| Huangdeng dam | |
|---|---|
Huangdeng During Construction | |
![]() Interactive map of Huangdeng dam | |
| Country | China |
| Location | Yunnan Province |
| Coordinates | 26°33′33″N99°06′56″E / 26.55917°N 99.11556°E /26.55917; 99.11556 |
| Purpose | Power, irrigation, recreation |
| Status | Operational |
| Construction began | January 2010 |
| Opening date | June 2019 |
| Owners | Yunnan Huaneng Lancang River Hydropower Co., Ltd. |
| Dam and spillways | |
| Impounds | Lancang (upper Mekong) |
| Height (thalweg) | 203 m |
| Length | 464 m |
| Dam volume | 3,678,000 m3 |
| Reservoir | |
| Total capacity | 1,613,000,000 m3 |
| Power Station | |
| Commission date | 2019 |
| Installed capacity | 1,900 MW |
TheHuangdeng Dam is agravity dam recently completed on theLancang (Mekong) River inLanping Bai and Pumi Autonomous County ofYunnan Province,China. The fact that work on the dam was begun without formal approval from the central government was a subject of some controversy.[1]
Construction on the dam began in 2010 and its 1,900 MWhydroelectric power station was initially planned to be operational in 2016, with the entire project complete in 2018.[2][3] The first unit was put into operation in July 2018[4] and the dam was fully commissioned in January 2019.[5]
This article about a dam or floodgate in Asia is astub. You can help Wikipedia byexpanding it. |
This article about abuilding or structure inChina is astub. You can help Wikipedia byexpanding it. |