It has been suggested that this article besplit out into articles titledHistory of the New York City Subway (1904–1940),History of the New York City Subway (1940–present) andIncidents and accidents on the New York City Subway. (Discuss)(March 2024) |

| Part ofa series of articles on |
| Annual passenger ridership | |||||
|---|---|---|---|---|---|
| Year | Passengers | %± | |||
| 1901 | 253,000,000 | — | |||
| 1905 | 448,000,000 | +77.1% | |||
| 1910 | 725,000,000 | +61.8% | |||
| 1915 | 830,000,000 | +14.5% | |||
| 1920 | 1,332,000,000 | +60.5% | |||
| 1925 | 1,681,000,000 | +26.2% | |||
| 1930 | 2,049,000,000 | +21.9% | |||
| 1935 | 1,817,000,000 | −11.3% | |||
| 1940 | 1,857,000,000 | +2.2% | |||
| 1945 | 1,941,000,000 | +4.5% | |||
| 1946 | 2,067,000,000 | +6.5% | |||
| 1950 | 1,681,000,000 | −13.4% | |||
| 1955 | 1,378,000,000 | −18.0% | |||
| 1960 | 1,345,000,000 | −2.4% | |||
| 1965 | 1,363,000,000 | +1.3% | |||
| 1970 | 1,258,000,000 | −7.7% | |||
| 1975 | 1,054,000,000 | −16.2% | |||
| 1980 | 1,009,000,000 | −4.3% | |||
| 1982 | 989,000,000 | −2.0% | |||
| 1985 | 1,010,000,000 | +2.1% | |||
| 1990 | 1,028,000,000 | +1.8% | |||
| 1995 | 1,093,000,000 | +6.3% | |||
| 2000 | 1,400,000,000 | +28.1% | |||
| 2005 | 1,450,000,000 | +3.6% | |||
| 2010 | 1,605,000,000 | +10.7% | |||
| 2011 | 1,640,000,000 | +2.2% | |||
| 2012 | 1,654,000,000 | +0.1% | |||
| 2013 | 1,708,000,000 | +3.3% | |||
| 2014 | 1,751,287,621 | +2.6% | |||
| 2015 | 1,762,565,419 | +0.6% | |||
| 2016 | 1,756,814,800 | -0.3% | |||
| 2017 | 1,727,366,607 | -1.7% | |||
| 2018 | 1,680,060,402 | -2.7% | |||
| 2019 | 1,697,787,002 | +1.1% | |||
| 2020 | 639,541,029 | -62.3% | |||
| 2021 | 759,976,721 | +18.8% | |||
| 2022 | 1,013,425,465 | +33.3% | |||
| 2023 | 1,151,998,158 | +13.7% | |||
| 2024 | 1,194,866,357 | +3.7% | [1][2][3][4][5][6][7][8] | ||
TheNew York City Subway is arapid transit system that serves four of the fiveboroughs ofNew York City,New York:the Bronx,Brooklyn,Manhattan, andQueens. Its operator is theNew York City Transit Authority (NYCTA), which is controlled by theMetropolitan Transportation Authority (MTA) of New York. In 2016, an average of 5.66 million passengers used the system daily, making it thebusiest rapid transit system in the United States and theseventh busiest in the world.[9][10]
By the late 1870s theManhattan Railway Company was anelevated railway company inManhattan andthe Bronx,New York City,United States. It operated four lines: theSecond Avenue Line,Third Avenue Line,Sixth Avenue Line, andNinth Avenue Line.The first underground line opened on October 27, 1904,[11] almost 35 years after the opening of the first elevated line in New York City, which became theIRT Ninth Avenue Line.[12] By the time the first subway opened, the lines had been consolidated into two privately owned systems, theBrooklyn Rapid Transit Company (BRT, laterBrooklyn–Manhattan Transit Corporation, BMT) and theInterborough Rapid Transit Company (IRT). After 1913, all lines built for the IRT and most lines for the BRT were built by the city and leased to the companies. The first line of the city-owned and operatedIndependent Subway System (IND) opened in 1932, intended to compete with the private systems and replace some of the elevated railways. It was required to be run "at cost", necessitating fares up to double the five-cent fare popular at the time.[13]
The city took over running the previously privately operated systems in 1940, with the BMT on June 1 and the IRT on June 12. Some elevated lines closed immediately while others closed soon after. Integration was slow, butseveral connections were built between the IND and BMT, which now operate as one division called theB Division. Since IRT infrastructure istoo small for B Division cars, it remains as theA Division.
The NYCTA, a public authority presided over by New York City, was created in 1953 to take over subway, bus, and streetcar operations from the city.[14] In 1968 the state-level MTA took control of the NYCTA, and in 1970 the city entered theNew York City fiscal crisis. It closed many elevated subway lines that became too expensive to maintain. Graffiti, crime, and decrepitude became common. To stay solvent, the New York City Subway had to make many service cutbacks and defer necessary maintenance projects. In the 1980s an $18 billion financing program for the rehabilitation of the subway began.
TheSeptember 11 attacks resulted inservice disruptions, particularly on theIRT Broadway–Seventh Avenue Line, which ran directly underneath theWorld Trade Center. Sections were crushed, requiring suspension of service on that line south of Chambers Street. By March 2002, seven of the closed stations had been rebuilt and reopened, and all but one on September 15, 2002, with full service along the line.[15][16]
Since the 2000s, expansions include the7 Subway Extension that opened in September 2015,[17][18] and theSecond Avenue Subway, the first phase of which opened on January 1, 2017.[19][20] However, at the same time, under-investment in the subway system led to a transit crisis that peaked in 2017.

Even though there was an earlier, underground railroad called theAtlantic Avenue Tunnel since 1844, it had no underground subway stops.[21][22][23] Construction of this tunnel, which was built mainly to create agrade-separatedright of way for theBrooklyn and Jamaica Railroad (now theLong Island Rail Road'sAtlantic Branch), began in May 1844, and the tunnel was open by December 1844. This led toSouth Ferry at the foot ofAtlantic Avenue, where passengers could catch ferries to Manhattan.[24] This extension, running underCobble Hill, was closed by 1861. The tunnel was reopened for tourism in 1982,[25] and closed again in 2010.[26][27]
The beginnings of the actual Subway came from various excursion railroads toConey Island andelevated railroads in Manhattan and Brooklyn. At that time,New York County (Manhattan Island and part of the Bronx), Kings County (including the cities of Brooklyn andWilliamsburg), and Queens County were separate municipal entities. Competing steam-powered elevated railroads were built over major avenues. The first elevated line was constructed from 1867 to 1870 by Charles Harvey and hisWest Side and Yonkers Patent Railway company along Greenwich Street and Ninth Avenue (althoughcable cars were the initial mode of transportation on that railway). More lines were built onSecond,Third andSixth Avenues. None of these structures remain today, but these lines later shared trackage with subway trains as part of the IRT system.[28]
In Kings County, elevated railroads were built by several companies overLexington,Myrtle,Third andFifth Avenues,Fulton Street andBroadway. These also later shared trackage with subway trains operated by the BRT and BMT. Most of these structures have been dismantled, but some have been rebuilt and upgraded. These lines were linked to Manhattan by various ferries and later the tracks along theBrooklyn Bridge (which originally had their own line and were later integrated into the BRT/BMT). Also in Kings County, sixsteam excursion railroads were built to various beaches in the southern part of the county; all but one (the Manhattan Beach Line) eventually fell under BMT control.[29]

TheBeach Pneumatic Transit was the first attempt to build an undergroundpublic transit system in New York City. In 1869,Alfred Ely Beach and his Beach Pneumatic Transit Company of New York began constructing a pneumatic subway line beneathBroadway. Funneled through a company he set up, Beach put up $350,000 of his own money to bankroll the project.[30] Built in only 58 days,[31] its single tunnel, 312 feet (95 m) long, 8 feet (2.4 m) in diameter, was completed in 1870 and ran under Broadway from Warren Street to Murray Street.[32]
It remained little more than a curiosity, running only a single car on its one-block-long track to a dead-end at its terminus. Passengers would simply ride out and back, to see what the proposed subway might be like. During its first two weeks of operation, the Beach Pneumatic Transit sold over 11,000 rides, with 400,000 rides provided during its first year of operation.[33][34] Although the public showed initial approval, Beach was delayed in getting permission to expand it. By the time he finally gained permission in 1873, public and financial support had waned, and the subway was closed down.[35]
The final blow to the project was astock market crash in 1873 which caused investors to withdraw support.[36] After the project was shut down, the tunnel entrance was sealed, and the station, built in part of the basement of theRogers Peet Building, was reclaimed for other uses. The entire building was lost to fire in 1898.[37] In 1912, workers excavating for the present-dayBMT Broadway Line dug into the old Beach tunnel; today, no part of this line remains as the tunnel was completely within the limits of the present dayCity Hall Station under Broadway.[38]

In 1898, New York, Kings and Richmond Counties, and parts of Queens and Westchester Counties and their constituent cities, towns, villages, and hamlets, were consolidated into theCity of Greater New York. During this era the expanded City of New York resolved that it wanted the core of future rapid transit to be underground subways but realized that no private company was willing to put up the enormous capital required to build beneath the streets.[39][40]
Planning for the system began with the Rapid Transit Act, authorized by theNew York State Legislature on May 22, 1894, which created theBoard of Rapid Transit Railroad Commissioners. The act provided that the commission would lay out routes with the consent of property owners and local authorities, either build the system or sell a franchise for its construction, and lease the operation to a private firm. A line throughLafayette Street (then Elm Street)[41] toUnion Square was considered, but at first a more costly route under lower Broadway was adopted. A legal battle with property owners along the route led to the courts denying permission to build through Broadway in 1896.[42]
The Elm Street route was chosen later that year, cutting west to Broadway via42nd Street. This new plan, formally adopted on January 14, 1897, consisted of a line fromCity Hall north toKingsbridge and a branch underLenox Avenue and toBronx Park, to have four tracks from City Hall to the junction at 103rd Street. The "awkward alignment...along Forty-Second Street", as the commission put it, was necessitated by objections to using Broadway south of34th Street. Legal challenges were resolved in 1899.[42]


The city decided to issue rapid transitbonds outside of its regular bondeddebt limit and build the subways itself; it contracted with the Interborough Rapid Transit Company (which by that time ran the elevated lines in Manhattan) to equip and operate the subways, sharing the profits with the city and guaranteeing a fixed five-cent fare.[43]
Starting in 1899, the Brooklyn Rapid Transit Company (BRT; 1896–1923) and Brooklyn–Manhattan Transit Corporation (BMT; 1923–1940) operated rapid transit lines in New York City — at first only elevated railways and later also subways.
The BRT was incorporated on January 18, 1896.[44] It took over the bankruptLong Island Traction Company in early February,[45] acquiring theBrooklyn Heights Railroad and the lessee of theBrooklyn City Rail Road. It then acquired theBrooklyn, Queens County and Suburban Railroad.[46] The BRT took over the property of a number of surface railroads, the earliest of which, theBrooklyn, Bath and Coney Island Railroad orWest End Line, opened for passenger service on October 9, 1863, between Fifth Avenue at 36th Street at the border ofBrooklyn City andBath Beach in the Town ofGravesend, New York. A short piece of surface route of this railroad, theBMT West End Line (today'sD, R, and W trains) on the west side of theConey Island Complex north of theConey Island Creek, is the oldest existing piece of rapid transit right-of-way in New York City and in the U.S., having opened on June 8, 1864.[47]
On January 30, 1899, the Brooklyn Union Elevated Railroad was incorporated; it acquired the property of the bankruptBrooklyn Elevated Railroad on February 17. The BRT gained control a month later, on March 25,[48] and leased the elevated company to the Brooklyn Heights Railroad, which was until then solely astreet railway company. The other elevated company in Brooklyn, theKings County Elevated Railway, was sold under foreclosure to the BRT on July 6, 1899.[49] Initially the surface and elevated railroad lines ran on steam power, but between 1893 and 1900 the lines were converted to run on electricity. An exception was the service on theBrooklyn Bridge. Trains were operated bycables from 1883 to 1896, when they were converted to electric power.[50]

