Kaluzhsko-Rizhskaya line

Route map:
From Wikipedia, the free encyclopedia
Moscow Metro line
This articleneeds additional citations forverification. Please helpimprove this article byadding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Kaluzhsko-Rizhskaya line" – news ·newspapers ·books ·scholar ·JSTOR
(June 2010) (Learn how and when to remove this message)
Kaluzhsko-Rizhskaya line
Overview
OwnerMoskovsky Metropoliten
LocaleMoscow
Termini
Stations24
Service
TypeRapid transit
SystemMoscow Metro
Operator(s)Moskovsky Metropoliten
Rolling stock81-765/766/767
81-765.3/766.3/767.3
81-765.4/766.4/767.4
81-775/776/777
Daily ridership1,283,024[1]
History
Opened1 May 1958
Technical
Line length37.8 kilometres (23.5 mi)
CharacterUnderground
Track gauge1,520 mm (4 ft 11+2732 in)
ElectrificationThird rail
Route map

Medvedkovo
Babushkinskaya
Sviblovo
Botanichesky Sad
Ground transferTransfer for #14 Moscow Central Circle at Botanichesky Sad
VDNKh
Alekseyevskaya
Rizhskaya
Transfer for #11 Bolshaya Koltsevaya line at RizhskayaGround transferRizhsky railway stationTransfer for #D2 Line D2 (Moscow Central Diameters) at Rizhskaya
Prospekt Mira
Transfer for #5 Koltsevaya line at Prospekt Mira
Sukharevskaya
Turgenevskaya
Transfer for #1 Sokolnicheskaya line at Chistyye PrudyTransfer for #10 Lyublinsko-Dmitrovskaya line at Sretensky Bulvar
Kitay-gorod
Transfer for #7 Tagansko-Krasnopresnenskaya line at Kitay-gorod via cross-platform interchange
Tretyakovskaya
Transfer for #2 Zamoskvoretskaya line at NovokuznetskayaTransfer for #8 Kalininskaya line at Tretyakovskaya via cross-platform interchange
Oktyabrskaya
Transfer for #5 Koltsevaya line at Oktyabrskaya
Shabolovskaya
(Transfer for #17 Rublyovo-Arkhangelskaya line at Shabolovskaya)
Leninsky Prospekt
Transfer for #14 Moscow Central Circle at Ploshchad Gagarina
Akademicheskaya
Transfer for #16 Troitskaya line at Akademicheskaya
Profsoyuznaya
Novye Cheryomushki
Kaluzhskaya
Transfer for #11 Bolshaya Koltsevaya line at Vorontsovskaya
Belyayevo
Konkovo
Tyoply Stan
Yasenevo
Novoyasenevskaya
Transfer for #12 Butovskaya line at Bittsevsky Park
This diagram:

TheKaluzhsko-Rizhskaya line (Russian:Калу́жско-Ри́жская ли́ния,IPA:[kɐˈɫuʂskəˈrʲiʂskəjəˈlʲinʲɪjə]) (Line 6; Orange Line) is a line of theMoscow Metro, that originally existed as two separate radial lines, Rizhskaya and Kaluzhskaya opened in 1958 and 1962, respectively. Only in 1971 were they united into a single line as the central section connecting the stationsOktyabrskaya toProspekt Mira was completed. It was also the first line in Moscow to have a cross-platform transfer. The Rizhsky radius is roughly aligned with a northern avenue Prospekt Mira, while the Kaluzhskiy radius generally follows a southwestern street Profsoyuznaya Ulitsa. Presently, the Kaluzhsko-Rizhskaya line is the third busiest in the Moscow Metro system with a passenger traffic rate of 1.015 million per day.[1] It has a bi-directional length of 37.8 kilometres (23.5 mi), and a travel time of 56 minutes, typically it is coloured orange on Metro maps and numbered6.

History

[edit]
Cut-and-cover construction of Akademicheskaya station (1960)

The Kaluzhsko-Rizhskaya line was the first one in Moscow to be built in the time of the new epoch, when contrary to the old time-consuming manual work that produced the most famous stations in the system theDe-Stalinization policies ofNikita Khrushchev forced the modernisation and development of new saving techniques.

Rizhskaya

[edit]

Nonetheless the overall layout of the Metro was completed in 1954 whenthe ring became fully operational. Moscow Metro planners immediately drew new areas of development which would come in radii starting at the ring. The first such radius became the Rizhskaya, which would expand northwards from the Botanichesky Sad (nowProspekt Mira) station along the Mira avenue past theRizhsky Rail Terminal and terminate at the newly builtAll-Russia Exhibition Centre. Construction began in the mid 1950s and in 1958 the first four stations of the new radius opened. Already the first stations show a clear transition away from theStalinist elements in architecture, where it is obvious how the original project was altered to make it simpler and aesthetic. New construction methods, such as shortening the station vault diameters from 9.5 to 8.5 metres (31 ft 2 in to 27 ft 11 in) and new element junction methods dramatically reduced the building time.

