1920 map of the railway | |
| Overview | |
|---|---|
| Dates of operation | 1862–1922 |
| Predecessor | Eastern Counties Railway Eastern Union Railway and others |
| Successor | London and North Eastern Railway |
| Technical | |
| Track gauge | 4 ft 8+1⁄2 in (1,435 mm)standard gauge |
| Length | 1,191 miles 23 chains (1,917.2 km) (1919)[1] |
| Track length | 2,631 miles 24 chains (4,234.7 km) (1919)[1] |
TheGreat Eastern Railway (GER) was apre-grouping British railway company, whosemain line linkedLondon Liverpool Street toNorwich and which had other lines throughEast Anglia. The company wasgrouped into theLondon and North Eastern Railway in 1923.
Formed in 1862 after the amalgamation of theEastern Counties Railway and several other smaller railway companies theGER servedCambridge,Chelmsford,Colchester,Great Yarmouth,Ipswich,King's Lynn,Lowestoft, Norwich,Southend-on-Sea (opened by theGER in 1889), and East Anglianseaside resorts such asHunstanton (whose prosperity was largely a result of theGER's line being built) andCromer.[2] It also served a suburban area, includingEnfield,Chingford,Loughton andIlford. This suburban network was, in the early 20th century, the busiest steam-hauled commuter system in the world.
The majority of the Great Eastern'slocomotives and rolling stock were built atStratford Works, part of which was on the site of today'sStratford International station and the rest was adjacent to Stratford Regional station. TheGER owned 1,200 miles (1,931 km) of line and had a near-monopoly in East Anglia until the opening of theMidland and Great Northern Joint Railway in 1893 although there were a number of minor lines, such as theMid-Suffolk Light Railway that stayed resolutely independent until after the grouping in 1923.
Between 1851 and 1854 theEastern Counties Railway (ECR) under the chairmanship ofDavid Waddington had negotiated arrangements to work most of the other railways in East Anglia resulting in a network of lines totalling 565 miles (909 km). Whilst Parliament favoured competition it was also aware that theECR was constantly at war with its neighbours and whilst these working arrangements were approved there was a condition that a bill for full amalgamation was presented by 1861.
Waddington departed under a cloud in 1856 and was replaced by Horatio Love. By 1860 many shareholders were unhappy listing several grievances they saw as getting in the way of their dividend payments. These included continual conflict over working of other lines, suspicion and distrust of the joint committee, inadequate services to and from London, on-going litigation and law costs and a lack of progress on amalgamation.
| Great Eastern Railway Act 1862 | |
|---|---|
| Act of Parliament | |
| Long title | An Act to amalgamate the Eastern Counties, the East Anglian, the Newmarket, the Eastern Union, and the Norfolk Railway Companies; and for other Purposes. |
| Citation | 25 & 26 Vict. c. ccxxiii |
| Territorial extent | United Kingdom |
| Dates | |
| Royal assent | 7 August 1862 |
| Other legislation | |
| Relates to | |
By February 1862 the bill had its second reading and was then followed by a lengthy committee process where various parties petitioned against the bill. On 7 August 1862 the bill passed as theGreat Eastern Railway Act 1862 (25 & 26 Vict. c. ccxxiii) and the Great Eastern Railway was formed by the amalgamation of theEastern Counties Railway and a number of smaller railways (theNewmarket and Chesterford Railway, theEastern Union Railway, and theNorfolk Railway).[3]
Unsurprisingly the firstGER board had a strong Eastern Counties flavour with Horatio Love in the chair and James Goodson the deputy chair. The board consisted of six formerECR directors with twoEastern Union Railway, twoNorfolk Railway and one each from theNorthern and Eastern Railway (still an independent body at this point) and East Anglian Railway.[4]
Operational costs were high on the new railway and new sources of revenue needed quickly. Work at improving suburban services was put in hand and trains from London to Norwich speeded up to give businessmen and merchants more time to conduct their business. A new suburban line toEnfield Town viaSeven Sisters was proposed as well as a new London terminus to replace an inadequateBishopsgate. By August 1863 receipts were increasing and many of the pre-amalgamation disputes were being settled.[5]
TheGER andGreat Northern Railway (GNR) each submitted bills for a line fromMarch toSpalding and although theGNR was successful theGER was awarded running rights over the new line which would later become part of theGreat Northern and Great Eastern Joint Railway. Steamboat services were also seen as a new source of revenue with services running from Harwich to Rotterdam, Flushing and Antwerp.
A change of leadership also occurred with Horatio Love being replaced by James Goodson as chairman with CaptainHenry Jervis-White-Jervis as his deputy. Love was considered too cautious and some on the board still resented his role prior to amalgamation at theECR. Various directors were allocated specific responsibilities (generally running these through committees) leaving Goodson free to develop new schemes and represent theGER on lines where they had a financial interest.[6]
Following an accident atNorth Wootton in early August 1863, where the deaths of five passengers was partially attributed to the poor state of the rolling stock, a large rolling stock order was placed.
By December 1863 the financial picture was looking better and in early 1864 theGER started looking a new railway to move coal fromSouth Yorkshire to London via Spalding and theGNR link from Spalding to March. The Great Eastern was clearly in an expansionist phase with further locomotives (forming the basis of standardisation over its disparate inherited fleet), carriages and wagons under construction. More ships were being ordered forAntwerp andRotterdam traffic and proposals for 28 miles of new metropolitan lines and a new city terminus.
In March 1864, a joint committee of theHouse of Commons andHouse of Lords approved theEast London Line which would link theNorth London, Great Eastern andLondon and Blackwall railways. The parliamentary bill for the new freight line failed although other bills including the construction of a new London terminus were approved. Later that year theGER was in talks about expansion northwards with theLancashire and Yorkshire Railway (L&YR) which lead to the deposition of a bill in early 1865.[7]
The board meeting of February 1865 saw passenger receipts outstripping goods receipts. Fish traffic fromLowestoft andGreat Yarmouth was growing and money was being spent on stations, replacing wooden bridges and upgrading the track. However, a number of shareholders voiced concern. The following month the House of Commons rejected the jointGER/L&YR bill forcing theGER to restart negotiations with the Great Northern Railway. The chairman of the parliamentary committee suggested to the board that the next bill should include a direct Spalding toLincoln link.[8]
Board unity was about to be shattered when a short paragraph inThe Times reported serious differences of opinions existed between the directors.[9] In August 1865 deputy chairman Jervis-White-Jervis issued an appeal raising concerns about the management of the railway. This prompted an internal investigation and in a board meeting at the end of the month, an absent Jervis-White-Jervis was replaced by William Shaw as deputy chairman.[10] The internal investigation concluded that many of Jervis-White-Jervis's concerns were relevant including borrowing more money than authorised and the poor deal theGER got on leasing the London and Blackwell Railway. In a meeting in January the following year many of the directors were duly replaced (by members of the investigating committee) and at the following board meeting in February, Charles Turner was elected as the new chairman.[11]
The new board, facing a financial crisis, had identified a number of issues including the provision of a new terminus station atLiverpool Street, Bishopsgate (the existing terminus) was to be converted to a goods terminal and a new coal depot to be built in Whitechapel. The financial environment was still proving difficult with losses on the London and Blackwell line and a cattle plague seriously affecting that traffic. By March the board was meeting most days in an effort to keep the railway running.[12]
Thefinancial crisis of 1866 saw loan interest rates rise to 10% on 12 May. On 8 June the board approached Parliament for the right to borrow more money and raise additional money through new shares to fund the expansion programme outlined above. This was confirmed on 4 July. By this time there was little money available for dividends and the company looked very carefully at their expansion programme and unprofitable branch lines. By December 1866 little interest was being shown in the new shares, so the board went unsuccessfully to the Bank of England andUnion Bank for further loans. TheGER did, however, manage to agree running rights via the Great Northern Railway as far as Wakefield and with theManchester, Sheffield and Lincolnshire Railway to interchange traffic at Lincoln and Retford.[13]
The crisis continued into 1867 and by March it was apparent that the preference share payments due in April could not be paid. The board also received a letter from the drivers seeking improved working conditions. AdditionallyThe Times suggested theGER may be about to appoint a receiver. Early April saw daily negotiations with the Union Bank although agreement was reached with the drivers by the middle of that month.
May saw the company trying to raise further funds via a parliamentary bill. However, by 25 June the House of Lords had rejected the bill and the board took steps to protect the company's property from its creditors. Matters were hardly helped when deputy chairmanSamuel Laing resigned to become the chairman of theLondon, Brighton & South Coast Railway on 1 July. On 2 July a suit was bought beforevice-chancellorSir Richard Malins and theGER was placed intochancery.[14]
Regrouping after this, the board pursuedEdward Watkin, an MP with many other railway interests, as chairman. He did advise that the board that it needed to reconstitute itself in order to rebuild confidence in order to acquire new capital. Some existing members of the board were not pleased with this and it was not until 3 January 1868 that a reduced board of eleven members met with six new members including Watkin and Viscount Cranbourne MP who was elected as the new chairman.[15]
The new directors were all allocated specific roles and a number of changes were made to reduce costs and improve profitability. Cranbourne also approached theLondon and North Western Railway to report on the state of the permanent way and rolling stock. By August 1868 the tide was turning with increased receipts and some debts being paid off. TheGER had done a deal with theMidland Railway to route their coal traffic via their lines and a new coal depot atWhitechapel opened in December further improving profitability.[16]
By August 1869 the financial position had improved enough to restore a dividend and this was whilst theWalthamstow line (now theChingford branch line) was under construction. In the same month, deputy chairman Charles Turner resigned due to suspected fraud which was to lead to his bankruptcy later in the year. Although proceedings were initiated no prosecution resulted.[17]
| Great Eastern Railway (Northern Extension) Act 1878 | |
|---|---|
| Act of Parliament | |
| Long title | An Act to authorise the Great Eastern Railway Company to raise capital for carrying into effect an arrangement with the Great Northern Railway Company with respect to an extension of their system to the railways of several other companies in Lincolnshire and Yorkshire; and for other purposes. |
| Citation | 41 & 42 Vict. c. xc |
The original London terminus was opened atShoreditch in east London by theEastern Counties Railway (ECR) on 1 July 1840 when the railway was extended westwards from an earlier temporary terminus inDevonshire Street, nearMile End.[18] The station was renamedBishopsgate on 27 July 1847.
The Great Eastern attempted to obtain aWest End terminus, alongside the one in east London, via theTottenham and Hampstead Junction Railway, formed by anact of Parliament, theTottenham and Hampstead Junction Railway Act 1862 (25 & 26 Vict. c. cc) of 28 July 1862.[19] Plans to extend the western end of this line via a proposed 'London Main Trunk Railway', underneath Hampstead Road, theMetropolitan Railway (modernCircle line) and Tottenham Court Road, toCharing Cross, were rejected by Parliament in 1864.[20]
A new London terminus atLiverpool Street was opened to traffic on 2 February 1874, and was completely operational from 1 November 1875. From this date the original terminus at Bishopsgate closed to passengers, although it reopened as a goods station in 1881.[a]
In 1902 theNorthern and Eastern Railway was finally absorbed by theGER, although it had been worked by theEastern Counties Railway under a 999-year lease taken on 1 January 1844 whereby the Eastern Counties Railway would work the Northern and Eastern Railway in return for an annual rent and division of the profits.
Despite several half-hearted attempts by theGER during the latter part of the nineteenth century, it was the Midland Railway (MR) that finally bought theLondon, Tilbury and Southend Railway (LT&SR) in 1912 with theMR offering a better deal for theLT&SR shareholders than theGER ever had. The agreement was ratified by theLT&SR shareholders on 26 June 1911. During the following parliamentary session, theMidland Railway (London, Tilbury and Southend Railway Purchase) Act 1912 (2 & 3 Geo. 5. c. c) allowing the takeover by theMR was passed on 7 August 1912 although it was legally backdated to 1 January 1912. At the time of the sale theLT&SR was one of the most prosperous railways in the UK but too small to fund the changes it needed to make.[21]
In 1914 theGER became the first UK railway company to employ a general manager from overseas,Henry Worth Thornton. He had previously worked as the General Superintendent of theLong Island Railroad in the USA.[22]
TheRailway Executive Committee was set up in 1912 after an incident between France and Germany in the Moroccan Port ofAgadir and would take directions from the military and liaise with the railway companies. As it adjoined the North Sea theGER undertook a significant role in the war.
Had there been an invasion then the railways had evacuation plans for the civilian populations. TheGER did require some upgrading to deal with the increased levels of traffic – lines were doubled, additional passing loops provided, platforms extended and watering facilities improved (for both the iron and more conventional horses). A number of link lines were provided including the link between theTottenham and Hampstead atGospel Oak to the Midland Railway and between theT&HJR and Great Northern Railway atCrouch Hill, Both links remain part of the national network in 2019[update].
When the war started several jobs fell to the railway – reserve troops and naval personnel had to be returned to their units and this saw an upsurge in usage of normal services. Various units were moved to the coast for defensive purposes and at the same time the government had started buying horses throughout the area leading to additional trains. There were also then the units that were being moved to the front line. TheRoyal Navy was using coal as its primary source of propulsion and additional coal trains would have been operated through the area as well.[23]
In August 1914 the Germans disguised a passenger steamer (theKönigin Luise) inGER colours and deployed it as a minelayer. This ruse was spotted on 5 August 1914 and the ship sunk by the British light cruiserHMS Amphion and destroyersHMS Landrail andHMS Lance.[24]
TheGER employed significant numbers of women during this period as many men had joined the army.
By 1916 unnecessary travel was being discouraged to conserve coal supplies.
The company set up a section dedicated to the movement of military traffic and between 1914 and 1918 nearly 10.5 million men were moved onGER services as well as significant numbers of horses and supplies. Specific military traffic was generated atBrimsdown,Ponders End andStowmarket. Because of attacks on east coast shipping, traffic previously moved by sea was also carried on theGER (and more specifically the Great Eastern and Great Northern Joint Railway).
TheGER also suffered from a number of Zeppelin attacks with, amongst others, the dormitory atStratford engine shed and the royal shelter atKing's Lynn both being hit.[25]
In 1922, a large marble memorial was installed at Liverpool Street station commemoratingGER staff who had answered the call of duty to fight but died in action in the First World War. The memorial was unveiled bySir Henry Wilson, who was assassinated by twoIrish Republican Army gunmen on his way home from the unveiling ceremony. A smaller memorial to Wilson was later placed adjacent to theGER memorial, alongside one toCharles Fryatt, a British mariner who was executed by the Germans for attempting to ram a U-boat in 1915.
The Great Eastern name has survived, being used both for theGreat Eastern Main Line route between London and Norwich, and also for theFirst Great Easterntrain operating company which served much of the oldGER route between 1997 and 2004.
The Great Eastern Railway was made up of a number of constituent companies when it was formed in 1862. The most notable was the Eastern Counties Railway, which had taken over most of the main companies by this time. After 1862 there were still a number of companies operating independently in East Anglia, but most of these were eventually taken over by Great Eastern, although some such as theMid-Suffolk Light Railway survived until 1923.[26]The history and exact status of many of these railways is quite complex. In many cases the operation of the railway that built the line was taken over (usually by the Eastern Counties Railway before 1862 and the Great Eastern Railway after that date) although the original railway company often existed in legal form after that date.
The Great Eastern Railway Act 1862 stated that the purpose of the legislation was "to amalgamate the Eastern Counties, the East Anglian, the Newmarket, the Eastern Union and the Norfolk railway companies, and for other purposes". This suggests that despite the fact that some of these railway companies had been taken over by the Eastern Counties Railway prior to the 1862 act, they still legally existed.
The table below shows the building dates of the railways that made up the Great Eastern and the companies that built them. Abbreviations from above list.[26]
| Opening date | Line | Opening company | Notes |
|---|---|---|---|
| 1839 | Mile End – Romford | ECR | Initially built to5 ft (1,524 mm) gauge. |
| 1840 | Shoreditch – Mile End | ECR | Initially built to5 ft gauge. |
| 1840 | Romford – Brentwood | ECR | Initially built to5 ft gauge. |
| 1840 | Minories – Blackwall | LBR | Minories used as a temporary terminus – initially a rope worked line. |
| 1840 | Stratford – Broxbourne | N&ER | Stratford was on theECR line – initially built to5 ft gauge. |
| 1841 | Fenchurch Street – Minories | LBR | |
| 1841 | Broxbourne – Spelbrook | N&ER | To Harlow (July), to Spelbrook (November). |
| 1842 | Spelbrook – Bishops Stortford | N&ER | |
| 1843 | Brentwood – Colchester | ECR | |
| 1843 | Broxbourne Junction – Hertford | N&ER | Later named Hertford East. |
| 1844 | Norwich – Great Yarmouth (Vauxhall) | Y&NR | Route via Reedham. |
| 1845 | Bishops Stortford – Newport | N&ER | |
| 1845 | Newport – Brandon | ECR | First line to Cambridge – working of Ely – Brandon taken over by Norfolk Railway March 1846. |
| 1845 | Brandon – Trowse | N&BR | Open 30 June – bridge at Trowse unfinished. |
| 1845 | Trowse – Thorpe Junction | NR | 15 December. Trowse bridge opened – through running from Norwich to London starts. |
| 1846 | Colchester –Ipswich (original station) | EUR | |
| 1846 | King's Lynn – Downham | LER | King's Lynn Harbour branch also opened same day. |
| 1846 | King's Lynn – Narborough | LER | |
| 1846 | Dereham – Wymondham | NR | |
| 1846 | Ipswich – Bury St Edmunds | IBR | The line did not serve the original Ipswich station directly – trains had to reverse into the station at Halifax Junction a short distance to the south. |
| 1847 | Ely North Junction – Peterborough Junction | ECR | |
| 1847 | Colchester – Hythe Quay | SVR | Freight only – leased to theEUR and operated by them. |
| 1847 | Lowestoft – Reedham | LRH | Leased toNR from opening. |
| 1847 | March – Wisbech | ECR | |
| 1847 | Stratford – North Woolwich | ECR | |
| 1847 | Thames Wharf branch | STJR | Opened same day as North Woolwich line. |
| 1847 | Narborough – Swaffham | EAR | |
| 1847 | Chesterton Junction (Cambridge) – St Ives | ECR | Later part ofGNGEJR route. |
| 1847 | Huntingdon – St Ives | EAR | |
| 1847 | Bentley – Hadleigh | EUR | This is in Suffolk. |
| 1847 | Downham – Ely North Junction | EAR | King's Lynn to Cambridge and London, now a through route. |
| 1848 | Swaffham – Sporle | EAR | |
| 1848 | Great Chesterford – Newmarket | NEW | See below – possibly first passenger route to close in the UK. |
| 1848 | Watlington – Wisbech | EAR | |
| 1848 | St Ives – March South Junction | ECR | Later part ofGNGEJR route. |
| 1848 | Haughley – Finningham | EUR | The first part of the link joining the Ipswich to Bury St Edmunds line to Norwich. |
| 1848 | Maldon – Witham | ECR | Witham – Braintree opened same day. |
| 1848 | Witham – Braintree | ECR | Maldon – Witham opened same day. |
| 1849 | Sporle – Dereham | ECR | |
| 1849 | Water Lane (Angel Road) – Enfield Town | ECR | |
| 1849 | Stepney – Bow Junction | LBR | Most trains only worked as far asBow and Bromley with a few trains being extended to a short lived interchange station calledVictoria Park & Bow which was located near the modern day (2015) Bow Junction on theGreat Eastern Main Line. The line became part of the originalLT&SR route from Tilbury via Stratford to Fenchurch Street in 1854 andGER services to Loughton also started operating on this route. |
| 1849 | Marks Tey – Sudbury | SVR | Leased to theEUR and operated by them. TheEUR had running powers over theECR route between Marks Tey and Colchester. |
| 1849 | Finningham – Norwich (Victoria) | EUR | Link between Ipswich and Norwich completed. |
| 1851 | Shelford – Shepreth | ECR | End on working withGNR allowing through trains between Cambridge and Kings Cross (London). |
| 1851 | Trowse Upper Junction – Trowse Lower Junction | EUR | This allowedEUR services from Ipswich to use Norwich Thorpe station rather than Norwich Victoria. |
| 1851 | Cambridge – Six Mile Bottom | NEW | Through route Cambridge to Newmarket now complete. This used materials from the closedNewmarket and Chesterford Railway. |
| 1854 | Newmarket – Bury St Edmunds | ECR | Through route Cambridge to Ipswich now complete. |
| 1854 | Manningtree – Harwich | ECR | Construction started byEUR but theECR leased theEUR about one week before opening. |
| 1854 | Victoria Park (Hackney) – Stratford Market (North Woolwich line) | ECR | Link toNLR. Worked byNLR until 1866, then byGER one year andNLR the next until 1874 thenGER and successors. Known locally as "the Stratford Jack". |
| 1854 | Halesworth – Haddiscoe | ESR | |
| 1855 | Tivetshall – Harleston | WVR | |
| 1856 | Loughton Branch Junction (Stratford) –Loughton | ECR | Now part of London Underground Central line. |
| 1857 | Wells – Fakenham | WFR | |
| 1859 | East Suffolk Junction (Ipswich) – Woodbridge | ECR | Opened same day as all East Suffolk lines listed below. |
| 1859 | Woodbridge – Halesworth | ESR | |
| 1859 | Saxmundham – Leiston | ESR | |
| 1859 | Wickham Market – Framlingham | ESR | |
| 1859 | Snape Junction – Snape | ESR | Freight only. |
| 1859 | Haddiscoe – Great Yarmouth (South Town) | ESR | Great Yarmouth – Ipswich through route complete. |
| 1859 | Beccles – Lowestoft | ESR | Lowestoft – Ipswich through route complete. NoteESR taken over byECR on opening day. |
| 1860 | Leiston – Aldeburgh | ECR | Built byESR but completed byECR. |
| 1860 | Harleston – Bungay | WVR | |
| 1862 | King's Lynn – Hunstanton | LHR | Worked byGER in return for share of gross receipts.[31] |
| 1863 | Bungay – Beccles | WVR | Taken over byGER on opening. |
| 1863 | Hythe – Wivenhoe | TEN | [28] |
| 1863 | St Margarets – Buntingford | WHBR | Branch off the Hertford East line – operated by theGER from opening and taken over in 1868. |
| 1865 | Loughton – Ongar | GER | Now part of London Underground Central line as far as Epping. The rest is run as preserved line. Original station at Loughton abandoned. |
| 1865 | Shelford – Haverhill – Sudbury | GER | |
| 1865 | Haverhill – Colne Valley Junction | GER | Junction with independent Colne Valley Line. |
| 1865 | Bury St Edmunds – Long Melford | GER | |
| 1865 | Saffron Walden – Audley End.[32] | SAWR | |
| 1866 | Wivenhoe – Weeley | TEN | |
| 1866 | Sutton Bridge Junction (Ely) – Sutton Bridge | EHSR | |
| 1866 | Wivenhoe – Brightlingsea | TEN | |
| 1866 | Weeley – Kirby Cross | TEN | |
| 1866 | Heacham – Wells | GER | |
| 1866 | Saffron Walden – Bartlow.[32] | SAWR | |
| 1867[33] | Mellis – Eye | GER | |
| 1867 | Kirby Cross – Walton-on-the-Naze | TEN | [28] |
| 1868 | Tottenham North and South junction – Highgate Road | T&HJR | An attempt by theGER to gain a terminus in the West End – Parliament terminated the line at Highgate Road, thus thwarting GE ambitions. The line, however went on to have a future with theMidland Railway – seeTottenham and Hampstead Junction Railway for further details – and for a few years some Great Eastern Cambridge line services were routed to St Pancras. |
| 1869 | Roudham Junction –Watton | TWR | |
| 1869 | Bishops Stortford – Braintree | GER | Completion of through Witham to Bishops Stortford line. |
| 1869 | Wapping – New Cross | ELR | First part of East London line. |
| 1870 | Lea Bridge – Shern Hall Street (Walthamstow) | GER | First section of modern-day Chingford branch. |
| 1870 | Lynn Docks branch | GER | |
| 1872 | Bethnal Green – Bury Street Junction | GER | opened in three stages. Gave shorter route to Enfield Town.. |
| 1872 | Hackney Downs – Coppermill junction | GER | This route is now used as main route to Cambridge. |
| 1872 | Bethnal Green – Bishopsgate Low Level | GER | First part of line into Liverpool Street. |
| 1872 | Clapton – Hall Farm Junction (Walthamstow) | GER | Route used by present-day (2012) Chingford trains. |
| 1872 | Haddiscoe Spur | GER | Enabled through running from Yarmouth South Town to Lowestoft. |
| 1873 | Shern Hall Street – Chingford | GER | |
| 1874 | Bishopsgate Low Level – Liverpool Street | GER | Suburban traffic only. |
| 1874 | Custom House – Beckton | GER | |
| 1874 | Whitlingham Junction (Norwich) – North Walsham | ENR | Note C |
| 1875 | Watton –Swaffham | TSR | |
| 1875 | Liverpool Street | GER | Open to all traffic. |
| 1876 | Bury St Edmunds – Thetford | BTR | |
| 1876 | Thetford Junction – Thetford East | TSR | |
| 1876 | East London Jn (Bishospgate) – Wapping | ELR | Northern section of theEast London Line. |
| 1876 | North Walsham – Gunton | ENR | Note C |
| 1877 | Gunton –Cromer High | ENR | Note C. Note also this is not the current Cromer station site. |
| 1877 | Westerfield Junction – Felixstowe (Beach) | FR | Extended to Pier later in year.[34] |
| 1878 | Chingford (old station) – Chingford (present station) | ||
| 1878 | Seven Sisters – Palace Gates | GER | Branch to Alexandra Palace – opened in two stages during year. |
| 1878 | Sutton – Needingworth Junction – St Ives | ESIR | |
| 1879 | Wroxham – Buxton Lamas | ENR | Note C |
| 1879 | Wensum Curve (Norwich) | GER | Norwich avoiding line. |
| 1879 | Ely – Fordham – Newmarket | E&NR | Built by Ely and Newmarket Railway but operated byGER from the outset.[35] |
| 1880 | Chippenham Junction – Snailwell Junction | E&NR | Completed direct routeIpswich to Ely line. Trains had had to reverse at Newmarket in 1879. |
| 1880 | Buxton Lamas – Aylsham | ENR | Note C |
| 1880 | Limehouse Jn – Salmons Lane Jn | GER | |
| 1880 | Custom House – Gallions | LIDR | |
| 1880 | Aylsham – Cawston | ENR | Note C |
| 1881 | Cawston – Reepham | ENR | Note C |
| 1881 | Forncett – Wymondham | GER | |
| 1882 | Spalding – Lincoln | GNGEJR | Opened in two sections - through running from theGER to Doncaster and York was now possible. |
| 1882 | Reepham – County School | GER | |
| 1882 | Manningtree North Curve | GER | Harwich branch doubled in the same year. |
| 1882 | Thorpe-le-soken – Clacton | TEN | |
| 1882 | Stoke Ferry – Denver | GER | The Wissington Light Railway (an agricultural railway) had a junction with the Stoke Ferry branch from 1905. |
| 1883 | Breydon Junction (Yarmouth) – Brundall | GER | Opened in two stages. |
| 1884 | Wisbech – Outwell Basin | GER | Operated by tram type locomotives. |
| 1884 | Barnwell Junction – Fordham | GER | |
| 1885 | Fordham – Mildenhall | GER | |
| 1886 | Norwich Thorpe | GER | |
| 1888 | Highgate Road –Gospel Oak | THJR | |
| 1888 | Shenfield – Wickford | GER | Initially open for goods traffic only. |
| 1889 | Wickford – Southend Victoria | GER | Initially open for goods traffic only. |
| 1889 | Wickford – Southminster | GER | Initially open for goods traffic only. |
| 1889 | Somersham –Ramsey East | RSJR | |
| 1891 | Edmonton Jn – Cheshunt | GER | Known as the Southbury Loop. |
| 1894 | Liverpool Street (East side) | GER | |
| 1896 | Newmarket Curve | GER | |
| 1897 | Three Horse Shoes Jn – Burnt House | GER | |
| 1898 | North Walsham – Mundesley | NSJR | |
| 1898 | Burnt House – Benwick | GER | |
| 1898 | Felixstowe Town | GER | Direct route closed to Beach and Pier station at this date and all trains had to run via Town for these stations.[34] |
| 1903 | Woodford – Fairlop – Ilford | GER | Remaining section part ofLULCentral line |
| 1903 | Yarmouth – Gorleston – Lowestoft | NSJR | Provided a more direct route than the Haddiscoe spur. |
| 1904 | Kelvedon – Tollesbury | GER | Served dedicated station adjacent toGER main line station at Tollesbury. |
| 1906 | Cromer Junction – Roughton Road Junction | GER | |
| 1906 | Roughton Road Junction – Runton West Junction | NSJR | |
| 1906 | Roughton Road Junction – Mundesley | NSJR | |
| 1907 | Tollesbury – Tollesbury Pier | GER | Extension of 1904 line – passenger services withdrawn from this section in 1921. |
| 1913 | Elsenham – Thaxted[36] | GER | Known as the 'Gin and Toffee' line. |
Other railways
Notes
The Great Eastern had one of the largest engine sheds in the country atStratford which in January 1923 had an allocation of 555 locomotives. At the other end of the scale, small engine sheds at the end of country branch lines had perhaps one or two locomotives in their charge. At this time the locomotives were generally allocated to the major shed in the area and the smaller sheds had no actual allocation.[37]
Before 1914 the engine sheds were organised into districts, with sheds at: Stratford; Ipswich; Norwich; Cambridge; Peterborough; King's Lynn; and Doncaster. In 1914 this was reduced to five with King's Lynn and Doncaster being abolished. By 1915 they were organised onto four districts (primary sheds in parentheses): Southern (Stratford); Eastern (Ipswich); Northern (Norwich); and Western (Cambridge/Peterborough).
The Great Eastern did not see the maintenance of engine sheds as one of its top priorities. Many original structures it inherited from constituent railways struggled on in various states of disrepair, not only through Great Eastern days, but through its successor companyLondon and North Eastern Railway from 1923 until 1947 and indeed to the end of steam on the Great Eastern in 1959.
Coaling at engine sheds was generally done by hand with the coaling stages constructed of wood. At a busy engine shed such as Stratford, each individual coaler employed on the coaling stage was expected to empty the contents of a 10-long-ton (10 t) coal truck during his shift.
