Line 17 (Chengdu Metro)

From Wikipedia, the free encyclopedia
Rapid transit line in Chengdu, China
Line 17
 17 
Line 17 train enteringHuangshi station
Overview
StatusOperational
OwnerCity of Chengdu
LocaleChengdu,Sichuan
Termini
Stations21
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)Chengdu Metro Corporation
Depot(s)Wutongmiao Depot (五桐庙停车场)
History
Opened18 December 2020; 4 years ago (2020-12-18)[1]
Technical
Line length30.286 km (18.8 mi) (in operation)
Number of tracks2
Characterunderground
Track gauge1,435 mm (4 ft 8+12 in)standard gauge
ElectrificationOverhead line25 kV 50 Hz AC
Operating speed140 km/h[2]

Line 17 of theChengdu Metro is ametro line inChengdu. The whole line is 30.286 km when Phase 2 opens. The line uses 8-car Type-A trains operating up to 140 km/h speed powered by 25kV AC overhead lines.[3]

Phase 1 runs from Jinxing station inWenjiang District to Jitouqiao station inWuhou District. Phase 1 is 26.145 km long with 5.5 km running elevated and 20.6 km running underground. There are 9 stations with 2 elevated stations and 7 underground stations.[4][5]

Phase 2, opened on September 17th 2025, extended the line west across central Chengdu to Gaohong station. It is 24.8 km long, all underground with 18 additional stations.[6]

Progress

[edit]
  • On February 23, 2017, Sichuan Development and Reform Commission approved Line 17 Phase 1.[7]
  • On February 27, 2017, Line 17 Phase 1 started construction.[8][9]
  • On November 11, 2017, the firsttunnel boring machine started digging section between Jiujiang North and Baifoqiao Stations.[10]
  • On March 24, 2019, Line 17 phase 1 elevated section was completed.
  • On April 9, 2019, Huangshi-Chengdu Fifth People's Hospital, Mingguang-#1 Vent Tunnel sections are completed.
  • On August 5, 2019, main structures of all stations on Line 17 was completed.[11]
  • On January 7, 2020, Line 17 Phase 2's Beimenqiao Station started excavation, marking the start of station construction for Phase 2.
  • On March 25, 2020, Line 17 Phase 1 finished track-laying.[12]
  • On June 19, 2020, Chengdu Metro started 3-month trial operation for Line 17.[13]
  • On June 24, 2020, Construction finished for Wutongmiao Depot (五桐庙停车场) for Line 17.[14]
  • On December 18, 2020, Line 17 from Jinxing station to Jitouqiao station was opened.
  • On October 20, 2022, 16:40, Line 17 Phase 2's Longzhuayan - Qingshuihedaqiao section finished both tunnel construction. This section is 369.602m long.[15]
  • On 12 Feb 2023,Line 19 Phase 2 is officially powered on.[16]
  • On 21 Feb 2023,Line 19 Phase 2 signal and communication system started operational testing in Xinmiao Control Centre (新苗控制中心), and Phase 2 signal now synchronizes with Phase 1.[17]
  • On 22 Feb 2023, Line 17 Phase 2 finishedJinxing station's main power centre's land clearance.[18]
  • On 20 March 2023,Line 19's Changshuncun Depot (长顺村停车场) is handover to operation.[19]
  • On 28 March 2023,Line 19 Phase 2 finished 160 km/h high-speed train testing, entering 1–2 months of systematic testing.[20]
  • On 28 March 2023, Chengdu Rail Transit 2023 Annal Media Gala was held in Wenjiashan Station ofLine 19.[21]
  • On 30 March 2023,Line 19 Phase 2 finished construction and handover to operation team for operational testing.[22]
  • On 26 May 2023, all 45 trains ofLine 19 Phase 2 are delivered.[23]
  • On 6 September 2023, Chengdu Metro debuted Train Maintenance Bots (车辆巡检机器人), AI-Railway Maintenance Bots (轨道智能巡检机器人), and Power-line Surveillance AI (弓网在线监测装置) onLine 19. This is the first AI-Maintenance Robot & System in the world. Chengdu Metro will implement full AI-Operation by 2025.[24]
  • On September 17, 2023, original Line 17 Phase 1: (Jinxing -Jitouqiao) splits into Line 19 Phase 1: (Jinxing -Jiujiang North) and new Line 17: (Jiujiang North -Jitouqiao), and 4-Car A-Train starts operation on Line 17. All passengers must transfer at the same platform atJiujiang North between line 17 and line 19.[25][26]
  • On September 26, 2023,Line 18 andLine 19 starts co-operational testing.[27]
  • On September 30, 2023, Line 17 Phase 2'sPeople's Park station finished structure construction.[28]
  • On October 3, 2023, Line 17 Phase 2's Qingshuihedaqiao station to Huanhhali station finished both tunnel construction.[29]
  • On 17 September, 2025, Line 17 Phase 2 from Jitouqiao station to Gaohong station was opened.