By 1900, The BRT had acquired virtually all of the rapid transit and streetcar operations in its target area. Only theConey Island and Brooklyn Railroad and the shortVan Brunt Street and Erie Basin Railroad remained independent; the former was acquired in 1913 or 1914.[51] The incorporated lines were:
The BRT became bankrupt by 1918. The New York Consolidated Railroad and New York Municipal Railway were merged in June 1923, the same month that the BRT was reorganized as the Brooklyn–Manhattan Transit Corporation, to form the New York Rapid Transit Corporation.[60]

A contract, later known as Contract 1, was executed on February 21, 1900, between the commission and the Rapid Transit Construction Company, organized byJohn B. McDonald and funded byAugust Belmont, for the construction of the subway and a 50-year operating lease from the opening of the line. The project was divided into fifteen sections on which subcontractors submitted construction bids.[61]

Ground was broken in a ceremony at City Hall on March 24, celebrated at the time as "Tunnel Day".[62] A plan for an extension from City Hall to theLong Island Rail Road'sFlatbush Avenue terminal station (now known as Atlantic Terminal) in Brooklyn was adopted on January 24, 1901, and Contract 2, giving a lease of 35 years, was executed between the commission and the Rapid Transit Construction Company on September 11, with construction beginning atState Street in Manhattan on November 8, 1902. Belmont incorporated the IRT in April 1902 as the operating company for both contracts; the IRT leased theManhattan Railway Company, operator of the four elevated railway lines in Manhattan and the Bronx, on April 1, 1903. Operation of the subway began on October 27, 1904, with the opening of all stations fromCity Hall to145th Street on the West Side Branch.[11][63]
Service was extended to157th Street on November 12, 1904. The West Side Branch was extended northward to a temporary terminus of221st Street and Broadway on March 12, 1906.[64] This extension was served by shuttle trains operating between 157th Street and 221st Street.[65] The original system as included in Contract 1 was completed on January 14, 1907, when trains started running across theHarlem Ship Canal on theBroadway Bridge to225th Street,[64] meaning that 221st Street could be closed. Once the line was extended to225th Street, the structure of the 221st Street was dismantled and was moved to 230th Street for a new temporary terminus. Service was extended to the temporary terminus at 230th Street on January 27, 1907. An extension of Contract 1 north to242nd Street atVan Cortlandt Park was approved in 1906[66] and opened on August 1, 1908.[67]
The original plan had been to turn east on 230th Street to just west of Bailey Avenue, at theNew York Central Railroad'sKings Bridge station.[68] When the line was extended to 242nd Street, the temporary platforms at 230th Street were dismantled, and were rumored to be brought to 242 Street to serve as the station's side platforms. There were two stations on the line that opened later;191st Street and207th Street. 191st Street was not open until January 14, 1911, because the elevators and other work had not yet been completed. 207th Street was completed in 1906, but since it was located in a sparsely occupied area, the station was opened in 1907.
The initial segment of the IRT White Plains Road Line opened on November 26, 1904, between East 180th Street and Jackson Avenue. Initially, trains on the line were served by elevated trains from theIRT Second Avenue Line and theIRT Third Avenue Line, with a connection running from the Third Avenue local tracks at Third Avenue and 149th Street to Westchester Avenue and Eagle Avenue. Once the connection to theIRT Lenox Avenue Line opened on July 10, 1905, trains from the newly opened IRT subway ran via the line.[69] Elevated service via this connection was resumed on October 1, 1907, when Second Avenue locals were extended to Freeman Street during rush hours.[70]
The line was then extended to Fulton Street on January 16, 1905,[71] to Wall Street on June 12, 1905,[72] and to Bowling Green and South Ferry on July 10, 1905.[73] In order to complete Contract 2, the subway had to be extended under the East River to reach Brooklyn. The tunnel was named the Joralemon Street Tunnel, which was the first underwater subway tunnel connecting Manhattan and Brooklyn, and it opened on January 9, 1908, extending the subway from Bowling Green to Borough Hall.[74] On May 1, 1908, the construction of Contract 2 was completed when the line was extended fromBorough Hall toAtlantic Avenue near theFlatbush Avenue LIRR station.[75] When the IRT extension to Brooklyn opened, riders on the BRT's elevated and trolley lines over the Brooklyn Bridge began using the new subway.[76]

The subway system began during thewar of the currents whenThomas Edison and his opponent,George Westinghouse, struggled over acceptance ofdirect current oralternating current as the standard way to deliver electricity. Alternating current became the standard for non-railroad purposes, but New York City Subway adopted direct current as more suitable for urban railroad purposes.[77]: 21 The companies built their ownpower stations to generate their DC. To this day, theNew York City Transit Authority converts alternating current to 600 V DCthird rail to power the trains, as do most transit railways around the world. (TheA Division uses 625 V DC third rail.[78])


After the statutory debt ceiling for the now-united city of New York had been raised, there were more plans for subway construction until 1908. The Triborough plan comprised three new lines:
The BRT lines were built to wider profiles because the BRT did not want to use IRT trackage, which was narrower by comparison and carried far fewer passengers per hour. The design was inspired by the cars built for theCambridge subway (MBTA Red Line) which were designed after studies were conducted on the design and operation of a subway car that could carry the most passengers the most efficiently. Therolling stock, however, had to be the sametrack gauge so the trains could interoperate under theDual Contracts. The Fourth Avenue and Sea Beach lines were opened on June 19, 1915, after years of delays for building of these lines and the Nassau Street Line. The first BRT section, however, had opened on September 16, 1908, fromEssex Street across theWilliamsburg Bridge, but using narrow-width cars.[79]
Until the completion of the Fourth Avenue Line, there was a tram across the Manhattan Bridge which did not connect to any tracks in the New York City Subway. The track was called "Manhattan Bridge Three Cent Line" because the fare was three cents. Along with theBrooklyn and North River Railroad, the two streetcar companies began operations on those tracks. When trackage was connected to the bridge in 1915, the trolleys were moved to the upper level roadways until 1929, when service was discontinued.[80]
The BRT, which just barely entered Manhattan via the Brooklyn Bridge, wanted the opportunity to compete with the IRT, and the IRT wanted to extend its Brooklyn line to compete with the BRT. This led to the city's agreement to contract for future subways with both the BRT and IRT.
The expansion of rapid transit was greatly facilitated by the signing of the Dual Contracts on March 19, 1913.Contract 3 was signed between the IRT and the city; the contract between the BRT and the city wasContract 4. The majority of the present-day subway system was either built or improved under these contracts.[43] TheAstoria Line andFlushing Line were built at this time and were for some time operated by both companies. Under the terms of Contracts 3 and 4, the city would build new subway and elevated lines, rehabilitate and expand certain existing elevated lines, and lease them to the private companies for operation. The cost would be borne more-or-less equally by the city and the companies. The city's contribution was in cash raised by bond offerings, while the companies' contributions were variously by supplying cash, facilities, and equipment to run the lines.[43]

As part of the contracts, the two companies were to share lines in Queens: a short line toAstoria called theAstoria Line; and a longer line reaching initially toCorona, and eventually toFlushing, called theCorona Line. The lines operated jointly and began fromQueensboro Plaza. The IRT accessed the station both from the 1907Steinway Tunnel and an extension of theSecond Avenue Elevated from Manhattan over theQueensboro Bridge. The BRT fed the Queens lines from a new tunnel from the60th Street Tunnel to Manhattan. Technically the line was under IRT ownership, but the BRT/BMT was grantedtrackage rights in perpetuity, essentially making it theirs also.[81][82]
Both lines were built to IRT specifications. This meant that IRT passengers had a one-seat ride to Manhattan destinations, whereas BRT passengers had to make a change at Queensborough Plaza. This came to be important when service was extended for the1939 World's Fair, as the IRT was able to offer direct express trains from Manhattan, and the BRT was not. This practice lasted well into the municipal ownership of the lines and was not ended until 1949.[81][82]
Several provisions were imposed on the companies: the fare was limited to five cents, and this led to financial troubles for the two companies after post-World War I inflation; the city had the right to "recapture" any of the lines it built and run them as its own; and the city was to share in the profits. This eventually led to their downfall and consolidation into city ownership in 1940.[81][82]
As part of the Dual Contracts, the operations of the original IRT system changed drastically. Instead of having trains go via Broadway, turn onto 42nd Street, and finally turn onto Park Avenue, there were two trunk lines connected by the42nd Street Shuttle. The system was changed from a "Z" system to an "H" system. The first trunk line, theLexington Avenue Line assumed the portion of the original IRT system south of Grand Central. The line was extended northward with a new station at Grand Central and turned onto Lexington Avenue, where the line remained as four tracks. The line had connections to the new IRT Pelham Line and IRT Jerome Avenue Line in the Bronx, in addition to a new connection to the IRT White Plains Road Line.[83]
The second trunk, the Broadway–Seventh Avenue Line assumed the portion of the original IRT system north of Times Square, and it extended southward with a new station at Times Square, running down Seventh Avenue, Varick Street and West Broadway. It was predicted that the subway extension would lead to the growth of the Lower West Side, and to neighborhoods such asChelsea andGreenwich Village. South of Chambers Street, two branches were constructed. The first branch ran to the Battery via Greenwich Street, while the second branch turned eastward under Park Place and Beeckman Street and down William Street, running under the East River through a tunnel before running under Clark Street and Fulton Street until it reached a junction at Borough Hall with the existing Contract 2 IRT Brooklyn Line.[83]