Turntables were generally small – in 1900 the longest was 50 feet (15 m) – enough to turn the laterB12 Class 4-6-0 locomotive. By 1932, with the advent of bigger locomotives and the working of other companies' locomotives onto GE territory, turntables had grown, with the major sheds generally having 60-or-65 ft (18-or-20 m) turntables.
In 1922 theGER locomotive allocation across its sheds was: Cambridge - 178; Colchester - 47; Doncaster - 5; Ipswich - 131; King's Lynn - 37; Lincoln (Pyewipe Junction) - 12; Lowestoft - 22; March - 97; Norwich - 119; Parkeston - 20; Peterborough East - 86; Stratford - 555; Wisbech - 7; and Yarmouth - 20.[38] Each main shed had a number of sub-sheds and locomotives would work from these sheds for significant periods. For instance it is estimated that some 150 engines were outbased from Stratford at any one time.
The main workshops were located atStratford Works and was responsible for the building of locomotives and carriages. Wagons were initially built here as well but as the railway grew a new wagon works was built atTemple Mills in 1896.[39]
In 1894 a carriage painting facility was opened at Felixstowe Beach station which dealt with the painting of around 200 carriages each year.[40]
Many engine sheds carried out heavier repairs.Ipswich engine shed for instance had a tube shop and a smithy containing eight forges and a steamhammer.[41]
Another wagon works was located at Ipswich (adjacent to the engine shed south of the tunnel).
Stratford Works and Ipswich lasted until the 1990s but Temple Mills closed in 1983.
TheGER always allowed contractors a certain amount of freedom within their specified design, and three early types evolved built bySaxby & Farmer, Stevens or McKenzie & Holland. By 1877 theGER were consolidating their own design, which featured a gabled roof, with large overhang, and weatherboarding. Windows were always two panes high in this design. A more ornate style of construction replaced this type in 1882, but this did not last long – theGER was never a rich railway. By 1883 brick boxes were being built to a plainer design, although 1884 saw some ornateness returning. For instance, March West box contained mock stonework in the gables, fancy window design and decorated bargeboards.
By 1886 timber boxes were being constructed again as well as brick examples but this – with some variation – was the last design for Great Eastern signal boxes.
By 1997 there were still 90 of these in service, but with recent (2012) changes, and more changes expected,[42] then it is unlikely that many will remain in service for much longer.[needs update]
Over the years the principal main line services between Norwich and Liverpool Street were routed via Ipswich or Cambridge, generally depending on the quickest journey time available. Before theGER was formed its predecessor theEastern Counties Railway had a reputation for speed second only to theGreat Western and Great Northern Railways. From 1850 to 1855 Cambridge could be reached in 75 minutes (53.75 miles (86.50 km) from Stratford), a further 20 minutes to Ely (14 miles (23 km)) and a further 55 minutes to Wymondham (43.5 miles (70.0 km)) giving an average speed of 47.5 mph (76 km/h). There is some doubt as to the reliability of these times; as the writerThackeray observed in The Lamentable Ballad of the Foundling of Shoreditch, "For even the Heastern Counties' trains must come in at last."
In the early days of theGER the 5 p.m. departure from Shoreditch (the terminus before Liverpool Street) took 52 minutes to reach Bishop's Stortford (average speed 38.5 miles per hour (62.0 km/h)) and 92 to get to Cambridge.
Because the route via Colchester had been built by a number of different companies, mostly in dubious states of financial stability, it was some years before the Colchester route rose to prominence. Then, as line speeds on this or the Cambridge line improved, the focus of the Norwich services would shift from one to another. On taking over the entire route in 1862, theGER improved speeds on the Colchester line so that Colchester was reached in 70 minutes (non-stop) and Yarmouth (via the East Suffolk route) could be reached in 3 hours 25 minutes. Norwich was 3 hours and 15 minutes via Ipswich and 4 hours via Cambridge.
In 1869 the situation had been reversed and it was quicker to get to Norwich via Cambridge (3 hours 30 minutes) compared to 4 hours 15 minutes via Ipswich. In 1870/1 the balance shifted back to the Ipswich route, with a time of 3 hours 35 minutes compared to 3 hours 53 minutes via Cambridge. By 1878 the Cambridge route was ascendant, with times of 3 hours 12 minutes for the fastest trains compared to a time of 4 hours 10 minutes via Ipswich. In the 1880s both routes had similar times, but by 1887 the Ipswich route offered a time of 2 hours 40 minutes which improved to 2 hours 31 minutes in 1897 and by a further five minutes in 1906.[43]
Boat trains commenced running toHarwich Parkeston Quay in 1882 and were timed at 1 hour 45 minutes from Liverpool Street. By 1895 this was down to 1 hour 30 minutes. In 1897 the 8:30 pm train was run as two separate trains - 8:30 pm for theHook of Holland and 8:35 pm for Antwerp. With the introduction of the corridor restaurant cars in 1904, the time was eased to 87 minutes, but the introduction of theClass 1500 4-6-0 express engines in 1912 saw a running time of 82 minutes.[44]

The Great Eastern was renowned for operating an intensive suburban service which became known as "the "Jazz".
Serving theEast End of London, theLondon Docklands and the capital's eastern suburbs, the Great Eastern's suburban services had a much greater proportion of working class industrial workers, labourers and lower-ranking office workers than the suburban networks of the likes of theLondon and South Western Railway or theMetropolitan. TheGER had to transport greater numbers of passengers commuting in and out of the urban centre and at lower fares. TheGER encouraged passenger numbers with low-price 'workman fares' services which ran in the early morning and late evening. These used older rolling stock with high-density seating (often using wooden benches for ease of cleaning after being used by passengers from docks, factories and markets in dirty work clothes). There were also 'half fare trains' using more modern and comfortable suburban coaching stock aimed at lower-incomewhite-collar workers such asclerks and junior office workers. There was a symbiotic relationship between the railway and property development - the existence of the railway made it possible for even industrial workers to move into new housing developments in the suburbs which then provided extra custom for theGER. TheGER itself invested in property development near its routes and in some cases even built its own housing on land purchased as part of railway construction. Although most closely associated with these crowded, low-cost commuter train serving the suburbs ofeastern London, theGER also provided luxuriousfirst class compartments in many of its commuter trains for businessmen and wealthier customers travelling to and fromthe City with its numerous banks and other financial offices.
By 1900 over 90 per cent of passengers usingLiverpool Street station were making journeys of 12 miles (19 km) or less and around 75,000 people arrived at the station before 10.30am each morning. A total of 400 suburban and 36 main line trains were timetabled to use the terminus each day. Passenger numbers continued to rise in the early 20th century and a survey in 1913 showed that some of theGER's suburban trains were carrying up to 1400 people each and the station itself was beginning to suffer from overcrowding at peak times that was not only preventing the easy movement of people in and out and delaying the departure of trains but presenting a danger to the public.
AfterWorld War I (during which a decline in passenger numbers provided something of a reprieve) theGER began to consider ways of alleviating the problem. The Liverpool Street site and its approaches were already full utilised, with no room for additional or extended platforms, more tracks or an enlarged station concours. Consideration was given toelectrification, following the model of theLondon, Brighton and South Coast Railway which had electrified its inner suburban routes between 1909 and 1912 and so been able to run both more and faster services on existing infrastructure. However the high capital costs required of electrifying theGER's much more extensive and wider-reaching suburban network - estimated at £3 million (£140 million in 2021) - were beyond the perennially cash-strappedGER's resources. Before the war the GER had recruited the American executiveHenry Worth Thornton - former superintendent of theLong Island Rail Road (in many ways an American counterpart to theGER, operating an intensive commuter service in and out ofNew York City) - as its general manager. Working with operations superintendent F. V. Russell (former chief designer atStratford Works), Thornton developed a way of comprehensively overhauling and optimising the Great Eastern's suburban service to increase capacity on the existing infrastructure with minimal investment.
At Liverpool street tracks were rearranged and new junctions between running lines added to improve capacity and flexibility. Small refuge tracks were added at the platform ends to stable locomotives between duties without blocking running lines, signalling was expanded to allow more than one train to occupy a platform road at a time and on the stationconcourse the passenger barriers were moved back to both direct outward-going passengers more effectively to their trains and to encourage outward-going passengers to leave the station without getting in the way of other streams of people leaving or joining other trains.
Improvements to the rolling stock were made on services running toChingford.Enfield andWood Green (Palace Gates). Trains were reformed into sets of 16 four-wheel coaches with each train having seating capacity for 848 people, with additional standing room in peak hours. These were non-corridorcompartment-type coaches, but in for third class the compartment dividing walls were cut down to the level of the tops of the seats, allowing more nimble passengers to climb over the seat backs between seating bays to find empty seats. This meant that passengers no longer had to find a compartment with vacant seats before boarding which reduced thedwell time – Thornton and Russell aimed to get the time spent at intermediate stops down from minutes to seconds. To help with this the coaches had their doors painted in different colours to identify the class of each compartment - first class were painted yellow and second class for blue, with the third class accommodation which made up the majority of all theGER's trains being unmarked. Similarly, a system of coloured boards representing the destination and/or route of each train was introduced, with the boards being fitted to the rear and sides of theguard's van which would be nearest the concourse at Liverpool Street and enable passengers to quickly find and board their train.
TheGER had already adopted theWestinghouse air brake due to its greater effectiveness and quicker response when making frequent stops in suburban services. Thornton and Russell instructed drivers to adopt a new technique of running into stations at speed, fully applying the brake as the engine reached the start of the platform, then fully releasing the brake as it approached the end, which would bring the train to a rapid but smooth stop with the engine right at the end of the platform. This would shave further crucial seconds of the time required for each intermediate stop when compared to the more usual technique of cutting speed on the approach to stations, making an initial part-application of the brake and easing the train to a stop. However, with the new method there was very little room for error and drivers had to learn exactly when to apply the brake (and by exactly what amount) and when to release it in order to bring the train to a stop without under- or over-shooting the stopping point and without jolting the train and its passengers.
