704 Green Line | |||
---|---|---|---|
![]() Green Line train at theGallivan Plaza station in Downtown Salt Lake City, Utah | |||
Overview | |||
Owner | Utah Transit Authority (UTA) | ||
Locale | Salt Lake Valley, Utah, U.S. | ||
Termini | |||
Stations | 18 | ||
Service | |||
Type | Light rail | ||
System | TRAX | ||
Route number | 704 | ||
Rolling stock | Siemens S70US | ||
History | |||
Opened | August 7, 2011; 13 years ago (2011-08-07) | ||
Technical | |||
Number of tracks | 2 | ||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm)standard gauge | ||
Electrification | Overhead line, 750 V DC | ||
Operating speed | 65 mph (105 km/h) (max.)[1] | ||
|
TheGreen Line is alight rail line on theUtah Transit Authority's (UTA)TRAX system inSalt Lake City,Utah, in the United States, operated by theUtah Transit Authority (UTA). It opened on August 7, 2011, and runs betweenAirport Station at theSalt Lake City International Airport andWest Valley Central Station inWest Valley City (viaDowntown Salt Lake City) serving a total of eighteen stations: thirteen inSalt Lake City, one inSouth Salt Lake, and four in West Valley City.
The TRAX Green Line is designated as UTA Route704.
The Green Line begins with the West Valley Central Station at the West Valley Intermodal Center, which is located at 2750 West 3590 South in West Valley City. Just after leaving that station, it immediately passes between theWest Valley City Police Department and the West Valley City Hall, before heading north down the middle of Constitution Boulevard (South 2700 West). After passing by the northern end ofValley Fair Mall, it crosses West 3500 South (SR-171) and continues north in the median of Constitution Boulevard to West 3100 South. It then heads east along the south side of West 3100 South (with a sidewalk between the tracks and the roadway) and crosses overI-215 and past the north side of theMaverik Center. Just after the Maverik Center it turns north, resuming a course in the median of the street, and immediately reaches the next station,Decker Lake, at 3070 South 2200 West. After Decker Lake it heads northeast in the median of Decker Lake Drive until that street heads due north at Research Way (West 2770 South). At Research Way the Green Line turns east again and heads down the median of that street. Just before South Redwood Road (South 1700 West/SR-68) isRedwood Junction.
Leaving the roadwayright-of-way, after an at-grade crossing on South Redwood Road, the Green Line continues east, crossing Lester Street (South 1595 West), until it reaches theJordan River. The tracks head north until they cross West Parkway Avenue (West 2455 South) and then runs down the middle of Winston Street (South 1070 West) toRiver Trail at 2340 South. After that station it continues north for about a half a block before leaving the street via an at-grade crossing and heading east. It immediately crosses the Jordan River (passing from West Valley City into South Salt Lake), and then follows along the south side of the 21st South Freeway (SR-201). After passing the Jordan River Service Center (one of UTA's two TRAX maintenance facilities) on the south, the track use a series of viaducts to cross South 900 West, South 700 West, the north end ofUnion Pacific's Roper Rail Yard, the UTAFrontRunner tracks, and South 600 West before reaching the "Spaghetti Bowl" (the junction ofI-15,I-80 and SR-201).
From South 600 West the Green Line briefly follows the route of the oldDenver and Rio Grande Western Railroad (D&RGW) Sugar House Branch, which goes under I-15/I-80 and then briefly runs along the south side of West Andy Avenue to South 300 West. After crossing South 300 West it continues east until about 220 West where it reaches the Union Pacific right-of-way and takes a sharp turn north as it merges with theBlue andRed lines), before enteringCentral Pointe, which is just south of West 2100 South (SR-201).
Central Pointe is the only TRAX station served by theS Line.[2] The S Line platform is situated just southeast of the TRAX platform. (The S Line providesstreetcar service east to theFairmont stop in theSugar House neighborhood of Salt Lake City.)
Upon crossing West 2100 South the three TRAX lines leave South Salt Lake and enter Salt Lake City and continue north as they cross West 1700 South and West 1300 South. Just north of West 1300 South isBallpark, which provides service toSmith's Ballpark. (Immediately north of this station is anon-revenue track that extends northwest to South 400 West at West 900 South and then north to West 600 South.) After Ballpark the three lines continue north in the center median of South 200 West, crossing under the 900 South/I-15 on and off ramps, until they reach the next station,900 South. This station, which is just north of West 900 South, is an infill station[3] and the last stop before the TRAX lines reachDowntown Salt Lake City.
The three lines continue north in the median of South 200 West, crossing West 800 South, until they reach West 700 South. At West 700 South they turn east and proceed down the middle of that street for two blocks, crossing South West Temple Street (SR-270). AtSouth Main Street, the lines turn north and continue down the center median of that street and cross West 600 South (Martin Luther King Jr Boulevard/SR-269 eastbound), pass between theGrand America Hotel and the Little America Hotel, and then cross West 500 South (Cesar E Chavez Boulevard/SR-269 westbound). Just north of West 500 South and slightly west of theScott Matheson Courthouse, is the first station within theFree Fare Zone,Courthouse. At West 400 South (University Boulevard/US Highway 89) the Red Line turns east and heads towardLibrary and eventually theUniversity of Utah while the Green and Blue lines continue north. After crossing West 300 South (West Broadway) the two lines reachGallivan Plaza, which is just west of theWells Fargo Center and theGallivan Center.
Continuing in the median of South Main Street, the Green and Blue lines continue north crossing West 200 South and West 100 South before reachingCity Center. This station is in the middle of the newCity Creek Center commercial and residential development. At the north end of South Main Street the two lines turn west down the middle of West South Temple Street for a little more than a block before reaching the next station,Temple Square. This station is just southwest ofTemple Square (home to theSalt Lake Temple,Salt Lake Tabernacle, and other notable buildings ofthe Church of Jesus Christ of Latter-day Saints). It is also just south of theFamily History Library, about two blocks south of theLDS Conference Center, and immediately north ofAbravanel Hall and theSalt Palace.
Continuing down the median of West South Temple Street the lines reachArena (formerly Delta Center). This station is immediately north ofDelta Center, east of theUnion Pacific Depot, and south ofLDS Business College. Arena was formerly the terminus of both the Sandy/Salt Lake and the oldUniversity Line. However, an extension opened on April 16, 2008, which provided access to theSalt Lake City Intermodal Hub and the newFrontRunner commuter rail train. Eventually, the Sandy/Salt Lake Line was renamed the Blue Line and the University Line was shut down. About this same time the Green Line was created and its route continued, along with the Blue Line, on to Salt Lake Central (Salt Lake City Intermodal Hub). However, with the rerouting of the Green Line to accommodate the Airport Extension, Arena became the temporary terminus of the Green Line from December 9, 2012, to April 13, 2013. Arena is the last station on the Green Line within the Free Fare Zone, along with the Blue Line.
Following Arena, the two lines continue on to 400 West where they divide paths. The Blue Line turns south down the middle of South 400 West towardsPlanetarium and eventually ending at the Salt Lake Intermodal Hub, while the Green Line turns north. After about a block down the middle of North 400 West, the Green Line turns west to run on the north side of West North Temple Street (West 100 North) and ascends the North Temple Viaduct to next station,North Temple Bridge/Guadalupe. This station is the only bi-level station operated by UTA. It is also flying junction since Green Line tracks cross over theFrontRunner and Union Pacific tracks. The station is on the viaduct and the North Temple is at ground level (at grade) just north of the viaduct, with escalators and stairs to transfer passengers between the two stations.
Leaving North Temple Bridge/Guadalupe the Green Line crosses back over the Union Pacific right-of-way and descends to North 600 West. Just after crossing North 600 West the tracks jog from the north side of North Temple Street to the median and then cross back under I-15. Just after crossing North 800 West it reachesJackson/Euclid. Continuing west down the median of West North Temple Street, it crosses North 900 West and North 1000 West before reachingFairpark at 1150 West. This station is located immediately south of the Utah State Fairpark (home of the annualUtah State Fair and other events). Just after Fairpark, the Green Line crosses back over the Jordan River and passes theRocky Mountain Power facility on the south before reachingPower at 1500 West.
From Power, the Green Line continues west down the median of West North Temple Street, crossing North Redwood Road, until it reaches the next to the last station on the line,1940 West North Temple. From this station it crosses underI-215 and then continues down the median of Old Highway 186 as that road splits from West North Temple Street and heads southwest towards I-80. Just after crossing South 2400 West, the Green Line crosses to the north side of the road as Old Highway 186 continues southwest to I-80. The tracks continue on the north side of the I-80 right-of-way, crossing over the Surplus Canal, until Old Highway 186 curves north again just east of the I-80/Bangerter Highway (SR-154) interchange and then merges with Terminal Drive as that road heads northeast and then north to theSalt Lake City International Airport. The tracks parallel the east side of Terminal Drive until it reaches theAirport Station, which is located immediately south of Terminal One. There is direct access to the terminal from the north end of the platform.
Many TRAX stations include freePark and Ride lots, with some lots having as few as six parking spaces and others having nearly 1200.[4] However, there are certain restrictions for all lots (for example, no 24-hour parking).
UTA currently has aFree Fare Zone inDowntown Salt Lake City for transportation patrons that both enterand exit bus or TRAX service within the Zone. The Zone covers an area of approximately thirty-six city blocks and the boundaries are roughly North Temple, 200 East, 500 South, and 400 West. TRAX stations within the Zone include Arena, City Center, Courthouse, Gallivan Plaza (mistakenly identified as "Gallivan Center Station" on the Free Fare Zone map), Planetarium, and Temple Square. In addition, the Free Fare Zone also includes the area of theState Capitol (north to 500 North), the bus stops on 400 South between 200 East and 300 East, and three additional TRAX stations:Library, Old GreekTown, and Salt Lake Central.[5] In June 2012 UTA revealed plans to eliminate the Free Fare Zone, but by September 2012 it announced that it would continue the Zone, but with some minor adjustments, including when and how fares are collected.[6]
Construction began on October 22, 2008, on an extension to theSalt Lake City International Airport. The extension included six new TRAX stations. In addition to theAirport Station, five new stations were constructed along West North Temple Street (West 100 North), including one on top of the newly built North Temple Viaduct bridge. The old bridge was torn down and a new one constructed as part of the project.[7] The new bridge features a TRAX station on top and aFrontRunnercommuter rail station underneath. After December 9, 2012, service on the Green Line was cut back to Arena in order to prepare for test trains and service to the Airport, thus permanently ending service (via the Green Line) to the first three stations of the former route (Salt Lake Central,Old GreekTown, andPlanetarium). Service to the airport began April 14, 2013.[8]
In 2014, construction commenced tocompletely rebuild[broken anchor] the airport terminal, adjacent to its existing location. In September 2020, the newly rebuilt airport was opened, causing the TRAX line to no longer reach the airport terminal. To accommodate passengers to the new terminal while the station was relocated, UTA operated abus bridge between the 1940 West North Temple station and the new terminal. On October 25, 2021, the TRAX station had been rebuilt at the new terminal, and normal train service all the way to the airport resumed.[9]
On weekdays the first northbound Green Line trains (to the Airport Station) leave the Central Pointe and the West Valley Central Station at about 5:00 am and the first southbound train (to the West Valley Central Station) leaves the Airport Station at about 5:45 am. The last northbound train leaving the West Valley Central at 10:27 pm and the last southbound train leaving the Airport Station at 11:27 pm. However, the last southbound train only goes as far as the Central Pointe Station; the last southbound train to the West Valley Station leaves the Airport Station at 10:42 pm.
On Saturdays, the first northbound trains leave the Central Pointe Station at about 5:00 am and the West Valley Central Station at about 6:15 am; the first southbound train leaves the Airport Station at about 6:30 am; and the last northbound train leaves the West Valley Station at 10:19 pm and the last southbound train leaves the Airport Station at 11:16 pm.
On Sundays, the first northbound trains leave the Central Pointe Station at about 9:00 am and the West Valley Central Station at about 10:00 am; the first southbound train leaves the Airport Station at about 9:30 am; and the last northbound train leaves the West Valley Central Station at 6:59 pm and the last southbound train leaves the Airport Station at 7:56 pm.
Green Line trains run every fifteen minutes on weekdays and every twenty minutes on weekends.[10]
The following table lists the current stations of the Green Line, from north to south.
Ø | Free Fare Zone |
Station Name | Municipality | Date opened | Major connections and notes |
---|---|---|---|
Airport | Salt Lake City | April 14, 2013 | ServesSalt Lake City International Airport |
1940 West North Temple | |||
Power | |||
Fairpark | Serves theUtah State Fairgrounds | ||
Jackson/Euclid | |||
North Temple Bridge/Guadalupe | 750 | ||
Arena Ø | December 14, 1999 | 701 ServesDelta Center | |
Temple Square Ø | 701 ServesAbravanel Hall andTemple Square | ||
City Center Ø | 701 ServesCity Creek Center | ||
Gallivan Plaza Ø | 701 Serves theGallivan Center | ||
Courthouse Ø | 701 703 Serves theFederal Courthouse and Third District Courthouse | ||
600 South | July 26, 2022 | 701 703 | |
900 South | May 19, 2005 | 701 703 | |
Ballpark | December 4, 1999 | 701 703 ServesSmith's Ballpark Park and ride: 170 spaces | |
Central Pointe | South Salt Lake | 701 703 720 Park and ride: 57 spaces | |
River Trail | West Valley City | August 7, 2011 | Park and ride: 100 spaces |
Redwood Junction | |||
Decker Lake | ServesMaverik Center Park and ride: 750 | ||
West Valley Central | ServesValley Fair Mall Park and ride: 80 |