JFK/UMass
A Braintree-bound Red Line train at the station in 2025
General information
Location599 Old Colony Avenue
Boston, Massachusetts
Coordinates42°19′14″N71°03′09″W / 42.32058°N 71.05239°W /42.32058; -71.05239
Lines
Platforms
Tracks
  • 1 (Commuter Rail)
  • 4 (Red Line)
Connections
Construction
Bicycle facilitiesRacks available
AccessibleYes
Other information
Fare zone1A (Commuter Rail)
History
Opened1840s; November 5, 1927[3]
RebuiltJune 1987–December 14, 1988
Previous namesColumbia (1927–1982)
Passengers
20241,095 daily boardings[1] (Commuter Rail)
FY20198,012 daily boardings[2] (Red Line)
Services
Preceding stationMBTAFollowing station
Andrew
towardAlewife
Red Line
Savin Hill
towardAshmont
North Quincy
towardBraintree
South Station
Terminus
Fall River/​New Bedford LineQuincy Center
Greenbush LineQuincy Center
towardGreenbush
Kingston LineQuincy Center
towardKingston
Former services (Crescent Avenue station)
Preceding stationNew York, New Haven and Hartford RailroadFollowing station
South Boston
Closed ca. 1917
towardBoston
Boston–​MattapanSavin Hill
towardMattapan
Boston–​BraintreeSavin Hill
towardBraintree
Track layout
Boston Street
Dorchester Avenue
Columbia Road
JFK/
UMass
station
Location
Map

JFK/UMass station is aMassachusetts Bay Transportation Authority (MBTA)intermodal transfer station, located adjacent to theColumbia Point area ofDorchester, Boston,Massachusetts. It is served by the rapid transitRed Line; theFall River/New Bedford Line,Greenbush Line, andKingston Line of theMBTA Commuter Rail system, and threeMBTA bus routes. The station is named for theJohn F. Kennedy Presidential Library and Museum and theUniversity of Massachusetts Boston, both located nearby on Columbia Point.

JFK/UMass station has four tracks and twoisland platforms for the Ashmont and Braintree branches of the Red Line, with one track and oneside platform for Commuter Rail. A waiting room and fare lobby over the Red Line platforms is connected to Columbia Road, Sydney Street, and the busway on the east side of the station by footbridge. The station is fullyaccessible. North of the station, the complex Columbia Junction connects the two Red Line branches with the downtown tunnel and Cabot Yard lead tracks.

TheOld Colony Railroad first opened through the area in 1845, with Crescent Avenue serving as a flag stop by 1848. A station building opened in 1868 and was rebuilt in 1883. TheBoston Elevated Railway began construction of Columbia station on the Dorchester Extension of the Cambridge–Dorchester Tunnel in 1925. Crescent Avenue station closed in July 1927; Columbia station opened on November 5, with an additional footbridge added in 1929.

Columbia station was modernized in 1970, though without a platform for South Shore (Braintree Branch) service, which started in 1971. UMass Boston moved to Columbia Point in 1974, while the Kennedy Library opened in 1979; the station was renamed JFK/UMass in 1982. A 1987–88 renovation added a platform for the Braintree Branch. Commuter Rail service on the former Old Colony, last operated in 1959, resumed in 1997. However, the platform at JFK/UMass did not open until 2001.

Station layout

[edit]
Aerial view of the station, facing north

JFK/UMass station is located south of Columbia Road near Kosciuszko Circle, with theInterstate 93 viaduct to the south and west andMorrissey Boulevard to the east. The Red Line has four tracks and twoisland platforms at the station; the west platform is served by the Ashmont branch, and the east platform by the Braintree branch.[4] (This unusual configuration is the result of the decision to not originally have the Braintree Branch stop at the station.)[5][6] East of the Red Line is a single track used by the three commuter rail lines, with a high-levelside platform on its east side.[4] A two-lane busway, drop-off lane, and plaza are located east of the tracks.[7]

A waiting room and fare lobby is located over the middle of the Red Line platforms, with elevators and stairs to both platforms. Footbridges connect the lobby to the Columbia Road bridge to the north, Sydney Street to the west, and the east plaza via a ramp structure. Exit-only stairs also lead from the north ends of the Red Line platforms to Columbia Road, and from the south ends to Sydney Street at Crescent Avenue.[7] Because northbound Red Line trains arrive on two different platforms, an automatic illuminated sign in the lobby indicates which platform the next northbound train will arrive at.[6]