Operation

[edit]

Opening - 2023 September

[edit]

Line 17 Phase 1 and Line 19 Phase 1 were running in connection as one route.

September 2023 - November 2023

[edit]

Original Line 17 Phase 1: (Jinxing -Jitouqiao) split into Line 19 Phase 1: (Jinxing -Jiujiang North) and new Line 17: (Jiujiang North -Jitouqiao), and 4-Car A-Train starts operation on Line 17. All passengers must transfer at the same platform atJiujiang North between line 17 and line 19.[30][31]

November 2023 - September 2025

[edit]

As Line 17 Phase 2 and Line 19 Phase 2 are finished, the operation plan since November 28th is:[32]Line 17 Section:Jiujiang NorthBaifoqiaoJitouqiao

Line 19 Section:JinxingHuangshiChengdu Fifth People's HospitalFengxiheWenquan AvenueMingguangJiujiang North

September 2025 - Now

[edit]

Line 17 Phase 2 and Phase 1 section going to operate together since September 17th, the route is going to operate from Jiujiang North - Jitouqiao - People's Park - Gaohong

Stations

[edit]
Station

Station nameTransferDistance
km
Location
EnglishChinese
1701Gaohong高洪Chenghua
1702Weiling威灵
1703Hangtian Road航天路
1704Renmintang人民塘 8  (OSI:Shengdeng Park)
1705Jichechang机车厂
1706Erxianqiao二仙桥 7 
1707Tashui Bridge踏水桥
1708Jianshe North Road建设北路 6 
1709Hongxing Bridge红星桥 3 Jinniu
1710Chenghuangmiao城隍庙
1711Xidajie Street西大街Qingyang
1712People's Park人民公园 2  10 
1713Xiaonan Street小南街 13 
1714Provincial Orthopaedics Hospital省骨科医院 5 
1715Huanhua Lane浣花里Wuhou
1716Qingshuihe Bridge清水河大桥
1717Longzhuayan龙爪堰 7 
1718Yanggongqiao阳公桥
1719Jitouqiao机投桥 9 ——0.000
1720Baifoqiao白佛桥1.4681.468
1721Jiujiang North九江北 19 4.1795.647Shuangliu