Kaluzhskaya

[edit]

On the opposite end of the ring, a second new radius was planned to be built – Kaluzhskaya, which would follow on a southeast contour to the first newly builtCheryomushki bedroom districts made fromKhrushchyovka houses. Like the cheap buildings it expanded into the Kaluzhsky radius was made completely of any decorative architecture whatsoever. For the first time a joint project for a sub-surface station – the Sorkonozhka (Centipede) was created. Consisting of an enclosed concrete prism, it featured two supporting rows of pillars for the ceiling. The original design was standardised to the point where stations differed only in the colour of marble on the pillars and the ceramic tiling patterns of the walls. However the method allowed for even further increase in construction methods. A rational combination of using deep-levelshield tunnels and a sub-surface station pit allowed for this, and would become the most widely used technique in manyex-USSR metro systems. In 1962 the Kaluzhskaya line was opened, and in 1964 it had its first extension to the new Kaluzhskoye depot where a temporary surface station was opened.

Transfer points

[edit]

Originally it was thought that the two radii could exist on their own and terminate at the ring; however, the dynamic passenger inflow immediately made the Metro planners realise the mistake. To correct this, it was decided to link the radii to a diameter and relieve the ring by allowing several transfer points inside the circumference. In 1970 the first extension northwards from Oktyabrskaya took place where the line met up with theTagansko-Krasnopresnenskaya line atKitay-gorod, for the first time, a combinedcross-platform transfer was opened with both stations built simultaneously. Finally, at the end of 1971, the lines linked up with the central section forming the Kaluzhsko-Rizhskaya line. The two stations that formed the final junction used a new method of mounting hydroisolation, which was made separately and then suspended instead of mounting it piece by piece. This allowed a three-month work to be finished in little more than a week.

Extension projects

[edit]
North

After the joining of the radii the line became a full transport artery. Several more extension projects were carried out. A northern one opened in 1978 and finally allowed the late Soviet decorative architecture to blossom. At four stations long, it extended past theRussian Botanical Gardens into the new northern districts ofBabushkinsky andMedvedkovo. The extension also featured a new depot. Part of the track lies acrossYauza River though passengers can not see it as the track bridge is a covered tunnel.

South

At the same time several projects on the southern radius took place. In 1974 the temporary depot station was closed and the line expanded into Belyayevo. In 1980 Shabolovskaya was opened between Oktyabrskaya and Leninsky Prospekt stations. The original stretch was built under very difficult geological conditions, with pressure as much as 2.3 bars. The planned deep-level station was abandoned due to difficulties in building an escalator tunnel. However, in 1980 the continued development in engineering techniques allowed for this to finish and the station was opened without any disruption to the service.

Southwest

In the late 1980s, work began on the final section in the southwest, to the new suburbs ofKonkovo andYasenevo, finally reaching the edge of theBitsa Park in 1990.

Timeline

[edit]
SegmentDate openedLength
Prospekt MiraVDNKh1 May 19584.5 km
OktyabrskayaNovye Cheryomushki13 October 196212.6 km
Novye Cheryomushki–Kaluzhskaya (temporary)15 April 196214.1 km
OktyabrskayaKitay-gorod30 December 19703.1 km
Prospekt MiraKitay-gorod31 December 19713.1 km
Novye Cheryomushki-Belyayevo12 August 19742.2 km
VDNKh-Medvedkovo29 September 19788.1 km
Shabolovskaya6 November 1980N/A
BelyayevoTyoply Stan6 November 19872.9 km
Tyoply StanNovoyasenevskaya17 January 19903.6 km
Total37.8 km

Name changes

[edit]
StationPrevious name(s)Years
VDNKhVSKhV1958–1959
AlekseyevskayaMir1958–1966
Scherbakovskaya1966–1990
Prospekt MiraBotanicheskiy Sad1958–1966
SukharevskayaKolkhoznaya1972–1990
Kitay-gorodPloshchad Nogina1971–1990
TretyakovskayaNovokuznetskaya1971–1983
NovoyasenevskayaBittsevsky Park1990–2008

Transfers

[edit]
#Transfer toAt
1Sokolnicheskaya lineTurgenevskaya
2Zamoskvoretskaya lineTretyakovskaya
5Koltsevaya lineProspekt Mira,Oktyabrskaya
7Tagansko-Krasnopresnenskaya lineKitay-gorod
8Kalininskaya lineTretyakovskaya
10Lyublinsko-Dmitrovskaya lineTurgenevskaya
11Bolshaya Koltsevaya lineRizhskaya,Kaluzhskaya
L1Butovskaya lineNovoyasenevskaya
14Moscow Central CircleBotanichesky Sad,Leninsky Prospekt
Troitskaya lineAkademicheskaya
RailRizhskoe direction
Kurskoye direction
Belorusskoye direction
Rizhskaya

Rolling stock

[edit]