On June 3, 1917, the first portion of the Broadway–Seventh Avenue Line south ofTimes Square–42nd Street, a shuttle to34th Street–Penn Station, opened; a separate shuttle service, running between 42nd and 34th Streets, was created.[84] This short extension was opened even though the rest of the route was not yet completed in order to handle the mass of traffic to and fromPennsylvania Station. Only the northern part of the station was opened at this time, and piles of plaster, rails, and debris could be seen on the rest of the platforms.[85] This shuttle was extended south toSouth Ferry, with a shorter shuttle on the Brooklyn branch betweenChambers Street andWall Street, on July 1, 1918.[86]
The new portion of the Lexington Avenue Line from Grand Central to 125th Street opened on July 17, 1918.[87] Until the evening of August 1, 1918, it ran as ashuttle on the local tracks only, terminating at 42nd Street and at 167th Street on theIRT Jerome Avenue Line (where the connection from the elevatedIRT Ninth Avenue Line merged). The new "H" system was implemented on August 1, 1918, joining the two halves of the Broadway–Seventh Avenue Line, and the two halves of the Lexington Avenue Line.[88]
An immediate result of the switch was the need to transfer using the 42nd Street Shuttle. The completion of the "H" system doubled the capacity of the IRT system.[83] The local tracks ran to South Ferry, while the express tracks used the Brooklyn Branch to Wall Street, extended into Brooklyn to Atlantic Avenue via theClark Street Tunnel on April 15, 1919.[89]
The Dual Contracts resulted in the expansion of New York City; people moved to the newly built homes along the newly built subway lines. These homes were affordable, about the same cost as the houses in Brooklyn and Manhattan.[82]: 7 The population in Manhattan below 59th Street decreased between the years of 1910 and 1920.[90] People were allowed to move to better parts at the same cost and could have a better and more comfortable life in the suburbs.[82]: 7
MayorJohn F. Hylan was a strong advocate of public operation of the subway. He was fired from the BRT after working as amotorman for some time, and he wanted to avoid having to spend more money to recapture the IRT and BRT, so he tried to push the two operators out of business. To that end, Hylan had denied allocating money for the BRT by refusing to build new lines, refusing to raise fares (thereby putting the BRT in more debt), denied building permits so that some major building work lasted longer than planned, and even refused to build a new subway yard for the BRT. TheMalbone Street Wreck in 1918 contributed to the losses incurred by the two companies, which led to the bankruptcy of the BRT in 1918. The BRT, however, was reorganized into the BMT. The IRT was almost bankrupt, but managed to complete theline to Flushing by 1928. Subsequently, Hylan drew up plans for a third subway network that would be city-built and -operated, in contrast to the existing subway lines, which were privately operated.[81]
On the other hand, New York City had grown to over five and a half million inhabitants and urgently needed new subway lines. The dual system could not keep pace with this ever-increasing ridership. So, a compromise solution was finally found that would allow Hylan's plans as well as the interests of private operators to be considered. However, the city's and Hylan's long-term goal was the unification and consolidation of the existing subway, with the city operating a unified subway system. The city, bolstered by political claims that the private companies were reaping profits at taxpayer expense, determined that it would build, equip and operate a new system itself, with private investment and without sharing the profits with private entities. This led to the building of theIndependent City-Owned Subway (ICOS), sometimes called theIndependent Subway System (ISS), theIndependent City-Owned Rapid Transit Railroad, or simplyThe Eighth Avenue Subway after the location of itspremier Manhattan mainline. After the city acquired the BMT and IRT in 1940, the Independent lines were dubbed theIND to follow the three-letterinitialisms of the other systems.[91]
The original IND system, consisting of the Eighth Avenue mainline and theSixth Avenue,Concourse,Culver, andQueens Boulevard branch lines, was entirely underground in the four boroughs that it served, with the exception of theSmith–Ninth Streets andFourth Avenue stations on theCulver Viaduct over theGowanus Canal inGowanus, Brooklyn.[91]
As the first line neared completion, New York City offered it for private operation as a formality, knowing that no operator would meet its terms. Thus the city declared that it would operate it itself, formalizing a foregone conclusion. The first line opened without a formal ceremony. The trains began operating their regular schedules ahead of time, and all stations of theEighth Avenue Line, from207th Street inInwood toHudson Terminal (now World Trade Center), opened simultaneously at one minute after midnight on September 10, 1932.[92]
On January 1, 1936, a second trunk line—theSixth Avenue Line—opened fromWest Fourth Street (where it splits from the Eighth Avenue Line) toEast Broadway.[93][94][95] The new subway line's construction required the suspension of streetcars on the avenue. The city, wanting to save money by not having to underpin theIRT Sixth Avenue Line before the elevated line was closed, bought the line for $12.5 million and terminated operations on December 5, 1938.[96] To help compensate for the loss in service, service on the Ninth Avenue Elevated was increased.[97]
The first section of the Queens Boulevard Line, west fromRoosevelt Avenue to50th Street, opened on August 19, 1933.[98]E trains ran local toHudson Terminal (today's World Trade Center) in Manhattan, while theGG (predecessor to currentG service) ran as a shuttle service between Queens Plaza andNassau Avenue on theIND Crosstown Line.[99][100][101][102][103] An extension east to Union Turnpike opened on December 31, 1936.[104][105]: 416–417 [106][98] The line was extended to Hillside Avenue and 178th Street, with a terminal station at 169th Street on April 24, 1937.[99][105][107][108] That day, express service began on the Queens Boulevard Line during rush hours, withE trains running express west of 71st–Continental Avenues, andGG trains taking over the local during rush hours.[101][109] The initial headway for express service was between three and five minutes.[110]23rd Street–Ely Avenue station opened as anin-fill station on August 28, 1939.[111][112] Upon its extension into Jamaica, the line drew Manhattan-bound passengers away from the nearbyBMT Jamaica Line subway and theLong Island Rail Road.[113]
On July 1, 1937, a third trunk line, theCrosstown Line, opened fromNassau Avenue toBergen Street.[91] Two years later, on December 15, 1940, local service was begun along the entire IND Sixth Avenue line, including its core part through Midtown Manhattan.[91]
Meanwhile, on the East Side, theneed for the Second Avenue Subway had been evident since 1919, when theNew York Public Service Commission launched a study at the behest of engineer Daniel L. Turner to determine what improvements were needed in the city's public transport system. TheGreat Depression resulted in soaring costs, and the expansion became unmanageable, so it was not built along with the other three IND trunk lines. Construction on the first phase of the IND was already behind schedule, and the city and state were no longer able to provide funding. A scaled-down proposal including a turnoff at 34th Street and a connection crosstown was postponed in 1931.[91]
Further revision of the plan and more studies followed. By 1939, construction had been postponed indefinitely, and Second Avenue was relegated to "proposed" status. The 1939 plan for subway expansion took the line not only into the Bronx (by now as a single line toThroggs Neck) but also south into Brooklyn, connecting to the stub of theIND Fulton Street Line atCourt Street. Construction of the line resumed in 1972 but was ended during the 1975 fiscal crisis, and work was again restarted in 2007.[91]
Since theopening of the original New York City Subway line in 1904, various official and planning agencies have proposed numerous extensions to the subway system. One of the better known proposals was the "Second System," which was part of a plan by the Independent Subway to construct new subway lines in addition and take over existing subway lines and railroad right-of-ways. Though most of the routes proposed over the decades have never seen construction, discussion remains strong to develop some of these lines, to alleviate existing subway capacity constraints and overcrowding, the most notable being theSecond Avenue Subway. Plans for new lines date back to the early 1910s.[114][115]
On August 28, 1922, Mayor John Francis Hylan announced that his new system would comprise 100 miles (160 km) of currently operating routes and another 100 miles of new routes, to be completed by December 31, 1925, and in competition with the IRT and BMT.[116][117]
In 1926, a loop subway service was planned to be built toNew Jersey.[118]
The most grandiose plan, conceived in 1929, was to be part of the city-operated IND. By 1939, with unification planned, all three systems were included. As this grandiose expansion was not built, the subway system is only 70% of what it was planned to be. Magnificently engineered, almost entirely underground, with 670 feet (200 m) platforms andflying junctions throughout, the IND system tripled the city's rapid transit debt, contributing to the demise ofplans for an ambitious expansion proposed before the first line of the first system was even opened.
After the IND Sixth Avenue Line was completed, only 28 new stations were built. Five stations were on the abandonedNYW&B-operatedIRT Dyre Avenue Line, fourteen stations were on the abandoned LIRRRockaway Beach Branch (now theIND Rockaway Line), six were on theArcher Avenue Lines and63rd Street Lines (built as part of a 1968 plan), two stations (57th Street andGrand Street) were part of theChrystie Street Connection, and theHarlem–148th Street terminal. FourMTA Capital Construction-funded stations (the34th Street station on the7 Subway Extension and the three stations on theSecond Avenue Subway) have been constructed with up to 14 more planned. The city's subway construction costs are the highest in the world, which has slowed the pace of expansion.[119]

In June 1940, the IND's operator, the New York City Board of Transportation, took over the transportation assets of the IRT and BMT.[14] In June 1953, the New York City Transit Authority, a state agency incorporated for the benefit of the city, now known to the public asMTA New York City Transit, succeeded the BoT.[14][120] A combination of factors had this takeover coincide with the end of the major rapid transit building eras in New York City.[121] The city immediately began to eliminate what it considered redundancy in the system, closing several elevated lines including theIRT Ninth Avenue Line[122] and most of theIRT Second Avenue Line in Manhattan,[123] and theBMT Fifth andThird Avenue Lines and most of theBMT Fulton Street Line[124][125][126] in Brooklyn.
Despite the unification, a distinction between the three systems survives in the service labels: IRT lines (now referred to asA Division) have numbers and BMT/IND (now collectivelyB Division) lines use letters.[127] There is also a physical and less widely noticed difference, as A Division cars are narrower than those of B Division by 18 inches (46 cm)[128] and shorter by 9 feet (2.7 m) to 24 feet (7.3 m).[128][129] Because the A Division lines are of lower capacity for a given capital investment, all new extensions and lines built between World War II and 2007[130][131][132] have been for the B Division. A Division cars can travel on B Division lines when necessary but are not used for passenger service on those lines because of the dangerously wide gap between the car and the station platform. This stems from the IRT and BRT's long-standing disagreement where the BRT intentionally built cars that were too wide for the IRT.[81]

The original IRT subway lines (those built before the Dual Contracts) were built to modified elevated line dimensions. Whereas the IRT lines were originally equipped with cars that were 47 feet (14 m) long, the cars designed for the IRT subway measure 51.3 feet (15.6 m) long. Both sets of lines did not permit cars wider than 9 feet (2.7 m). The clearances and curves on these lines are too narrow and too sharp for any IND or BMT equipment. The later extensions of the IRT, constituting the bulk of the IRT system, were built to wider dimensions, and so are of a profile that could support the use of IND/BMT sized equipment.[133][43]
B Division equipment could operate on much of A Division if station platforms were trimmed and trackside equipment moved, thus letting A Division service carry more passengers. However, there is virtually no chance of this happening because the older, narrower portions of A Division are centrally situated, such that it would be impossible to put together coherent through services. The most that can be reasonably hoped for is that some branch lines of Division A might be resized and attached to B Division lines. This was done with theBMT Astoria Line in Queens[133] which had formerly been dual-operated with normal IRT trains and special narrow BMT shuttles.[43]
New York hoped that the profits from the remaining formerly privately operated routes would support the expensive and deficit-ridden IND lines and simultaneously be able to repay the systems' debts, without having to increase the original fare of five cents. But duringWorld War II, which gave a reprieve to the closure of most rail transit in the U.S., some closures continued, including the remainder of the IRT Second Avenue Line in Manhattan (1942)[123] and the surviving BMT elevated services over the Brooklyn Bridge (1944).[134] The Second World War also caused renewed inflation, which finally caused a fare increase to ten cents in 1947 and six years later to 15 cents.[81]
Ridership skyrocketed during the late 1940s, and on December 23, 1946, the system-wide record of 8,872,249 fares was set.[135]: 73
Because the consolidation dragged in the first years after unification, some improvements in operational processes were rather slow, and soon the question of organization was raised. The outsourcing of subway operations to thePort Authority of New York and New Jersey was favored at one point. On June 15, 1953, the NYCTA was founded with the aim of ensuring a cost-covering and efficient operation in the subways.[81]
There was a need to overhaul rolling stock and infrastructure of the once-private routes, especially for the IRT, where nearly all of the infrastructure was aged. The oldest cars came there from the time the subway opened in 1904, and the oldest subway cars of BMT in 1953 dated from the system's first years, in 1913. Therefore, a total of 2,860 cars for the A Division were delivered between 1948 and 1965, which constituted the replacement of almost the entire prewar IRT fleet. On the B Division, 2,760 cars were ordered. Platforms were doubled in length systemwide. At some stations,gap fillers were installed because the station extensions were curved. Also in this period, the BMT replaced their signals. TheMain Line R36 cars were the first equipment to be equipped with two-way radio as delivered standard equipment in 1965, with the first use of radio in the subway system on theIRT Lexington Avenue Line in May 1965. The first successful air conditioned train (R38) was placed into service in July 1967.[136]
In 1946, MayorWilliam O'Dwyer initiated a program to lengthen station platforms to accommodate ten-car trains. The first contract, which was completed in August 1946, extended the platforms at 125th Street, 207th Street, 215th Street, 225th Street, 231st Street and 238th Street on theIRT Broadway–Seventh Avenue Line for $423,000. Additional platform extensions were completed on the Broadway–Seventh Avenue Line in October 1946. On this date the platform extensions at 103rd Street, 110th Street, 116th Street, 137th Street, 145th Street, 157th Street, 168th Street, 181st Street, 191st Street and Dyckman Street were completed. This project cost $3.891 million. The platform extensions at the Hoyt Street station on theIRT Eastern Parkway Line opened in November 1946, being completed for $733,200. Stations along theIRT Lexington Avenue Line were next to receive the improvements.[137]
In January 1947, the 23rd Street, 28th Street and 33rd Street platform extensions were completed, costing $4.003 million. Work was subsequently completed at the Bleecker Street and Spring Street stations for $1.97 million. The $1.992 million contract to lengthen the platforms at the Canal Street and Worth Street stations to the south was completed in April 1947. In September 1947, a contract extending the platforms for stations in the Bronx was completed. The first stage of the plan was completed in June 1949, lengthening the platforms at Prospect Avenue, Jackson Avenue, Intervale Avenue, Simpson Street, Freeman Avenue, 174th Street and 177th Street on the IRT White Plains Road Line for $315,000. In September 1949, the Chairman of the Board of Transportation, William Reid, announced that the program to lengthen 32 IRT stations had been completed for $13.327 million. Reid also announced that the Board had created a five-year plan to lengthen all remaining BMT and IRT stations to accommodate ten-car trains.[137]