References

[edit]
  1. ^"12月18日五线齐发,成都轨道交通运营里程突破500公里!".
  2. ^"成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved2017-08-01.
  3. ^"成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved2017-08-01.
  4. ^"地铁19号线一期" (in Chinese). 成都地铁. 2017-10-16. Retrieved2017-10-16.
  5. ^"轨道交通17号线一期". Retrieved2018-04-04.
  6. ^"成都轨道交通17号线二期工程可行性研究及勘察设计总承包招标公告" (in Chinese). 四川日报. 2017-08-01. Retrieved2017-08-01.
  7. ^"成都轨道交通11号线一期、17号线一期工程可研报告获批" (in Chinese). 四川新闻网. 2017-02-23. Retrieved2017-02-23.
  8. ^成都地铁17号线一期开建 预计2020年通车_网易新闻.news.163.com. Retrieved2018-08-19.
  9. ^"成都地铁17号线一期开建 预计2020年通车" (in Chinese). 网易. 2017-02-28. Archived fromthe original on 2018-05-08. Retrieved2017-02-28.
  10. ^"串联温江、武侯和双流 成都地铁17号线开始"打洞"" (in Chinese). 四川在线. 2017-11-29. Retrieved2017-11-29.
  11. ^"成都地铁17号线一期全线车站封顶" (in Chinese). 成都市温江区人民政府. 2019-08-07.
  12. ^"成都轨道交通17号线一期"长轨通" 温江将迎双地铁时代".
  13. ^"即将开启空载调试、空载试运行 成都地铁9号线、17号线离开通也近了!".
  14. ^"成都地铁17号线列车有家啦!五桐庙停车场主体工程完工".
  15. ^"成都地铁17号线二期龙~清区间双线顺利贯通". crcc 24. 2022-10-24. Retrieved2023-10-09.
  16. ^"195座车站封顶、23个TOD实施 成都轨道集团迎来一季度"开门红"" (in Chinese).
  17. ^"地铁19号线二期年内试运营!成都轨交建设最新进展" (in Chinese). 2022-12-21.
  18. ^"地铁19号线二期年内试运营!成都轨交建设最新进展" (in Chinese). 2022-12-21.
  19. ^"195座车站封顶、23个TOD实施 成都轨道集团迎来一季度"开门红"" (in Chinese).
  20. ^"热滑完成!成都地铁19号线二期提前通车有望".
  21. ^"成都轨道交通19号线二期举办"开门评风"媒体交流活动".
  22. ^"成都轨道交通19号线二期轨行区正式移交运营".
  23. ^"成都轨道交通19号线二期45列电客车全数交付".Sohu (in Chinese).
  24. ^"成都:创新引领科技赋能轨道交通高质量发展".
  25. ^"地铁17号线"一拆为二" 来看看会有哪些变化" (in Chinese).
  26. ^"成都地铁19号线二期开通在即 17号线将在九江北站"分家"" (in Chinese).
  27. ^"离开通再近一步!成都地铁19号线二期最新消息" (in Chinese).
  28. ^中铁广州工程局城建公司 (2023-09-29)."中铁广州局重点项目之成都地铁10号线项目". 中铁广州工程局城建公司. Retrieved2023-10-09.
  29. ^"【e周发声】第247期-成都轨道交通17号线清水河大桥站~浣花里站区间双线贯通". 2023-10-09. Retrieved2023-10-09.
  30. ^"地铁17号线"一拆为二" 来看看会有哪些变化" (in Chinese).
  31. ^"成都地铁19号线二期开通在即 17号线将在九江北站"分家"" (in Chinese).
  32. ^"成都地铁17号线"最难建段"开始掘洞" (in Chinese). 四川在线. 2018-03-29. Retrieved2018-03-29.
Public transportation inSichuan Province (SC)
Chengdu MetroChengdu MetroChengdu Metro
Lines in operation
Under construction
Planned
  •  5  (phase III)
  •  9  (phase II)
  •  10  (phase IV)
  •  12 
  •  16 
  •  18  (phase IV)
  •  20 
  •  22 
  •  23 
  •  27  (phase II)
  •  S13 
Guang'an MetroGuang'an Metro
Under construction
Planned
Yibin ART
Lines in operation
  • T1
  • T4
Under construction
  • T2
China Railway C-train
Lines in operation
China Railway Intercity rails
Lines in operation
Chengdu Trams
Lines in operation
Under construction
Under planning
Other rail transits
Under construction
Chengdu BRT
Lines in operation
Transportation hubs
List of airports in China Int'l airports
China Railway Railway stations
Line 17
Note: Stations inItalic are under construction.
※only interchange service available, no entrance/exit