Jiamin line | |
---|---|
Jiamin | |
Overview | |
Other name(s) | L3 (planned nameShanghai Metro) Line 17 (planned nameShanghai Metro up to 2011) |
Status | Under construction |
Locale | Shanghai,China |
Termini | |
Connecting lines | 1 2 5 9 10 11 12 13 14 22 25 Airport Link |
Stations | 15 |
Service | |
Type | Commuter rail |
System | Shanghai Suburban Railway |
Operator(s) | Shentong Metro Group |
Rolling stock | China Railway CRH6 |
History | |
Commenced | June 28, 2021; 3 years ago (2021-06-28) |
Planned opening | 2027[2] |
Technical | |
Line length | 44.04 km (27 mi) km[2] |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (AC 25 kV) |
Operating speed | 160 km/h (99 mph) |
Jiamin line (Chinese:嘉闵线;pinyin:Jiāmǐn xiàn) is acommuter rail line currently under construction on theShanghai Suburban Railway, and will be run byShentong Metro Group.[3] It runs fromYindu Road inMinhang District toChengbei Road inJiading District.[1] Construction started on 28 June 2021. The line is expected to open in 2027.[2]
Station name[1] | Connections | Distance km | Location | Open- ing | ||
---|---|---|---|---|---|---|
English | Chinese | |||||
Yindu Road | 银都路 | 5 | 0.0 | 0.0 | Minhang | Phase I 2027 |
Xinjian Road | 莘建路 | 1 [note 1] (via Humin Road/North Xinzhuang Station) | 2.123 | 2.123 | ||
Qixin Road | 七莘路 | 12 | 2.991 | 5.114 | ||
Qibao | 七宝 | 9 | 2.843 | 7.957 | ||
Huxing Road | 沪星路 | 25 [note 2] | 1.218 | 9.175 | ||
Yingbinsan Road | 迎宾三路 | 2.079 | 11.254 | |||
Hongqiao Airport Terminal 2 | 虹桥2号航站楼站 | 2 10 17 (viaHongqiao Railway Station) Airport Link Demonstration Area [note 3] ![]() | 2.417 | 13.671 | ||
Tianshan Road | 天山路 | 2.859 | 16.530 | |||
Jinyun Road | 金运路 | 13 | 2.250 | 18.780 | Jiading | |
Lexiu Road | 乐秀路 | 14 | 3.275 | 22.075 | ||
Nanxiang | 南翔 | 11 22 [note 4] | 3.815 | 25.870 | ||
Fengmao Road | 丰茂路 | 7.179 | 33.049 | |||
Jiajian Highway | 嘉戬公路 | 3.236 | 36.285 | |||
Xincheng Road | 新成路 | 3.883 | 40.168 | |||
Chengbei Road | 城北路 | 11 (viaNorth Jiading) | 3.086 | 43.255 | ||
Except for the Hongqiao hub section, which is laid on the ground, the length of the ground section is 2.68 kilometers, and the rest are all underground sections, the length of which is 41.36 kilometers. There are 14 underground stations and 1 ground station on the whole line. It adopts EMU trains with a maximum operating speed of 160 km/h, and a combined fast and slow train transportation mode.[4]
The line has double island platforms in some stations, allowing express/local services.
The line is expected to be extended north toTaicang in neighboringJiangsu Province in the future.[5]
![]() | This Shanghai Metro-related article is astub. You can help Wikipedia byexpanding it. |