Only two new lines were opened in this era,[120] theIRT Dyre Avenue Line in 1941[138] and theIND Rockaway Line in 1956,[139][140][141][142] with an extension of the latter toFar Rockaway–Mott Avenue in 1958.[143] Both of these lines were rehabilitations of existing railroad rights-of-way rather than new construction. The former line was the City portion of theNew York, Westchester and Boston Railway, an electrified commuter line closed in 1937,[138] and the latter a line obtained from theLong Island Rail Road.[144] While the latter is a long and substantial line, it consists mostly of a long right-of-way crossingJamaica Bay with a single station onBroad Channel island and two branches on a peninsula that is only several city blocks wide.[145] For a time, the IND Rockaway Line was considered its own subway division.[91]
The169th Street station on the IND Queens Boulevard Line provided an unsatisfactory terminal setup for a four track line, and this required the turning ofF trains at Parsons Boulevard, and no storage facilities were provided at the station. Therefore, the line was going to be extended to 184th Place with a station at179th Street with two island platforms, sufficient entrances and exits, and storage for four 10-car trains. The facilities would allow for the operation of express and local service to the station.[146][147] Construction on the extension started in 1946 with planned completion in 1949.[147] The extension was completed later than expected and opened on December 11, 1950.[148] This extension was delayed due to theGreat Depression andWorld War II. BothE andF trains were extended to the new station.[148][149]

The originally planned IND system was built to the completion of its original plans after World War II ended, but the system then entered an era ofdeferred maintenance in which infrastructure was allowed to deteriorate. In 1951 a half-billion dollar bond issue was passed to build theSecond Avenue Subway, but money from this issue was used for other priorities and the building of short connector lines, namely a ramp extending theIND Culver Line over the ex-BMT Culver Line at Ditmas and McDonald Avenues in Brooklyn (1954), allowing IND subway service to operate toConey Island for the first time,[120] the60th Street Tunnel Connection (1955), linking theBMT Broadway Line to theIND Queens Boulevard Line,[120] and theChrystie Street Connection (1967), linking the BMT line via theManhattan Bridge to theIND Sixth Avenue Line.[150]
By January 1955, thePort Authority of New York and New Jersey and theTriborough Bridge and Tunnel Authority could theoretically raise $1.25 billion effective immediately (equivalent to $14,672,000,000 in 2024). In his 1974 bookThe Power Broker,Robert A. Caro estimated that this amount of money could modernize both theLong Island Rail Road for $700 million and theHudson & Manhattan Railroad for $500 million, with money left over to build theSecond Avenue Subway as well asproposed extensions of subway lines in Queens and Brooklyn.[151]: 928–929 However,Robert Moses, the city's chief urban planner at the time, did not allow funding for most mass transit expansions in the New York City area,[151]: 930–933 instead building highways and parkways without any provisions for mass transit lines in the future.[151]: 939–958 Caro noted that the lack of attention to mass transit expansions and routine maintenance contributed to the decline of the subway: "When Robert Moses came to power in New York in 1934, the city's mass transportation system was probably the best in the world. When he left power in 1968 it was quite possibly the worst."[151]: 933
Soon after, the city entered a fiscal crisis. Closures of elevated lines continued. These closures included the entireIRT Third Avenue Line in Manhattan (1955) and the Bronx (1973), as well as theBMT Lexington Avenue Line (1950), much of the remainder of theBMT Fulton Street Line (1956), thedowntown Brooklyn part of theBMT Myrtle Avenue Line (1969), and theBMT Culver Shuttle (1975), all in Brooklyn, and theBMT Jamaica Line in Queens starting in 1977.[152] TheBMT Archer Avenue Line was supposed to replace the BMT Jamaica Line's eastern end, but it was never completed to its full extent, and opened in 1988 as a stub-end line, terminating at Jamaica Center.[120]

Construction and maintenance of existing lines was deferred, and graffiti and crime were very common. Trains frequently broke down, were poorly maintained, and were often late, while ridership declined by the millions each year. As in all of the city, crime was rampant in the subway in the 1970s. Thefts, robberies, shootings and killings became more frequent. The rolling stock was very often painted with graffiti or vandalized both inside and outside. As theNew York City Police Department was completely overwhelmed, the public reacted with unease, and the subway was deliberately avoided. Around 1980, the reliability of the vehicles was a tenth of their reliability in the 1960s, and 40 percent of the network required speed restrictions. Because there had been no further studies of the subway since 1975, one third of the fleet was out of use during rush hours due to serious technical defects. In addition, signs were fitted incorrectly, and spare parts were missing or were bought in too large quantities, could not be found, or could not be installed due to lack of repairmen.[152]
The New York City Subway tried to keep its budget balanced between spending and revenue, so deferred maintenance became more common, which drew a slow but steady decline of the system and rolling stock. Furthermore, the workers were consolidated into theTransport Workers Union in 1968. A pension was set up, and workers were allowed to retire after 20 years of service without any transitional period. About a third of the most highly experienced staff immediately retired, resulting in a large shortage of skilled workers.[152]
Rehabilitation started in the 1980s as part of a $18 billion financing program. Between 1985 and 1991 over 3,000 subway cars were overhauled and fitted withair conditioning to increase comfort, reliability and durability while deferring car purchases. The TA only replaced the oldest cars in each division, so it bought only 1,350 new vehicles. Increased patrols and fences around the train yards offered better protection against graffiti and vandalism.[153] At the same time, the TA began an extensive renovation of the routes. Within ten years the tracks were thereby renewed almost systemwide. The Williamsburg Bridge and the Manhattan Bridge, which had strong corrosion damage, were refurbished over the years.[153]
The renovation of the stations was initially limited to security measures, fresh paint, new lighting and signs, but the TA also tried to improve the service that had been neglected. This ranged from new uniforms and training for the staff to correct destination signs on the rolling stock. Somesubway services were also adapted to the changing needs of customers.[153] Another stated goal was to reduce crime or at least an improvement in the subjective sense of security. At night, the railway police and members of the citizens' initiativeGuardian Angels, formed in 1979, patrolled in the subway trains.[153] In the 1990s, the crime in the city and its subway declined significantly.
In 1956, the NYCTA chairman, Charles Patterson, proposed removing the seats from the trains on the42nd Street Shuttle to increase the passenger load.[154]
On May 1, 1957, a standard maximum interval of 20 minutes between trains was put into place during late nights, with the exception of the Rockaway lines where it was 24 minutes. Some lines had service run as infrequently as 30 minutes. Also on this date, BMT express service was extended to 57th Street from 42nd Street. Earlier in 1957, local service on the BMT Jamaica Line was extended to Crescent Street from Eastern Parkway, and rush hour service was increased to run every 5 minutes.[155]
Under a $100 million rebuilding program, increased and lengthened service was implemented during peak hours on the1 train. Switching at a junction north of 96th Street, delayed service as trains from the Lenox Avenue Line which ran local switched from the express to the local, while trains from the Broadway Branch that ran express switched from the local to the express. This bottleneck was removed on February 6, 1959. All Broadway trains were locals, and all Lenox Avenue trains were expresses, eliminating the need to switch tracks. All3 trains began to run express south of 96th Street on that date running to Brooklyn.1 trains began to run between 242nd Street and South Ferry all times. Trains began to be branded as Hi-Speed Locals, being as fast as the old express service was with 8-car trains consisting of newR21s andR22s on the line.[156]
On November 15, 1962, the express platforms atLexington Avenue–59th Street opened to reduce transfer congestion atGrand Central–42nd Street, and to allow transfers between the express trains and BMT trains toQueens. Even before the express platforms were added, this station was the busiest on the line.[157] Construction on the express station had begun on August 10, 1959.[158]

In the mid-1960s,US$600,000,000 was made available to theMetropolitan Transportation Authority (MTA) ofNew York City for a large subway expansion proposed by then-MayorJohn Lindsay. About $1.23 billion was spent to create threetunnels and a half-dozen holes as part of construction on theSecond Avenue and63rd Street Lines.[153][152] Construction for the lines stopped in 1975 because the city almost went bankrupt, yet none of the lines were done when federal payments were suspended in 1985.[159] The two-phaseProgram for Action was funded as follows:[160]
The Program for Action also called for supplanting elevated structures with new subways. The eastern end of theBMT Jamaica Line was to be replaced with theBMT Archer Avenue Line, while theIRT Third Avenue Line was to be demolished to make way for a subway route parallel to theMetro-North tracks at Park Avenue.[153]
Because the early subway systems competed with each other, they tended to cover the same areas of the city, leading to much overlapping service. The amount of service has actually decreased since the 1940s as many elevated railways were torn down, and finding funding for underground replacements has proven difficult. The subway's decline began in the 1960s and continued through the late 1980s.[153]



In 1973, the city's graffiti epidemic surged so that nearly every subway car was tagged with graffiti.[161] It was worsened by the budgetary restraints on New York City, which limited its ability to remove graffiti and perform transit maintenance.[162] MayorJohn Lindsay declared the first war on graffiti in 1972, but it would be a while before the city was able and willing to dedicate enough resources to that problem to start impacting the growing subculture.[162][163] The MTA tried rubbing the graffiti off with an acid solution, but maintaining the cars to keep them relatively graffiti-free was costing them around $1.3 million annually. In the winter of 1973, the car-washing program was stopped. Attempts to wash cars with an acid solution in September 1974 were detrimental to the fleets' upkeep.[153]
As graffiti became associated with crime, many demanded that the government take a more serious stance toward it, particularly after the popularization of theFixing Broken Windows philosophy in 1982.[163][164][165] By the 1980s, increased police surveillance and implementation of increased security measures (razor wire, guard dogs) combined with continuous efforts to clean it up led to the weakening of the New York's graffiti subculture.[161]
An extensive car-washing program in the late 1980s ensured the elimination of graffiti throughout the system's rolling stock. In 1984 the NYCTA began a five-year program to eradicate graffiti. The years between 1985 and 1989 became known as the "die hard" era.[162] A last shot for the graffiti artists of this time was in the form of subway cars destined for thescrap yard.[162] With the increased security, the previous elaborate "burners" on the outside of cars were now marred with simplistic marker tags which often soaked through the paint.[120][162][163] By mid-1986 the NYCTA were winning their "war on graffiti". On May 10, 1989, the rolling stock was made 100% graffiti-free,[166] with the washing of the last train in the subway system that still had graffiti.[167][168] As the population of artists lowered so did the violence associated with graffiti crews and "bombing".[162]
Ridership in 1975 had decreased to 1918 levels, with ridership declining by 25 million or more per year. The MTA reduced the length of trains during off-peak periods, and canceled work on several Program for Action projects, including theSecond Avenue Subway and anLIRR line through the63rd Street Tunnel to a Metropolitan Transportation Center inEast Midtown, Manhattan. Ridership kept dropping rapidly, having decreased by 25 million passengers between June 30, 1976, and June 30, 1977; in the previous eight years, 327 million passengers had stopped using the subway.[153] The proportion of the fleet that was in service during the morning peak period was reduced, and train headways were increased: on four local services, trains were reduced from once every four minutes to once every five minutes.[153][169]
On May 27, 1975, the NYCTA announced that in September of that year 94 daily IRT trips would be discontinued, accounting for 4 percent of then-existing service on the IRT. The trips were to be discontinued to cut operating deficits. Express service on the 7 train was to be discontinued between the hours of 9:30 a.m. and 3:30 p.m. and was to be replaced by more frequent local service.[170] During the same month, the NYCTA was considering making the A train a local at all times except rush hours, when it would remain an express.[171]
On December 17, 1975, the MTA announced that a 4.4 percent cutback of rush hour train service would take place on January 18, 1976. The cutbacks, the third of the year, trimmed 279 train runs from the previous 6,900. Service was most drastically reduced on the Lexington Avenue Line, with seven fewer southbound express trains during the morning rush hours. The cuts were the first of a three-phase program that was put in effect between January and July 1976. The cuts permitted a savings of $12.6 million a year for the NYCTA, which had an increasing deficit. Other subway services were changed or discontinued as part of the plan. On January 19, F trains were planned to stop running express in Brooklyn, and the GG was to be cut back toSmith–Ninth Streets.[172]
In April 1975 it was planned that all rush hour 1 trains would begin running to242nd Street; these runs had previously terminated at137th Street. During midday hours, trains on the 1 were to be shortened to five cars. In July, it was planned that the EE would be discontinued; N trains were to have been extended to Continental Avenue via the Queens Boulevard Line to replace it. Manhattan-bound N trains were to continue running express, while in the opposite direction they would run local. N trains would alternate between terminating at Whitehall Street or Coney Island during rush hours. CC trains, in July, were planned to be extended from Hudson Terminal to Rockaway Park replacing the E, which was to have been cut back to Hudson Terminal. The K was planned to be discontinued in July.[172]
The changes that were supposed to take place in July instead took effect on August 30 with 215 more runs eliminated that date. In 1967 there were 8,200 daily trips, and on August 30, 1976, there were 6,337 daily trips.[169]
On December 14, 1976, the NYCTA proposed another package of service cuts. The cuts, planned to take effect in January 1977, would have eliminated service on the Bowling Green–South Ferry Shuttle, the Franklin Avenue Shuttle, and AA service, which would be replaced by the A during late nights. GG service would be truncated to Queens Plaza during late evenings and late nights. B and N service would have been cut back to shuttles, running between 36th Street and Coney Island on their respective lines. It was also proposed that during off-peak hours 10-car trains would be cut to eight, six or four car trains.[173]
In 1986, the NYCTA launched a study to determine whether to close 79 stations on 11 routes, spread across all four of the boroughs that the subway system served, due to low ridership and high repair costs.[174][175] Numerous figures, including New York City Council memberCarol Greitzer, criticized the plans.[175][176]

The subway had been gradually neglected since the 1940s, and its situation had been exacerbated by the low fare. On May 20, 1970, two people died at theJackson Heights–Roosevelt Avenue station in the worst subway collision since the1928 Times Square derailment. Following the 1970 accident,New York Magazine highlighted the subway system's condition in a lengthyexpose.[177] Even though each of the approximately 7,200 subway cars were checked once every six weeks or 7,500 miles (12,100 km) of service, four or five dead motors were allowable in a peak-hour 10-car train, according to some transit workers' accounts. About 85.8% of trains were on schedule in 1970, with 1,142 equipment-related delays in April 1970.[177] However, issues such as broken lights, fans, and signs; defective doors, wheels, and brakes; and subway cars that often became uncoupled or "pulled apart", were still prevalent. One out of three IRT stations did not have running water in case of emergency. In addition, the system's staff were leaving in massive numbers, with 5,655 workers having retired or quit from early 1969 to mid-1970.[177]
The system also had many slow-speed areas because of obstacles that could cause derailments, and every subway car had graffiti; fleet availability during rush hours declined from 5,557 in 1976 to 5,025 in 1977, and to 4,900 in May 1978. Mean Distance Between Failures (MDBF) rates were at all time lows, as the MDBF rate system-wide was 6,000 miles by 1980. In 1979, 200 retiredR16 cars were reactivated because the newest rolling stock in the system, theR46, had cracked trucks, and were only allowed to operate during rush hours while they were sent for rehabilitation.[153]
At the height of the transit crisis in 1983, on-time performance dropped below 50%.[178] Hundreds of trains never made it to their destination and in 1981, 325 train runs were abandoned on a typical day.[178] Additionally, cars caught fire 2,500 times every year.[178]
In December 1978 aNew York Daily News article highlighted the worst parts of the subway. TheGrand Central–42nd Street station was the worst underground station and theMiddle Village–Metropolitan Avenue station was the worst elevated station. The subway cars in the worst condition were theR10s. The subway line with the worst signals was theIRT Broadway–Seventh Avenue Line, so the signals were upgraded in the 1980s. TheBMT Sea Beach Line had the worst track; its infrastructure had not been upgraded since its opening in 1915.[152] Despite $800 million being allocated by the state in 1978, the TA had spent less than half its 1967 allocation of $600 million. The agency made some infrastructure improvements, though because they were not cosmetic improvements, the public still assumed that the subway had high crime, even during periods of decreased crime.[153]
Due to deferred maintenance, the condition of the subway system reached dangerous conditions in the early 1980s, and the TA considered abandoning the Archer Avenue and 63rd Street projects. Structural defects were found in elevated structures systemwide and on theManhattan andWilliamsburg Bridges, causing frequent closures or delays on many subway lines during the 1980s. Reroutes from both bridges were necessitated; while the Manhattan Bridge, between 1986 and 2004, had two of its four tracks closed at a time for construction, the Williamsburg Bridge needed a shutdown from April to June 1988 for emergency structural repairs to be made.[153] Federal funding for the repair of theBMT Jamaica Line was deferred throughout the 1980s due to the extremely bad state of the Williamsburg Bridge. Pigeon droppings corroded the bridge's steel, there were over 200 broken suspender cables, and concrete in the bridge began to come off and leave large holes.[153]
Due to low ridership and the increasing shabbiness of the subway, parts or most of several lines—theBMT Canarsie Line; theIND Crosstown Line; theIRT Jerome Avenue Line orIND Concourse Line north of161st Street–Yankee Stadium; and the BMT Jamaica Line east of eitherBroadway Junction orCypress Hills—were proposed for closure and abandonment in 1981. Other lines proposed for closure included the remaining part of theIND Culver Line, theBMT West End Line, theIRT Dyre Avenue Line, part of theIND Rockaway Line, part of theIRT White Plains Road Line, and the remaining part of theBMT Myrtle Avenue Line.[179] The BMT Jamaica Line was demolished, mainly as part of the Program for Action, but also due to low ridership.[153] Officials also proposed shutting the subway at night between midnight and 6 a.m. in order to reduce crime.[180] Off-peak train trips, as well as trips on the branches outside the city's core, were reduced sharply.[181]
Operations in 1981 had deteriorated so that:[182][183]
In 1986, the MTA andRegional Plan Association again considered closing 26 miles (42 km) of above-ground lines to follow population shifts. They included the Jerome Avenue, Dyre Avenue, Franklin Avenue, Crosstown, and Rockaway lines, as well as parts of the Myrtle and Jamaica lines. The south end of the Culver Line and the north ends of the IRTBroadway–Seventh Avenue and White Plains Road Lines were also proposed for closure, as was all of theBMT Sea Beach Line. However, unlike the 1981 proposal, this plan called for a net expansion of the subway system, as 37 miles (60 km) of new underground and surface lines would also be built.[185][175] Numerous figures, including New York City Council memberCarol Greitzer, criticized the 1986 plans.[175][176]
In the 1960s, mayorRobert Wagner ordered an increase in the Transit Police force from 1,219 to 3,100 officers. During the hours at which crimes most frequently occurred (between 8:00 p.m. and 4:00 a.m.), the officers went on patrol in all stations and trains. In response, crime rates decreased, as extensively reported by the press.[186] Due to another crime increase in the subway, the rear cars of subway consists were shut at night beginning in July 1974.[187]
However, during the subway's main era of decline following the city's 1976 fiscal crisis, there were daily reports of crime. Two hundred were arrested for possible subway crimes in the first two weeks of December 1977 under an operation dubbed "Subway Sweep".[152] Violence on the subway increased drastically in the last week of 1978, and six murders occurred in the first two months of 1979, compared to nine during the entire previous year. TheIRT Lexington Avenue Line was known to frequent muggers, so in February 1979,Curtis Sliwa'sGuardian Angels group began patrolling the4 train during the night. By February 1980, there were 220 Guardian Angels across the system.[188]
To attract passengers, in September 1978 the TA introduced the "Train to the Plane", a premium-fare service that provided limited stops along Sixth Avenue in Manhattan from57th Street toHoward Beach, where passengers could transfer to a shuttle bus to JFK Airport. The service was staffed by atransit police officer, and the additional fare was paid on board. This was discontinued in 1990 due to low ridership and the high cost of its operation.[189][190][191]
The increase of crime in the subway led to the firing of Transit Police ChiefSanford Garelik.[152] There were about 250 felonies (equivalent to 13,000 per year) occurring in the system every week by September 1979, leading to the deprioritization ofquality of life crimes in favor of violent crimes. Additionally, police patrols were too predictable, and MTA and NYPD officers could not easily coordinate with each other.[152] While the daily rate of felonies nearly halved between 1979 and 1980,overall crime increased by 70% in the same period.[192] A series of window-smashing incidents on subway cars started in 1980 on theIRT Pelham Line and spread throughout the rest of the system, causing delays when damaged trains needed to be taken out of service.[193] Over a thousand pieces of damaged windows were replaced between January 27 and February 2, 1985.[194] Other actions included increasing the 60-cent fare to 65 cents to pay the salaries of additional transit police;[192] putting a subway-crimes court in the Times Square station; and stationing a police officer in each car during night hours.[195]
Richard Ravitch, chairman of the MTA, said that even he was scared of going on the subway.[196] Despite the MTA discussing methods to increase ridership, the 1982 figures fell to levels last seen in 1917.[197] Within less than ten years, the MTA had lost around 300 million passengers, mainly because of fears of crime. In July 1985, theCitizens Crime Commission of New York City published a study showing this trend, fearing the frequent robberies and generally bad circumstances.[198] As a result, theFixing Broken Windows policy, which proposed to stop large-profile crimes by prosecuting quality of life crimes, was implemented.[164][199] Along this line of thinking, the MTA began a five-year program to eradicate graffiti from subway trains in 1984, and hired one of the original theorists of Broken Windows policing,George L. Kelling, as a consultant for the program in 1985.[200][201][202]
In the early afternoon of December 22, 1984,Bernhard Goetz shot four youngAfrican American men fromthe Bronx on a New York City Subway train. The incident got nationwide media coverage. That day, the men—Barry Allen, Troy Canty, Darrell Cabey (all 19), and James Ramseur (18)—boarded a downtown2 train (Broadway – Seventh Avenue Line express) carrying screwdrivers, apparently on a mission to steal money fromvideo arcade machines in Manhattan.[203] When the train arrived at the14th Street station in Manhattan, 15 to 20 other passengers remained with them inR22 subway car 7657,[204][205] the seventh car of the ten-car train.[206][207]
At the 14th Street station, Goetz entered the car through the rearmost door, crossed the aisle, and took a seat on the long bench across from the door. After Canty asked Goetz how he was, Goetz replied affirmatively, at which point the four boys supposedly moved over to the left of Goetz, blocking Goetz off from the other passengers in the car. They then asked Goetz for money. He fired five shots, seriously wounding all four men. Nine days later he surrendered to police and was eventually charged withattempted murder,assault,reckless endangerment, and several firearms offenses. A jury found him not guilty of all charges except for one count of carrying an unlicensed firearm, for which he served eight months of a one-year sentence.[208]
The incident sparked a nationwide debate onrace and crime in major cities, the legal limits ofself-defense, and the extent to which the citizenry could rely on the police to secure their safety.[209] Although Goetz, dubbed the "Subway Vigilante" by New York City's press, came to symbolize New Yorkers' frustrations with the high crime rates of the 1980s, he was both praised and vilified in the media and public opinion. The incident has also been cited as a contributing factor to the groundswell movement against urban crime and disorder.[210]
In 1989, the Metropolitan Transportation Authority asked the transit police (then located within the NYCTA) to focus on minor offenses such as fare evasion. In the early nineties, the NYCTA adopted similar policing methods forPenn Station andGrand Central Terminal. In 1993, crime rates in the subway dropped, part of a larger decrease across the city.[211]
On April 2, 1995, the New York City Police Department and the Transit Police Department merged.[120]

