![]() Interactive map of Kangy Angy Maintenance Centre | |
| Location | |
|---|---|
| Location | Kangy Angy |
| Coordinates | 33°19′52″S151°23′57″E / 33.33111°S 151.39917°E /-33.33111; 151.39917 |
| Characteristics | |
| Owner | Transport Asset Holding Entity |
| Operator | Sydney Trains |
| Rolling stock | D sets |
| History | |
| Opened | 24 February 2021 |
TheKangy Angy Maintenance Centre is a railway depot atKangy Angy on theCentral Coast, New South Wales to maintain theNew South Wales D sets. The depot was officially opened on 24 February 2021.
The depot is almost 500,000 square metres (5,400,000 sq ft) in size and has about 6 kilometres (3.7 mi) of electric rail lines. It runs24/7 and is operated byUGL Rail under a 15-year contract.
In 2017,Transport for NSW awarded a contract toJohn Holland to build a new depot adjacent to theMain Northern line atKangy Angy to maintain theNSW TrainLink D sets.[1] Construction commenced in May 2018 with the depot.[2][3]
Major construction was completed in 2020 and the firstD set arrived at the facility in October 2020.[4] The facility was officially opened on 24 February 2021.[5]