Movatterモバイル変換


[0]ホーム

URL:


Jump to content
WikipediaThe Free Encyclopedia
Search

Heysham nuclear power station

Coordinates:54°1′44″N2°54′58″W / 54.02889°N 2.91611°W /54.02889; -2.91611
From Wikipedia, the free encyclopedia
Nuclear power plant located Heysham, Lancashire, England

Heysham nuclear power station
Heysham 1 & 2
Map
CountryEngland
LocationHeysham,Lancashire
Coordinates54°1′44″N2°54′58″W / 54.02889°N 2.91611°W /54.02889; -2.91611
StatusOperational
Construction began
  • Unit A-1: 1 December 1970 (1970-12-01)[1]
  • Unit A-2: 1 December 1970 (1970-12-01)[2]
  • Unit B-1: 1 August 1980 (1980-08-01)[3]
  • Unit B-2: 1 August 1980 (1980-08-01)[4]
Commission date
  • Unit A-1: 9 July 1983 (1983-07-09)[1]
  • Unit A-2: 11 October 1984 (1984-10-11)[2]
  • Unit B-1: 12 July 1988 (1988-07-12)[3]
  • Unit B-2: 11 November 1988 (1988-11-11)[4]
Decommission date
  • Heysham 1: March 2027 (2027-03)[5]
  • Heysham 2: March 2030 (2030-03)[5]
(planned)
OwnerEDF Energy
OperatorEDF Energy
Nuclear power station
Reactors4 (Units A-1 and A-2 in Heysham 1, Units B-1 and B-2 in Heysham 2)
Reactor typeGCR -AGR
Thermal power station
Primary fuelUranium dioxide
Cooling sourceCarbon dioxide
Thermal capacity
Power generation
Units operational
  • 1 × 485MWe (Unit A-1 in Heysham 1)[1]
  • 1 × 575 MWe (Unit A-2 in Heysham 1)[2]
  • 2 × 620 MWe (Heysham 2)[3][4]
Nameplate capacity2,452 MWe (Total)
Capacity factor
  • Lifetime: (As of the end of 2021)
  • Unit A-1: 67.2%[1]
  • Unit A-2: 66.3%[2]
  • Unit B-1: 78.1%[3]
  • Unit B-2: 77.4%[4]
Annual net output
  • 2021:
  • 5,760.93 GWh (20,739.3 TJ) (Heysham 1)[1][2]
  • 5,787.26 GWh (20,834.1 TJ) (Heysham 2)[3][2]
  • 11,548.19 GWh (41,573.5 TJ) (Total)
External links
Website
CommonsRelated media on Commons

grid referenceSD4000459632

TheHeysham nuclear power stations are operated byEDF Energy inHeysham, Lancashire, England. On the site two separatenuclear power stations, Heysham 1 and Heysham 2 operate independently, only with joint entry protocol, both with two reactors of theadvanced gas-cooled reactor (AGR) type.

In 2010, the British government announced that Heysham was one of the eight sites it considered suitable for future nuclear power stations.[6]

On 1 August 2016, Heysham 2's Unit 8 broke the world record for longest continuous operation of a nuclear power reactor without a shutdown. This record-breaking run exceeds the previous record of 894 days set byPickering Nuclear Generating Station's Unit 7 (Lake Ontario, Canada) in 1994. The reactor had generated 13.5 TWh of electricity so far during this continuous operation, taking its lifetime generation to 115.46 TWh.[7]

In December 2024, EDF, the owner and operator of the plant declared a life extension of 1 year for Heysham 1 and of 2 years for Heysham 2. They will now operate until 2027 and 2030 respectively.

Heysham 1

[edit]

Construction of Heysham 1, which was undertaken by British Nuclear Design & Construction (BNDC), a consortium backed ofEnglish Electric,Babcock & Wilcox andTaylor Woodrow Construction,[8] began in 1970, with the first reactor commencing operations in 1983 and the second reactor following in 1984. However, initial production levels were low, and full commercial operation was only declared in 1989. It is likely to remain in operation until 2026. Its generating capacity is 1,150 MWe. The reactors were supplied by National Nuclear Corporation and the turbines byGEC.[9] There were four 17.5 MW auxiliary gas turbines on the site, these had been first commissioned in January 1977.[10]

Heysham 1 shares its reactor design withHartlepool nuclear power station, which introduced the replaceable pod boiler design. TheCEGB specified a compact design for the Heysham 1 and Hartlepool power station reactor islands in comparison to the design of the two preceding stations atHinkley Point B andHunterston B in order to reduce the capital cost, but this caused expensive construction delays because of restricted access. The Heysham 2 reactor island occupies a much larger footprint than Heysham 1 for a similar design output of power.