The Program for Action forced the closure of several subway lines. The Bronx remnant of theIRT Third Avenue Line closed in 1973, to be provisionally replaced by a new subway under theMetro-North Railroad tracks on Park Avenue, one block to the west. The single-trackedCulver Shuttle betweenDitmas Avenue andNinth Avenue, once a three-tracked line, closed on May 11, 1975.[212][213][214][215] On August 27, 1976, theGG service was truncated fromChurch Avenue toSmith–Ninth Streets, while service was discontinued on theK andEE routes. On December 15, 1976, GG service at the other terminal was shortened toQueens Plaza. TheBMT Jamaica Line was truncated from168th Street to121st Street between September 11, 1977, and the early 1980s, replaced by theBMT Archer Avenue Line in 1988.[153]
Existing elevated structures posed a large danger; theNew York Post published a story that featured debris that had fallen from theBMT Astoria Line. Debris from theIRT Pelham Line nearly killed a passerby, and debris from theBMT West End Line led to a lawsuit against the MTA. Concrete falling on theBMT Brighton Line near theBeverley Road station caused a months-long service disruption between November 1976 and February 1977.[153]
Fare evasion seemed a small problem compared to the graffiti and crime; however, fare evasion was causing the NYCTA to lose revenue.[216] NYCTA's strategy for restoring riders' confidence took a two-pronged approach. In 1981, MTA's first capital program started system's physical restoration to a State-of-Good-Repair. Improving TA's image in riders' minds is as important as overcoming deferred maintenance. Prompt removal of graffiti[217] and prevention of blatant fare evasion would become central pillars of the strategy to assure customers that the subway is "fast, clean, and safe":[218]
Similarly, fare evasion was taken seriously. The NYCTA began formally measuring evasion in November 1988. When TA's Fare Abuse Task Force (FATF) was convened in January 1989, evasion was 3.9%. After a 15-cent fare increase to $1.15 in August 1990, a record 231,937 people per day, or 6.9%, didn't pay. The pandemonium continued through 1991.[219] To combat the mounting problem, FATF designated 305 "target stations" with most evaders for intensive enforcement and monitoring. Teams of uniformed and undercover police officers randomly conducted "mini-sweeps", swarming and arresting groups of evaders.[220] Special "mobile booking centers" in converted city buses allowed fast-track offender processing.[221] Fare abuse agents covered turnstiles in shifts and issued citations. Plainclothes surveyors collected data for five hours per week at target locations, predominantly during morning peak hours. In 1992, evasion began to show a steady and remarkable decline, dropping to about 2.7% in 1994.[222]
The dramatic decrease in evasion during this period coincided with a reinvigorated Transit Police, a 25% expansion of City police, and a general drop in crime in U.S. cities. In the city, crime rate decline begun in 1991 under MayorDavid Dinkins and continued through next two decades under MayorsRudolph Giuliani andMichael Bloomberg. Some observers credited the "broken windows" approach of law enforcement[223] where minor crimes like evasion are routinely prosecuted, and statistical crimefighting tools, whereas others have indicated different reasons for crime reduction.[224][225] Regardless of causality, evasion checks resulted in many arrests for outstanding warrants or weapons charges, likely contributing somewhat to public safety improvements. Arrests weren't the only way to combat evasions, and by the early 1990s NYCTA was examining methods to improve fare control passenger throughputs, reduce fare collection costs, and maintain control over evasions and general grime. The AFC system was being designed, and evasion-preventing capability was a key consideration.
TA's queuing studies concluded that purchasing tokens from clerks was not efficient. Preventing 'slug' use required sophisticated measures like tokens with metal alloy centers and electronictoken verification devices. To provide better access control, the NYCTA experimented with floor-to-ceiling gates and "high wheel" turnstiles. Prototypes installed at110th Street/Lexington Avenue station during a "target hardening" trial reduced evasions compared to nearby "control" stations.[226] However, controls consisting entirely of "high-wheels" created draconian, prison-like environments, with detrimental effects on station aesthetics. Compromises with more secure low-turnstile designs were difficult, as AFC did not prevent fare evasion.[227]
ProductionAutomated Fare Collection (AFC) implementation began in 1994. New turnstiles, including unstaffed high wheels, and floor-to-ceiling service gates, featured lessons learned from trials. As AFC equipment was rolled out, evasion plummeted. Fare abuse agents, together with independent monitoring, were eliminated.

Ridership increased 4% between 1978 and 1979, mainly because of the improving economy.[228] Numerous improvements were touted in a 1979Daily News report, including air conditioning andclosed-circuit television. As part of the Urban Mass Transit Act, $1.7 billion would be provided bythe state and thePort Authority.[228] Aesthetics chairperson Phyllis Cerf Wagner announced a program called "Operation Facelift", which entailed aesthetic improvements such as repainting and relighting the platforms, quicker replacement processes for windows and doors, and expanding the number of seats on platforms.[228]
During the mid-1980s, reconstruction began. Stations were refurbished and rolling stock was repaired and replaced. "Neighborhood maps" for wayfinding were added in subway stations starting in 1985.[229] Maintenance of the subway began to improve: while 21 trains derailed while in passenger service during 1983, there were 15 such incidents in 1984 and three in 1985. "Red tag" areas, where trains reduced speed to 10 mph due to dangerous maintenance conditions, were almost entirely eliminated by 1986.[230] The 325 R62 cars had a MDBF rate of 50,000 miles, more than five times higher than the other fleet, with the newly overhauled World's Fair R36 equipment on the Flushing Line averaging over 30,000 miles in 1986–87.[231] The MDBF of many rolling stock increased from 6,000 miles in 1980 to 10,000 miles in September 1986, and hundreds cars were overhauled or cleaned of graffiti.Speedometers were also installed on existing and new rolling stock.[228]
On January 1, 1982, the MTA implemented the first of its five-year Capital Improvement programs to repair the existing system.[120] Scheduled Maintenance Services were formed to proactively replace components, and the MTA conducted general overhauls of theR26 throughR46 fleets. Older equipment (any car classes with contract numbers belowR32s on the B Division and R26s on the A Division) were retrofitted with air conditioning. The red tag areas were incrementally repaired and replaced withwelded rail. At the end of the century, the MDBF rates for the entire system were at record highs and steadily increasing. TheFranklin Avenue Shuttle, however, was worse in 1989 than it was in 1980, and necessitated a complete renovation by 1998, because the MTA planned to abandon the line by the end of the century.[228]
Starting in the early 1970s, there were plans for improving the subway system.In 1976, the MTA proposed abandoning theFranklin Avenue Shuttle to save money, but dropped the plan due to community pushback.[91] The possibility of the discontinuation was revisited again in 1998, but again, fierce community opposition to it forced the MTA to rehabilitate the line.[232]
In 1977, theLinden Shops opened in Brooklyn, enabling the MTA to build track panels indoors throughout the year, among other objects.[91]
On January 16, 1978, the MTA opened three transfer stations:[91]
In April 1981, the following projects were considered by the MTA:[233]
In 1981, the MTA began installingwelded rails on a few underground portions of the system.[91]
In June 1983, the following projects were considered by the MTA:[234][235]
On March 25, 1986, theRegional Plan Association (RPA) proposed several changes.[236] A major part of the plan was eliminating parts of the system and expanding the system to reflect population shifts. The plan called for eliminating 26 miles of elevated lines and building 17 miles of new subway lines, and 20 miles of new surface lines. The RPA also suggested buying new subway cars; implementingOne Person Train Operation outside of rush hours; giving reduced fares to city residents using theLong Island Rail Road orMetro-North Railroad to travel toMidtown Manhattan; adding premium-fee express services; closing 10% of stations; and doubling off-peak services.[237] The RPA also suggested:[236]
In April 1986, the New York City Transit Authority began to study the possibility of eliminating sections of 11 subway lines because of low ridership. The segments are primarily located in low-income neighborhoods of the Bronx, Brooklyn and Queens, with a total of 79 stations, and 45 miles of track, for a total of 6.5 percent of the system. The lines were first identified in the first part of a three-year project, the Strategic Plan Initiative, which started in April 1985, by the MTA to evaluate the region's bus, subway, and commuter rail systems. The eleven segments all had low ridership, needed expensive rebuilding, and duplicated service on parallel lines. The lines being studied included the following lines:[237]

By August 1989, the MTA was considering these projects:[238]