North of the station is a complex Red Line interlocking called Columbia Junction. The two track line from downtown Boston exits the tunnel under Dorchester Avenue about 0.4 miles (0.6 km) north of JFK/UMass station and splits into the four tracks with aflying junction. The junction also connects two yard leads from Cabot Yard, the main Red Line maintenance facility, which is located on the surface nearBroadway.[4][6] South of the station, the Braintree Branch tracks cross over the commuter rail tracks via a lengthy flyover.[4] The flyover is dedicated to Milton DeVaughn, an MBTA track worker, who died in December 1993 when he fell under the wheels of an MBTA work train.[8]

Bus connections

[edit]

Columbia was not built as a transfer station; streetcar—and later, bus—routes mostly served Andrew and Fields Corner. Bus service to the station began in 1954 when the Columbia Point Development was constructed, and increased in 1974 when the UMass campus opened.[3] The 1988 renovations added a dedicated two-lane busway on the east side of the station.[7][9] The station is served byMBTA bus routes8,16, and 41.[10] During service disruptions – both planned track work and unplanned incidents – JFK/UMass is often used as the terminus of busing on either Red Line branch.[3] A privately operated shuttle bus also connects the station with the UMass campus and theJohn F. Kennedy Library.[10]

History

[edit]

Old Colony Railroad

[edit]
Crescent Avenue station building

In 1845, theOld Colony Railroad opened between Boston andPlymouth, Massachusetts.[11]Crescent Avenue was aflag stop for South Braintree andDorchester and Milton Branch trains by 1848.[12] A station building was opened at Crescent Avenue on November 2, 1868, and replaced in 1883.[13][5][14] The Old Colony Railroad was an early proponent of decorating the grounds of its train stations. By 1891, flowers were planted to spell "☾ AVE" at the station.[15]

In the early 1920s, theBoston Elevated Railway (BERy) began planning an extension of theCambridge–Dorchester Tunnel over theShawmut Branch toAshmont. TheNew York, New Haven, and Hartford Railroad, which had succeeded the Old Colony, sold the Shawmut Branch to the BERy, with service ending on September 6, 1926.[16] The mainline stations at Crescent Avenue andSavin Hill were kept open during construction.[17] Crescent Avenue station was closed on July 15, 1927, for final construction and demolished shortly thereafter.[18][19]

Boston Elevated Railway

[edit]
Columbia station in March 1928

Crescent Avenue was replaced withColumbia station, which primarily served the residential areas to the west.[20] The station had a singleisland platform, 300 feet (91 m) long and varying 20–25 feet (6.1–7.6 m) wide, covered with a full-lengthreinforced concrete canopy.[17] It was designed to be extended southwards if future ridership required six-car trains.[20] The entrance to the station was from the Columbia Road overpass; like other stations on the Dorchester Extension, it was a rectangular red brick structure withred sandstone and Concordgranite trim. The roofs of the headhouse, the stairway to the platform, and the canopy were all flashed with copper. Fare control was in the headhouse, with a waiting room on the platform. The station was designed byWilliam D. Austin.[17]

Construction of the station began in 1925 with the reconstruction of the Columbia Road bridge.[21] The station platform was built in mid-1926.[17] Construction was completed in May 1927; the station was finished during the next several months under the possibility it would open before Savin Hill andFields Corner.[18] The three stations ultimately opened together on November 5, 1927.[3][18]

In November 1928, the BERy began construction of a second station entrance from Sydney Street at Crescent Avenue. A footbridge was built over the southbound track at the south end of the station, with fare control located on a short extension of the platform.[22] The new entrance opened on March 18, 1929; by May, it was used by 42% of passengers at the station.[23][24] In late 1938, the footbridge was extended east over the other tracks to serve a parking area.[25][26]

MBTA era

[edit]
The 1970-built north headhouse

On January 13, 1961, the MTA began operating "modified express service" on the line during the morning rush hour, following the introduction of similar service on theForest Hills–Everett line the month before. Every other train bypassed Columbia and three other stations.[27] This was discontinued in September 1961 to reduce wait times at the skipped stations, most of which were outdoors.[28]

The New Haven Railroad ended commuter service on the Old Colony lines in 1959, but subway service to Ashmont via Columbia continued. On July 28, 1965, the MBTA signed an agreement with theNew Haven Railroad to purchase 11 miles (18 km) of the former Old Colony mainline fromFort Point Channel toSouth Braintree in order to construct a new rapid transit line along the corridor. The line was expected to be completed within two years.[3][29] On August 26, 1965, the Cambridge–Dorchester line was renamed as the Red Line as part of a rebranding by theMassachusetts Bay Transportation Authority (MBTA), which had taken over the system in 1964.[3]

