Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Interstate 285 (North Carolina)

Route map:
From Wikipedia, the free encyclopedia
Highway in North Carolina

Interstate 285 marker
Interstate 285
Map
I-285 highlighted in red; Future I-285 highlighted in blue
Route information
Auxiliary route ofI-85
Maintained byNCDOT
Length23.49 mi[1] (37.80 km)
Existed2018[2]–present
NHSEntire route
Major junctions
South endI-85 /US 29 /US 52 /US 70 inLexington
Major intersections
North endI-40 /US 52 /NC 8 inWinston-Salem
Location
CountryUnited States
StateNorth Carolina
CountiesDavidson,Forsyth
Highway system
NC 281NC 294

Interstate 285 (I-285) is a 23.49 mile longauxiliary interstate highway connecting the cities ofLexington andWinston-Salem, in the U.S. state ofNorth Carolina. The route was approved in February 2018 and was first signed in November 2018. Anauxiliary route ofI-85, it branches off of its parent route and runs northeast, bypassing central Lexington, before turning due north and heading toward Winston-Salem, terminating at an interchange withI-40. I-285 iscosigned withUS Highway 52 (US 52) for its entire route, and as of November 2018, still uses US 52 milemarkers and exit numbers. Other routes cosigned along parts of the route includeI-85 Business (I-85 Bus),US 29,US 70, andNorth Carolina Highway 8 (NC 8). I-285 has been approved for an extension along the US 52 freeway through Winston-Salem to meet the futureWinston-Salem Northern Beltway.

Route description

[edit]

The southern terminus of I-285 is at the southwestern corner of the city of Lexington, at a partial interchange with I-85, with northbound-to-northbound and southbound-to-southbound the only possible movement; other directions require the use of surface streets in Lexington, using exit 84 (NC 47), the first exit on I-285. From the southern terminus, the route is also cosigned withUS 52,US 29,US 70, andI-85 Bus. The route follows the western boundary of Lexington's corporate limits, acting as a bypass of the city. Exit 85 is for Green Needles Road, while exit 86 provides access to Salisbury Road and Main Street, an old alignment of US 29/US 70. Exit 87 is a partial interchange and marks the northern end of the concurrency with I-85 Bus/US 29/US 70, which branch off to the northeast here. Exit 89 (US 64/Center Street) provides access for drivers heading from southbound I-85 Bus and northbound I-285, and vice-versa, as those movements are not covered at the direct interchange at exit 87. North of US 64, the route passes the communities ofBethesda andWelcome. At exit 89,NC 8 joins the freeway and the road turns from northeast to due north. The next interchange is exit 97 (Old US 52) which provides access to both Welcome and the community ofMidway. After exit 100 (Hickory Tree Road), I-285 enters the city ofWinston-Salem. Exit 103 is for South Main Street, and exit 105 is for Clemmonsville Road. The I-285 designation ends at exit 107 (I-40), though the freeway continues on as US 52/NC 8.

History

[edit]

Approved by theAmerican Association of State Highway and Transportation Officials (AASHTO) in September 2005, after receiving an earlier approval from theFederal Highway Administration (FHWA) in July 2005, intending to provide anInterstate-quality freeway to connect Winston-Salem toCharlotte (via a portion of I-85). TheNorth Carolina Department of Transportation (NCDOT) installed "Future Interstate 285 Corridor" signs along the route in February 2006. The initial $2.5-million (equivalent to $3.43 million in 2024[3]) project to improve the roadway toInterstate standards was approved in October 2011.[4][5] With property acquisition already started in December 2012, cost estimates rose to $8.57 million (equivalent to $11.8 million in 2024[3]). The contract was awarded to J.T. Russell and Sons Inc. ofAlbemarle for $7.6 million (equivalent to $10.4 million in 2024[3]). Construction began in March 2014 and included reconstructing shoulders, improving drainage systems, resurfacing travel lanes, and realigning Marco Boulevard to accommodate a new southbound exit ramp alignment at Green Needles Road. In addition, crews resurfaced and preserved the bridges over Swearing Creek. The project was completed in late 2017.

On February 15, 2018, based on the completed improvements, the FHWA approved the I-285 signing between I-85 and I-40.[2][6] In November 2018, NCDOT placed I-285 ground-mounted route shields along the route from I-85 to I-40.[7][unreliable source?]