In December 1988, three transfers were opened between existing stations, and three brand-new stations were opened. The transfer points were:[239]
The new stations wereSutphin Boulevard – Archer Avenue – JFK Airport,Jamaica Center – Parsons/Archer, andJamaica – Van Wyck.[120] Other service changes were implemented that day. Skip-stop service on theJ/Z trains was also started on December 11, 1988. Additionally,IND Fulton Street Line express service was extended from weekdays only to all times except late nights. Discontinuous services on theB,D, andQ trains over theManhattan Bridge were replaced by continuous services.
New subway cars were also purchased: theR62 andR62A fleets for the A Division and theR68 andR68A fleets for the B Division. The R62 in particular was the first New York City Subway car class built by a foreign manufacturer.[240] These were all delivered between 1983 and 1989. TheR10,R14,R16,R17,R21, andR22 car classes all were retired with the deliveries of the R62/As and R68/As. On May 10, 1989, the last train withgraffiti was taken out of service;[166] the subway has been mostly graffiti-free since this point.[167]
On October 29, 1989, theIND 63rd Street Line was opened. It was nicknamed the "tunnel to nowhere" due to its stub end at21st Street–Queensbridge, and also due to the fact that the three-station extension lay dormant for over a decade after completion.[120][241] The 3.2 mile line included three new stations and cost a total of $868 million. The line was viewed as an enormous waste of money.[242]
Subway ridership increased through the 1990s. ThroughoutDavid Dinkins's mayoralty from 1989 to 1993, the city went from being in debt to having a $200 million surplus, which was achieved by raising taxes. However, Dinkins's tax plans were unpopular, and he lost the1993 election toRudy Giuliani.[105]: 360 Giuliani wanted to demonstrate that he could successfully run New York City without raising taxes, so he eliminated $400 million from the MTA's capital budget in 1994. He did not suggest any transit improvements, however.[243] State lawmakers also reduced MTA funding in the 1990s, which remained mostly unchanged through the 2000s.[243]
In 1998, a large portion of the New York City Subway system was nominated for addition to theNational Register of Historic Places. The nomination encompassed 48 stations, 11 electrical substations, six signal towers, four stationhead houses, three buildings in storage yards, and one tunnel. The MTA supported the listing, which would increase the agency's chances of receiving more federal funding.[244]

TheSeptember 11 attacks resulted in service disruptions on lines running through Lower Manhattan. Tracks and stations under the World Trade Center were shut down within minutes of the first plane crash. All remainingNew York City Subway service was suspended from 10:20am to 12:48pm.[245] Immediately after the attacks and more so after thecollapses of the Twin Towers, many trains running in Lower Manhattan lost power and had to be evacuated through the tunnels. Some trains had power, but the signals did not, requiring special operating procedures to ensure safety.
TheIRT Broadway–Seventh Avenue Line, which ran below theWorld Trade Center betweenChambers Street andRector Street was the most destroyed. Sections of the tunnel as well asCortlandt Street were badly damaged and had to be rebuilt. Service was immediately suspended south of Chambers Street and then cut back to14th Street. There was also subsequent flooding on the line south of34th Street–Penn Station. After the flood was cleaned up, express service was able to resume on September 17 with1 trains running betweenVan Cortlandt Park–242nd Street and 14th Street, making local stops north of and express stops south of96th Street, while2 and3 trains made all stops in Manhattan (but bypassed all stations betweenCanal Street andFulton Street until October 1).1/9 skip-stop service was suspended.
After a few switching delays at 96th Street, service was changed on September 19. The1 train resumed local service in Manhattan, but was extended toNew Lots Avenue in Brooklyn (switching onto the express tracks at Chambers Street) to replace the3, which now terminated at 14th Street as an express. The2 train continued to make local stops in Manhattan and service between Chambers Street andSouth Ferry as well as skip-stop service remained suspended. Normal service on all four trains was restored September 15, 2002.[246][15] The Cortlandt Street station needed extensive reconstruction, and after a total rebuild costing $158 million, it reopened on September 8, 2018.[247][248]
Service on theBMT Broadway Line was also disrupted because the tracks from theMontague Street Tunnel run adjacent to the World Trade Center and there were concerns that train movements could cause unsafe settling of the debris pile.Cortlandt Street station, which sits underChurch Street, sustained significant damage in the collapse of the towers. It was closed until September 15, 2002, for removal of debris, structural repairs, and restoration of the track beds, which had suffered flood damage in the aftermath of the collapse.
Starting September 17, 2001, theN andR service was suspended and respectively replaced by theM (which was extended toConey Island–Stillwell Avenue via theBMT Montague Street Tunnel,BMT Fourth Avenue Line, andBMT Sea Beach Line) and theJ (also extended via Fourth Avenue toBay Ridge–95th Street). In Queens, theQ replaced theR while theW replaced theN. All service on the BMT Broadway Line ran local north ofCanal Street except for theQ, which ran normally from57th Street toBrighton Beach via Broadway and Brighton Express.J/Z skip-stop service was suspended at this time. Normal service on all seven trains resumed on October 28.
The only subway line running between Midtown and Lower Manhattan at a close proximity to the former World Trade Center Complex was theIRT Lexington Avenue Line, which was overcrowded before the attacks and at crush density until the BMT Broadway Line reopened.Wall Street was closed until September 21.
TheIND Eighth Avenue Line, which has a stub terminal serving theE train underFive World Trade Center was not damaged, but covered in soot.E trains were extended toEuclid Avenue, Brooklyn, replacing the then suspendedC train (theA andD trains replaced it as the local north of59th Street–Columbus Circle on nights and weekends, respectively. TheB train, which ran normally from145th Street orBedford Park Boulevard to34th Street–Herald Square via Central Park West Local, also replacedC trains on weekdays). Service was cut back toCanal Street whenC service resumed on September 21, butChambers Street andBroadway–Nassau Street remained closed until October 1.World Trade Center remained closed until January 2002.[15][16]

Generally, ridership kept rising as the subway system improved in its maintenance, cleanliness, frequency, and on-time ratio; ridership started to increase as graffiti and crime rates dropped heavily after 1989. From 1995 to 2005, ridership on city buses and subways grew by 36%, compared with a population gain in the city of 7%.[249] With dramaticincreases in fuel prices in 2008, as well as increasedtourism and residential growth, ridership on buses and subways grew 3.1% up to about 2.37 billion trips a year compared to 2007. This is the highest ridership since 1965.[250]
By 2013, ridership had reached 1.7 billion riders per year (despite closures related toHurricane Sandy), a level not seen since 1949.[251] In April 2013,New York magazine reported that the system was more crowded than it had been in the previous 66 years.[252] The subway reached a daily ridership of 6 million for 29 days in 2014, and was expected to record a similar ridership level for 55 days in 2015; by comparison, in 2013, daily ridership never reached 6 million.[253]
Several expansions started construction or were opened during the mayoralty ofMichael Bloomberg from 2001 to 2013.[243] TheIND 63rd Street Line's connection to theIND Queens Boulevard Line was first, opened on December 16, 2001. To serve the new connection, theF train was rerouted via the 63rd Street Line, and to replace the F along 53rd Street, a newV train was created–running betweenForest Hills–71st Avenue andSecond Avenue via the Queens Boulevard and Sixth Avenue local tracks. TheG, to allow for room to operate the V, was cut back to Court Square. Two out-of-system transfers were put into place; the first was to allow F passengers to continue to have a free transfer to the Lexington Avenue Line, which was lost when the line was rerouted–the transfer connects theLexington Avenue/59th Street station and theLexington Avenue–63rd Street stations. The second one connected the Court Square station with the45th Road–Court House Square station.[254][255][256]
In 2003, money was allocated for the construction of a new station atSouth Ferry, and in 2005, construction commenced on the new station.[257] Initially, the station's construction had been opposed because of the high cost and low perceived time savings.[258] The South Ferry loop station only accommodates the first five cars of a train, so that the rear five cars of a 10-car1 train cannot load or unload.[259] Because of the curve at the stationgap fillers are required, and as a result the new station was built as a two-track, full (10-car)-lengthisland platform on a less severe curve, permitting the operation of a typicalterminal station.[259][260] The MTA claimed that the new station saved four to six minutes of a passenger's trip time and increased the peak capacity of the1 service to 24 trains per hour, as opposed to 16 to 17 trains per hour with the loop station.[259]
In the late 1990s and early 2000s, talk began to circulate about taking up the construction of theSecond Avenue Subway. Most New Yorkers regarded these plans with cynicism, since citizens were promised the line since well before theThird Avenue elevated was torn down in 1955. Funds have been set aside and environmental impact reports have been completed. Atunnelling contract was awarded to the S3 consortium of Schiavone, Shea andSkanska by the MTA on March 20, 2007.[261] This followed preliminary engineering and a final tunnel design completed by ajoint venture betweenAecom andArup.[262][263] A ceremonial groundbreaking for the subway was held on April 12, 2007, and contractor work to prepare the project's initial construction site at 96th Street and Second Avenue began on April 23, 2007.[261][264]

In October 2007, the7 Subway Extension construction contract was awarded, extending theIRT Flushing Line to34th Street.[131] Groundbreaking began in June 2008 and the tunnels were completed by 2010. The project, which was the first one funded by the city in over 60 years,[265] was intended to aid redevelopment ofHell's Kitchen around theWest Side Yard of theLong Island Rail Road.[266]
The MTA faced a budget deficit of US$1.2 billion in 2009.[267] This resulted in fare increases (three times from 2008 to 2010)[268] and service reductions (including the elimination of two part-time subway services, theV andW). Several other routes were modified as a result of the deficit. TheN was made a full-time local in Manhattan (in contrast to being a weekend local/weekday express before 2010), while theQ was extended nine stations north toAstoria–Ditmars Boulevard on weekdays, both to cover the discontinued W. TheM was combined with theV, routing it over theChrystie Street Connection,IND Sixth Avenue Line andIND Queens Boulevard Line toForest Hills–71st Avenue on weekdays instead of via theBMT Fourth Avenue Line andBMT West End Line to Bay Parkway. TheG was truncated toCourt Square full-time. Construction headways on eleven routes were lengthened, and off-peak service on seven routes were lengthened.[269]


On October 28, 2012, a full closure of the subway was ordered the day before the arrival ofHurricane Sandy. All services on the subway, theLong Island Rail Road andMetro-North were gradually shut down that evening.[270] The stormcaused serious damage to the system, especially theIND Rockaway Line, which had many sections betweenHoward Beach–JFK Airport and Hammels Wye on theRockaway Peninsula heavily damaged, leaving it essentially isolated from the rest of the system. This required the NYCTA to truck in 20R32 subway cars to the line to provide some interim service, which was temporarily designated theH.[271][272] The H ran between Beach 90th Street and Far Rockaway–Mott Avenue, where passengers could transfer to a free shuttle bus.[273] The line reopened on May 30, 2013, with a new retaining wall along the line to prevent against future storm surges.[274][275][276]
Several of the system's tunnels under the East River were flooded by the storm surge.[277] TheSouth Ferry station suffered serious water damage, and on April 4, 2013, the olderloop-configured station reopened to provide temporary service.[278][279] The first tunnel to be repaired, theGreenpoint Tube underNewtown Creek, was fixed during a series of weekend closures in 2013 and a full closure during summer 2014.[280] The second tunnel, theMontague Street Tunnel, was closed completely from August 2013[281][282] to September 2014.[283][284][285]
Hurricane Sandy also damaged the Clark Street Tubes, necessitating a full closure on weekends between June 2017 and June 2018, thus affecting2,3,4, and5 service.[286] The new South Ferry station reopened on June 27, 2017, in time to accommodate the Clark Street closures.[287][288] A week after South Ferry reopened, the MTA closed theBMT Myrtle Avenue Line for ten months to rebuild two of the line's viaducts, the 310-foot-long (94 m) approaches to the line's junction with theBMT Jamaica Line and Fresh Pond Bridge over theMontauk Branch in Queens. This was in preparation for a reconstruction of theBMT Canarsie Line tunnels under theEast River.[289][290][291][292]
The MTA also planned tocompletely close the BMT Canarsie Line west ofBedford Avenue for 18 months between early 2019 and mid-2020.[293][294][295] In April 2017, the shutdown was shortened to 15 months.[296] The closure was changed to a night and weekend shutdown in January 2019.[297][298][299]
Other rehabilitation projects included:
Originally budgeted at $400 million, the new South Ferry station opened in 2009 at a total of $530 million, with most of the money being a grant from theFederal Transit Administration earmarked for World Trade Center reconstruction.[259] In January 2009, the opening was delayed because the tracks were too far from the edge of the platform. Other delays were attributed to leaks in the station.[304] The problem was corrected and the station opened on March 16, 2009. With the opening of the new station, a transfer was available to the Whitehall Street station with a new connecting passageway.[305]

The 7 Subway Extension originally was expected to open in 2014,[306][307] but did not open until September 13, 2015.[308][309] According toThe New York Times, the delay in the extension's opening was due to the installation of custom-madeincline elevators that kept malfunctioning.[310] TheFulton Center building opened to the public on November 10, 2014, completing a decade-long refurbishment of theFulton Street station in lower Manhattan.[311][312][313] It was controversially funded as part of the post-9/11 rebuilding project.[243] As part of theopening of the Second Avenue Subway, W service, which had not run since 2010, was restored on November 7, 2016.[314] On January 1, 2017, the Second Avenue Subway was opened.
Underlying the fanfare of expansions, however, there was a gradual decline in maintenance of the subway, and consequently, fewer trains started arriving to their destinations on time. Maintenance spending declined before rising again from the 1990s to 2012, but on-time performance slowly eroded during that same time period. By 2017, only 65% of weekday trains reached their destinations on time, the lowest rate since the transit crisis of the 1970s.[243] In the summer of that year, the subway system was officially put in a state of emergency after a series of derailments,[315][316] track fires,[317][318] and overcrowding incidents.[317][319]
To solve the system's problems, the MTA officially announced theGenius Transit Challenge on June 28, 2017, where contestants could submit ideas to improve signals, communications infrastructure, or rolling stock.[320][321] On July 25, 2017, ChairmanJoe Lhota announced a two-phase, $9 billion New York City Subway Action Plan to stabilize the subway system and to prevent the continuing decline of the system.[322][323][324][325] The first phase, costing $836 million, consisted of five categories of improvements; the $8 billion second phase would implement the winning proposals from the Genius Transit Challenge and fix more widespread problems.[323][324][325] Six winning submissions for the Genius Transit Challenge were announced in March 2018.[326]
In October 2017, city comptrollerScott Stringer released an analysis of the effect of subway delays on the economy and on commuters. The study found that based on a normal wait time of 5 minutes and an average wage of $34 per hour in 2016, "worst-case" subway delays of more than 20 minutes could cost up to $389 million annually in lost productivity.[327] By comparison, "mid-case" delays of between 10 and 20 minutes could cost $243.1 million per year, and "best-case" delays of between 5 and 10 minutes could cost $170.2 million per year.[328]
In November 2017,The New York Times published its investigation into the crisis. It found that the crisis had arisen as a result of financially unsound decisions by local and state politicians from both theDemocratic andRepublican parties. By this time, the subway's 65% average on-time performance was the lowest among all major cities' transit systems, and every non-shuttle subway route's on-time performance had declined in the previous ten years.[243]
Several improvements were made in response to the transit crisis. In the short term, signals, trains, and tracks were improved under the "Fast Forward" program.[329][330] Further, the MTA's 2020–2024 capital plan called for adding elevators and ramps to 66 subway stations and adding modern signaling systems to parts of six more physical lines, to be funded bycongestion pricing in Manhattan.[331][332] Additionally, several other changes were proposed to improve service. For instance, in February 2019, several politicians wrote a letter to the MTA, asking the agency to consider splitting theR train in half to increase reliability.[333][334] In January 2020, Stringer sent a letter to NYCTA presidentAndy Byford stated that the "abundance" of shuttered entry points along subway routes was contributing to severe overcrowding and longer commute times, and requested that the MTA develop and publicize plans for restoring closed entry points.[335] The state of emergency ended on June 30, 2021, after previously being renewed 49 times.[336]
There are several lines under consideration. This includes a subway line underUtica Avenue in Brooklyn;[337][338] an outer-borough circumferential line, theTriboro RX;[339][340] a reuse of the northern part of theRockaway Beach Branch;[341][342] and a line toLaGuardia Airport.[343] The Triboro RX proposal later became theInterborough Express light-rail line, the development of which was formally announced in 2023.[344][345]
In November 2016, the MTA requested that the Second Avenue Subway's Phase 2 project be entered into the Project Development phase under the Federal Transit Administration's New Starts program.[346] The FTA granted this request in late December 2016;[347] The line will eventually comprise four phases, running as far north as125th Street inEast Harlem during Phase 2, and south toHanover Square inLower Manhattan in Phases 3 and 4.[348] The MTA began soliciting bids in July 2023 for the first Phase 2 construction contract.[349][350]
The spread of theCOVID-19 pandemic to the New York City area in March 2020 resulted in mass closures of gathering spaces.[351] After the MTA recommended that only essential workers use the New York City Subway, ridership started to decrease.[352][353] Part-time services were temporarily suspended.[354] Starting on May 6, 2020, stations were closed overnight for cleaning, in what became the first planned overnight closure in the subway's history. The overnight closures were to be suspended once the pandemic was over, and bus service was added.[355] In early May 2021, GovernorAndrew Cuomo announced that the overnight subway closures would end on May 17, 2021, with 24-hour service resuming on that date.[356][357]
In February 2021, the New York City Subway removed benches from several stations in an effort to reduce the number of homeless persons sleeping on them, which during the COVID-19 pandemic was considered to be unsanitary. This move drew considerable backlash from riders who alleged that the removal of the benches amounts to disenfranchising disabled people and senior citizens, as well as being unfair to homeless populations.[358][359] On September 7, 2022, the mask mandate on public transit was lifted.[360]
Although ridership decreased by 40 percent from 2019 to 2022, the number of crimes in the system remained roughly the same, prompting riders to express concerns over increased crime.[361][362] There had been six murders in the subway in 2020; the following year, the subway recorded eight murders, the highest annual total in 25 years.[363] During the pandemic, the subway system experienced several high-profile incidents, including aJanuary 2022 shoving death of a passenger in Times Square and anApril 2022 mass shooting in Brooklyn.[362] As of October 2022[update], crime in the system had increased 40 percent from the previous year; the number of crimes recorded to date was roughly the same as in 2019, when ridership was much higher.[364][365] In response, governorKathy Hochul and mayorEric Adams announced a plan to increase police presence within the subway system.[366]
Amid an increase in violent crimes in the subway system, Hochul announced a five-point plan to improve subway safety on March 6, 2024. A key element of the plan was the deployment of 250 members of the MTA PD andNew York State Police and 750 members of theNational Guard onJoint Task Force Empire Shield to conduct baggage checks at busy locations.[367] Hochul also directed the MTA to install new cameras in conductors' cabs to help police identify people targeting them, announced a bill to enable judges to ban people convicted of committing an assault in the system from using the MTA system, and allocated $20 million to expand the Subway Co-Response Outreach Team (SCOUT) program, which was set up in January, to ten teams by the end of 2025, to help individuals with mental health treatment and supportive housing. Finally, she started regular meetings to improve coordination between the MTA, district attorneys and law enforcement. The MTAPD would also develop a system to flag recidivist offenders to the offices of district attorneys while individuals are booked for crimes, and the MTA would hire a Criminal Justice Advocate to help victims of crime in the system.[368] On December 18, 2024, Hochul deployed 250 more members of the National Guard to the subway, and announced that all subway cars now had security cameras.[369]
On January 14, 2025, Governor Hochul announced another set of safety initiatives, including temporarily surging 750 NYPD officers into the system and having 300 additional officers on trains so there could be a uniformed officer on every train between 9 p.m. and 5 a.m., installing LED lighting in all stations to improve visibility, working with the New York CITY Department of Homeless Services to expand a program to add spaces at end-of-line stations for mobile outreach teams to provide services to homeless individuals, and adding platform edge fences at over 100 stations. The platform edge fences would be funded by the Governor, and would go at stations with standard stopping positions for subway cars on portions of the 1, 2, 3, 4, 5, 6, 7, F, M, and L, with stations that had island platforms and higher ridership prioritized. In addition, to reduce fare evasion, 150 stations would have egress delayed at emergency exit gates, and 20 stations would get new fare gates in both 2025 and 2026. The first stations to get the new fare gates would beDelancey Street/Essex Street,42nd Street–Port Authority Bus Terminal, andJackson Heights–Roosevelt Avenue/74th Street.[370] On March 6, 2025, the Governor marked the one-year anniversary of her five-point safety plan by noting that year-to-date, arrests were up 71 percent and major crimes decreased by 29 percent, with the subway having the lowest number of crimes outside the pandemic during the previous 30 years.[371]
Several upgrades and improvements were announced in the early 2020s. The newOMNY fare-payment system was implemented across the subway between 2019 and 2020,[372][373] The MTA announced in 2022 that it would installplatform screen doors at three stations,[374][375] and it reached a legal settlement the same year, agreeing to make 95 percent of subway and Staten Island Railway stations wheelchair-accessible by 2055.[376] Despite decreased ridership due to the COVID-19 pandemic, the MTA had balanced its budget by 2023 while also raising fares and increasing service on several subway routes.[377] In 2024, as part of its 2025–2029 Capital Program, the MTA announced that it would spend billions of dollars on new rolling stock,upgraded signals, andaccessibility projects at 60 subway stations.[378][379]
On July 26, 2022, the MTA announced that all subway tunnels would be wired for cell service and that Wi-Fi would be introduced to all subway and Staten Island Railway stations as part of a public-private partnership with Transit Wireless. Transit Wireless would design, build, and operate the network, and would improve the agency's existing communications system. The company would invest over $600 million in the project. The two sides would share revenue from commercial customers.[380] During the2025 New York City Democratic mayoral primary, several candidates proposed that the city government take partial control of the subway system,[381] including Andrew Cuomo, who was running as an independent candidate.[382][383]
Many train accidents have been recorded since 1918, when a train bound forSouth Ferry smashed into two trains halted nearJackson Avenue on theIRT White Plains Road Line in the Bronx.[384]
Only accidents that caused injuries, deaths, or significant damage are listed.


Additionally, in an accident recorded before 1918,a derailment happened on theNinth Avenue Elevated in Manhattan on September 11, 1905, resulting in 13 deaths and 48 serious injuries.[426][427]
Other accidents in the history of the subway do not involve trains;[428][429][430] several people have been fatally electrocuted by the subway'sthird rails,[431][432] and yet others have been fatally pushed onto the tracks.[433][434] Fatal pushing incidents include the 2022death of Michelle Go at the Times Square station.[435]
In 1960, a person nicknamed theSunday Bomber set off a series of bombs in the New York City Subway during Sundays and holidays, killing one woman and injuring 51 other commuters.[436][437][438] The bomber also set off bombs in ferries.[439] On April 12, 2022, amass shooting attack occurred on theN train, injuring at least 29 people.[440]
{{cite book}}: CS1 maint: location missing publisher (link){{cite web}}: CS1 maint: multiple names: authors list (link){{cite web}}: CS1 maint: bot: original URL status unknown (link)subway death.