In 1967, the MBTA began a station modernization program; modifications to Columbia took place in 1970.[30] A southward extension made the platform long enough for six-car trains (which were not run until 1987).[3] The original brick headhouse was replaced with a plain concrete headhouse, which opened on February 20, 1970, and the platform waiting room was removed.[7][31] The footbridge was also replaced.[7] The South Shore Branch (later the Braintree Branch) opened in 1971. Trains used two new tracks on the east side of Columbia; they did not stop in order to speed travel time between Quincy and Boston.[3]

1980s

[edit]

The Columbia Point Development opened to the southeast of the station in 1954; residents of the housing development secured the 1962 closure of the city dump, which opened the peninsula to development. Ridership at Columbia station grew quickly despite the MBTA's refusal to have the South Shore Branch stop.[5]: 80  Three major developments opening on Columbia Point in the 1970s—theUMass Boston campus in 1974, theJohn F. Kennedy Presidential Library and Museum in 1979, and theBayside Expo Center—increased the importance of the station.[32][5]: 80  On December 2, 1982, the station was renamed asJFK/UMass after the campus and library.[3][31] Columbia was re-added as a secondary name in 1985 as part of a series of station name changes.[33] Repairs to the Columbia Road bridge closed the north entrance from early 1982 until January 10, 1983.[31]

The Braintree Branch platform and the overhead waiting room (left) opened in 1988, while the commuter platform (right) opened in 2001

In January 1980, the MBTA indicated that a $1 million renovation of the station, including a second platform, would be completed in 1982.[34] However, the project proved controversial; residents nearSavin Hill station instead wanted a flyover there so that Braintree Branch trains would stop at both Savin Hill and JFK/UMass. State officials insisted that the flyover would be significantly more expensive than the second platform, and that five times as many South Shore riders were riding to JFK/UMass as to Savin Hill.[35][36]

The MBTA awarded a $13.5 million construction contract on February 4, 1987, and work began that June.[37] A groundbreaking ceremony was held on July 16.[31][5] A large waiting room and fare control lobby was built over the center of the platforms, with footbridges to Sydney Street on the west and a new busway on the east. The 1970s Columbia Road entrance became exit-only; an adjacent footbridge to the lobby was added. The south footbridge was modified with a connection to the new platform, and became exit-only. The east part of the footbridge was removed and an employee building constructed in its place.[7] The platform for the Braintree Branch opened on December 14, 1988, allowing all Red Line trains to stop at the renovated station.[3][5] The renovation included elevators to both platforms, making the stationaccessible.[38][39][9]

2000s

[edit]

Commuter rail service on the Middleborough/Lakeville and Plymouth/Kingston lines was restored in September 1997.[3] The MBTA initially did not plan to include a stop at JFK/UMass; not until November 1996 did the agency agree to build the platform.[40] Construction began in 2000, and trains began stopping on April 30, 2001.[3][40] This was the first time that mainline commuter trains stopped at the station since 1927. Several rush-hour Greenbush Line trains began to stop concurrent with that line's restoration in 2007.[3] Not all commuter trains on the line stopped at JFK/UMass, however, because the station is in a single-tracked bottleneck section of the otherwise double-tracked route. All weekend trains, however, stopped at the station prior to July 2025 due to the more limited weekend schedule.[6][41][42]

Closed south stairs in December 2022

JFK/UMass station was a proposed stop on the MBTA's plannedUrban Ring Project.[43] The Urban Ring was to be abus rapid transit (BRT) line designed to connect the current MBTA lines to reduce strain on the downtown stations. Under 2008 plans, the Urban Ring would access the station via Columbia Road, with a one-bay dedicated BRT platform in the existing busway.[44] The project was cancelled in January 2010.[45] In 2012 and 2013, the MBTA installed over 50 security cameras in the station—in addition to over ten already present—in response to an increase of crime in nearby areas.[46] Improvements to the station were proposed in 2014 as part of the city'sbid for the 2024 Olympics, which was withdrawn in 2015.[47]

On June 11, 2019, a Red Line train derailed just north of JFK/UMass station due to a broken axle, damaging three sheds of signal equipment that control the nearby Columbia Junction.[48][49] The Red Line was limited to 10 trains per hour (instead of the usual 13–14) for three months while repairs were made.[49][50] Full service resumed on September 25, 2019.[51]

Structural deterioration affected the station entrances in the early 2020s. On January 29, 2020, the stairs between Columbia Road and the east side of the station were taken out of service for repairs.[52]Boston University professor David K. Jones was killed when he fell through a missing section of the still-closed stairs (owned by theDepartment of Conservation and Recreation) on September 11, 2021.[53][54] The stairs from the east footbridge to the busway were closed from May to September 2022, and the southern stairs to Sydney Street were indefinitely closed in mid-2022.[55][56] In November 2022, the MBTA closed the Columbia Road entrance, with repairs initially expected to take at least a month.[56] Part of the Red Line was closed for a weekend in January 2023 to accommodate repairs.[57] The Columbia Road entrance reopened that month.[58]

The MBTA included $2.3 million in its draft fiscal year 2024–2028 capital plan for a planning study to redesign the station.[59] Buses replaced service on the Ashmont Branch from October 14–29, 2023, to allow for track work.[60] Repairs and repainting of the Red Line platforms at JFK/UMass station was also performed during the closure.[61] In November 2024, the MBTA applied for a $99 million federal grant to fund half of a renovation of the station.[62] In January 2025, theU.S. Department of Transportation did not approve the MBTA's petition but did award a $2 million grant for planning and design work at the station.[63]

Off-peak and weekend commuter rail trains no longer stop at JFK/UMass effective July 21, 2025, leaving only peak-hour peak-direction stops. The change was intended to improve reliability on the lines, which had been lowered after theSouth Coast Rail extension opened.[41]

References

[edit]
  1. ^"MBTA Commuter Rail Ridership by Trip, Season, Route Line, and Stop".Massachusetts Bay Transportation Authority. 2024.Archived from the original on August 26, 2025. Also seecollated data andmethodology details.
  2. ^"A Guide to Ridership Data". MassDOT/MBTA Office of Performance Management and Innovation. June 22, 2020. p. 8.
  3. ^abcdefghijklmBelcher, Jonathan."Changes to Transit Service in the MBTA district"(PDF).Boston Street Railway Association.
  4. ^abcd"Ridership and Service Statistics"(PDF) (14th ed.).Massachusetts Bay Transportation Authority. 2014.
  5. ^abcdefCheney, Frank (2002).Boston's Red Line: Bridging the Charles from Alewife to Braintree. Arcadia Publishing. pp. 77–80.ISBN 9780738510477.
  6. ^abcdCentral Transportation Planning Staff (January 2012). Improving the Southwest Expressway: A Conceptual Plan (Report). Boston Region Metropolitan Planning Organization.hdl:2452/119128.
  7. ^abcdefO'Regan, Gerry (2005)."MBTA Red Line". nycsubway.org. RetrievedFebruary 23, 2020.
  8. ^"T worker dies following accident".The Boston Globe. December 4, 1993 – via Newspapers.com.Open access icon
  9. ^ab"New JFK/UMass T station opens".The Boston Globe. December 15, 1988 – via Newspapers.com.Open access icon
  10. ^ab"Fall 2025 System Map". Massachusetts Bay Transportation Authority. August 25, 2025.
  11. ^Karr, Ronald Dale (1995).The Rail Lines of Southern New England. Branch Line Press. pp. 310–315.ISBN 0942147022.
  12. ^"Old Colony Railroad".Boston Evening Transcript. January 20, 1848. p. 1 – via Newspapers.com.
  13. ^Jacobs, Warren (October 1928). "Dates of Some of the Principal Events in the History of 100 Years of the Railroad in New England. 1826-1926".Railway and Locomotive Historical Society Bulletin.17 (17). Railway and Locomotive Historical Society:15–28.JSTOR 43504499.
  14. ^Twentieth Annual Report of the Old Colony Railroad Co. to the Stockholders. Old Colony Railroad Company. November 1883. p. 7.
  15. ^"Railroad Gardening".Fall River Daily Evening News. June 10, 1891. p. 2 – via Newspapers.com.
  16. ^"GETS PERMISSION TO CLOSE STATIONS: N. Y., N. H. & H. Abandons Shawmut Branch Sept 6 Commission Rules It Necessary to Complete New Service".Boston Daily Globe. August 27, 1926. p. 13 – via Newspapers.com.
  17. ^abcdBoston Transit Department (1927).Report of the Transit Department for the Year ending December 31, 1926. City of Boston. pp. 31-32,36–37 – via Internet Archive.
  18. ^abcBoston Transit Department (1928).Report of the Transit Department for the Year ending December 31, 1927. City of Boston. pp. 26, 28, 33 – via Internet Archive.
  19. ^"State Approves Closing of Crescent-Av Station".Boston Globe. July 19, 1927. p. 28 – via Newspapers.com.
  20. ^ab"First Station Completed on Dorchester Rapid Transit".Electric Railway Journal.70 (11). McGraw-Hill Company: 428. September 10, 1927 – via Internet Archive.
  21. ^Boston Transit Department (1926).Report of the Transit Department for Eleven Months ending December 31, 1925. City of Boston. pp. 35–36 – via Internet Archive.
  22. ^Boston Transit Department (1929).Report of the Transit Department for the Year ending December 31, 1928. City of Boston. pp. 28–29 – via Internet Archive.
  23. ^Boston Transit Department (1930).Report of the Transit Department for the Year ending December 31, 1929. City of Boston. p. 55 – via Internet Archive.
  24. ^"Novel entrance to Columbia station".Co-operation. Vol. 8, no. 5. Boston Elevated Railway. May 1929. pp. 67–68.
  25. ^"Columbia Station overpass to parking area". Boston Elevated Railway. December 23, 1938 – via Historic New England.
  26. ^Twentieth Annual Report of the Board of Trustees of the Boston Elevated Railway Company for the Year Ending December 31, 1938. Boston Elevated Railway. 1939. pp. 21-22 – via Internet Archive.
  27. ^"MTA Boosts Service For New Year's Eve".The Boston Globe. December 29, 1960. p. 8 – via Newspapers.com.
  28. ^"M.T.A. Dropping Morning Express".The Boston Globe. September 27, 1961. p. 10 – via Newspapers.com.
  29. ^Carr, Robert (July 29, 1965)."MBTA Buys Old Colony Line For a South Shore Express".The Boston Globe – via Newspapers.com.Open access icon
  30. ^Sixth Annual Report. Massachusetts Bay Transportation Authority. 1970. pp. 12, 18 – via Internet Archive.
  31. ^abcdSanborn, George M. (1992).A Chronicle of the Boston Transit System. Massachusetts Bay Transportation Authority. Archived fromthe original on November 27, 2019. RetrievedOctober 30, 2019 – via Massachusetts Institute of Technology.
  32. ^Malone, M.E. (September 27, 1986)."Planned Red Line stop expected to give easier access to UMass area".The Boston Globe. p. 18 – via Newspapers.com.Open access icon
  33. ^Crocket, Douglas S. (July 27, 1985)."T board votes to change the names of some stations".Boston Globe. p. 26 – via Newspapers.com.Open access icon
  34. ^Richard, Ray (January 26, 1980)."A Better Day for Columbia Point / 'New' Columbia Point".The Boston Globe. pp. 1, 12 – via Newspapers.com.Open access icon
  35. ^Crocket, Douglas S. (June 28, 1984)."MBTA board approves contract for new North Station trestle".The Boston Globe. p. 27 – via Newspapers.com.Open access icon
  36. ^Crocket, Douglas S. (May 19, 1984)."MBTA says Savin Hill sign was removed as 'hazardous'".The Boston Globe. pp. 17, 20 – via Newspapers.com.Open access icon
  37. ^Howe Globe Staff, Peter J. (June 7, 1987)."Construction starts on platform for Braintree at JFK-UMass station".Boston Globe. p. 34 – via Newspapers.com.
  38. ^Tran Systems and Planners Collaborative (August 24, 2007)."Evaluation of MBTA Paratransit and Accessible Fixed Route Transit Services: Final Report"(PDF). Massachusetts Bay Transportation Authority.
  39. ^Operations Directorate Planning Division (November 1990)."Ridership and Service Statistics" (3 ed.). Massachusetts Bay Transportation Authority. pp. 1–4 – via Internet Archive.
  40. ^abKahn, Ric (July 1, 2001)."T trains bypass new JFK stop".The Boston Globe City Weekly. pp. 1, 9 – via Newspapers.com. (second page,third page)Open access icon
  41. ^ab"Braintree – South Station Line Spring/Summer Schedule"(PDF). Massachusetts Bay Transportation Authority. July 21, 2025.
  42. ^"MBTA and Keolis Announce Commuter Rail Schedule Adjustments" (Press release). Keolis Commuter Services. July 9, 2025. Archived fromthe original on July 10, 2025.
  43. ^"Urban Ring Phase 2 FACT SHEET"(PDF). Massachusetts Executive Office of Transportation. January 2009. Archived fromthe original(PDF) on July 8, 2011.
  44. ^"Conceptual alignments, profiles, station locations, and typical sections"(PDF).The Urban Ring Phase 2: Revised Draft Environmental Impact Report/Statement. Massachusetts Executive Office of Transportation. November 2008. Archived fromthe original(PDF) on July 28, 2013. RetrievedJuly 19, 2011.
  45. ^Mullan, Jeffery B. (January 22, 2010)."Re: Urban Ring Phase 2, EOEEA #12565"(PDF). Massachusetts Executive Office of Energy and Environmental Affairs.
  46. ^Feathers, Todd (January 30, 2013)."MBTA installs 50 surveillance cameras at JFK/UMass Red Line stop to fight crime in area".The Boston Globe. Archived fromthe original on February 17, 2020.
  47. ^Levenson, Michael; Dungca, Nicole (January 10, 2015)."Revenue to dictate difficult choices on Olympic transit projects".The Boston Globe. Archived fromthe original on August 14, 2015.
  48. ^Buell, Spencer (September 16, 2019)."At Long Last, We Know What Caused the Red Line Derailment".Boston Magazine. Metrocorp. Archived fromthe original on October 1, 2019.
  49. ^ab"Plans to Accelerate Red Line Signal Repairs" (Press release). Massachusetts Bay Transportation Authority. June 21, 2019.
  50. ^Stout, Matt; Siu, Diamond Naga (June 21, 2019)."T says Red Line reduced schedule to last through summer".The Boston Globe. Archived fromthe original on July 19, 2019.
  51. ^"Completion of Red Line Signal Repairs" (Press release). Massachusetts Bay Transportation Authority. September 25, 2019.
  52. ^"Alerts: Commuter Rail". Massachusetts Bay Transportation Authority. January 29, 2020. Archived fromthe original on March 1, 2020.
  53. ^Fortier, Marc (September 13, 2021)."BU Professor Dies After Apparent Fall From Stairs Near MBTA Station in Boston".NBC Boston. Archived fromthe original on September 14, 2021. RetrievedSeptember 14, 2021.
  54. ^MilNeil, Christian (September 14, 2021)."BU Professor Dies On Crumbling DCR Staircase In Dorchester".Streetsblog Massachusetts. Archived fromthe original on September 15, 2021.
  55. ^Dumcius, Gintautas (June 23, 2022)."MBTA stairs at JFK/UMass shut down, fixes are a 'priority'".Dorchester Reporter. Archived fromthe original on June 25, 2022.
  56. ^abDumcius, Gintautas."Citing 'critical structural finding,' MBTA closes Columbia Rd. entrance to JFK/UMass station".Dorchester Reporter. Archived fromthe original on November 22, 2022.
  57. ^"Upcoming Weekend Service Changes on Orange, Green, Red Lines in January" (Press release). Massachusetts Bay Transportation Authority. January 2, 2023.
  58. ^Armanini, Kate (January 10, 2023)."Pedestrian entrance at JFK/UMass stop set to reopen by the end of the week, MBTA says". Archived fromthe original on January 10, 2023.
  59. ^Dumcius, Gintautas (March 29, 2023)."T finally adds JFK/UMass upgrade to list of projects".Dorchester Reporter. Archived fromthe original on March 29, 2023.
  60. ^"MBTA to Expedite Critical Track Work Between JFK/UMass and Ashmont Stations and on the Mattapan Line, Shuttle Buses to Replace Service on Ashmont Branch and Mattapan Line October 14–29" (Press release). Massachusetts Bay Transportation Authority. August 24, 2023.
  61. ^Dumcius, Gintautas (September 13, 2023)."T chief, top aide tour JFK/UMass Station as Oct. shutdown looms".Dorchester Reporter. Archived fromthe original on September 14, 2023.
  62. ^Daniel, Seth (November 13, 2024)."MBTA seeks federal help to fund a new Savin Hill Bridge".Dorchester Reporter. Archived fromthe original on November 14, 2024.
  63. ^"MBTA gets $2M federal grant for JFK-UMass station redesign".Dorchester Reporter. January 15, 2025. Archived fromthe original on January 16, 2025.

External links

[edit]
Wikimedia Commons has media related toJFK/UMass station.
Blue Line
Orange Line
Red Line
Ashmont branch
Braintree branch
Mattapan Line
Green Line
Campus
Chancellors
Miscellaneous
  • Italics indicates interim chancellor
  • Category
Retrieved from "https://en.wikipedia.org/w/index.php?title=JFK/UMass_station&oldid=1318254670"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp