Grosvenor Canal

Coordinates:51°29′11″N0°08′57″W / 51.48639°N 0.14917°W /51.48639; -0.14917 (Lock)
From Wikipedia, the free encyclopedia
Former canal in the Pimlico area of London

Grosvenor Canal
The view from the entrance lock towards the River Thames
Map
Specifications
StatusClosed, mostly infilled
History
Date of first use1824
Date completed1825
Date closed1858, 1925, 1990s
Geography
Connects toRiver Thames
Grosvenor Canal
Victoria Station (Kent Lines)
Grosvenor Basin + Brighton Lines
Eccleston Bridge
Eaton Wharf
Elizabeth Street Bridge
Baltic Wharf
Lime Wharf
Ebury Wharf
Ebury Bridge
Upper Basin
Lock
Lower Basin
A3712 Grosvenor Road
River Thames
ToClapham Junction

Grosvenor Canal was a canal in thePimlico area ofLondon, opened in 1824. It was progressively shortened, as first the railways toVictoria Station and then the Ebury Bridge housing estate were built over it. It remained in use until 1995, enabling barges to be loaded with refuse for removal from the city, making it the last canal in London to operate commercially. A small part of it remains within the Grosvenor Waterside development.

History

[edit]

In the early 18th century, there were marshes and a tidal creek on the north bank of the Thames near Pimlico. TheChelsea Waterworks Company obtained anact of Parliament, theChelsea Waterworks Act 1721 (8 Geo. 1. c. 26), in 1722; they were authorised to take water from the Thames via one of more "Cutt or Cutts". These fed the water into the marshes, and a tide mill was used to pump the water to reservoirs at Hyde Park and St James's Park as the tide ebbed. The reservoirs supplied westLondon with drinking water. The land between the river and the later site of Victoria Station was owned bySir Richard Grosvenor, who leased it to the company in 1724. They enlarged the existing creek and built the tide mill, which continued to work until 1775, after which the pumping was performed by a steam engine.[1]

The company were able to take water directly from the Thames following the granting of another act of Parliament, theChelsea Waterworks Act 1809 (49 Geo. 3. c. clvii). They continued to lease the land until 1823, when the lease expired. In the following year, theEarl of Grosvenor then decided to turn the creek into a canal, building a lock near the junction with the Thames and a basin at the upper end, around 0.75 miles (1.21 km) inland. Most of the commercial traffic appears to have been coal, to supply the neighbourhood.[1] The resident engineer for the construction of the tidal lock and upper basin wasJohn Armstrong, originally fromIngram, Northumberland. Having trained as a millwright in Newcastle, he worked on a number of bridge projects under several of the major civil engineers of the time, includingThomas Telford,William Jessop andJohn Rennie, before taking on the Grosvenor Canal project. It was one of the few times he worked independently as a civil engineer.[2] The canal opened in 1824,[3] and Chelsea Waterworks continued to extract water from it, until the passing of theMetropolis Water Act 1852 (15 & 16 Vict. c. 84), which prohibited extraction from the Thames belowTeddington Lock. They moved toSeething Wells,Surbiton in 1856.

A still-operational swing bridge is located above one of the locks.

The canal originally stretched from theThames nearChelsea Bridge to Grosvenor Basin on the current site ofVictoria station. It is difficult to tell whether all of the clear area marked Grosvenor Basin on the 1850 map was actually water,[4] but the size of the basin was described as "immense" in 1878.[5] When the station was built around 1858, theVictoria Station and Pimlico Railway obtained an act of Parliament, theVictoria Station and Pimlico Railway Act 1858 (21 & 22 Vict. c. cxviii), which ratified an agreement between them and the Duke of Westminster, allowing the station to be built on the basin site, and a new towpath to be constructed between Ebury Bridge and Eccleston Bridge. The station opened on 1 October 1860. As the railways continued to expand, more room was needed, and another act[which?] was obtained by theLondon, Brighton and South Coast Railway in 1899, which allowed the canal above Ebury Bridge to be closed. This took place around 1902, resulting in the canal being half its original length. Since 1866, a local authority called theSt George Hanover Square Vestry had used the canal to transport household refuse away from the area. They were based close to the end of the canal at Ebury Bridge. Following the cutback of the canal to this point, the Duke of Westminster sold what was left of the canal toWestminster City Council, and its primary function became rubbish removal.[6]

Around 1925 it was halved in length again to allowEbury Bridge Estate to be built by Westminster City Council. The lower portion of the canal was kept as a dock, allowing the council to continue loading barges with rubbish. In July 1928, the canal closed for nearly a year, while major improvements were made to facilitate the barge traffic.[7] At its peak, 8,000 tons of refuse were loaded onto barges each week, and the barge traffic lasted until 1995,[8] making it the last canal in commercial operation in London. The area has since been redeveloped as Grosvenor Waterside. The lock and the basin between it and the Thames have been retained,[9] as has some of the upper basin.[10] The lock has three sets of gates, two facing away from the Thames, and a third set facing towards the Thames, to cope with high tides where the river level exceeds that in the canal.[8] The third set was first fitted some time between 1896 and 1916.[11]

Development

[edit]

In 2000 planning permission was granted to turn the dock site into high end housing known asGrosvenor Waterside. Although there is no access to boats, the development has included an operational swing bridge over the lock, and the inner dock has been refurbished to include mooring pontoons.[12][13]

Route

[edit]
Part of an 1858 map showing the Grosvenor Canal and Basin

Grosvenor Road, part of the London Embankment, runs close to the river, and the canal passes under it where it joins the Thames. On the north side of the road is the Lower Basin, which is tidal and is normally empty at low tide. The lock is immediately to the north of it, while above the lock was a wider section to the east, called the Upper Basin. In 1875 there was a timber yard to the west of the Upper Basin, behind which were the offices of the Chelsea Water Works. A saw mill and an iron works had been built between the timber yard and the canal by 1916, and a large building marked Corporation Depot occupied the west bank to the end of the truncated canal in 1951. By 1896, a sewage works had been built on the narrow strip of land between the basin and the railway tracks to the east, consisting of cooling ponds and a pumping station.[11] This was the Western Pumping Station, completed by 1875, and the final part of the main drainage system for London. Four high-pressure condensing beam-engines, housed in a building 71 feet (22 m) tall, developing 360 hp (270 kW) raised sewage by 18 feet (5.5 m) from a low level sewer, to pump it to the Abbey Mills station atBarking. The station could pump 55 milliongallons per day (250 Mld), and a backup non-condensing engine was provided in case of failure of any of the main engines.[5]

Between the upper basin and Ebury Bridge, the railway hemmed in the east bank, while to the left there was a saw mill and a wider section with wharves. The saw mill had become a motor car depot and works by 1916, and the whole area was part of the Ebury Bridge housing estate in 1951. Between Ebury Bridge and Elizabeth Bridge, there were a series of wharves, labelled Victoria Wharf, Bangor Slate Wharf, Ebury Wharf, Commercial Wharf and Lime Wharf on a wide section of canal, after which it narrowed, and was flanked by a livery stables, Baltic Wharf, Eaton Wharf and Elizabeth Bridge Wharf. The buildings were all still there in 1896, but only Ebury, Lime and Baltic wharves were named. All of them had disappeared beneath the railway tracks by 1916. Beyond Elizabeth Bridge there was a short wide section, flanked by St George's Wharf in 1875 and a narrow section bordered by various types of works. The wharf was called Eaton Wharf in 1896, and the buildings were no longer named. Before Eccleston Bridge, the canal ended, its width reduced by the tracks swinging westwards to reach the western platforms of the station.[11]

Points of interest

[edit]
PointCoordinates
(Links to map resources)
OS Grid RefNotes
Site of Grosvenor Basin51°29′41″N0°08′43″W / 51.4946°N 0.1454°W /51.4946; -0.1454 (Site of Grosvenor Basin)TQ288789Under Victoria Station
Site of Eaton Wharf51°29′33″N0°08′49″W / 51.4926°N 0.1470°W /51.4926; -0.1470 (Site of Eaton Wharf)TQ287787Under railway sidings
Site of Ebury Wharf51°29′27″N0°08′56″W / 51.4908°N 0.1490°W /51.4908; -0.1490 (Site of Ebury Wharf)TQ286784now a car park
Upper basin51°29′15″N0°08′57″W / 51.4875°N 0.1492°W /51.4875; -0.1492 (Upper basin)TQ286781
Lower basin51°29′10″N0°08′58″W / 51.4862°N 0.1494°W /51.4862; -0.1494 (Lower basin)TQ285779

See also

[edit]

References

[edit]
  1. ^abHadfield 1970, p. 139.
  2. ^Skempton 2002, p. 21.
  3. ^Hadfield 1970, pp. 272–273.
  4. ^Ordnance Survey, 1:5280 map, 1850
  5. ^abWalford 1878, pp. 39–49.
  6. ^Hadfield 1970, p. 238.
  7. ^"London's Minor Canals". London Canal Museum.Archived from the original on 11 May 2020. Retrieved2 February 2012.
  8. ^abCumberlidge 2009, p. 378.
  9. ^"The Grosvenor Canal". London Canals. Archived fromthe original on 21 January 2012. Retrieved2 February 2012.
  10. ^Google satellite view
  11. ^abcOrdnance Survey, 1:2500 maps, 1875, 1896, 1916, 1951
  12. ^"Grosvenor Waterside". My London Home. Archived fromthe original on 20 April 2013. Retrieved24 November 2012.
  13. ^"Grosvenor Waterside". Caro Point. Archived fromthe original on 28 February 2012. Retrieved24 November 2012.

Bibliography

[edit]
  • Cumberlidge, Jane (2009).Inland Waterways of Great Britain (8th Ed.). Imray Laurie Norie and Wilson.ISBN 978-1-84623-010-3.
  • Hadfield, Charles (1970).The Canals of the East Midlands. David and Charles.ISBN 978-0-7153-4871-0.
  • Skempton, Sir Alec; et al. (2002).A Biographical Dictionary of Civil Engineers in Great Britain and Ireland: Vol 1: 1500 to 1830. Thomas Telford.ISBN 978-0-7277-2939-2.
  • Walford, Edward (1878).Old and New London: Volume 5. Centre for Metropolitan History. British History Online.

External links

[edit]

Media related toGrosvenor Canal at Wikimedia Commons

England
Northern Ireland
Scotland
Wales

51°29′11″N0°08′57″W / 51.48639°N 0.14917°W /51.48639; -0.14917 (Lock)

Retrieved from "https://en.wikipedia.org/w/index.php?title=Grosvenor_Canal&oldid=1252698772"
Categories:
Hidden categories:

[8]ページ先頭

©2009-2025 Movatter.jp