This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Line 13" Chengdu Metro – news ·newspapers ·books ·scholar ·JSTOR(January 2021) (Learn how and when to remove this message) |
| Line 13 | |
|---|---|
| 13 | |
| Overview | |
| Status | Under construction |
| Owner | Chengdu |
| Locale | Chengdu,China |
| Termini | |
| Stations | 21 |
| Service | |
| Type | Rapid transit |
| System | Chengdu Metro |
| Services | 1 |
| Operator(s) | Chengdu Metro Limited |
| Rolling stock | 8-car Type A (Driverless)[1] |
| Technical | |
| Line length | 29.06 km (18.06 mi) |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Operating speed | 140 kilometres per hour (87 mph) |
Line 13 of theChengdu Metro (Chinese:成都地铁13号线) is a metro line inChengdu,Sichuan,China. The first phase of the line is currently under construction and is entirely underground.
| Segment | Commencement | Length | Stations | Name |
|---|---|---|---|---|
| Wayaotan — Long'an | Under construction | 29.06 km (18.06 mi) | 21 | Phase 1 |
| Station name | Connections | ||||||
|---|---|---|---|---|---|---|---|
| English | Chinese | ||||||
| Wayaotan | 瓦窑滩 | ||||||
| Wanjiawan | 万家湾 | ||||||
| Peifeng | 培风 | 9 | |||||
| Wanshouqiao | 万寿桥 | ||||||
| Dongpo Road | 东坡路 | 7 | |||||
| Guanghuacun | 光华村 | ||||||
| Du Fu Thatched Cottage | 杜甫草堂 | ||||||
| Qingyang Taoist Temple | 青羊宫 | 5 | |||||
| Xiaonan Street | 小南街 | 17 | |||||
| Wenweng Shishi | 文翁石室 | 10 | |||||
| Huaxiba | 华西坝 | 1 | |||||
| Xinnanmen | 新南门 | 3 | |||||
| Jiuyan Bridge | 九眼桥 | ||||||
| Sanguantang | 三官堂 | 6 | |||||
| Jingjusi | 净居寺 | 8 | |||||
| Sichuan Normal University | 四川师大 | 7 | |||||
| Jiaozi Flyover | 娇子立交 | 30 | |||||
| Xingfu Meilin | 幸福梅林 | ||||||
| Sansheng Flower Town | 三圣花乡 | ||||||
| Longhua Temple | 龙华寺 | ||||||
| Long'an | 龙安 | ||||||