The line is served by two depots, Kaluzhskoe (№ 5) and Sviblovo (№ 10). Most of the trains are 81–717.5/714.5 models which were received new from 1987, however 12 of them are the new 81-717.5M/714.5M which were added to Sviblovo's park in 1996/1997. In 2017, the Moscow Metro began replacing the81–717.5/714.5 and81-717.5M/714.5M models with81-760/761s (Oka). The 81-760/761s stopped being used on the line on 22 August 2018. In 2018, Moscow MayorSergey Sobyanin announced that the next-generation 81-765/766/767 (Moscow) trains would operate on the line from 2019, and within five to six years the old rolling stock would be entirely replaced.[2] In May 2018, the first 81-765/766/767 train began operating on the line, ahead of schedule.[3] In December 2020, the first 81-775/776/777 train began operating on the line.

Subway car types used on the line over the years:

TypeDates
Series G1958 - 1982
Series E, Ezh, Em-508 and Em-5091972 - 1996
Series81-717/7141987 - 2023
Series81-717.5/714.51989 - 2023
Series81-717.5M/714.5M1993 - 2022
Series81-760/7612017 - 2018
Series81-760A/761A/763A2018
Series81-765/766/7672018–present
Series81-765.3/766.3/767.32018–present
Series81-765.4/766.4/767.42019–present
Series81-775/776/7772020–present

Recent developments and future plans

[edit]

Currently the line spans through the entire city and no extensions are planned in the nearby future. However several projects exist. The first one was to connect the town ofMytishchi in theMoscow Oblast with the Moscow Metro, this was however declared unnecessary by the mayor of the city. Another one was to extend from Bitsevsky Park toAnnino of theSerpukhovsko-Timiryazevskaya line, however it is unlikely this will be realized due to the preserved area of the Bitsa Park, and a newer project to bring theButovskaya Light Metro line to the southern radius.

The lack of transfer to the Serpukhovsko-Timiryazevskaya line has led to a plan to build Yakimanka station between Oktyabrskaya and Tretyakovskaya, which will offer a transfer toPolyanka.

Several projects also exist to modernize the older stations. A second entrance was added to VDNKh in 1997 and Akademicheskaya has had a restoration of its ceramic tiled walls replacing them with aluminium planes. Recently it has emerged that the Moscow circular railway will be converted into a form of urban transport. If so then the conserved transfer from Leninsky Prospekt to the railway station Ploschad Gagarina will be opened.

References

[edit]
  1. ^abПассажиропотоки 2009 год.Олимп (in Russian). Archived fromthe original on 28 September 2010. Retrieved18 June 2010.
  2. ^"Поезда нового поколения выйдут на Калужско-Рижскую линию в 2019 году".uzao.mos.ru (in Russian). Archived fromthe original on 2018-03-04. Retrieved2018-02-21.
  3. ^"Поезд "Москва" запустили на Калужско-Рижской линии / Новости города / Сайт Москвы".Сайт Москвы (in Russian). 2018-05-14. Retrieved2018-05-14.

External links

[edit]
Wikimedia Commons has media related toKaluzhsko-Rizhskaya Line.
Template:Attached KML/Kaluzhsko-Rizhskaya Line
KML is from Wikidata
Lines of theMoscow Metro
Lines under construction or proposed
Former and closed lines
#1 Sokolnicheskaya line Sokolnicheskaya line
#2 Zamoskvoretskaya line Zamoskvoretskaya line
#3 Arbatsko-Pokrovskaya line Arbatsko-Pokrovskaya line
#4 Filyovskaya line Filyovskaya line
Main
#4А 4А line Branch
#5 Koltsevaya line Koltsevaya line
#6 Kaluzhsko-Rizhskaya line Kaluzhsko-Rizhskaya line
#7 Tagansko-Krasnopresnenskaya line Tagansko-Krasnopresnenskaya line
Kalininsko-Solntsevskaya line
#8 Kalininskaya line Kalininskaya line
#8A Solntsevskaya line Solntsevskaya line
#9 Serpukhovsko-Timiryazevskaya line Serpukhovsko-Timiryazevskaya line
#10 Lyublinsko-Dmitrovskaya line Lyublinsko-Dmitrovskaya line
#11 Bolshaya Koltsevaya line Bolshaya Koltsevaya line
#12 Butovskaya line Butovskaya line
#13 Moscow Monorail Moscow Monorail
#14 Moscow Central Circle Moscow Central Circle
#15 Nekrasovskaya line Nekrasovskaya line
#16 Troitskaya line Troitskaya line
#17 Rublyovo-Arkhangelskaya line Rublyovo-Arkhangelskaya line
#18 Biryulyovskaya line Biryulyovskaya line
#19 19 line 19 line
Authority control databases: GeographicEdit this at Wikidata
Retrieved from "https://en.wikipedia.org/w/index.php?title=Kaluzhsko-Rizhskaya_line&oldid=1318916836"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp