | 人民公园 | 2 10 | |||
| 1713 | Xiaonan Street | 小南街 | 13 | |||
| 1714 | Provincial Orthopaedics Hospital | 省骨科医院 | 5 | |||
| 1715 | Huanhua Lane | 浣花里 | Wuhou | |||
| 1716 | Qingshuihe Bridge | 清水河大桥 | ||||
| 1717 | Longzhuayan | 龙爪堰 | 7 | |||
| 1718 | Yanggongqiao | 阳公桥 | ||||
| 1719 | Jitouqiao | 机投桥 | 9 | —— | 0.000 | |
| 1720 | Baifoqiao | 白佛桥 | 1.468 | 1.468 | ||
| 1721 | Jiujiang North | 九江北 | 19 | 4.179 | 5.647 | Shuangliu |