Future

[edit]

On May 20, 2019, AASHTO approved a request by NCDOT to establish Future I-285 north from its current northern terminus to a future I-74/I-274 interchangeWinston-Salem Northern Beltway. The justification for the 11.3-mile (18.2 km) extension was that Winston-Salem was a major transfer point for motor freight services and that numerous freight operators were already utilizing US 52 to access other major highways in and around the city; and that it would also serve the 330-acre (130 ha) Innovation Quarter, which will house research, business, and several college education facilities. The transition from future designation is dependent upon completion of the I-74/I-274 interchange and upgrades to interstate standards along the route.[8][9][10] Other plans include possible widening to six total lanes (three in each direction).[11]

Exit list

[edit]

Current exit numbers are based on US 52 mileage.

CountyLocationmi[12]kmExitDestinationsNotes
DavidsonLexington0.000.00



I-85 south /US 29 south /US 52 south /US 70 west
Continuation beyond southern terminus; south end of US 29/US 52/US 70 overlap; former southern terminus ofI-85 BL; I-85 exit 87
0.60.9784

NC 47 toI-85 north
1.52.485Green Needles Road
2.84.586Lexington, Downtown
3.76.087

US 29 north /US 70 east –High Point
North end of US 29/US 70 overlap; northbound exit and southbound entrance; formerI-85 BL north
5.38.589US 64 –Lexington,Mocksville
Bethesda8.814.292
NC 8 south (Old U.S. Highway 52) –Welcome,Lexington
South end of NC 8 overlap
14.022.597Welcome
Midway
Northbound signage
Southbound signage
Midway16.226.1100Hickory Tree Road
ForsythWinston-Salem19.431.2103S. Main Street
21.734.9105Clemmonsville Road
22.836.7107

I-40 toNC 109 south –Statesville,Greensboro
Current northern terminus; I-40 exits 193A-B




Future I-285 north /US 52 north /NC 8 north
Future continuation of I-285 north
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

[edit]
  1. ^Starks, Edward (January 27, 2022)."Table 2: Auxiliary Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways".FHWA Route Log and Finder List.Federal Highway Administration. RetrievedAugust 28, 2022.
  2. ^ab"Route Change (2018-02-01)"(PDF). North Carolina Department of Transportation. February 1, 2018. RetrievedJanuary 16, 2019.
  3. ^abcJohnston, Louis; Williamson, Samuel H. (2023)."What Was the U.S. GDP Then?".MeasuringWorth. RetrievedNovember 30, 2023. United StatesGross Domestic Product deflator figures follow theMeasuringWorth series.
  4. ^"I-85 Winston-Salem Connector". Archived fromthe original on September 27, 2011. RetrievedNovember 25, 2011.
  5. ^"Correspondence 050616 Peters to Sanderson"(PDF). North Carolina Department of Transportation. June 16, 2005. RetrievedJuly 7, 2013.
  6. ^"I-285 Gets Federal Approval as the Next New Interstate for North Carolina" (Press release). Raleigh, NC: North Carolina Department of Transportation. February 15, 2018. Archived fromthe original on February 16, 2018. RetrievedFebruary 15, 2018.
  7. ^"I-285 Winston-Salem Connector". Robert H. Malme. November 30, 2018. RetrievedDecember 6, 2018.
  8. ^Special Committee on U.S. Route Numbering (May 21, 2019)."2019 Spring Meeting Report to the Council on Highways and Streets"(PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. p. 8. Archived fromthe original(PDF) on July 12, 2019. RetrievedJune 2, 2019.
  9. ^"Ask SAM: Upgrades needed before US 52 can be called I-285".Winston-Salem Journal. January 10, 2014. RetrievedJanuary 10, 2014.
  10. ^"NCDOT: Project U-2826". Archived fromthe original on November 14, 2012. RetrievedApril 17, 2014.
  11. ^Richard Craver (February 15, 2018)."U.S. 52 renamed as Interstate 285 between Winston-Salem and Lexington. Is expansion to 6 lanes next?". Winston-Salem News. RetrievedDecember 6, 2018.
  12. ^"Interstate 285 (North Carolina)" (Map).Google Maps. RetrievedDecember 21, 2018.

External links

[edit]
Template:Attached KML/Interstate 285 (North Carolina)
KML is not from Wikidata
Wikimedia Commons has media related toInterstate 285 (North Carolina).
  • 1Cancelled
  • 2Former
  • 3Proposed
Retrieved from "https://en.wikipedia.org/w/index.php?title=Interstate_285_(North_Carolina)&oldid=1304584722"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp