3°3′2.0″N101°38′39.2″E / 3.050556°N 101.644222°E /3.050556; 101.644222
SP22 Kinrara BK 5 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
Station signage of the station. | |||||||||||
| General information | |||||||||||
| Location | Bukit Jalil Highway Bandar Kinrara 2 47180,Puchong,Selangor Malaysia | ||||||||||
| System | |||||||||||
| Owned by | Prasarana Malaysia; operated byRapid Rail. | ||||||||||
| Line | 4Sri Petaling Line | ||||||||||
| Platforms | 2side platforms | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated | ||||||||||
| Parking | Available with payment. 176 total parking bays. | ||||||||||
| Other information | |||||||||||
| Station code | SP22 | ||||||||||
| History | |||||||||||
| Opened | 31 October 2015 | ||||||||||
| Services | |||||||||||
| |||||||||||
Kinrara BK5 LRT station is a Light Rapid Transit station inBandar Kinrara,Puchong,Petaling District,Selangor,Malaysia. It was the southern terminus for passenger services on the LRT Extension Project Phase 1.[1][2]
It is operated underSri Petaling Line network as found in the station signage. Like most other LRT stations operating inKlang Valley, this station is elevated.
The work of LRT Extension Project (LEP) that was kicked off in the middle of 2013 started fromAwan Besar and passes throughKinrara,Puchong, and ended at Putra Heights. The extension is 17.7 km long with 11 new stations and was completed in stages. The first stage of 4 stations was completed in September 2015 and commenced operations on 31 October 2015.
The LEP Phase 2 covering the remaining stations have commenced operations on 30 June 2016.
This Malaysian rapid transit article is astub. You can help Wikipedia byexpanding it. |