In 2013, a defect was found by a regular inspection in one of the eight pod boilers of unit 1. The reactor resumed operation at a lower output level with the defective pod boiler disabled, until June 2014 when more detailed inspections confirmed a crack in the boiler spine. As a precaution, unit 2 and the sisterHartlepool nuclear power station were also shut down for inspection.[11][12]

Heysham 1 was scheduled to be shut down for defueling and then decommissioning in March 2024.[13] EDF subsequently announced plans to extend the life of Heysham 1 and Hartlepool to March 2026.[14] In December 2024, EDF further extended the life of Heysham 1 until March 2027.[5]

Heysham 2

[edit]
Heysham 2

The construction, which was undertaken by a consortium known as National Nuclear Corporation (NNC),[8] began in 1979 and the station opened in 1988. Its generating capacity is 1,250 MWe. Heysham 2 shares its reactor design withTorness nuclear power station nearDunbar inEast Lothian, and is a development of the reactor design used atHinkley Point B inSomerset. The reactors were supplied by NNC, the turbines and boilers byNEI.[9]

On 15 August 2019, Reactor 8 inside Heysham 2 let off a large amount of steam, with banging noises at approximately 11 pm that could be heard 7 miles (11 km) away inLancaster. This caused alarm among local residents, and numerous calls to the police reporting “gunshots”. EDF later reported that a reactor had earlier experienced a "non-planned shutdown after an electrical fault", and the noise was from the re-start process when unsilenced relief valves lifted on the Startup Vessels during boiler feeding.[15][16]

In December 2024, EDF announced that Heysham 2 would continue producing electricity until March 2030 in response to concerns over energy security following delays to the opening ofHinkley Point C.[5]

See also

[edit]

References

[edit]
  1. ^abcdef"HEYSHAM A-1".Public Reactor Information System.IAEA. 29 August 2022. Retrieved30 August 2022.
  2. ^abcdefg"HEYSHAM A-2".Public Reactor Information System.IAEA. 29 August 2022. Retrieved30 August 2022.
  3. ^abcdef"HEYSHAM B-1".Public Reactor Information System.IAEA. 29 August 2022. Retrieved30 August 2022.
  4. ^abcde"HEYSHAM B-2".Public Reactor Information System.IAEA. 29 August 2022. Retrieved30 August 2022.
  5. ^abcdAmbrose, Jillian (4 December 2024)."Four of UK's oldest nuclear plants to run for even longer as Hinkley Point delayed". Retrieved4 December 2024.
  6. ^"Nuclear power: Eight sites identified for future plants".BBC News. BBC. 18 October 2010. Retrieved18 October 2010.
  7. ^"British reactor takes record for longest continuous operation". World Nuclear News. Retrieved10 October 2024.
  8. ^abThe UK Magnox and AGR Power Station Projects[permanent dead link]
  9. ^ab"Nuclear Power Plants in the UK". Archived from the original on 19 July 2009. Retrieved11 April 2009.
  10. ^Handbook of Electricity Supply Statistics 1989. London: The Electricity Council. 1990. p. 8.ISBN 085188122X.
  11. ^"EDF Energy shuts Heysham A1&2 and Hartlepool for pod boiler inspections". Nuclear Engineering International. 11 August 2014. Retrieved14 August 2014.
  12. ^"UK regulator backs EDF Energy on reactor checks". World Nuclear News. 13 August 2014. Retrieved14 August 2014.
  13. ^"Heysham 2 and Torness end dates brought forward by EDF".World Nuclear News. 11 January 2022. Retrieved26 March 2022.
  14. ^"Extended life for two UK nuclear power stations". BBC. 9 March 2023. Retrieved10 March 2023.
  15. ^Calderbank, Matthew (16 August 2019)."Loud bangs cause alarm in Heysham, Morecambe and Lancaster after 'incident' at nuclear power station".Lancashire Post. Retrieved17 August 2019.
  16. ^"A statement on noise from Heysham 2 power station".EDF. EDF Energy. 17 August 2019. Retrieved17 August 2019.

External links

[edit]
Wikimedia Commons has media related toHeysham nuclear power station.
Companies
Current
New build operators
Defunct
Organisations
Reactors
AGR
AGR (closed)
FBR (closed)
Magnox (closed)
PWR
Active
Planned
Non-reactor sites
Anti-nuclear
Other
Power stations
Biomass
Closed
Coal
Closed
Gas
Active
Proposed/future
Incinerators/Waste
Active
Proposed/future
Nuclear
Active
Closed
Oil
Closed
Wind
Active
Tidal
Proposed/future
Organisations
Buildings and structures in theCity of Lancaster
Grade I
Ashton Memorial, Lancaster
Grade II*
Grade II
Unlisted
Demolished
Listed
buildings
in
Retrieved from "https://en.wikipedia.org/w/index.php?title=Heysham_nuclear_power_station&oldid=1279937416"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp