Company type | Public |
---|---|
ISIN | INE749A01030 |
Industry | Steel,Energy |
Founder | O P Jindal |
Headquarters | New Delhi, India[1] |
Area served | Worldwide |
Key people | Naveen Jindal (Chairman)[2] Bimlendra Jha[2] (MD) |
Products | Steel,Iron,Electricity generation anddistribution |
Revenue | ![]() |
![]() | |
![]() | |
Total assets | ![]() |
Total equity | ![]() |
Number of employees | 11,178 (including 4,807 non permanent)(2024) |
Subsidiaries | Jindal Petroleum Limited Vulcan Green Steel JSPL Machinery Jindal Cement Jindal Panther TMT Rebars Jsp Metallics Limited Jindal Infosolutions Ltd Jindal Synfuels Ltd Jindal Minerals & Metals Jindal Power Raigarh Pathalgaon Expressway Ltd. |
Website | jindalsteelpower.com |
Jindal Steel and Power Limited (JSPL) is an Indiansteel company based inNew Delhi.[4] JSPL is a part ofOP Jindal Group.[5]
In terms of tonnage, it is the third-largest private steel producer in India and the only private player in India to produce rails. The company manufactures and sellssponge iron, mild steel slabs, rails, mild steel, structural, hot rolled plates, iron ore pellets, and coils.[6] Jindal Steel and Power set up the world's firstMXCOL plant at Angul, Odisha that uses the locally available and cheap high-ash coal and turns it intosynthesis gas for steel making, reducing the dependence on importedcoking coal.[7]
Recently Union Steel Minister Ram Chandra Prasad Singh inaugurated Jindal Steel's 1.4 MTPA TMT rebar mill at its integrated complex in Odisha's Angul district.[8]
JSPL's pellet plant at Barbil has a total installed capacity of 9 MTPA[9] production for different pellet grades. The plant includes a dry grinding facility that harnesses the recuperation type of straight grate technology.[citation needed]
JSPL's manufacturing facility at Patratu, Jharkhand has a total finished steel capacity of 1.6 MTPA.[10]
Nalwa Steel and Power Limited (NSPL) is an integrated steel plant in Raigarh, Chhattisgarh, India with a capacity of 0.36 million tons of finished steel per year.[11]
The equity shares of JSPL are listed on theBombay Stock Exchange[12] and theNational Stock Exchange of India.[13]
Shareholding: On 31 March 2022, the promoter group Jindal Group held 60.5% of itsequity shares. 27% of the shares were owned by the Institutional Investors. Public shareholders own approx. 12.5% of its shares.[14][15]
Shareholders (as of 31-March-2022) | Shareholding[14][15] |
---|---|
Promoter Group (Jindal Family) | 60.45% |
ForeignInstitutional Investors (FII)/NRI/OCB/Trusts/Foreign national | 9.7% |
Public | 12.5% |
Financial Institutions/Banks/Mutual Funds/UTI/Insurance companies/Central Government | 27% |
Total | 100.0% |
Jindal Panther TMT Rebars
JSPL has forayed into the construction retail industry with the launch of Jindal Panther TMT Rebars for the housing segment. These rebars are manufactured in 1.0 MTPA capacity TMT Rebar mill atPatratu,Jharkhand, supplied bySiemens.[16]
Jindal Institute of Power Technology (JIPT)
JIPT was established to develop a pool of technically trained power plant professionals for power utilities in India and abroad. The course authorizes the pass-outs to operate or undertake maintenance of any part or whole of generating stations of capacity 100 MW & above together with the associated substations.[citation needed]
It is promoted by Jindal Education & Welfare Society, which is supported by Jindal Power Limited. The Institute possesses a simulator of 250 MW/600 MW generating units. JIPT is located in the 4X250, 4X600 MWJindal Tamnar Thermal Power Plant inTamnar,Raigarh, Chhattisgarh.[citation needed]
Jindal Steel and Power was one of the two private companies to get a coal field in February 2009. JSPL got the Talcher coal field in Angul with reserves of 150 crore (1,500 million) metric tonnes after the cut-off date by the Central Government, while theGovernment-run Navratna Coal India Ltd was refused.[17]
Both the blocks were inOdisha, with a combined worth of over ₹2lakh crore, and were meant for liquification of coal. The opposition parties alleged that the Government violated all norms in granting the coal fields. Naveen Jindal, however, denied any wrongdoing.[18]
On 3 June 2006,Bolivia granted development rights for one of the world's largest iron ore reserves in theEl Mutún region to Jindal Steel. With an initial investment of US$1.5 billion, the company plans to invest an additional US$2.1 billion over the next eight years in the South American country.[19]
Jindal Steel is likely to terminate the contract of investing $2.1 billion in setting up a steel plant in Bolivia, due to non-fulfilment of contractual obligations by theBolivian Government.[20]
In 2024, theInternational Court of Arbitration of theInternational Chamber of Commerce ruled in favor of Bolivia against the Indian company Jindal Steel Bolivia S.A. (JSB) that demanded compensation of 100 million dollars from the Bolivian State for the Mutún project, which is about to be completed in Santa Cruz.
The court, in its ruling, dismissed JSB's claims and declared that Empresa Siderúrgica de El Mutún (ESM) complied with all of its contractual obligations in good faith under Bolivian law. In addition, it determined that the Indian transnational must assume the costs of the arbitration, which amount to 740 thousand dollars, and pay the ESM more than 1.9 million dollars in costs and expenses, plus interest based on the yield of the bonds of the United States Treasury.[21][22]