The new services were introduced in July 1920. When fully combined these improvements and alterations allowed 24 suburban trains to use Liverpool Street each hour - over 40,000 passengers when inward and outward flows were combined. This was a world record for a steam-hauled railway system. On arrival, the engine that had brought the train in would immediately be uncoupled, while another engine was attached at the other end - in many cases this engine would have followed the train into the platform through the station approaches, having been let out of a holding siding to run close behind by the new signalling arrangements.[45] The detached engine would be topped up with water from a newly installedwater column at the concourse end of each platform road. As the train departed, the now-available engine would follow it down the platform before being sent either to one of the refuge bays in the platform ends or to a siding at the approaches to follow another arriving service into another platform in its turn. In most cases engines were not kept at Liverpool Street for more than ten minutes between duties. Each individual train was arranged to spend as little as four minutes at the terminus between arrival and departure.[46] This intensity of service is all the more remarkable when it is considered that the vast majority of the suburban services were concentrated in only four of Liverpool Street's 18 platforms, with the remainder being used for outer suburban and mainline services.
In total, Thornton and Russell's new optimised service provided an increase in capacity of between 50 and 75 per cent without any major changes to infrastructure, no new rolling stock and a total cost of only £80,000 (£3.6 million in 2020 - only a fortieth of the projected cost of electrification). The new suburban services were popular with passengers and the press (which had frequently criticised theGER in the pre-WW1 years for overcrowding and slow journey times, even to the extent of running long-term campaigns against the company). The clashing bright colours of the painted doors and the identification boards were seen as a distinctive feature of the new services from the start and early GER publicity referred to 'The Rainbow Service'. However the appearance was thought of as 'jazzy' in the slang of the period and a local newspaper called the serviceThe Jazz, which quickly became widely used.
The service was initially operated by theGER's existing stud of 2-4-2T engines such as theM15 andG69 while carriages were adapted versions of either existing four-wheelers or new-builds to these older designs. TheGER had always intended to introduce more powerful engines and more modern and higher-capacity carriages to The Jazz to maximise the improvements. New0-6-2L77 Class tank engines were introduced from 1921, along with new eight-wheel 57 ft-long (17.3 metres) compartment coaches (with the added refinement of steam heating for winter use), which had their class identification colours painted in a strip between the windows and the roof rather than on the doors. By 1924 over 280,000 people were using The Jazz every day and Liverpool Street was regularly handling over 40,000 passengers per hour in peak periods. When the GER wasgrouped into theLondon and North Eastern Railway in 1923 the LNER began introducingarticulated car sets of even higher capacityto a design developed by theGreat Northern Railway.
The true Jazz services only lasted until 1926 when the service frequency and intensity was cut down due to theGeneral Strike and rising competition from trams, trolley buses, motorbuses and private cars meant that the service on the former GER suburban lines was never brought back up to its planned level. Nonetheless, the services remained widely known as The Jazz and even in the 1940s was still running 18 trains per hour and between 160,000 and 180,000 passengers used Liverpool Street each day. Plans to electrify the formerGER system had been developed in the 1930s and were put into action underBritish Railways. Liverpool Street received its first electric lines in 1946 and electric suburban services – finally replacing The Jazz - began in 1960.
TheGER also operated suburban services out ofFenchurch Street station with trains toNorth Woolwich, Blackwall (until 1925)Gallions andLoughton sharing the station with theLondon Tilbury and Southend until 1912 when the Midland railway took over operation of that railway.
TheCathedrals Express operated from Liverpool Street via Cambridge, Ely, Lincoln and Doncaster to York. Three services were run each day although it was never a particularly well patronised service.[47]
TheNorth Country Continental operated between Harwich and Manchester Piccadilly usually being routed via March and theGNGEJR route. This train included the first restaurant car on the Great Eastern (in 1891) and this was also the first service in the UK to allow third-class passengers to dine. A new train set was built for this service in 1906 and generally operated in the following formation:
ENGINE+THIRD CLASS BRAKE+CORRIDOR THIRD+OPEN THIRD+KITCHEN AND OPEN FIRST+SEMI-OPEN FIRST+SIX WHEEL BRAKE (this constituted the York section). Then followed various corridor composite brakes followed each detached from the rear of the northbound train en route. These were for LIVERPOOL (detached Doncaster on the outward journey)+ LIVERPOOL + MANCHESTER(detached at Lincoln and routed via the Great Central routes) + BIRMINGHAM (via Midland Railway routes) + BIRMINGHAM (via London and North Western routes)(both of which were detached at March).[48]
TheNorfolk Coast Express operated between Cromer and Liverpool Street and a purpose-built train was built for this service in 1907. This was the first formation without six-wheeler carriages in the 12-car formation, which included eight carriages for Cromer, two for Sheringham and two for Mundesley. The portions were detached at North Walsham.
However whether all (or indeed any) of these trains carried nameboards in Great Eastern days is doubtful.
Typically branch line services were worked by small tank engines usually with ancient carriages handed down from main line or suburban services. Generally many branch services would be timed to connect to services to the main line thus providing through journeys. Many rural branch lines had no more than a handful of services each day.
For instance in the July 1922 Bradshaws Timetable Guide, Table 316 showed five departures from Framlingham at 07:20, 08:30, 12:40, 16:25 and 18:30. All services had connections to London Liverpool Street. All trains called at the two stations on the branch, taking 18 minutes to get to the junction station at Wickham Market.[49]
From Wickham Market the trains departed at 07:56, 09:35, 13:14, 17:52 and 19:10. All services except the 09:35 departure had a connection fromLondon Liverpool Street.[50]
In 1865, when theSaffron Walden Railway opened, theGER provided some of its most modern rolling stock on opening day before reverting to stock of more dubious quality for general operation of the line.[32]
TheGER ran a number of trains from Ely and Cambridge to St Pancras after the Midland Railway completed the Tottenham and Hampstead Junction Railway in 1880. in 1914 there were three express services from St Pancras to Cambridge (12:22 pm 2:40 pm and 5:05 pm) with the 12:22 pm reaching Cambridge in a creditable 71 minutes. Suspended during the First World War, these were briefly revived but stopped running in 1922.[43]
Royal trains were also worked from St Pancras to Sandringham in Norfolk, and race day trains to Newmarket also operated into St Pancras.
TheGER also operated services from Liverpool Street via the East London Line toNew Cross andNew Cross Gate with some services being extended toEast Croydon.
As theGER served a predominantly rural area, the majority of outward traffic was agricultural in nature. The opening of the Great Northern and Great Eastern Joint railway in 1882 gave theGER access to the coal fields in South Yorkshire and East Nottinghamshire and this became an important source of traffic for the railway.
There were a number of ports on theGER including King's Lynn, Great Yarmouth, Lowestoft, Felixstowe and Parkeston Quay. Fish traffic emanated from Lowestoft and Great Yarmouth.
One of the more obscure services theGER offered was the delivery of sea water. This service started in the 1870s and by 1880 it was reported that 4,500 imperial gallons (20,000 L; 5,400 US gal) had been delivered on a single day. A redundant steam locomotive was employed in the task at Lowestoft and a number of fish and open carriage wagons were converted to saltwater tanks. The trains ran to London where the water was distilled into three-imperial-gallon (14 L; 3.6 US gal) barrels and sold for sixpence (pre decimalisation price c. 1880, about £8.00 in 2023). The sea water was used in baths and was still running as late as 1910 although the exact final date of operation is unknown.[51]

Prior to 1862 the companies that had built the various parts of the network operated locomotives from a variety of engineering companies. Generally the wheel arrangements were2-2-0 and2-2-2 for most classes of locomotives. It was not until 1850 that the Eastern Counties Railway underGooch built a locomotive at the then newly opened Stratford Works. Number 20 was the first of a class of six2-2-2T locomotives (although three more were also built byR B Longridge and Co of Bedlington, Northumberland). Slightly bigger improved versions of the class followed in 1853 and 1854.
In 1859Sinclair (Chief mechanical engineer (CME) of the Eastern Counties Railway and later first CME of the Great Eastern) started some form of standardisation with the Y Class2-4-0 locomotives, of which 110 were built by various engineering firms (including one French firm). The last locomotives of this class were withdrawn in 1894.
Sinclair's first design for theGER was theW class single drivers built between 1862 and 1867 by a number of engineering firms. Two of these locomotives were rebuilt from the2-2-2 to a4-2-2 configuration later in their lives and these two, plus one of the original locomotives, carried a canary yellow livery. Another member of this class carried a cream livery "encircled by garlands of roses" when it was used to haul a special train in 1863 for the Prince and Princess of Wales (Edward VII andQueen Alexandria) after their marriage atWestminster Abbey. These locomotives were responsible for running express services on the Great Eastern and in later life worked the Cathedrals Express to Lincoln and York.
Scrapping began in 1883 with the last two locomotives being withdrawn in 1894. The only other classes of locomotive that Sinclair designed were a2-4-0T class of five engines built for the North Woolwich line and a class of2-4-2T engines known as Scotchmen because they were built byNeilson, Reid & Co of Glasgow. Both classes entered service in 1864/65.
Generally Great Eastern locomotives carried a pea-green livery with black lining at this time.
WhenJohnson took over as CME, theGER was so short of locomotives that he persuaded theNorth British Railway to let the GER have five locomotives of a2-4-0 class being built by theNeilson, Reid & Co for them on loan. These formed the basis of the 40 strong 'little Sharpie' (orNumber 1) class, with 10 being built by Stratford Works and the other 30 bySharp Stewart hence the nickname. The GER was working many trains on theLondon Tilbury and Southend Railway at this time and the Sharpies were deployed on this traffic. The last two were withdrawn in 1913.
The next Johnson class was an0-6-0 goods engine (Class 417) introduced in 1867 and 1868 and numbering 60 engines. A number of these engines had hinged chimneys for use through Silvertown tunnel on theNorth Woolwich line which had limited headroom. Scrapping began in 1888 with the final locomotive withdrawn in 1899.
Another more powerful0-6-0 design followed in 1872/3 and was known as the477 class. Introduced in 1872 and 1873, this 50-strong class was built by 5 different companies, and was notable for being the firstGER engines with a six-wheeled tender. All were withdrawn between 1898 and 1902.
The growth of London suburban traffic saw a requirement for additional tank engines. The GER borrowed someMetropolitan Railway A Class4-4-0T engines in the early 1870s and had 15T7 class0-4-2T engines built, followed by some0-4-4T engines, one of which was the first locomotive to carry the distinctive GER Royal Blue livery.
The final locomotives introduced by Johnson were twoC8 class4-4-0 locomotives which were built with no engine brakes and no dedicated tenders. These locomotives, numbers 305 and 306, were frequently used on royal trains and finished their careers as station pilots at St Pancras and Liverpool Street.
The 0-4-4T61 class was the firstAdams engine, and these 50 engines were built for suburban traffic. Ten0-4-2T locomotives (Class 61) followed between 1877 and 1879 and these lasted until 1907. Adams next design was a4-4-0 class known as Ironclads. Unfortunately these were not very successful on passenger traffic and were soon deployed on freight workings.
The next Adams locomotive was the first UK2-6-0 locomotive built in 1877. Another failure, this class of 15 locomotives were withdrawn after a working life of eight years, mostly working coal traffic between Peterborough and London.
Adams was succeeded byMassey Bromley who made the decision that henceforth more locomotives would be built at Stratford Works. Up to this point only 80 had been built.
However Bromley's first class of4-2-2 locomotives were built byDubs and Kitson with 12 allocated to Stratford and four each to Norwich and Yarmouth sheds. One of these locomotives was later equipped with oil-burning capabilities, but the increasing demands of railway traffic saw these engines withdrawn by 1893 after a relatively short life. Bromley also designed an0-6-0 class which lasted some 24 years in traffic. He also designed theE10 class0-4-4T some of which were fitted withcondensing gear and operated over theEast London Line to New Cross and East Croydon.



Between 1880 and 1922 the Great Eastern produced some distinctive locomotives, and several of these have been preserved. Almost all of the Great Eastern's locomotives were, after 1880, built atStratford Works and many lasted until the end of steam on the Great Eastern.[64]
Express services on theGER were latterly in the hands of theClass S69 (LNER class B12)4-6-0 locomotives. Designed by James Holden and also known as the '1500 class', these engines were built at Stratford Works (51 engines) and William Beardmore (20 engines). Ten engines were later built for the London and North Eastern Railway byBeyer Peacock, and it is one of these locomotives that is preserved today.
These locomotives were built to succeed the three classes of4-4-0 employed by theGER on express services which were becoming heavier as the railways prospered. ClassesS46,D56 andH88 (LNER D14, D15, and D16) were collectively nicknamed "Claud Hamiltons" because the first S46 (built at Stratford in 1900, numbered 1900) was named after the then-current chairman of the GER,Lord Claud Hamilton. Most of the "Clauds" were later rebuilt by the LNER; the final one was withdrawn in 1960 and scrapped.[65]
Local suburban traffic was dealt with by numerous 2-4-2T and 0-6-0T locomotives belonging to several different classes.Stratford Engine Shed, for instance, had 163 2-4-2T engines of four classes. As trains got heavier, these locomotives were replaced by theClass L77 0-6-2T (LNER N7) designed byAlfred John Hill and introduced in 1915. 134 were built, including a number after the LNER took over in 1923; one is preserved. The 2-4-2Ts, of which none survive, were mostly cascaded out of suburban traffic by the 1940s and worked until the late 1950s on branch lines.
Mention should also be made of theT26 (LNER E4)2-4-0s, which remained in service as the last locomotives of this wheel arrangement in Great Britain. Derived from the larger T192-4-0, 100 of these locomotives were built between 1891 and 1902 and worked a variety of trains across East Anglia. The last one, GER no. 490, was preserved as part of theNational Collection when withdrawn in 1959. Today it resides atBressingham Steam Museum, Norfolk.[66] Some of theT19s, incidentally, were rebuilt as4-4-0s (class T19R) between 1905 and 1908, having been taken off express work by the "Claud Hamiltons". As LNER class D13, the last worked until 1944.[67]
GER goods designs of this period were invariably0-6-0 tender engines. The main freight class built by the GER wasWorsdell'sY14 (LNER J15)0-6-0 class. 289 examples were produced between 1883 and 1913 with most being built at Stratford Works, although a small number were built bySharp Stewart. On 10–11 December 1891, the Great Eastern Railway'sStratford Works built one of these locomotives and had it in steam with a coat of greyprimer in just 9 hours 47 minutes; this remains a world record.[citation needed] The locomotive then went off to run 36,000 miles (58,000 km) onPeterborough toLondon coal trains before coming back to the works for the final coat of paint. It lasted 40 years and ran a total of 1,127,750 miles (205,594 km).[68] As freight traffic grew heavier after 1900, more 0-6-0 freight locomotives were built including classesF48 (LNER J16),E72 (LNER J18),G58 (LNER J17) andD81 (LNER J20); the Y14s, meanwhile, went into general local and branch line service, on both passenger and freight trains. The last Y14s ran until 1962, and no. 564 is preserved on theNorth Norfolk Railway;[69] and G58 no. 1217 (withdrawn 1962) is in the National Railway Museum, York.[70]
Shunting was generally in the hands of0-6-0T locomotives although of note were theClass J70 tram engines employed atIpswich docks and on theWisbech and Upwell Tramway. This class of locomotive was later the inspiration of theReverend Awdry'sToby the tram engine.
Finally mention must be made of theDecapod which was the first0-10-0T built in Britain, and possibly the only locomotive built for purely political purposes in order to block the passage through Parliament of a new rival scheme for an electric railway.[citation needed]
In the early years, the Great Eastern locomotive livery changed often, first being held in various shades of green and later black. In 1882 the well-known Ultramarine Blue livery was introduced. It consisted ofUltramarine Blue over anundercoat ofFrench Grey, with blacksmokebox andvermillionbuffer beams and lining. From 1915 locos were not given a top coat and ran in French Grey undercoat but with the boiler bands picked out in black.[71]
Numbers of eachGER locomotive class and running numbers (first and last numbers only) in 1922, prior to the1923 Grouping. Note that the numbering is not necessarily contiguous:[38]
| Class | LNER Class | Wheel Arrangement | Total | Traffic type | Running Numbers |
|---|---|---|---|---|---|
| S69 | B12 | 4-6-0 | 70 | Express Passenger | 1500–1570 |
| T19 | D13 | 4-4-0 | 58 | Passenger | 700–779 1012–1039 |
| S46 | D14 | 4-4-0 | 21 | Passenger | 1862–1900 |
| D56 | D15 | 4-4-0 | 90 | Passenger | 1790–1899 Note D14/15 numbered in same series |
| T26 | E4 | 2-4-0 | 100 | Passenger | 407–506 |
| C32 | F3 | 2-4-2T | 50 | Branch Passenger | 1040–1099 |
| M15 | F4 | 2-4-2T | 118 | Suburban Passenger | 71–189 211–244 572–591 650–679 791–800 |
| M15 | F5 | 2-4-2T | 30 | Suburban Passenger | 91–96 100–110 141–147 170 179 188 589/90 780–788 |
| G69 | F6 | 2-4-2T | 22 | Suburban Passenger | 1-10 61–70 789 790 Note F4/F5/F6 numbered in same series. |
| Y65 | F7 | 2-4-2T | 12 | Passenger | 1300–1311 |
| S44 | G4 | 0-4-4T | 40 | Suburban Passenger | 1100–1139 |
| N31 | J14 | 0-6-0 | 18 | Freight | 604 951–998 |
| Y14 | J15 | 0-6-0 | 272 | Freight | 37–39 119–124 507–699 801–945 |
| F48 | J16 | 0-6-0 | 46 | Freight | 1150–1209 |
| G58 | J17 | 0-6-0 | 44 | Freight | 1153–1198 numbered in same series as J16. 1201–1239 |
| E72 | J18 | 0-6-0 | 10 | Freight | 1240–1249 |
| T77 | J19 | 0-6-0 | 25 | Freight | 1140–1149 1250–1269 |
| D81 | J20 | 0-6-0 | 25 | Freight | 1270–1294 |
| E22 | J65 | 0-6-0T | 20 | Shunting/Local Freight | 150–159 245–254 |
| T18 | J66 | 0-6-0T | 50 | Shunting/Local Freight | 275–326 |
| R24 | J67 | 0-6-0T | 51 | Shunting/Local Freight/Suburban Passenger | 11–20 161 164 169 199–264 327–336 397–406 |
| C72 | J68 | 0-6-0T | 20 | Shunting/Local Freight/Suburban Passenger | 21–30 41–50 |
| R24 /S56 | J69 | 0-6-0T | 109 | Shunting/Local Freight/Suburban Passenger | 51–60 81–90 160–168 190–198 265–274 305 328 335 337–396 |
| C53 | J70 | 0-6-0T | 12 | Tram type shunting locos | 125–139 |
| J92 | 0-6-0T | 3 | Crane Tank engines | B C and D were Stratford works shunters. | |
| L77 | N7 | 0-6-2T | 12 | Suburban Passenger | 1000–1011 |
| B74 | Y4 | 0-4-0T | 5 | Dock/Works shunters | 210 226–229 |
| 209 | Y5 | 0-4-0T | 4 | Dock/Works shunters | 209 0228 230 231 |
| G15 | Y6 | 0-4-0T | 6 | Dock/Works shunters | 0125 0126 0129 132–134 - all allocated to Wisbech and Outwell tramway |

The following GE locomotives are preserved:
| Number | GE class | LNER class | Wheel arrangement | Location |
|---|---|---|---|---|
| BR 61572 | S69 | B12 | 4-6-0 | North Norfolk Railway |
| GER 490 | T26 | E4 | 2-4-0 | Bressingham Steam and Gardens |
| GER 564 | Y14 | J15 | 0-6-0 | North Norfolk Railway |
| LNE 8217 | G58 | J17 | 0-6-0 | Barrow Hill Roundhouse |
| GER 87 | S56 | J67 | 0-6-0T | Bressingham Steam and Gardens |
| BR 69621 | L77 | N7 | 0-6-2T | East Anglian Railway Museum |
| GER 225 | 209 | Y5 | 0-4-0T | The Flour Mill,Lydney |
As of 2025[update] there are plans to build a replica steam locomotive - a classM152-4-2T.[72]
Whilst not being at the forefront of carriage development, there were a number of interesting developments on theGER worth noting.[73]
In 1904 Stratford produced a complete corridor train (this means a person can walk from the first to the last carriage whilst the train is moving). Despite the trend to bogied stock, Stratford still included three 6-wheeler carriages and a 4-wheeled luggage van in this formation. The other vehicles were all bogied stock and included a kitchen car. This train was also fitted for steam heating throughout and was employed on Liverpool Street - Parkeston Quay services.
In 1906 a new train set was produced for the North Country Continental train (see below) and in 1907 for the Norfolk Coast Express (see below). The latter was notable for being the first all corridor set built by Stratford Works.[74] However, with the restaurant sets built in 1900 being corridor coaches, more corridor coaches were being added to main line sets.
The livery of the stock wasteak (effectively varnished wood) but in 1919 the decision was taken to paint all stock dark red. At the grouping in 1923 however all stock reverted to the teak livery.
The introduction of Pullman cars to theGER was the idea of American General Manager Henry Worth Thornton. These were tried across the network and required payment of a supplementary fare. Unfortunately it was not a success although they were used on Liverpool Street - Harwich Continental trains for many years.
In 1891 the Great Eastern introduced the first restaurant car to its North Country Continental service.
In 1899Stratford Works produced four restaurant car sets consisting of three cars vestibuled together but without any corridor connections. This meant passengers had to spend the whole journey in the restaurant car. These were employed on services from Cromer and Yarmouth to Liverpool Street.

In 1900 the majority ofGER suburban trains were composed of four-wheeler carriages.
Interior design was spartan and around 1900 third-class passengers sat on bare boards five abreast, second-class passengers on cushions also five abreast, while first-class passengers sat four abreast and enjoyed more legroom. In 1899 James Holden produced the first six passengers sat abreast carriages in a 13-carriage, third-class only train (each carriage was 27 feet (8.2 m) long and 9 feet (2.7 m) wide and had five compartments). This set, which also included such modern features as slam lock doors and gas tail lamps became the model for future suburban carriage design.
In 1899 Holden built the first GER all-bogied suburban train and although a success, the next one did not follow until 1911.
TheGER made every effort to maximise the capacity of its suburban carriages to deal with the rise in usage. In the early 1900s some four-wheeler carriages were cut in half longitudinally and a section inserted to make them wider in order to increase the capacity.[75]More bogied suburban trains followed in 1911 and were deployed on the Ilford, Gidea Park and Loughton services. By 1915 A. J. Hill instigated a policy of converting old four-wheel carriages into bogied stock and some 500 four-wheeled carriages were converted this way. The GER had a reputation for doing things on the cheap and this certainly was cheaper than building new stock.
TheGER also operated a number offerries.[76][77][78][79][80]
| Ship | Launched | Tonnage (GRT) | Notes |
|---|---|---|---|
| PS Adelaide | 1880 | 969 | Built byBarrow Shipbuilding Company. The company's first steel ship and last paddle steamer onHarwich –Rotterdam route.[81] Named after Adelaide Simpson the wife of GER directorLightly Simpson and launched by her.[82] Sold for scrapping in 1896 |
| SS Amsterdam | 1894 | 1,745 | Built byEarle's Shipbuilding of Hull forHarwich –Hook of Holland route, and later transferred toAntwerp service in 1910 when replaced by modern tonnage.[83] Scrapped in 1928 |
| RMS Antwerp | 1919 | 2,957 | Built byJohn Brown and Company of Clydebank forHarwich –Antwerp service.[84] She served as aQ-ship in the First World War.[85] Scrapped in 1951 |
| SS Archangel | 1910 | 2,570 | Built byJohn Brown and Company of Clydebank forHarwich –Hook of Holland service.[86] Bombed and sunk off east coast ofScotland in May 1941 |
| PS Avalon | 1864 | 670 | Built byJ & W Dudgeon atCubitt Town on theRiver Thames for serviceHarwich –Rotterdam. Sold in 1888 toEarle's Shipbuilding, Hull and wrecked offJamaica in 1909.[87] |
| SS Berlin | 1894 | 1,745 | Built forHarwich –Hook of Holland service byEarle's Shipbuilding of Hull. Sister of SS Amsterdam. Sank whilst entering Hook of Holland in February 1907 with loss of 112 lives.[83] |
| SS Brandon | 1871 | 718 | Built as the "Richard Young" byJ & W Dudgeon atCubitt Town on theRiver Thames for theHarwich –Rotterdam service. Converted to a single screw byEarle's Shipbuilding in 1890 and renamed "Brandon", after which she was used for secondary and relief services. Scrapped in 1905.[88] |
| MV Brightlingsea | 1925 | 51 | Built by Rowhedge Ironworks.[89] Launch used betweenHarwich,Felixstowe Docks and occasionallyShotley, Suffolk. Passed toLNER,British Railways and Orwell and Harwich Navigation Co. Ltd., who re-openedFelixstowe Docks service in 1962.[89] |
| SS Bruges | 1920 | 2,949 | Built byJohn Brown and Company at Clydebank for theHarwich –Antwerp service. Bombed and sunk atLe Havre in 1940[84] |
| SS Brussels | 1902 | 1,380 | Built byGourlay Brothers, of Dundee for theHarwich –Antwerp service. Switched toTilbury –Rotterdam whenHarwich taken over by Admiralty in 1914. Captured by Germany in 1916 under command of Capt.Charles Fryatt who was tried and executed for an earlier war-like act. Scuttled 1918 atZeebrugge. The ship was raised in 1919, sold at auction and repaired in 1920. She was eventually scrapped in 1929.[90] |
| SS Cambridge | 1886 | 1,196 | Built byEarle's Shipbuilding of Hull for service fromHarwich and her career includedAntwerp,Rotterdam andHook of Holland routes. Sold in 1912 to Anglo-Ottoman Steamship Company.[91] |
| SSChelmsford | 1893 | 1,635 | Built byEarle's Shipbuilding of Hull for theHarwich –Hook of Holland service. The first triple expansion vessel for the company and inaugurated the new terminal atHook of Holland in June 1893. Sold in 1910 to theGreat Western Railway and renamedBretonne where she was placed on thePlymouth –Nantes route.[92] |
| SS Clacton | 1904 | 820 | Built byEarle's Shipbuilding in 1904. Sunk during the First World War in 1917. |
| PS Claud Hamilton | 1875 | 922 | Built by John Elder and Company, who were later known asFairfield Shipbuilding and Engineering Company in Govan and launched theHarwich –Hook of Holland service. The vessel was named after the chairman of the company. Sold in 1897 to theCity of London as a cattle carrier. Vessel broken up in 1914.[93] |
| SS Colchester | 1889 | 1,160 | Built byEarle's Shipbuilding of Hull and with her sister "Cambridge" operated the three main routes fromHarwich. Was operating to neutral Holland when captured by Germany in 1916. She grounded atKiel in 1918 and was scrapped in 1919.[92] |
| SS Copenhagen | 1907 | 2,570 | Built byJohn Brown and Company at Clydebank as a replacement for the lost "Berlin" and was so successful that she was quickly followed by her sisters "Munich" [1908] and "St. Petersburg"[1910] on theHarwich –Hook of Holland service. The vessel was torpedoed and sunk in theNorth Sea in 1917 en route toHook of Holland.[94] |
| SS Cromer | 1902 | 812 | A freight vessel which served until 1934. |
| SS Dresden | 1896 | 1,805 | Built byEarle's Shipbuilding of Hull for theHarwich –Antwerp service. Dr.Rudolf Diesel was travelling on the vessel in 1913 when he disappeared overboard in uncertain circumstances. The vessel was requisitioned by theAdmiralty in 1915 and renamedLouvain, and was lost when torpedoed in theAegean Sea in 1918.[95] |
| MV Epping | 1914 | 21 | Small launch used betweenHarwich andShotley, Suffolk. |
| PS Essex | 1896 | 297 | Built byEarle's Shipbuilding of Hull and employed on local services and coastal excursions fromHarwich. Sold in 1913 and became aRiver Thames excursion vessel.[95] |
| SS Felixstowe | 1918 | 892 | Built by Hawthorns of Leith as a cargo steamer. Renamed HMSColchester in 1942 and back toFelixstowe in 1946. Sold in 1951 to the Limerick Steam Ship Company and renamedKylemore. |
| SS Frinton | 1903 | 1,419 | PreviouslyKilkenny, the vessel served theHarwich –Antwerp route. She passed to theLNER in 1923 and was sold on again in 1926.[96] |
| SS Great Yarmouth | 1866 | 731 | A freight vessel which served theHarwich –Antwerp route from 1866 to 1873. |
| MV Hainault | 1914 | 21 | Small launch used betweenHarwich andShotley, Suffolk. |
| PS Ipswich | 1864 | 87 | Built by James Ash ofCubitt Town on theRiver Thames she served as a river steamer betweenIpswich andHarwich. She was the first GER vessel having replaced the "Cardinal Wolsey" which was anEastern Counties Railway ship on this service.[97] Withdrawn 1873. |
| SS Ipswich | 1883 | 1,067 | Built byEarle's Shipbuilding of Hull, she was designed with her sister "Norwich" for the company's new quay atParkeston, Essex. Operated on theAntwerp service until retired in 1905. Sold in 1906 to Shah Steam Navigation Co,Bombay, where she was broken up in 1909.[91] |
| SS Kilkenny | 1903 | 1,419 | Purchased in 1917 fromCity of Dublin Steam Packet Company, renamedFrinton in 1919. She was built at Port Glasgow and served on theDublin –Liverpool andCork –Liverpool routes.[96] |
| PS Lady Tyler | 1880 | 995 | Built by T and W Smith at North Shields she operated on theHarwich –Rotterdam service. Sold in 1893 toEarle's Shipbuilding of Hull.[98] |
| SS Malines | 1921 | 2,969 | Built byArmstrong Whitworth and Company at Newcastle, she was the final steamer ordered by the GER and entered service on theHarwich –Antwerp route. She was torpedoed by an air attack and was beached offPort Said in July 1942. Having been raised in September 1943 and towed back to her builders, the machinery damage caused her to be laid up 1945 and finally scrapped in 1948.[99] |
| PS Middlesex | 1879 | 103 | Built in 1879 for the Woolwich Ferry and used in 1908. |
| SS Munich | 1908 | 2,570 | Built byJohn Brown and Company of Clydebank for theHarwich –Hook of Holland service. A sister of "Copenhagen". Requisitioned in 1918, renamedSt Denis and converted to a hospital ship. She retained her new name on return to GER and passed toLNER in 1923. She was relegated to relief and secondary services in 1932. Was scuttled when cornered inAmsterdam in 1940. Having been raised by the Germans, she had her name changed to "Barbara" and was found inKiel in 1945 where she served as an accommodation ship for Kiel University. In 1950 she was towed toSunderland and scrapped.[94] |
| SS Newmarket | 1907 | 833 | Built byEarle's Shipbuilding in 1907. Sunk during the First World War in 1918. |
| PS Norfolk | 1882 | 295 | Built on the Thames she was employed on summer excursions from Harwich to Felixstowe and Ipswich. Sold to the Eastham Ferry Pleasure Gardens and Hotel Company in 1897 and renamedOnyx. |
| PS Norfolk | 1900 | 295 | Built byGourlay Brothers, of Dundee. Used on local services and coastal excursions. Passed toLNER in 1923 and withdrawn in 1931. Scrapped in 1935.[90] |
| SS Norwich | 1883 | 1,062 | Built byEarle's Shipbuilding at Hull as a sister to "Ipswich" for theHarwich –Antwerp service. Sold in 1905 to Channel Drydock & Shipbuilding Company, Harwich. Re-sold several times to companies inCape Verde, Montevideo, New York andMexico and sank in 1920.[91] |
| PS Orwell | 1873 | 114 | Built by Lewis and Stockwell in London and operated onIpswich –Harwich ferry service with her sister "Stour". Sold in 1890 for scrapping. |
| PS Pacific | 1864 | 700 | Built in 1864 by C. Lungley of Deptford, this ship was acquired by the Great Eastern Railway in 1872 and withdrawn in 1887 |
| MV Pin Mill | 1912 | 11 | Small launch used between Harwich and Shotley. Withdrawn from ferry service in 1925, converted to work boat. Still in service in 1985. |
| PS Princess of Wales | 1878 | 1,098 | Built byLondon and Glasgow Shipbuilding Company at Govan. EnteredHarwich –Rotterdam service and transferred to theHook of Holland service when it opened in 1893. Sold and scrapped in May 1896.[93] |
| PS Richard Young | 1871 | 718 | Built byJ & W Dudgeon atCubitt Town in London. Served on theHarwich –Rotterdam service. Converted to single screw propulsion byEarle's Shipbuilding of Hull and was renamedBrandon in 1890.[88] |
| SS Roulers | 1894 | 1,753 | Built byEarle's Shipbuilding at Hull and was launched as "Vienna". EnteredHarwich –Hook of Holland service with sister "Amsterdam" Was transferred to theAntwerp service in 1910. Renamed "Roulers" when she enteredHarwich –Zeebrugge service in 1920. Passed toLNER in 1923. Was withdrawn and scrapped in 1930.[83] |
| SS St Denis | 1908 | 2,570 | Built byJohn Brown and Company at Clydebank and launched as "Munich" for theHarwich –Hook of Holland service. Renamed "St. Denis" in 1914 and returned to GER service with the new name after the war. Passed toLNER in 1923 and relegated to relief work in 1932. Scuttled in 1940 atAmsterdam, salvaged by the Germans and repaired. Scrapped 1950.[94] |
| St George | 1906 | 2,456 | Built byCammell Laird at Birkenhead for theGWR and was sold to Canadian interests in 1913. Purchased from theCanadian Pacific Railway in 1919 by GER. Passed toLNER in 1923 and scrapped in 1929.[84] |
| PS Stour | 1864 | 87 | Built by James Ash atCubitt Town on theRiver Thames. A sister of "Ipswich" and operated as a river steamer fromIpswich toHarwich. Withdrawn in 1878 and replaced by a slightly larger newbuilding with the same name.[97] |
| PS Stour | 1878 | 112 | Built byThames Ironworks and Shipbuilding Company and a sister of the "Orwell". Based inIpswich for the river service toHarwich. Replaced slightly smaller vessel of same name. Sold in 1900 forRiver Thames river service.[93] |
| SS St Petersburg | 1910 | 2,570 | Built byJohn Brown and Company of Clydebank. A sister of the very successful "Copenhagen" for theHarwich –Hook of Holland service. RenamedArchangel in 1916 and used a cross-channel troop ship. Resumed service after the war and passed toLNER in 1923. The vessel was bombed and sank off Scotland in 1941.[86] |
| PS Suffolk | 1895 | 245 | Built byEarle's Shipbuilding of Hull and employed on local services and coastal excursions fromHarwich. Used as a picket ship atHarwich from 1914 to 1918. re-opened her pre-war services in 1919. Withdrawn in 1931.[95] |
| SS Vienna | 1894 | 1,753 | Built byEarle's Shipbuilding as a sister for "Amsterdam". EnteredHook of Holland service. Transferred to theAntwerp service in 1910. RenamedRoulers in 1920 when transferred to theHarwich –Zeebrugge route. Passed toLNER in 1923 and withdrawn in 1930.[83] |
| PS Woolwich | 1890 | 148 | Built as a sister to PSMiddlesex for the Woolwich Ferry Service. Sold in 1908 to David Wilson and Sons for the service between North and South Queensferry on the Forth. |
| SS Yarmouth | 1903 | 805 | Built byGourlay Brothers, Dundee, for the Rotterdam–Harwich cargo service. Sank with all hands in the North Sea on 27 October 1908.[100] |
| PS Zealous | 1864 | 613 | Built byJ & W Dudgeon atCubitt Town on the Thames. Served on theHarwich –Rotterdam andAntwerp routes. Scrapped in 1887.[97] |
TheGER had a total of 11breakdown cranes. Numbers 1a, 2a and 3a were built at Stratford Works in 1885 initially as hand cranes. They were converted to steam cranes at Stratfordc. 1905/06 and lasted into LNER days.
Three examples built byCowans, Sheldon & Company were purchased between 1892 and 1899. With lifting capacity of 10–12 long tons (10–12 t) they were employed on permanent way work.
Three more cranes (numbers 4a, 5a and unnumbered) were also built at Stratford c1907. The unnumbered example was lost at sea during the First World War whilst in War Department use. All three cranes had a lifting capacity of 20 long tons (20 t) and were used as breakdown cranes. 4a and 5a worked from Ipswich (until 1967) and March (until 1962).
The last two cranes (number 6a and SB4) were built byRansomes & Rapier ofIpswich in 1913 and 1919. With a lifting capacity of 35 long tons (36 t) both were employed on railway work until the 1960s. During LNER days SB4 was frequently used at publicity events to give people an aerial ride in an old wagon body. While 6a was transferred away from theGER shortly after 1923, SB4 was allocated to Stratford, Norwich and March before moving north to the Sheffield area.[101][102]
The May 1911 issue of theGreat Eastern Railway Magazine (the in-house magazine of theGER) stated the company had 1,750 horses the majority of which worked in the London area. Some wagon shunting work was carried out by horses but they would have found widespread work hauling delivery carts.[103]
The Great Eastern built buses at Stratford and ran a number of omnibus services including Halesworth to Southwold.[104]
TheGER owned five hotels at the end of their existence in 1922.[105][106]
TheGreat Eastern Hotel was located atLiverpool Street Railway station opened in May 1884 and enlarged in 1901. This was the biggest hotel on the system.The large function room known as the Hamilton Hall was restored in the 1990s and re-opened as a pub. The hotel is still open today.

The Felix Hotel located in Felixstowe was purchased by theGER in the 1920s. Built by the local Tollemache family (of brewing fame) in 1902, the hotel was lavishly equipped with tennis courts, winter gardens, a putting course, croquet lawns and a squash court. Hugely popular when Felixstowe was a resort by the 1930s it was in decline and sold toFisons in 1952. Visitors includedKaiser Wilhelm in 1891 and in later post GER days,Wallis Simpson andFred Perry. In the 1980s the building - then named Harvest House – was converted to apartments.[107]
This was opened in 1865 and, although well-equipped and furnished, struggled to make a profit (especially after Parkeston Quay opened). TheGER tried to sell it in early 1907 but it failed to meet its reserve price so closed in July 1907.
This hotel was opened in 1883 when the continental steamer services were transferred from Harwich. It had 26 rooms. It was part of the station buildings – later used as shipping agent's offices.
The Sandringham Hotel atHunstanton was opened on 1 May 1876 and built by theLynn and Hunstanton Railway. It was not acquired by theGER until 1 July 1890 when theGreat Eastern, Hunstanton and West Norfolk Railway Companies Act 1890 (53 & 54 Vict. c. xiii) incorporated theHunstanton and West Norfolk Railway. TheGER expanded the premises in the early 1900s with rooms numbering over 100. The hotel prospered until the Second World War where it first housed the LNER accounts department and was then requisitioned by the War Department and used by various British and Canadian regiments during the rest of the war.
It was bought by Hunstanton Urban District Council in 1950 and used as offices and a library until 1959 when the property was converted into flats. The building was demolished in 1967.[108][b]
During 1916 theGER ran a poultry demonstration trains throughout East Anglia often visiting towns on market day. The purpose of this train was to encourage self-sufficiency during the food shortages of the First World War. Encouraged by the reception this train got, theGER purchased Dodnash Priory Farm inBentley, Suffolk as a poultry demonstration farm. The hen houses were built atStratford Works and had individual works numbers. By 1920 the farm was producing 40,000 eggs per month for theGER as well as chickens, turkeys, fruit and vegetables for theGER hotels, restaurants, dining cars and buffets. Another establishment at Chigwell has been doing this for some years previously.[109]
Dodnash Priory also served as a rest home forGER horses. A siding about three-quarters of a mile south ofBentley railway station on the down side served the farm.[110]
The farm survived into LNER days being sold in 1927 when the farmer reached 70 and retired. The siding had been removed in May 1925.[111]
Stratford Market was founded by theGER in 1879 as a wholesale fruit and vegetable market as a competitor to theCity of London'sSpitalfields Market. The market also had an extensive goods depot and a nearbyrailway station.
Thechief mechanical engineers of the Great Eastern Railway were:
The chairmen of the Great Eastern Railway were:
Viscount Cranborne went on to be the British prime minister between 1885 and 1892 and between 1895 and 1903.Parkeston Quay is named after C. H. Parkes and the famous Great Eastern 4-4-0 class was named after Claud Hamilton.
Some details of other directors can be foundhere.
{{cite journal}}:Missing or empty|title= (help){{cite book}}:ISBN / Date incompatibility (help)